BEAMS
Bar AT MIDSPAN/END AT SUPPORT
MARK WIDTH HEIGHT TIES SPACING
Diameter TB BB TB BB
TB 150 200 16mm 2 2 2 2 10mm 2 @0.05; 4 @0.10; rest at 0.20m O.C.
RB 150 250 16mm 3 2 2 3 10mm 2 @0.05; 4@0.10; rest at 0.2m O.C.
B1 200 400 16mm 4 2 2 4 10mm 2 @0.05; 4@0.10; rest at 0.2m O.C.

COLUMNS
WIDTH HEIGHT Main Bar VERT TIES
MARK SPACING

G-2nd C1 300 300 16mm 5 10mm 5 @0.05; 4@0.10; rest at 0.20m O.C.
2nd-RB C1 300 300 16mm 5 10mm 5 @0.05; 4@0.10; rest at 0.20m O.C.

FOOTINGS
MATT BOTH
MARK LENGTH WIDTH HEIGHT DEPTH
BARS WAYS
F1 1.1 1.1 0.2 1.5 16mm 4
F1-2 1 1 0.2 1.5 16mm 4
0.675 2.7
5 0.25
5 0.5