The document outlines procedures for pile load testing for the 91MWac Layla PV Project in Saudi Arabia. The project owner is M/s. ACWA POWER and the EPC contractor is M/s. JAKSON GREEN PRIVATE LIMITED. The document provides procedures for load testing piles to support the solar panels at the 91 megawatt alternating current Layla photovoltaic project located in Saudi Arabia.
The document outlines procedures for pile load testing for the 91MWac Layla PV Project in Saudi Arabia. The project owner is M/s. ACWA POWER and the EPC contractor is M/s. JAKSON GREEN PRIVATE LIMITED. The document provides procedures for load testing piles to support the solar panels at the 91 megawatt alternating current Layla photovoltaic project located in Saudi Arabia.
The document outlines procedures for pile load testing for the 91MWac Layla PV Project in Saudi Arabia. The project owner is M/s. ACWA POWER and the EPC contractor is M/s. JAKSON GREEN PRIVATE LIMITED. The document provides procedures for load testing piles to support the solar panels at the 91 megawatt alternating current Layla photovoltaic project located in Saudi Arabia.