SITE TYPE ISSUE STATUS 131032 GF Manhole finishes is poorly done Open Clearance of materials in front of gate to allow 131032 GF proper gate opening and access Open 131032 GF Chamfer all sharp concrete edges including MH Open 131034 GF Manhole not well done Open 131034 GF Site aggregate is not 5cm level Open 131034 GF Cable duct foaming Open 131034 GF Guard house toilet ventilation is not done Open 131034 GF Earthing connection is not visible Open 131034 GF Gate topbar installed incorrectly Open Horizontal fence member is not correctly 131034 GF installed Open 131034 GF Missing bolts for the fence Open 131034 GF Guard house toilet is not correctly painted Open 131034 GF Site light is not installed Open 131034 GF Razor wire is loose Open 131036 GF RRU busbar are not installed for all RF Open 131036 GF Ladder not grounded Open 131036 GF Gate topbar installed incorrectly Open 131036 GF Missing bolts for the fence tightining Open 131036 GF Cable duct foaming Open 131036 GF Concret sharp edges chamfering Open GH outer finish paint at the back is not well 131036 GF done Open 131036 GF Site light is not installed Open 131036 GF GH toilet vent is not done Open 131036 GF Gate bottom stopper is not done Open 151022 RT Clamping earthing plate and power cable Open Rebuild the parapet wall above the foundation 151022 RT beam Closed 151022 RT Backfill is not done for earhting pit Open 151022 RT Tower and fall arrest signage is not installed Open 151024 GF Ducts to be foamed Closed 151024 GF Correct the gravel leveling in the site Open 151024 GF Ladder not grounded Open 151024 GF RRU busbar to bolted using v-bolt Open 151024 GF Site light is not installed Open 131002 GF Fence bolt tightining Open 131002 GF Site side ditch not done Open 131002 GF PVC Foaming Open 131002 GF Manhole chesiling Open 131010 GF Grouting is not done Open 131010 GF Site clerance Open 131010 GF Equipment foundation chamfering is not done Open 131010 GF fence bolt missing Open 131010 GF Cable tray cover is not properly done Open 131010 GF Fence external masonry needs correction work Open 131010 GF Razor wire is loose Open 131010 GF PVC Foaming Open 131010 GF Fence mesh is not done properly at the bottom Open 131010 GF Manhole is not done properly Open 131010 GF Guard house painting is not done properly Open 131010 GF Ladder and ladder foundation chamfering Open 131010 GF Vent pipe is not proprerly done Open Column5 Column6Column7 Column8
REMARK remark material or labour price
Not done not done mason 700
Not done not done daily labour 300
Not done done Not done done mason 700 Not done not done aggregate nedded 25000 Not done done Not done not done welder needed 2000 Not done done Not done done
Not done done
Not done not done bolt needed Not done not done paint and painter n 2000 Not done not done led light needed 2400 Not done done daily labour 300 Customer visit snag done Customer visit snag done Customer visit snag done Customer visit snag not done bolt needed Customer visit snag done Customer visit snag done mason 700
Customer visit snag not done paint and painter n 2000
Customer visit snag not done Customer visit snag led light needed 2400 Customer visit snag done Customer visit snag not done clamp and fisher n 800