You are on page 1of 12

VIJAYAN THEKKEVEEDU

QC ELECTRICAL ENGINEER
14-JUNE-2023
VIJAYAN THEKKEVEEDU
QC ELECTRICAL ENGINEER
14-JUNE-2023
King Faisal Air Academy Project in Majmaah
Royal Saudi Airforce
Kingdom of Saudi Arabia

INSPECTION CHECKLIST FOR LV WIRE AND CABLE 600 VOLTS AND BELOW
WIR No.:NAS-FIR-0-GE00-QA-89530 Checklist No.: KFAA-1422-ICL-E-0014-R03

Drawing No.:NAS-6-PI11-SL030-1004-SD-01-01-R00-Code B ITP No.: NAS-0-GE00-EE032-0014 R03

Location Area:From PLP-BH-1 to SA4-001-SA4-004 & From PLP-BH-1 to SA5-001-SA5-004 DATE: 14-Jun-23

S/N Acceptance Criteria YES NO N/A Remarks / Comments


A. MATERIAL
1 Attached Approved Material Submittal. √
2 Delivered material were received in good condition( No Physical Damage). √
3 Inspect shipments to assure that products comply with the requiremnts / Specification √
Store and protect products in accordance with manufacturer's instructions, with seals and labels intact and legible.
4
Store senitive products in weather tight, climate controlled enclosures. √
5 Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage. √
B. INSTALLATION
6 The Method Statement and Shop drawing approval should be the first item to check before installation. √
Verify the LV/LC Trench/manhole Excavation (Depth of trench Before cable direct buried /concrete duct laying)
7
instalation as per approved shop drawing. √
Verify cable direct buried/concrete duct bank laying (conduits size, number of conduit and type of conduit is as per
8
approved shop drawing) for (LV&LC system) √
9 Identify the cable/wiring methods in use and verify their suitability for the occupancy and conditions. √
10 Check installation of warning tape √
Verify that cables/wires are secured to cabinets and cutout boxes or that the conditions for cables with nonmetallic
11
sheaths are met. √
12 Verify that all conductors of a circuit are grouped together/color code as per drawing and specification. √
13 Check cover, fill, protection, and allowances for ground movement on underground conductors and raceways. √
14 Verify that electrical raceways and cable trays are used exclusively for electrical conductors. √
15 Verify that raceway systems are complete prior to installation of conductors. √
Verify that cables/wires extra length or slack to be provided in every outlet/pullbox/junctionbox/panels as per
16
specification √
17 Verify that cable/wires are joint/tab in the junction/pull box only √
18 Ensure to preform insulation resistance test cables/wiresbackfill density test as directed by specification. √
Check spacing between cables and raceway filling factors shall be as per approved shop drawings and project
19
specification. √
20 No through joints will be permitted in LV cables where adequate manufacturers lengths are available. √
21 All cut cable ends shall be promply sealed after cutting. √
22 Check cable dressing, cable tagging and cable tie installation. √
23 Check trench and duct bank inspection before cable pulling. √
24 Cable trench and duct bank back filling inspection. √
25 Check the cable protection cover tiles and cable warning tape in the cable trench before back filling. √
26 Check Final installation of LV Wire and Cable 600 Volts and Below. √
Note: Other inspection criterias which is not in this list & applicable as per site condition shall be refered to the technical specifications & Approved drawings.

Remarks:

CONSTRUCTION : NAS-JV QA/QC ENG'R/INSPECTOR : NAS-JV SITE SUPERVISING CONSULTANT: DAR

NAME: ALI ALMAKKI NAME: VIJAYAN THEKKEVEEDU NAME:

SIGNATURE: SIGNATURE: SIGNATURE:

DATE:14-June-2023 DATE:14-June-2023 DATE:

2 of 2
King Faisal Air Academy Project in Majmaah
Royal Saudi Airforce
Kingdom of Saudi Arabia

INSPECTION CHECKLIST FOR LV WIRE AND CABLE 600 VOLTS AND BELOW
WIR No.:NAS-FIR-0-GE00-QA-89527 Checklist No.: KFAA-1422-ICL-E-0014-R03

Drawing No.:NAS-6-PI11-SL030-1004-SD-01-01-R00-Code B ITP No.: NAS-0-GE00-EE032-0014 R03

Location Area:From PLP-BH-1 to SA4-001-SA4-004 & From PLP-BH-1 to SA5-001-SA5-004 DATE: 14-Jun-23

S/N Acceptance Criteria YES NO N/A Remarks / Comments


A. MATERIAL
1 Attached Approved Material Submittal. √
2 Delivered material were received in good condition( No Physical Damage). √
3 Inspect shipments to assure that products comply with the requiremnts / Specification √
Store and protect products in accordance with manufacturer's instructions, with seals and labels intact and legible.
4
Store senitive products in weather tight, climate controlled enclosures. √
5 Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage. √
B. INSTALLATION
6 The Method Statement and Shop drawing approval should be the first item to check before installation. √
Verify the LV/LC Trench/manhole Excavation (Depth of trench Before cable direct buried /concrete duct laying)
7
instalation as per approved shop drawing. √
Verify cable direct buried/concrete duct bank laying (conduits size, number of conduit and type of conduit is as per
8
approved shop drawing) for (LV&LC system) √
9 Identify the cable/wiring methods in use and verify their suitability for the occupancy and conditions. √
10 Check installation of warning tape √
Verify that cables/wires are secured to cabinets and cutout boxes or that the conditions for cables with nonmetallic
11
sheaths are met. √
12 Verify that all conductors of a circuit are grouped together/color code as per drawing and specification. √
13 Check cover, fill, protection, and allowances for ground movement on underground conductors and raceways. √
14 Verify that electrical raceways and cable trays are used exclusively for electrical conductors. √
15 Verify that raceway systems are complete prior to installation of conductors. √
Verify that cables/wires extra length or slack to be provided in every outlet/pullbox/junctionbox/panels as per
16
specification √
17 Verify that cable/wires are joint/tab in the junction/pull box only √
18 Ensure to preform insulation resistance test cables/wiresbackfill density test as directed by specification. √
Check spacing between cables and raceway filling factors shall be as per approved shop drawings and project
19
specification. √
20 No through joints will be permitted in LV cables where adequate manufacturers lengths are available. √
21 All cut cable ends shall be promply sealed after cutting. √
22 Check cable dressing, cable tagging and cable tie installation. √
23 Check trench and duct bank inspection before cable pulling. √
24 Cable trench and duct bank back filling inspection. √
25 Check the cable protection cover tiles and cable warning tape in the cable trench before back filling. √
26 Check Final installation of LV Wire and Cable 600 Volts and Below. √
Note: Other inspection criterias which is not in this list & applicable as per site condition shall be refered to the technical specifications & Approved drawings.

Remarks:

CONSTRUCTION : NAS-JV QA/QC ENG'R/INSPECTOR : NAS-JV SITE SUPERVISING CONSULTANT: DAR

NAME: ALI ALMAKKI NAME: VIJAYAN THEKKEVEEDU NAME:

SIGNATURE: SIGNATURE: SIGNATURE:

DATE:14-June-2023 DATE:14-June-2023 DATE:

1 of 2
C-15 CHAIN LINK FENCE 1. FOR LIGHTING TYPE, WATTAGE AND OTHER DETAILS REFER NOTE DWG # 1422-04-GE-SL-001
NOTES
2. THE OPERATIONAL VOLTAGE FOR EACH LUMINARY IS 230V AND THE LIGHTING LUMINARIES
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X O VAL SHALL BE EQUALLY DISTRIBUTED ON THREE PHASES
PPR

X
3. THE VOLTAGE FOR STREET LIGHTING CIRCUITS SHALL BE 400/230 VOLTS.
CONCRETE DUCT BANK R A 4. ALL STREET LIGHTING CABLES SHALL BE ARMORED, MULTICORE, COPPER, XLPE / PVC
FO INSULATED.
DB12-1 / 1x2x110mmØ

X
L
TRO
SEWAGE PUMP STATION
5. ALL CABLES SHALL BE DIRECT BURIED EXCEPT AT ROAD CROSSINGS, WHERE THESE CABLES
N

X
CO SHALL BE INSTALLED IN UNREINFORCED CONCRETE DUCT BANKS.
QC
E 528991.597 E 529025.901 E 529062.704 E 529094.506 E 529129.811 E 529163.113
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

QA/ 6. THE PERMISSIBLE VOLTAGE DROP FROM SOURCE (TRANSFORMER) TO THE LAST LUMINAIRE IN

X
X

X
THE STREET LIGHTING CIRCUIT SHALL NOT EXCEED 5%.

X
X

X
N 2885715.501 N 2885715.495 N 2885715.507 N 2885715.501 N 2885715.507 N 2885715.502

X
(UT27)
7. THE SYSTEM LAYOUTS ARE PROVISIONAL, FINAL LAYOUTS CONSTRUCTION DRAWINGS WILL

X
X

X
X

X
X

X
BE PREPARED BY THE CONTRACTOR AFTER COORDINATING WITH OTHER DISCIPLINE AND AS

X
X

X
X

X
PER ACTUAL SITE CONDITION AND WILL GET APPROVAL FROM CLIENT PRIOR TO THE

X
X

X
X

X
DA1-003

X
EXECUTION OF WORK.

X
0+716 0+700 0+650 0+600 0+550

X
X

X
0+ 8. ALL LIGHTING POLE PROPOSED IN THE LAYOUT ARE TENTATIVE ONLY, THE CONTRACTOR

X
SLP-1/1 DA1-005 SLP-1/1

X
X

X
500

X
DA1-001 DA1-002 DA1-004 DA1-006

X
SHALL SUBMIT A PROPOSAL TO THE OWNER ALONG WITH ORIGINAL CATALOGUES AND SHALL

X
X

X
DA1-007

X
PROCURE THE POLE /LUMINARIES ONLY AFTER GETTING THE APPROVAL FROM THE OWNER.
CONCRETE DUCT BANK

X
X

X
X

X
X

X
9. SINCE LED EFFICACY i.e LUMIN PER WATT IS IMPROVING WITH THE PASSAGE OF TIME. THERE

X
X

X
X

X
E 529086.643 FORE, THE CONTRACTOR WILL USE LED LUMINAIRE WITH STATE OF THE ART TECHNOLOGY
DB13-15 / 1x3x110mmØ

X
X

X
E 528979.450

X
X

X
X

X
N 2885693.260 N 2885693.260 AVAILABLE AT THE TIME OF INSTALLATION KEEPING THE SAME ACHIEVED ILLUMANCE LEVEL.

X
E 529194.097

X
X

X
10. IN CASE OF ANY CONFLICT BETWEEN LAYOUT AND UTILITY CROSS SECTIONS CONTRACTOR IS
SA2-001

X
X

X
N 2885699.932

X
X

X
TO FOLLOW THE UTILITY CROSS SECTIONS FOR THE EXACT LOCATION OF NETWORKS

X
X
SA2-012

X
11. THE DUCT BANK SHOWN ARE 2 WAY 110mmØ UNLESS OTHERWISE NOTED.

X
X
ROAD-UT-27

X
SA2-036 SA2-037 SA2-038 SA2-039 SA2-040 SA2-041 SA2-042 SA2-043

X
12. FOR LIGHTING LEGENDS REFER DRAWING No. 1422-04-G-SL-001

X
X
X
SLP-1/2

X
X 0+000

X
X
X
E 529163.396 REFERENCE DRAWING

X
SLP-1/2 CONCRETE DUCT BANK

X
X
E 529031.945 E 529101.304 E 529120.805 E 529141.488 N 2885688.382

X
E 528988.128 E 529010.037 E 529053.854

X
X
CONCRETE DUCT BANK
X
X X X

DESCRIPTION
X X

N 2885688.382 N 2885688.382 N 2885688.382 N 2885688.382 DRAWING NO.


N 2885688.382 N 2885688.382 N 2885688.382
CONCRETE DUCT BANK DB13-5 / 1x3x110mmØ
X

DB13-4 / 1x3x110mmØ SLP-1/1

X
E 529063.508
DB13-18 / 1x3x110mmØ SA1-001 SA1-003 SA1-003 SA1-004
DA2-001 E 528988.493 E 529013.498 E 529120.142 MODEL NAME :
X

N 2885667.015 E 529095.136 E 529145.147 E 529170.152

0+450
E 528973.267 E 529038.503
N 2885667.015 N 2885667.015
DA2-004 SA2-013 N 2885667.015 N 2885667.015 N 2885667.015 N 2885667.015
DA1-008
X X X X X X X X X X X X X X X X X X

X
N 2885667.015 N 2885667.015 E 529232.254 E 529269.754 E 529307.252 E 529344.754 LEGEND
N 2885672.996 N 2885672.996 N 2885672.996 N 2885672.996
SLP-1/2 DA2-002 DA2-003 DA2-005 DA2-006 DA2-007 DA2-008 SLP-1/1
X

SA2-002 E 529086.643
PHASE BOUNDARY

CONCRETE DUCT BANK E 529198.746 13.8kV/400V PACKAGE UNIT SUBSTATION (PU)

X
CONCRETE DUCT BANK N 2885667.024 SLP-1/2 N 2885666.804 INCLUDING RMU AND LV CIRCUIT BREAKER
DB12-3 / 1x2x110mmØ E 529080.901 AREA LIGHTING PANEL
X

DB13-17 / 1x3x110mmØ SLP-1/2 E 529063.508


N 2885651.515 SLP-1/2 SLP-1/2 STREET LIGHTING PANEL

X
E 528988.458 E 529013.498 E 529038.502 N 2885646.034 E 529095.136 E 529120.142 E 529145.146 E 529170.152 PLAYFIELD LIGHTING PANEL

SA2-007
N 2885646.034 N 2885646.034 N 2885646.034 N 2885646.034 N 2885646.034 N 2885646.034 N 2885646.034 CONCRETE DUCT BANK
X

EARTH PIT

X
SA2-003 SA2-004 SA2-005 SA2-006 SA2-008 SA2-009 SA2-010 SA2-011 TYPE U1, INGROUND TREE UP-LIGHT LUMINAIRE, WITH 25
WATTS, 230V, 60Hz LED LAMP, IP-67.
TYPE AL2, 4.5m HEIGHT, TOP POST TYPE, LIGHTING POLE

BACKFILLED AREA
X

E 529198.746
WITH LED LUMINAIRE OF 36W, 230V, 60Hz IP66
N 2885630.862

X
TYPE DA1, 10m HEIGHT, DOUBLE ARM LIGHTING POLE WITH 2x140W,
DA1-009 230 V,60Hz
X

MAIN ENTRANCE MAIN ENTRANCE TYPE SA1, SAME AS ABOVE BUT WITH THE SINGLE ARM
-0.62 FL -0.62 FL
WALKWAY LEVEL WALKWAY LEVEL

TYPE TA1, SAME AS ABOVE BUT WITH THE TRIPLE ARM

X
-0.62 FL -0.62 FL -0.62 FL -0.62 FL
WALKWAY LEVEL WALKWAY LEVEL WALKWAY LEVEL WALKWAY LEVEL
RAMP RAMP RAMP RAMP
RAMP 1:12

-0.10 FCL
RAMP 1:12 RAMP 1:12

-0.10 FCL
RAMP 1:12

TYPE DA2, 7m HEIGHT, DOUBLE ARM LIGHTING POLE WITH 2


x78W, 230 V,60Hz
-0.02 FFL -0.02 FFL
X

SLP-1/1 TYPE SA2, SAME AS ABOVE BUT WITH THE SINGLE ARM

0+400

X
SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER
SHOWER SHOWER

TYPE DA4, 10m HEIGHT, SINGLE ARM LIGHTING POLE WITH 2x311W,

RA09 RA09
-0.10 FCL -0.10 FCL

230V,60Hz
±0.00 FFL ±0.00 FFL
60mm. 60mm. 60mm. 60mm.
EXP.JOINT EXP.JOINT EXP.JOINT EXP.JOINT

E 529177.889
X

-0.10 FCL
SHOWER SHOWER

-0.10 FCL -0.10 FCL


SHOWER SHOWER

-0.10 FCL
TYPE DA5, 10m HEIGHT, SINGLE ARM LIGHTING POLE WITH 2x257W,
±0.00 FFL SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER ±0.00 FFL ±0.00 FFL SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER ±0.00 FFL
N 2885602.820 230V,60Hz
*Refer to the comments in the attached comments sheet.

X
RAMP

RAMP
SLP-1/PLP-1 --
-0.60 FFL
RAMP
RAMP RAMP

RAMP --
-0.60 FFL
RAMP
RAMP

E 529180.689 4Cx16mm²+16mm²G CU, LV ARMORED CABLE DIRECT BURIED.


-0.62 FL -0.62 FL -0.62 FL -0.62 FL

N 2885602.820 4Cx10mm²+10mm²G CU, LV ARMORED CABLE DIRECT BURIED.


SLP-1/PLP-1
WALKWAY LEVEL WALKWAY LEVEL WALKWAY LEVEL WALKWAY LEVEL
X

RAMP RAMP RAMP

RAMP
RAMP
4Cx6mm²+6mm²G CU, LV ARMORED CABLE DIRECT BURIED.
SLP-1/PLP-1 SLP-1/PLP-2

X
DB12 CONCRETE ENCASED uPVC DUCTBANK FOR ROAD CROSSING
E 529198.746 SIZE IS 1x2x110mmØ
N 2885594.781 LIGHTING CABLE No.
X

Supervision and Management Services for King Faisal Air Academy


(725 M²)
DA1-010 Facilities Relocation and Construction Project, Majmaah PU - FH - 1 / 1

X
CIRCUIT NUMBER
(PV GRASS) (725 M²)
(PV GRASS) SLP-1/PLP-2 PANEL NUMBER
E 528993.224 E 529162.281 DOCUMENT / DESIGN REVIEW
X

AREA: (FH- FAMILY HOUSING)


N 2885587.299
SA4-005 N 2885587.315 CONCRETE DUCT BANK ☐ A - Approved - Construction / Fabrication / installation may be undertaken. (BH- BACHELOR HOUSING)

X
☐ B - Approved as noted - Approval does not authorize changes in contract sum or contract time.
SA4-001 DB22-7 / 2x2x110mmØ ☐ C - Revise and Resubmit - Construction / Fabrication / installation may not be undertaken.
SOURCE: (PACKAGE UNIT - PU)
(STREET LIGHTING PANEL- SLP)
☐ D - Rejected
X

- In resubmitting, limit corrections to the items marked.


COURT COURT (AREA LIGHTING PANEL- ALP)
EVOLLEYBALL
528993.224 VOLLEYBALL E 529162.281 ☐ E - Not reviewed
- Dar Al Riyadh approval of submitted item is not required or the submittal is not

X
N 2885576.435 N 2885576.450 SLP-1/3,4 Squad Checking:
complying with contract requirements
☐ Architecture ☐ Interior Design ☐ Civil ☐ Electrical ☐ Survey
ACKNOWLEDGEMENT:
☐ Mechanical ☐ Structural ☐ Telecom ☐ Landscape "I ACKNOWLEDGE THAT THE SPECIFICATION REQUIREMENTS HAVE BEEN MET AND
SA4-002
X

Reviewed By : KH.S/O.K Date: 13-April-2022 THAT THE DIMENSIONS, CONDITIONS, AND QUANTITIES HAVE BEEN VERIFIED, AS
SA4-006 SHOWN OR MODIFIED IN THE DRAWING"

X
Disclaimer:

0+350
1. Review and approval are for conformance with the information given and the design concept of the Project as
expressed in the Contract Documents.
KEYPLAN
PLP-1/3 PLP-2/3
X

E 529013.589
PLP-2/1 DA1-011
2. Dar Al Riyadh review and approval of the Contractor’s submittals shall not relieve the Contractor from any obligation
contained in the Contract Documents.
3. No responsibility is assumed for accuracy or completeness of submittal dimensions, quantities or details.

X
E 528995.936 4. The Contractor is responsible to field verify all dimensions prior to fabrication, Construction or installation.
N 2885555.084 E 529157.964
PLP-BH-1
N 2885555.084 E 529140.312
N 2885555.084 PLP-BH-2 5. Coordinate with all adjacent and/or related contractors, disciplines, other equipment and materials.
6. Respond to and address all previous comments from Dar Al Riyadh. X C-15 X
X

ROAD-UT-27

N 2885555.084 7. Comply with the requirements of all required approving authorities and obtain timely approval/consent as necessary.
X X

E 528991.095
SA5-001 E 529162.805 E 529198.752

X
X
X

SA5-003 SEWAGE PUMP STATION

NORTH

X
(UT27)
SC2

N 2885553.095 N 2885553.095
RAMP RAMP
RAMP RAMP

N 2885563.972

X
RA27
RA30 RA30

X
RAMP RAMP RAMP RAMP

RAMP RAMP
RAMP RAMP

RAMP
RAMP
SA5-005
RA30

OPEN ABOVE
VOLLEYBALL VOLLEYBALL

RA13
COURT COURT

MULTI-PURPOSE MULTI-PURPOSE
COURT COURT

RAMP
D1

MAIN ENTRANCE

RAMP
OPEN ABOVE
RA29

PLP-1/1 SA5-007

C-15
VOLLEYBALL VOLLEYBALL
COURT COURT
X

RAMP

RAMP
LC2 RAMP RAMP

COMMERCIAL AREA BUILDING


RAMP RAMP

ARCADE
RA09 RA09

SA4-007 SLP-1/R1, Y1, B1


LVOLLEYBALL
LABYELLOV
COURT
TRUOC
MULTI-PURPOSE

SA4-003
MAIN ENTRANCE

COURT

X
OUT OF SCOPE

COURT E 528995.936 E 529140.312 COURT

X
VOLLEYBALL VOLLEYBALL X
E 529162.805
PLP-1/2 N 2885543.216 N 2885543.216
SA5-008 4Cx16mm² CU,XLPE/DST/PVC
LIMIT OF SCOPE OF WORKS FOR BUILDING / LANDSCAPE / BACKFILLING

C15-A
N 2885542.231
X

SA5-004 SA5-006 +1Cx16mm²Cu,PVC(G)

X
SA4-004 SA5-002 E 529157.964 SA4-008 UT-17

C-15
UT17
LOCAL MEDIUM VOLTAGE

X X X
DISTRIBUTION SUBSTATION ROOM-2
X X X X
E 529013.589
PLP-2/2
RA10 SECURITY FENCE

E 528991.095
FUEL STATION

N 2885543.216
SLP-1/R2, Y2, B2
FUTURE EXTENSION
X

FIRE FIGHTING
STATION RA11
X GRAVEL AREA

CONTROL

WATER TANK
PROPOSED IRRIGATION
PUMP STATION-07 (UT38)
RA-31 RA-30
ASPHALT AREA PUMP HOUSE

N 2885543.216

STEEL FENCE (TYP.)


RA-29
WATER TANK

GATE
ASPHALT AREA

STEEL FENCE (TYP.)


UT-17
C-10
N 2885542.231
PAVED AREA

UT17
PIPE CHAMBER
WATER INLET GRAVEL AREA
FLOW METER
PAVED AREA ASPHALT AREA

GUARD HOUSE

ENTRANCE GATE
LOCAL MEDIUM VOLTAGE
DISTRIBUTION SUBSTATION ROOM-1

X
X
DA1-012 4Cx16mm² CU,XLPE/DST/PVC SITE DISTRIBUTION TOILET
GUARD ROOM

KITCHENETTE
ROOM
ELECTRIC ROOM
STORE

X
NODE UT35 ROOM
GENERATOR

UNDERGROUND FUEL TANK

(725 M²)

X
X
(725 M²)
PUMP ROOM

X
X
X

SEWAGE PUMP

SUB
F151

L-02
OFF
(PV GRASS)
SING

ICER
X
HOU

HOU
ICER
SUB OFFICER OFFICER
STATION UT25
(PV GRASS)
OFFICER

SING
SUB OFFICER SUB
OFF
SUB OFFICER SUB OFFICER OFFICER OFFICER

F150
HOUSING F153 HOUSING F152 HOUSING F104 HOUSING F103
HOUSING F149 HOUSING F148 HOUSING F108 HOUSING F107

L-01
UP UP

GUIDANCE & CLINIC

SOC

SOC
CER

CER
FIEL

FIEL
ORIENTATION RA37
X

RA43 RA42 RA42 RA41

D
SOC

SOC
+1Cx16mm²Cu,PVC(G)

CER

CER
FIEL

FIEL
D

D
SUB OFFICER SUB OFFICER
SUB OFFICER SUB OFFICER OFFICER OFFICER OFFICER OFFICER

LK-10
HOUSING F146 HOUSING F147

SUB
F145
HOUSING F142 HOUSING F97 HOUSING F98

OFF
HOUSING F143 SING
HOUSING F101 HOUSING F102

TR
TR
ICER
HOU
UP

HOU
ICER
OFF

SING
SUB

F144

X
C-09
C-11
X
L-03 L-03
E 529198.752 LK-09

SLP-1/R3, Y3, B3
STEEL FENCE (TYP.)

UP

SPACE FRAME

TR
TR
SUN SHADE WITH
LIGHTING

HIGH SCHOOL IRRIGATION PUMP

PAVED AREA
GUARD HOUSE

ASPHALT AREA
RA35

PAVED AREA

GRAVEL AREA
ASPHALT AREA
ENTRANCE GATE

ASPHALT AREA
KINDERGARTEN

X
0+300
GIRLS RA19

N 2885529.028
STATION UT38

INLET
CHAMBER

PUMP HOUSE

CONTROL
WATER
PIPE
HIGH SCHOOL PRIMARY SCHOOL SCHOOL RA33 FOR HOLY QURAN RECITATION

FLOW METER
GATE
ENTRANCE

WATER TANK

WATER TANK
BUILDING OF WOMEN'S PREMISES

BOYS RA16 GIRLS RA17

GRAVEL AREA
X

PG2
01:1 PMAR

01:1 PMAR
STEEL FENCE (TYP.)

SB1 OFFICER'S CLUB


MSC1 RA25

GUARD HOUSE

LK-04
LK-01

LK-02

LK-03

LK-06

LK-07

LK-08
LK-05
LM7
OFFICER'S

L-02
4Cx16mm² CU,XLPE/DST/PVC

X
FUTURE CLUB RA25
MOSQUE TO BE SPACE FRAME
SUN SHADE WITH

X
LIGHTING

INTERMEDIATE COMBINED WITH FUTURE FUTURE

RAMP 1:12
PB2

SCHOOL BOYS PHASE 2 MOSQUE


PRIMARY SCHOOL KINDERGARTEN

UP
INTERMEDIATE

UP
RA15 GATE
ENTRANCE

DETALUSNI mm003 DETALUSNI mm003 BOYS RA14 SCHOOL RA33 SCHOOL GIRLS

RAMP 1:12
06.0- LLAW KCOLB 06.0- 06.0- LLAW KCOLB 06.0-
LEVEL YAWKLAW LEVEL YAWKLAW LEVEL YAWKLAW LEVEL YAWKLAW RA18
GUARD HOUSE

TENT
01.0- 01.0-
LSS LSS
RAMP 1:12

RAMP

+1Cx16mm²Cu,PVC(G)

X
RAMP
RAMP RAMP X X C-08 X X X X X
X

21:1 PMAR 21:1 PMAR 21:1 PMAR

RAMP 21:1 PMAR

F175 F176 F177 F178 F179 F180 F180 F179 F178 F177 F176 F175

RA30
LSS 00.0+ LSS 00.0+ LSS 00.0+ LSS 00.0+

X
RA30
TFIL TFIL

LFF 00.0+
LSS 01.0-
LFF 00.0+
LSS 01.0-
SLP-1/R4, Y4, B4
SLP-1/3,4
X

4Cx16mm² CU,XLPE/DST/PVC

X
DA1-013 +1Cx16mm²Cu,PVC(G)
X

DETALUSNI mm003 DETALUSNI mm003


LLAW KCOLB LLAW KCOLB

01 APRIL 2022 ISSUED FOR APPROVAL


SLP-1/RA, YA, BA

02/17/21
00
ISSUED FOR APPROVAL

X
RAMP 21:1 PMAR

LFF 00.0±
21:1 PMAR

RAMP RAMP 21:1 PMAR

LFF 00.0±
21:1 PMAR

RAMP

0 DECEMBER 2021 ISSUED FOR APPROVAL

02/17/21
00
ISSUED FOR APPROVAL

06.0- 06.0-
LEVEL YAWKLAW LEVEL YAWKLAW

4Cx16mm² CU,XLPE/DST/PVC
MAIN ENTRANCE MAIN ENTRANCE

E 529198.752
X

MAIN ENTRANCE
MAIN ENTRANCE REV DATE DESCRIPTION
N 2885494.083

X
+1Cx16mm²Cu,PVC(G)
MINISTRY OF DEFENCE
X

E 528975.155
SA2-014 SA2-016 SA2-017 SA2-018 SA2-019 SA2-021 SA2-022 SLP-1/RB, YB, BB ROYAL SAUDI AIR FORCES
SA2-015

X
N 2885474.588
4Cx16mm² CU,XLPE/DST/PVC
SA2-020 E 529150.423 E 529172.332
X

E 528997.064 E 529040.881 E 529088.332


E 529018.972 E 529063.636 E 529107.832 N 2885474.588 N 2885474.588 CONCRETE DUCT BANK +1Cx16mm²Cu,PVC(G)
SA2-023 SLP-1/4
N 2885474.588 N 2885474.588 N 2885474.588 N 2885474.588
SLP-1/4 ENGINEERING AND WORKS

X
N 2885474.588 N 2885474.588

CONCRETE DUCT BANK DB12-8 / 1x2x110mmØ DEPARTMENT


SLP-1/RC, YC, BC
X

SLP-1/4 E 529128.515
SLP-1/3 DA1-014 ENGINEERING AFFAIRS
DB13-10 / 1x3x110mmØ N 2885474.588

X
E 528993.126
E 529017.126
N 2885453.588
E 529041.126
N 2885453.588 E 529065.195 E 529097.321 DA2-014 E 529121.321 DA2-015 E 529145.321 DA2-016 E 529169.391 4Cx35mm² CU,XLPE/DST/PVC
SLP-1/4 N 2885453.588 N 2885453.588 SA2-025 N 2885453.588 N 2885453.588
X

DA2-010 DA2-011 N 2885453.588 N 2885453.588


E 529198.752
+1Cx16mm²Cu,PVC(G) KING FAISAL AIR ACADEMY

X
SA2-024 E 528979.448
DA2-009 DA2-012 DA2-013 SLP-1/4 N 2885459.139 IN MAJMA'A
X

N 2885453.588 CONCRETE DUCT BANK E 529086.643

X
N 2885453.588
DB12-11 / 1x2x110mmØ
SA2-034 SA2-033 SA2-032 SA2-031 SA2-029 SA2-028 SA2-027 SA2-026
X

X
SLP-1/4 E 529097.391 E 529121.391 E 529145.391 E 529169.391
E 528993.195 E 529017.195 E 529041.195 E 529065.195 N 2885437.853 SLP-1/4 N 2885437.851 N 2885437.761 N 2885437.832
X

BURNS & McDONNEL


N 2885437.840 N 2885437.882 N 2885437.908 N 2885437.696
SA2-030
X
9400 WARD PARKWAY
DA1-015 KANSAS CITY M O 64114
SA2-035
X

E 528979.447 E 529086.643
0+200

X
N 2885427.341 N 2885427.341
Dar Al-Riyadh Consultants
CONCRETE DUCT BANK E 529198.752
N 2885424.195
P.O. Box 250170, Riyadh 11391-Saudi Arabia
X

Tel.: (+966-11) 206 00 88


DB13-12 / 1x3x110mmØ SLP-1/3 E 529179.653
X

E 529151.197 www.daralriyadh.com

E 528987.132 E 529014.585 E 529042.036


E 529069.493
E 529094.292 E 529123.744 N 2885405.089 N 2885405.089 CONCRETE DUCT BANK
0+000 N 2885405.089 N 2885405.089 N 2885405.089
0+100 N 2885405.089
N 2885405.089 N 2885405.089
0+200 0+233
X

DB12-14 / 1x2x110mmØ JV NAS


X

P.O. Box 4339, Riyadh 11491-Saudi Arabia


Tel.: (+966-11) 408 51 00
SLP-1/3 DA1-023 DA1-022 DA1-021 DA1-020 DA1-019 DA1-018 TA1-001 CONCRETE DUCT BANK Fax: (+966-11) 405 78 28
X

DA1-024 DB13-19 / 1x3x110mmØ


X

SLP-1/3
X

CONCRETE DUCT BANK DA1-016


X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

DB12-13/ 1x2x110mmØ PHASE - VI


X

E 529198.752
PRIMARY INFRASTRUCTURE
0+150
X

N 2885385.995
LIMIT OF SCOPE OF WORKS FOR BUILDING / LANDSCAPE / BACKFILLING BACHELOR HOUSING
X
X

ELECTRICAL STREET LIGHTING LAYOUT

C15-A DA1-017
X
X

ROAD C-15 INTERFACE SAL


ARCH'L ICT

GUARD HOUSE
JMC/WH OZ SNS HW AKH MJR MH
ROOM

Excluded this portion


X
ROOM

E 529198.752
POINT OF PHASE 2
ROOM ROOM
LFF 00.0±
X

N 2885362.256 1 : 500 APRIL 2022

STA. 0+132.82 X X X X X

NAS-6-PI11-SL030-1001-SD-01-01 01
N 2885351.960
NOTES
1. THE CONTRACTOR SHALL COORDINATE WITH THE CLIENT & SEC PRIOR

FROM FEEDER # 5 / T101


Cable size/type to be as VAL
TO THE START OF WORKS AND COMMISSIONING.
per LF/calculation. O
APPR 2. PRIOR TO PROCUREMENT OF EQUIPMENT AND MATERIALS,
R
FO CONTRACTOR SHALL SUBMIT TO CLIENT THE CATALOGUES AND
4Cx300mm² AL, XLPE/PVC
TCL = TROL SPECIFICATIONS OF THE PROPOSED EQUIPMENT/ MATERIAL .
CON
DF = QC
QA/
3. THE CONTRACTOR SHALL PREPARE THE SHOP DRAWINGS SHOWING
TDL = ALL DETAILS OF THE EQUIPMENT, PANELS AND GET THE APPROVAL OF
C.L.= 33.9 KVA
TDL + 20% = CLIENTS REPRESENTATIVE PRIOR TO SUPPLY AND INSTALLATION.
SLP-BH-1 D.F.= 1 No. of Ways=
250 AT
R Y B D.L.= 33.9 KVA MOUNTING=
250 AF
3P
BAR
N
3C - 4mm² CABLE
STOP STOP
(OFF) (OFF)

CT C1 START C2 START
KWH 250/5A (ON) (ON)
A A A
M
.
0 . 250A
SC rating shall be as per DIGITAL REFERENCE DRAWING
OFF OFF
the technical specs. T
TIMER SWITCH
PE
M 24HR PROGRAMMABLE DRAWING NO. DESCRIPTION
(Typical), Bus bar size to FUSE
A M A
be as per approved VS V NAS-1-GE00-CV030-0100-SD-01-01-R00 TYPICAL PLAN & SECTION
panel board .
0 . 500V
C1 C2
manufacturer's 230V PHOTO CELL
drawings. N MODEL NAME :

~
~
(MOUNTED ON TOP OF
THE NEAREST STREET
~
MAIN SECTION 250A, 25kA (SYM.) 400/231V, 3PH, 4W & GROUNDING, Cu 5x40mm
LIGHTING POLE)
LEGEND
~
1 3 5 2,4,6 7,9,11 8,10,12 13,15,17 14,16,18 19,21,23 20,22,24 25,27,29 26,28,30
A B C D E F G MOULDED CASE CIRCUIT BREAKER, BOLT ON TYPE
1P 1 PHASE - ONE POLE - SINGLE PHASE.
20A 20A 20A 150 AT 30 AT 30 AT 60 AT 60 AT 40 AT 30 AT 20 AT 150 AT 3P 3 PHASE - THREE POLES - THREE PHASE.
3 1P 1 PHASE - THREE CIRCUIT BREAKER ONE POLE - SINGLE PHASE.
SC rating shall be as per 1P 1P 1P 250 AF
3P
100 AF
3P
100 AF
3P
100 AF
3P
100 AF
3P
100 AF
3P
100 AF
3P
100 AF
3P
250 AF
3P
the technical specs. 4Cx16mm² + 16mm²G Cu,XLPE/PVC
CURRENT TRANSFORMER
(Typical), Bus bar size to 4Cx35mm² + 16mm²G Cu,XLPE/PVC
be as per approved C COIL OF CONTACTOR
panel board 250 A PLP-BH-1 PLP-BH-2 ALP-BH-1 SPARE SPARE SPARE SPARE 150 A
E.L 220V,16A C1 (2.7 KVA) (2.7 KVA) (13.34 KVA)
manufacturer's 12W OUTLET C2 3P CONTACTOR CONNECTED TO COIL
drawings. NORMALLY OPEN
3P CONTACTOR CONNECTED TO COIL
SECTION "A", 150A, 16kA (SYM.) 400/231V, 3PH, 4W & GROUNDING, Cu 5x20mm SECTION "B", 150A, 16kA (SYM.) 400/231V, 3PH, 4W & GROUNDING, Cu 5x20mm
NORMALLY CLOSE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

31,33,35

32,34,36

37,39,41

38,40,42

43,45,47

44,46,48
25,27,29
13,15,17

14,16,18

19,21,23

20,22,24

26,28,30
8,10,12
7,9,11
1,3,5

2,4,6
PE 231V PHOTO ELECTRIC CELL

INDICATOR LAMP
- The contractor is responsible to rectify the shop drawing
20 AT 20 AT 20 AT 20 AT 30 AT 30 AT 30 AT 20 AT 20 AT 30 AT 30 AT 30 AT 30 AT 30 AT 40 AT 40 AT according to any modification.
100 AF
AUXILARY N/O CONTACT
100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF
3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P
1x40 W FLOURESCENT LAMP WITH BATERY
MF BACK UP (MAINTENANCE FIXTURE)
40W

V VOLTMETER

650m

629m

546m

828m
A AMMETER
SPARES SPARES
AS VS SELECTOR SWITCH
4C x 16mm² + 16mm²G Cu, XLPE/PVC

PLAYFIELD LIGHTING PANEL


Supervision and Management Services for King Faisal Air Academy PLP - PLAYFIELD LIGHTING PANEL
Facilities Relocation and Construction Project, Majmaah BLP - BASKETBALL FIELD LIGHTING PANEL
FLP - FOOTBALL FIELD LIGHTING PANEL
SLP-1/1R SLP-1/2R SLP-1/3R SLP-1/4R
DOCUMENT / DESIGN REVIEW LIGHTING AND POWER PANEL
SLP-1/1Y SLP-1/2Y SLP-1/3Y SLP-1/4Y
☐ A - Approved - Construction / Fabrication / installation may be undertaken.
SLP-1/1B SLP-1/2B SLP-1/3B SLP-1/4B ☐ B - Approved as noted - Approval does not authorize changes in contract sum or contract time.

☐ C - Revise and Resubmit - Construction / Fabrication / installation may not be undertaken.


SLP-1/1R SLP-1/2R SLP-1/3R SLP-1/4R ACKNOWLEDGEMENT:
☐ D - Rejected - In resubmitting, limit corrections to the items marked.
- Dar Al Riyadh approval of submitted item is not required or the submittal is not
"I ACKNOWLEDGE THAT THE SPECIFICATION REQUIREMENTS HAVE BEEN MET AND
SLP-1/1Y SLP-1/2Y SLP-1/3Y SLP-1/4Y ☐ E - Not reviewed complying with contract requirements THAT THE DIMENSIONS, CONDITIONS, AND QUANTITIES HAVE BEEN VERIFIED, AS
☐ Architecture ☐ Interior Design ☐ Civil ☐ Electrical ☐ Survey SHOWN OR MODIFIED IN THE DRAWING"
SLP-1/1B SLP-1/2B SLP-1/3B SLP-1/4B Squad Checking:
☐ Mechanical ☐ Structural ☐ Telecom ☐ Landscape

SLP-1/1R SLP-1/2R SLP-1/3R SLP-1/4R Reviewed By : Kh.S/A.A/AMM Date: 24-1-2022 KEYPLAN


Disclaimer:
SLP-1/1Y SLP-1/2Y SLP-1/3Y SLP-1/4Y 1. Review and approval are for conformance with the information given and the design concept of the Project as
expressed in the Contract Documents.
SLP-1/1B SLP-1/2B SLP-1/3B SLP-1/4B 2. Dar Al Riyadh review and approval of the Contractor’s submittals shall not relieve the Contractor from any obligation
contained in the Contract Documents.
SLP-1/1R SLP-1/2R SLP-1/3R SLP-1/4R 3. No responsibility is assumed for accuracy or completeness of submittal dimensions, quantities or details.
4. The Contractor is responsible to field verify all dimensions prior to fabrication, Construction or installation.
5. Coordinate with all adjacent and/or related contractors, disciplines, other equipment and materials.
SLP-1/1Y SLP-1/2Y SLP-1/3Y SLP-1/4Y
6. Respond to and address all previous comments from Dar Al Riyadh.
7. Comply with the requirements of all required approving authorities and obtain timely approval/consent as necessary.
SLP-1/1B SLP-1/2B SLP-1/3B SLP-1/4B

SLP-1/1R SLP-1/2R SLP-1/3R SLP-1/4R

SLP-1/1Y SLP-1/2Y SLP-1/3Y SLP-1/4Y

SLP-1/2B SLP-1/3B SLP-1/4B

SLP-1/2R SLP-1/4R

SLP-1/2Y SLP-1/4Y

SLP-1/2B SLP-1/4B

SLP-1/2R SLP-1/4R

SLP-1/2Y SLP-1/4Y

SLP-1/2B SLP-1/4B

SLP-1/4R

SLP-1/4Y

SLP-1/4B

SLP-1/4R

SLP-1/4Y

SLP-1/4B

SLP-1/4R

SLP-1/4Y 0 DECEMBER 2021 ISSUED FOR APPROVAL

00
02/17/21 ISSUED FOR APPROVAL

SLP-1/4B REV DATE DESCRIPTION

MINISTRY OF DEFENCE
Earthing ROYAL SAUDI AIR FORCES

ENGINEERING AND WORKS


DEPARTMENT
ENGINEERING AFFAIRS

KING FAISAL AIR ACADEMY


IN MAJMA'A

BURNS & McDONNEL


9400 WARD PARKWAY
KANSAS CITY M O 64114

Dar Al-Riyadh Consultants


P.O. Box 250170, Riyadh 11391-Saudi Arabia
Tel.: (+966-11) 206 00 88
www.daralriyadh.com

JV NAS
P.O. Box 4339, Riyadh 11491-Saudi Arabia
Tel.: (+966-11) 408 51 00
Fax: (+966-11) 405 78 28

PHASE - VI

PRIMARY INFRASTRUCTURE

BACHELOR HOUSING
STREET AND AREA LIGHTING SINGLE LINE DIAGRAM

ARCH'L ICT
SAL OZ HW AKH MJR MH
JMC/WH SNS

1 : 500 DECEMBER 2021

NAS-6-PI11-SL080-1001-SD-01-01 0
NOTES: NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS EXCEPT WHERE OTHERWISE INDICATED.

OVAL 2. GROUND RODS SHALL HAVE 16mm² DIA WITH A LENGTH AS REQUIRED BY SPECIFICATIONS.
R
R APP JOINTING OF GROUND RODS AND WIRE SHALL BE BY EXOTHERMIC WELD.
FO
L 3. 16mm² TAPE COPPER WIRE, 7 STRANDED SHALL BE CONNECTED WITH EXOTHERMIC WELD
N TRO TO 16mm GROUND ROD, PULLING EYES, HANDHOLE FRAMES AND CHANNEL IRONS.
CO
QC
QA/ 4. RESIN FOR SPLICES SHALL BE COLD POUR POLYURETHANE RESIN. EPOXY
RESIN IS NOT PERMITTED, POLYURETHANE RESIN MUST ONLY BE USED FROM
SEALED PRE- PACKS, ONE FOR EACH SPLICE.

5. ADDITIONAL SPUR CABLES MAY, IF REQUIRED, BE TAKEN FROM A "T" SPLICE SUCH
ADDITIONAL SPUR CABLES MAY LEAVE SPLICE ADJACENT TO EITHER FIRST SPUR CABLE
OR EITHER ENTRY OF MAIN CABLE.

6. FOR FULL DETAILS ON SPLICES AND RESIN FILLERS SEE SPECIFICATION.

7. IF DESIRED AN ANGLED SPLICE MAY BE USED IN PLACE OF A "T" SPLICE.

8. SPUR CABLES ARE NOT PERMITTED FROM A THROUGH SPLICE.

50
TOP LAYER OF ASPHALT
9. PREFERRED POSITION FOR A THROUGH SPLICE IS MIDWAY BETWEEN 2 LIGHT POLES.
THE POSITION OF A THROUGH SPLICE MUST BE MARKED BY A CABLE MARKER

80
SECONDARY LAYER OF ASPHALT OR INCISION INTO THE CURB ADJACENT.
FINISHED ROAD / SIDEWALK SURFACE OR FINISHED ROAD / SIDEWALK SURFACE OR 10. ACRYLIC STOVED ENAMEL SHALL BE USED FOR THE PAINTING OF THE WARNING

300
FINAL GROUND LEVEL FINAL GROUND LEVEL MARKER SIGNS.
POLE 1 POLE 2 POLE 3
11. A TERMINATION SPLICE WILL ONLY BE PROVIDED AT THE END OF A CONTRACT
SECTION AND/OR WHERE LATER EXTENSION IS EXPECTED.

12. SPUR CABLE FROM SPLICE TO THE LIGHTING POLE SHALL BE ARMOURED XLPE
WARNING TAPE INSULATED 2x 16mm2.

300

300
REFERENCE DRAWING

750
BACKFILL
DRAWING NO. DESCRIPTION
MCB MCB MCB BACKFILL NAS-1-GE00-CV030-0100-SD-01-01-R00 TYPICAL PLAN & SECTION

WARNING TAPE WARNING TAPE


4 POLES R 4 POLES Y 4 POLES B
TERMINAL BOX TERMINAL BOX TERMINAL BOX
MODEL NAME :

1050
700

700
LEGEND

150

150
R Y B N R Y B N R Y B N

FINE SAND

180

180
L1 RED CONCRETE

100
ENCASEMENT
STREET L2 YELLOW

70

70
LIGHTING
CIRCUIT L3 BLUE

300
110
200 200 150 100 150 4" DIA NEMA TC-6 CONDUIT(TYP.)
N BLACK
(AS PER APPROVED MATERIAL)
400 400

90
TYPICAL CONNECTION OF LIGHTING POLES
ONE CIRCUIT, 3 PHASE, 4 WIRES STREET LIGHTING CABLE TRENCH CONFIGURATION 135 200 135

Provide protection tiles 470


as per tender drawings.
ACKNOWLEDGEMENT:
"I ACKNOWLEDGE THAT THE SPECIFICATION REQUIREMENTS HAVE BEEN MET AND
THAT THE DIMENSIONS, CONDITIONS, AND QUANTITIES HAVE BEEN VERIFIED, AS
SHOWN OR MODIFIED IN THE DRAWING"

SECTION DETAIL FOR LV DUCT BANK - DB12 (1x2) KEYPLAN

FOR THE LUMINAIRE FOR THE LUMINAIRE FOR THE LUMINAIRE


PHASE DESIGNATION PHASE DESIGNATION PHASE DESIGNATION
SEE LIGHTING PLANS SEE LIGHTING PLANS SEE LIGHTING PLANS
BLACK WIRE (N) BLACK WIRE (N) BLACK WIRE (N)

Supervision and Management Services for King Faisal Air Academy


Facilities Relocation and Construction Project, Majmaah
GREEN WIRE (G) GREEN WIRE (G) GREEN WIRE (G)
DOCUMENT / DESIGN REVIEW
RED WIRE (L) RED WIRE (L) RED WIRE (L) ☐ A - Approved - Construction / Fabrication / installation may be undertaken.
☐ B - Approved as noted - Approval does not authorize changes in contract sum or contract time.

☐ C - Revise and Resubmit - Construction / Fabrication / installation may not be undertaken.


PREWIRED LUMINAIRE PREWIRED LUMINAIRE PREWIRED LUMINAIRE
☐ D - Rejected - In resubmitting, limit corrections to the items marked.
- Dar Al Riyadh approval of submitted item is not required or the submittal is not
TERMINAL BLOCK TERMINAL BLOCK SAME FOR POLE WITH TERMINAL BLOCK ☐ E - Not reviewed 0 DECEMBER 2021 ISSUED FOR APPROVAL

00
02/17/21 ISSUED FOR APPROVAL

complying with contract requirements


(SHOWN ILLUSTRATIVELY) (SHOWN ILLUSTRATIVELY) TWO BRACKET ARMS (SHOWN ILLUSTRATIVELY)
☐ Architecture ☐ Interior Design ☐ Civil ☐ Electrical ☐ Survey
Squad Checking:
☐ Mechanical ☐ Structural ☐ Telecom ☐ Landscape REV DATE DESCRIPTION
Reviewed By : Kh.S/A.A/AMM Date: 24-1-2022
Disclaimer:
1. Review and approval are for conformance with the information given and the design concept of the Project as MINISTRY OF DEFENCE
3-4mm² WIRES FOR 1 LUMINAIRE 6-4mm² WIRES FOR 2 LUMINAIRES expressed in the Contract Documents.
2. Dar Al Riyadh review and approval of the Contractor’s submittals shall not relieve the Contractor from any obligation ROYAL SAUDI AIR FORCES
LIGHT POLE LIGHT POLE contained in the Contract Documents.
3. No responsibility is assumed for accuracy or completeness of submittal dimensions, quantities or details.
4. The Contractor is responsible to field verify all dimensions prior to fabrication, Construction or installation.
5. Coordinate with all adjacent and/or related contractors, disciplines, other equipment and materials.
6. Respond to and address all previous comments from Dar Al Riyadh.
7. Comply with the requirements of all required approving authorities and obtain timely approval/consent as necessary.
ENGINEERING AND WORKS
CIRCUIT BREAKER EXCESS DOOR OPENING CIRCUIT BREAKER EXCESS DOOR OPENING DEPARTMENT
ENGINEERING AFFAIRS
CONCRETE COVER WITH
INSCRIPTION "GROUNDING PIT"
GROUNDING LUG
LEAVE ENOUGH WIRE SLACK TO PULL OUT
GROUNDING LUG
LEAVE ENOUGH WIRE SLACK TO PULL OUT KING FAISAL AIR ACADEMY
FUSE HOLDER BOX FOR SERVICING FUSE HOLDER BOX FOR SERVICING
BOLTED TO POLE BOLTED TO POLE IN MAJMA'A
BASE BASE

FOUNDATION FOUNDATION

2#50mm O.D. 2#50mm O.D.


PVC CONDUIT PVC CONDUIT
BURNS & McDONNEL
9400 WARD PARKWAY
OUTGOING LIGHTING KANSAS CITY M O 64114
CU 1x16mm² CABLE 4 CONDUCTORS CU 1x16mm²
GROUNDING GROUNDING
Dar Al-Riyadh Consultants
P.O. Box 250170, Riyadh 11391-Saudi Arabia
Tel.: (+966-11) 206 00 88
www.daralriyadh.com
OUTGOING LIGHTING CABLE 4 CONDUCTORS
TO NEXT POLE
INCOMING LIGHTING
CABLE 4 CONDUCTORS
INCOMING LIGHTING
CABLE 4 CONDUCTORS
JV NAS
P.O. Box 4339, Riyadh 11491-Saudi Arabia
OUTGOING EARTHING CABLE 1 CONDUCTOR OUTGOING EARTHING CABLE 1 CONDUCTOR Tel.: (+966-11) 408 51 00
INCOMING EARTHING INCOMING EARTHING
CABLE 1 CONDUCTOR TO NEXT POLE CABLE 1 CONDUCTOR FROM LAST POLE TO THE EARTH ROD PIT Fax: (+966-11) 405 78 28
COPPER BOND EARTH ROD
3/4ø 3000mm (min) SHALL BE
AS PER APPROVED MATERIAL

PHASE - VI

PRIMARY INFRASTRUCTURE

BACHELOR HOUSING
LIGHTING POLE WIRING DIAGRAM
STREET LIGHTING SYSTEM - MISCELLANEOUS DETAILS

ARCH'L ICT
SAL OZ HW AKH MJR MH
JMC/WH SNS

1 : 500 DECEMBER 2021

NAS-6-PI11-SL030-1003-SD-01-01 0
C-15 CHAIN LINK FENCE 1. FOR LIGHTING TYPE, WATTAGE AND OTHER DETAILS REFER NOTE DWG # 1422-04-GE-SL-001
NOTES
2. THE OPERATIONAL VOLTAGE FOR EACH LUMINARY IS 230V AND THE LIGHTING LUMINARIES
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X O VAL SHALL BE EQUALLY DISTRIBUTED ON THREE PHASES
PPR

X
3. THE VOLTAGE FOR STREET LIGHTING CIRCUITS SHALL BE 400/230 VOLTS.
CONCRETE DUCT BANK R A 4. ALL STREET LIGHTING CABLES SHALL BE ARMORED, MULTICORE, COPPER, XLPE / PVC
FO INSULATED.
DB12-1 / 1x2x110mmØ

X
L
TRO
SEWAGE PUMP STATION
5. ALL CABLES SHALL BE DIRECT BURIED EXCEPT AT ROAD CROSSINGS, WHERE THESE CABLES
N

X
CO SHALL BE INSTALLED IN UNREINFORCED CONCRETE DUCT BANKS.
QC
E 528991.597 E 529025.901 E 529062.704 E 529094.506 E 529129.811 E 529163.113
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

QA/ 6. THE PERMISSIBLE VOLTAGE DROP FROM SOURCE (TRANSFORMER) TO THE LAST LUMINAIRE IN

X
X

X
THE STREET LIGHTING CIRCUIT SHALL NOT EXCEED 5%.

X
X

X
N 2885715.501 N 2885715.495 N 2885715.507 N 2885715.501 N 2885715.507 N 2885715.502

X
(UT27)
7. THE SYSTEM LAYOUTS ARE PROVISIONAL, FINAL LAYOUTS CONSTRUCTION DRAWINGS WILL

X
X

X
X

X
X

X
BE PREPARED BY THE CONTRACTOR AFTER COORDINATING WITH OTHER DISCIPLINE AND AS

X
X

X
X

X
PER ACTUAL SITE CONDITION AND WILL GET APPROVAL FROM CLIENT PRIOR TO THE

X
X

X
X

X
DA1-003

X
EXECUTION OF WORK.

X
0+716 0+700 0+650 0+600 0+550

X
X

X
0+ 8. ALL LIGHTING POLE PROPOSED IN THE LAYOUT ARE TENTATIVE ONLY, THE CONTRACTOR

X
SLP-1/1 DA1-005 SLP-1/1

X
X

X
500

X
DA1-001 DA1-002 DA1-004 DA1-006

X
SHALL SUBMIT A PROPOSAL TO THE OWNER ALONG WITH ORIGINAL CATALOGUES AND SHALL

X
X

X
DA1-007

X
PROCURE THE POLE /LUMINARIES ONLY AFTER GETTING THE APPROVAL FROM THE OWNER.
CONCRETE DUCT BANK

X
X

X
X

X
X

X
9. SINCE LED EFFICACY i.e LUMIN PER WATT IS IMPROVING WITH THE PASSAGE OF TIME. THERE

X
X

X
X

X
E 529086.643 FORE, THE CONTRACTOR WILL USE LED LUMINAIRE WITH STATE OF THE ART TECHNOLOGY
DB13-15 / 1x3x110mmØ

X
X

X
E 528979.450

X
X

X
X

X
N 2885693.260 N 2885693.260 AVAILABLE AT THE TIME OF INSTALLATION KEEPING THE SAME ACHIEVED ILLUMANCE LEVEL.

X
E 529194.097

X
X

X
10. IN CASE OF ANY CONFLICT BETWEEN LAYOUT AND UTILITY CROSS SECTIONS CONTRACTOR IS
SA2-001

X
X

X
N 2885699.932

X
X

X
TO FOLLOW THE UTILITY CROSS SECTIONS FOR THE EXACT LOCATION OF NETWORKS

X
X
SA2-012

X
11. THE DUCT BANK SHOWN ARE 2 WAY 110mmØ UNLESS OTHERWISE NOTED.

X
X
ROAD-UT-27

X
SA2-036 SA2-037 SA2-038 SA2-039 SA2-040 SA2-041 SA2-042 SA2-043

X
12. FOR LIGHTING LEGENDS REFER DRAWING No. 1422-04-G-SL-001

X
X
X
SLP-1/2

X
X 0+000

X
X
X
E 529163.396 REFERENCE DRAWING

X
SLP-1/2 CONCRETE DUCT BANK

X
X
E 529031.945 E 529101.304 E 529120.805 E 529141.488 N 2885688.382

X
E 528988.128 E 529010.037 E 529053.854

X
X
CONCRETE DUCT BANK
X
X X X

DESCRIPTION
X X

N 2885688.382 N 2885688.382 N 2885688.382 N 2885688.382 DRAWING NO.


N 2885688.382 N 2885688.382 N 2885688.382
CONCRETE DUCT BANK DB13-5 / 1x3x110mmØ
X

DB13-4 / 1x3x110mmØ SLP-1/1

X
E 529063.508
DB13-18 / 1x3x110mmØ SA1-001 SA1-003 SA1-003 SA1-004
DA2-001 E 528988.493 E 529013.498 E 529120.142 MODEL NAME :
X

N 2885667.015 E 529095.136 E 529145.147 E 529170.152

0+450
E 528973.267 E 529038.503
N 2885667.015 N 2885667.015
DA2-004 SA2-013 N 2885667.015 N 2885667.015 N 2885667.015 N 2885667.015
DA1-008
X X X X X X X X X X X X X X X X X X

X
N 2885667.015 N 2885667.015 E 529232.254 E 529269.754 E 529307.252 E 529344.754 LEGEND
N 2885672.996 N 2885672.996 N 2885672.996 N 2885672.996
SLP-1/2 DA2-002 DA2-003 DA2-005 DA2-006 DA2-007 DA2-008 SLP-1/1
X

SA2-002 E 529086.643
PHASE BOUNDARY

CONCRETE DUCT BANK E 529198.746 13.8kV/400V PACKAGE UNIT SUBSTATION (PU)

X
CONCRETE DUCT BANK N 2885667.024 SLP-1/2 N 2885666.804 INCLUDING RMU AND LV CIRCUIT BREAKER
DB12-3 / 1x2x110mmØ E 529080.901 AREA LIGHTING PANEL
X

DB13-17 / 1x3x110mmØ SLP-1/2 E 529063.508


N 2885651.515 SLP-1/2 SLP-1/2 STREET LIGHTING PANEL

X
E 528988.458 E 529013.498 E 529038.502 N 2885646.034 E 529095.136 E 529120.142 E 529145.146 E 529170.152 PLAYFIELD LIGHTING PANEL

SA2-007
N 2885646.034 N 2885646.034 N 2885646.034 N 2885646.034 N 2885646.034 N 2885646.034 N 2885646.034 CONCRETE DUCT BANK
X

EARTH PIT

X
SA2-003 SA2-004 SA2-005 SA2-006 SA2-008 SA2-009 SA2-010 SA2-011 TYPE U1, INGROUND TREE UP-LIGHT LUMINAIRE, WITH 25
WATTS, 230V, 60Hz LED LAMP, IP-67.
TYPE AL2, 4.5m HEIGHT, TOP POST TYPE, LIGHTING POLE

BACKFILLED AREA
X

E 529198.746
WITH LED LUMINAIRE OF 36W, 230V, 60Hz IP66
N 2885630.862

X
TYPE DA1, 10m HEIGHT, DOUBLE ARM LIGHTING POLE WITH 2x140W,
DA1-009 230 V,60Hz
X

MAIN ENTRANCE MAIN ENTRANCE TYPE SA1, SAME AS ABOVE BUT WITH THE SINGLE ARM
-0.62 FL -0.62 FL
WALKWAY LEVEL WALKWAY LEVEL

TYPE TA1, SAME AS ABOVE BUT WITH THE TRIPLE ARM

X
-0.62 FL -0.62 FL -0.62 FL -0.62 FL
WALKWAY LEVEL WALKWAY LEVEL WALKWAY LEVEL WALKWAY LEVEL
RAMP RAMP RAMP RAMP
RAMP 1:12

-0.10 FCL
RAMP 1:12 RAMP 1:12

-0.10 FCL
RAMP 1:12

TYPE DA2, 7m HEIGHT, DOUBLE ARM LIGHTING POLE WITH 2


x78W, 230 V,60Hz
-0.02 FFL -0.02 FFL
X

SLP-1/1 TYPE SA2, SAME AS ABOVE BUT WITH THE SINGLE ARM

0+400

X
SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER
SHOWER SHOWER

TYPE DA4, 10m HEIGHT, SINGLE ARM LIGHTING POLE WITH 2x311W,

RA09 RA09
-0.10 FCL -0.10 FCL

230V,60Hz
±0.00 FFL ±0.00 FFL
60mm. 60mm. 60mm. 60mm.
EXP.JOINT EXP.JOINT EXP.JOINT EXP.JOINT

E 529177.889
X

-0.10 FCL
SHOWER SHOWER

-0.10 FCL -0.10 FCL


SHOWER SHOWER

-0.10 FCL
TYPE DA5, 10m HEIGHT, SINGLE ARM LIGHTING POLE WITH 2x257W,
±0.00 FFL SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER ±0.00 FFL ±0.00 FFL SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER ±0.00 FFL
N 2885602.820 230V,60Hz
*Refer to the comments in the attached comments sheet.

X
RAMP

RAMP
SLP-1/PLP-1 --
-0.60 FFL
RAMP
RAMP RAMP

RAMP --
-0.60 FFL
RAMP
RAMP

E 529180.689 4Cx16mm²+16mm²G CU, LV ARMORED CABLE DIRECT BURIED.


-0.62 FL -0.62 FL -0.62 FL -0.62 FL

N 2885602.820 4Cx10mm²+10mm²G CU, LV ARMORED CABLE DIRECT BURIED.


SLP-1/PLP-1
WALKWAY LEVEL WALKWAY LEVEL WALKWAY LEVEL WALKWAY LEVEL
X

RAMP RAMP RAMP

RAMP
RAMP
4Cx6mm²+6mm²G CU, LV ARMORED CABLE DIRECT BURIED.
SLP-1/PLP-1 SLP-1/PLP-2

X
DB12 CONCRETE ENCASED uPVC DUCTBANK FOR ROAD CROSSING
E 529198.746 SIZE IS 1x2x110mmØ
N 2885594.781 LIGHTING CABLE No.
X

Supervision and Management Services for King Faisal Air Academy


(725 M²)
DA1-010 Facilities Relocation and Construction Project, Majmaah PU - FH - 1 / 1

X
CIRCUIT NUMBER
(PV GRASS) (725 M²)
(PV GRASS) SLP-1/PLP-2 PANEL NUMBER
E 528993.224 E 529162.281 DOCUMENT / DESIGN REVIEW
X

AREA: (FH- FAMILY HOUSING)


N 2885587.299
SA4-005 N 2885587.315 CONCRETE DUCT BANK ☐ A - Approved - Construction / Fabrication / installation may be undertaken. (BH- BACHELOR HOUSING)

X
☐ B - Approved as noted - Approval does not authorize changes in contract sum or contract time.
SA4-001 DB22-7 / 2x2x110mmØ ☐ C - Revise and Resubmit - Construction / Fabrication / installation may not be undertaken.
SOURCE: (PACKAGE UNIT - PU)
(STREET LIGHTING PANEL- SLP)
☐ D - Rejected
X

- In resubmitting, limit corrections to the items marked.


COURT COURT (AREA LIGHTING PANEL- ALP)
EVOLLEYBALL
528993.224 VOLLEYBALL E 529162.281 ☐ E - Not reviewed
- Dar Al Riyadh approval of submitted item is not required or the submittal is not

X
N 2885576.435 N 2885576.450 SLP-1/3,4 Squad Checking:
complying with contract requirements
☐ Architecture ☐ Interior Design ☐ Civil ☐ Electrical ☐ Survey
ACKNOWLEDGEMENT:
☐ Mechanical ☐ Structural ☐ Telecom ☐ Landscape "I ACKNOWLEDGE THAT THE SPECIFICATION REQUIREMENTS HAVE BEEN MET AND
SA4-002
X

Reviewed By : KH.S/O.K Date: 13-April-2022 THAT THE DIMENSIONS, CONDITIONS, AND QUANTITIES HAVE BEEN VERIFIED, AS
SA4-006 SHOWN OR MODIFIED IN THE DRAWING"

X
Disclaimer:

0+350
1. Review and approval are for conformance with the information given and the design concept of the Project as
expressed in the Contract Documents.
KEYPLAN
PLP-1/3 PLP-2/3
X

E 529013.589
PLP-2/1 DA1-011
2. Dar Al Riyadh review and approval of the Contractor’s submittals shall not relieve the Contractor from any obligation
contained in the Contract Documents.
3. No responsibility is assumed for accuracy or completeness of submittal dimensions, quantities or details.

X
E 528995.936 4. The Contractor is responsible to field verify all dimensions prior to fabrication, Construction or installation.
N 2885555.084 E 529157.964
PLP-BH-1
N 2885555.084 E 529140.312
N 2885555.084 PLP-BH-2 5. Coordinate with all adjacent and/or related contractors, disciplines, other equipment and materials.
6. Respond to and address all previous comments from Dar Al Riyadh. X C-15 X
X

ROAD-UT-27

N 2885555.084 7. Comply with the requirements of all required approving authorities and obtain timely approval/consent as necessary.
X X

E 528991.095
SA5-001 E 529162.805 E 529198.752

X
X
X

SA5-003 SEWAGE PUMP STATION

NORTH

X
(UT27)
SC2

N 2885553.095 N 2885553.095
RAMP RAMP
RAMP RAMP

N 2885563.972

X
RA27
RA30 RA30

X
RAMP RAMP RAMP RAMP

RAMP RAMP
RAMP RAMP

RAMP
RAMP
SA5-005
RA30

OPEN ABOVE
VOLLEYBALL VOLLEYBALL

RA13
COURT COURT

MULTI-PURPOSE MULTI-PURPOSE
COURT COURT

RAMP
D1

MAIN ENTRANCE

RAMP
OPEN ABOVE
RA29

PLP-1/1 SA5-007

C-15
VOLLEYBALL VOLLEYBALL
COURT COURT
X

RAMP

RAMP
LC2 RAMP RAMP

COMMERCIAL AREA BUILDING


RAMP RAMP

ARCADE
RA09 RA09

SA4-007 SLP-1/R1, Y1, B1


LVOLLEYBALL
LABYELLOV
COURT
TRUOC
MULTI-PURPOSE

SA4-003
MAIN ENTRANCE

COURT

X
OUT OF SCOPE

COURT E 528995.936 E 529140.312 COURT

X
VOLLEYBALL VOLLEYBALL X
E 529162.805
PLP-1/2 N 2885543.216 N 2885543.216
SA5-008 4Cx16mm² CU,XLPE/DST/PVC
LIMIT OF SCOPE OF WORKS FOR BUILDING / LANDSCAPE / BACKFILLING

C15-A
N 2885542.231
X

SA5-004 SA5-006 +1Cx16mm²Cu,PVC(G)

X
SA4-004 SA5-002 E 529157.964 SA4-008 UT-17

C-15
UT17
LOCAL MEDIUM VOLTAGE

X X X
DISTRIBUTION SUBSTATION ROOM-2
X X X X
E 529013.589
PLP-2/2
RA10 SECURITY FENCE

E 528991.095
FUEL STATION

N 2885543.216
SLP-1/R2, Y2, B2
FUTURE EXTENSION
X

FIRE FIGHTING
STATION RA11
X GRAVEL AREA

CONTROL

WATER TANK
PROPOSED IRRIGATION
PUMP STATION-07 (UT38)
RA-31 RA-30
ASPHALT AREA PUMP HOUSE

N 2885543.216

STEEL FENCE (TYP.)


RA-29
WATER TANK

GATE
ASPHALT AREA

STEEL FENCE (TYP.)


UT-17
C-10
N 2885542.231
PAVED AREA

UT17
PIPE CHAMBER
WATER INLET GRAVEL AREA
FLOW METER
PAVED AREA ASPHALT AREA

GUARD HOUSE

ENTRANCE GATE
LOCAL MEDIUM VOLTAGE
DISTRIBUTION SUBSTATION ROOM-1

X
X
DA1-012 4Cx16mm² CU,XLPE/DST/PVC SITE DISTRIBUTION TOILET
GUARD ROOM

KITCHENETTE
ROOM
ELECTRIC ROOM
STORE

X
NODE UT35 ROOM
GENERATOR

UNDERGROUND FUEL TANK

(725 M²)

X
X
(725 M²)
PUMP ROOM

X
X
X

SEWAGE PUMP

SUB
F151

L-02
OFF
(PV GRASS)
SING

ICER
X
HOU

HOU
ICER
SUB OFFICER OFFICER
STATION UT25
(PV GRASS)
OFFICER

SING
SUB OFFICER SUB
OFF
SUB OFFICER SUB OFFICER OFFICER OFFICER

F150
HOUSING F153 HOUSING F152 HOUSING F104 HOUSING F103
HOUSING F149 HOUSING F148 HOUSING F108 HOUSING F107

L-01
UP UP

GUIDANCE & CLINIC

SOC

SOC
CER

CER
FIEL

FIEL
ORIENTATION RA37
X

RA43 RA42 RA42 RA41

D
SOC

SOC
+1Cx16mm²Cu,PVC(G)

CER

CER
FIEL

FIEL
D

D
SUB OFFICER SUB OFFICER
SUB OFFICER SUB OFFICER OFFICER OFFICER OFFICER OFFICER

LK-10
HOUSING F146 HOUSING F147

SUB
F145
HOUSING F142 HOUSING F97 HOUSING F98

OFF
HOUSING F143 SING
HOUSING F101 HOUSING F102

TR
TR
ICER
HOU
UP

HOU
ICER
OFF

SING
SUB

F144

X
C-09
C-11
X
L-03 L-03
E 529198.752 LK-09

SLP-1/R3, Y3, B3
STEEL FENCE (TYP.)

UP

SPACE FRAME

TR
TR
SUN SHADE WITH
LIGHTING

HIGH SCHOOL IRRIGATION PUMP

PAVED AREA
GUARD HOUSE

ASPHALT AREA
RA35

PAVED AREA

GRAVEL AREA
ASPHALT AREA
ENTRANCE GATE

ASPHALT AREA
KINDERGARTEN

X
0+300
GIRLS RA19

N 2885529.028
STATION UT38

INLET
CHAMBER

PUMP HOUSE

CONTROL
WATER
PIPE
HIGH SCHOOL PRIMARY SCHOOL SCHOOL RA33 FOR HOLY QURAN RECITATION

FLOW METER
GATE
ENTRANCE

WATER TANK

WATER TANK
BUILDING OF WOMEN'S PREMISES

BOYS RA16 GIRLS RA17

GRAVEL AREA
X

PG2
01:1 PMAR

01:1 PMAR
STEEL FENCE (TYP.)

SB1 OFFICER'S CLUB


MSC1 RA25

GUARD HOUSE

LK-04
LK-01

LK-02

LK-03

LK-06

LK-07

LK-08
LK-05
LM7
OFFICER'S

L-02
4Cx16mm² CU,XLPE/DST/PVC

X
FUTURE CLUB RA25
MOSQUE TO BE SPACE FRAME
SUN SHADE WITH

X
LIGHTING

INTERMEDIATE COMBINED WITH FUTURE FUTURE

RAMP 1:12
PB2

SCHOOL BOYS PHASE 2 MOSQUE


PRIMARY SCHOOL KINDERGARTEN

UP
INTERMEDIATE

UP
RA15 GATE
ENTRANCE

DETALUSNI mm003 DETALUSNI mm003 BOYS RA14 SCHOOL RA33 SCHOOL GIRLS

RAMP 1:12
06.0- LLAW KCOLB 06.0- 06.0- LLAW KCOLB 06.0-
LEVEL YAWKLAW LEVEL YAWKLAW LEVEL YAWKLAW LEVEL YAWKLAW RA18
GUARD HOUSE

TENT
01.0- 01.0-
LSS LSS
RAMP 1:12

RAMP

+1Cx16mm²Cu,PVC(G)

X
RAMP
RAMP RAMP X X C-08 X X X X X
X

21:1 PMAR 21:1 PMAR 21:1 PMAR

RAMP 21:1 PMAR

F175 F176 F177 F178 F179 F180 F180 F179 F178 F177 F176 F175

RA30
LSS 00.0+ LSS 00.0+ LSS 00.0+ LSS 00.0+

X
RA30
TFIL TFIL

LFF 00.0+
LSS 01.0-
LFF 00.0+
LSS 01.0-
SLP-1/R4, Y4, B4
SLP-1/3,4
X

4Cx16mm² CU,XLPE/DST/PVC

X
DA1-013 +1Cx16mm²Cu,PVC(G)
X

DETALUSNI mm003 DETALUSNI mm003


LLAW KCOLB LLAW KCOLB

01 APRIL 2022 ISSUED FOR APPROVAL


SLP-1/RA, YA, BA

02/17/21
00
ISSUED FOR APPROVAL

X
RAMP 21:1 PMAR

LFF 00.0±
21:1 PMAR

RAMP RAMP 21:1 PMAR

LFF 00.0±
21:1 PMAR

RAMP

0 DECEMBER 2021 ISSUED FOR APPROVAL

02/17/21
00
ISSUED FOR APPROVAL

06.0- 06.0-
LEVEL YAWKLAW LEVEL YAWKLAW

4Cx16mm² CU,XLPE/DST/PVC
MAIN ENTRANCE MAIN ENTRANCE

E 529198.752
X

MAIN ENTRANCE
MAIN ENTRANCE REV DATE DESCRIPTION
N 2885494.083

X
+1Cx16mm²Cu,PVC(G)
MINISTRY OF DEFENCE
X

E 528975.155
SA2-014 SA2-016 SA2-017 SA2-018 SA2-019 SA2-021 SA2-022 SLP-1/RB, YB, BB ROYAL SAUDI AIR FORCES
SA2-015

X
N 2885474.588
4Cx16mm² CU,XLPE/DST/PVC
SA2-020 E 529150.423 E 529172.332
X

E 528997.064 E 529040.881 E 529088.332


E 529018.972 E 529063.636 E 529107.832 N 2885474.588 N 2885474.588 CONCRETE DUCT BANK +1Cx16mm²Cu,PVC(G)
SA2-023 SLP-1/4
N 2885474.588 N 2885474.588 N 2885474.588 N 2885474.588
SLP-1/4 ENGINEERING AND WORKS

X
N 2885474.588 N 2885474.588

CONCRETE DUCT BANK DB12-8 / 1x2x110mmØ DEPARTMENT


SLP-1/RC, YC, BC
X

SLP-1/4 E 529128.515
SLP-1/3 DA1-014 ENGINEERING AFFAIRS
DB13-10 / 1x3x110mmØ N 2885474.588

X
E 528993.126
E 529017.126
N 2885453.588
E 529041.126
N 2885453.588 E 529065.195 E 529097.321 DA2-014 E 529121.321 DA2-015 E 529145.321 DA2-016 E 529169.391 4Cx35mm² CU,XLPE/DST/PVC
SLP-1/4 N 2885453.588 N 2885453.588 SA2-025 N 2885453.588 N 2885453.588
X

DA2-010 DA2-011 N 2885453.588 N 2885453.588


E 529198.752
+1Cx16mm²Cu,PVC(G) KING FAISAL AIR ACADEMY

X
SA2-024 E 528979.448
DA2-009 DA2-012 DA2-013 SLP-1/4 N 2885459.139 IN MAJMA'A
X

N 2885453.588 CONCRETE DUCT BANK E 529086.643

X
N 2885453.588
DB12-11 / 1x2x110mmØ
SA2-034 SA2-033 SA2-032 SA2-031 SA2-029 SA2-028 SA2-027 SA2-026
X

X
SLP-1/4 E 529097.391 E 529121.391 E 529145.391 E 529169.391
E 528993.195 E 529017.195 E 529041.195 E 529065.195 N 2885437.853 SLP-1/4 N 2885437.851 N 2885437.761 N 2885437.832
X

BURNS & McDONNEL


N 2885437.840 N 2885437.882 N 2885437.908 N 2885437.696
SA2-030
X
9400 WARD PARKWAY
DA1-015 KANSAS CITY M O 64114
SA2-035
X

E 528979.447 E 529086.643
0+200

X
N 2885427.341 N 2885427.341
Dar Al-Riyadh Consultants
CONCRETE DUCT BANK E 529198.752
N 2885424.195
P.O. Box 250170, Riyadh 11391-Saudi Arabia
X

Tel.: (+966-11) 206 00 88


DB13-12 / 1x3x110mmØ SLP-1/3 E 529179.653
X

E 529151.197 www.daralriyadh.com

E 528987.132 E 529014.585 E 529042.036


E 529069.493
E 529094.292 E 529123.744 N 2885405.089 N 2885405.089 CONCRETE DUCT BANK
0+000 N 2885405.089 N 2885405.089 N 2885405.089
0+100 N 2885405.089
N 2885405.089 N 2885405.089
0+200 0+233
X

DB12-14 / 1x2x110mmØ JV NAS


X

P.O. Box 4339, Riyadh 11491-Saudi Arabia


Tel.: (+966-11) 408 51 00
SLP-1/3 DA1-023 DA1-022 DA1-021 DA1-020 DA1-019 DA1-018 TA1-001 CONCRETE DUCT BANK Fax: (+966-11) 405 78 28
X

DA1-024 DB13-19 / 1x3x110mmØ


X

SLP-1/3
X

CONCRETE DUCT BANK DA1-016


X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

DB12-13/ 1x2x110mmØ PHASE - VI


X

E 529198.752
PRIMARY INFRASTRUCTURE
0+150
X

N 2885385.995
LIMIT OF SCOPE OF WORKS FOR BUILDING / LANDSCAPE / BACKFILLING BACHELOR HOUSING
X
X

ELECTRICAL STREET LIGHTING LAYOUT

C15-A DA1-017
X
X

ROAD C-15 INTERFACE SAL


ARCH'L ICT

GUARD HOUSE
JMC/WH OZ SNS HW AKH MJR MH
ROOM

Excluded this portion


X
ROOM

E 529198.752
POINT OF PHASE 2
ROOM ROOM
LFF 00.0±
X

N 2885362.256 1 : 500 APRIL 2022

STA. 0+132.82 X X X X X

NAS-6-PI11-SL030-1001-SD-01-01 01
N 2885351.960
NOTES
1. THE CONTRACTOR SHALL COORDINATE WITH THE CLIENT & SEC PRIOR

FROM FEEDER # 5 / T101


Cable size/type to be as VAL
TO THE START OF WORKS AND COMMISSIONING.
per LF/calculation. O
APPR 2. PRIOR TO PROCUREMENT OF EQUIPMENT AND MATERIALS,
R
FO CONTRACTOR SHALL SUBMIT TO CLIENT THE CATALOGUES AND
4Cx300mm² AL, XLPE/PVC
TCL = TROL SPECIFICATIONS OF THE PROPOSED EQUIPMENT/ MATERIAL .
CON
DF = QC
QA/
3. THE CONTRACTOR SHALL PREPARE THE SHOP DRAWINGS SHOWING
TDL = ALL DETAILS OF THE EQUIPMENT, PANELS AND GET THE APPROVAL OF
C.L.= 33.9 KVA
TDL + 20% = CLIENTS REPRESENTATIVE PRIOR TO SUPPLY AND INSTALLATION.
SLP-BH-1 D.F.= 1 No. of Ways=
250 AT
R Y B D.L.= 33.9 KVA MOUNTING=
250 AF
3P
BAR
N
3C - 4mm² CABLE
STOP STOP
(OFF) (OFF)

CT C1 START C2 START
KWH 250/5A (ON) (ON)
A A A
M
.
0 . 250A
SC rating shall be as per DIGITAL REFERENCE DRAWING
OFF OFF
the technical specs. T
TIMER SWITCH
PE
M 24HR PROGRAMMABLE DRAWING NO. DESCRIPTION
(Typical), Bus bar size to FUSE
A M A
be as per approved VS V NAS-1-GE00-CV030-0100-SD-01-01-R00 TYPICAL PLAN & SECTION
panel board .
0 . 500V
C1 C2
manufacturer's 230V PHOTO CELL
drawings. N MODEL NAME :

~
~
(MOUNTED ON TOP OF
THE NEAREST STREET
~
MAIN SECTION 250A, 25kA (SYM.) 400/231V, 3PH, 4W & GROUNDING, Cu 5x40mm
LIGHTING POLE)
LEGEND
~
1 3 5 2,4,6 7,9,11 8,10,12 13,15,17 14,16,18 19,21,23 20,22,24 25,27,29 26,28,30
A B C D E F G MOULDED CASE CIRCUIT BREAKER, BOLT ON TYPE
1P 1 PHASE - ONE POLE - SINGLE PHASE.
20A 20A 20A 150 AT 30 AT 30 AT 60 AT 60 AT 40 AT 30 AT 20 AT 150 AT 3P 3 PHASE - THREE POLES - THREE PHASE.
3 1P 1 PHASE - THREE CIRCUIT BREAKER ONE POLE - SINGLE PHASE.
SC rating shall be as per 1P 1P 1P 250 AF
3P
100 AF
3P
100 AF
3P
100 AF
3P
100 AF
3P
100 AF
3P
100 AF
3P
100 AF
3P
250 AF
3P
the technical specs. 4Cx16mm² + 16mm²G Cu,XLPE/PVC
CURRENT TRANSFORMER
(Typical), Bus bar size to 4Cx35mm² + 16mm²G Cu,XLPE/PVC
be as per approved C COIL OF CONTACTOR
panel board 250 A PLP-BH-1 PLP-BH-2 ALP-BH-1 SPARE SPARE SPARE SPARE 150 A
E.L 220V,16A C1 (2.7 KVA) (2.7 KVA) (13.34 KVA)
manufacturer's 12W OUTLET C2 3P CONTACTOR CONNECTED TO COIL
drawings. NORMALLY OPEN
3P CONTACTOR CONNECTED TO COIL
SECTION "A", 150A, 16kA (SYM.) 400/231V, 3PH, 4W & GROUNDING, Cu 5x20mm SECTION "B", 150A, 16kA (SYM.) 400/231V, 3PH, 4W & GROUNDING, Cu 5x20mm
NORMALLY CLOSE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

31,33,35

32,34,36

37,39,41

38,40,42

43,45,47

44,46,48
25,27,29
13,15,17

14,16,18

19,21,23

20,22,24

26,28,30
8,10,12
7,9,11
1,3,5

2,4,6
PE 231V PHOTO ELECTRIC CELL

INDICATOR LAMP
- The contractor is responsible to rectify the shop drawing
20 AT 20 AT 20 AT 20 AT 30 AT 30 AT 30 AT 20 AT 20 AT 30 AT 30 AT 30 AT 30 AT 30 AT 40 AT 40 AT according to any modification.
100 AF
AUXILARY N/O CONTACT
100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF 100 AF
3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P 3P
1x40 W FLOURESCENT LAMP WITH BATERY
MF BACK UP (MAINTENANCE FIXTURE)
40W

V VOLTMETER

650m

629m

546m

828m
A AMMETER
SPARES SPARES
AS VS SELECTOR SWITCH
4C x 16mm² + 16mm²G Cu, XLPE/PVC

PLAYFIELD LIGHTING PANEL


Supervision and Management Services for King Faisal Air Academy PLP - PLAYFIELD LIGHTING PANEL
Facilities Relocation and Construction Project, Majmaah BLP - BASKETBALL FIELD LIGHTING PANEL
FLP - FOOTBALL FIELD LIGHTING PANEL
SLP-1/1R SLP-1/2R SLP-1/3R SLP-1/4R
DOCUMENT / DESIGN REVIEW LIGHTING AND POWER PANEL
SLP-1/1Y SLP-1/2Y SLP-1/3Y SLP-1/4Y
☐ A - Approved - Construction / Fabrication / installation may be undertaken.
SLP-1/1B SLP-1/2B SLP-1/3B SLP-1/4B ☐ B - Approved as noted - Approval does not authorize changes in contract sum or contract time.

☐ C - Revise and Resubmit - Construction / Fabrication / installation may not be undertaken.


SLP-1/1R SLP-1/2R SLP-1/3R SLP-1/4R ACKNOWLEDGEMENT:
☐ D - Rejected - In resubmitting, limit corrections to the items marked.
- Dar Al Riyadh approval of submitted item is not required or the submittal is not
"I ACKNOWLEDGE THAT THE SPECIFICATION REQUIREMENTS HAVE BEEN MET AND
SLP-1/1Y SLP-1/2Y SLP-1/3Y SLP-1/4Y ☐ E - Not reviewed complying with contract requirements THAT THE DIMENSIONS, CONDITIONS, AND QUANTITIES HAVE BEEN VERIFIED, AS
☐ Architecture ☐ Interior Design ☐ Civil ☐ Electrical ☐ Survey SHOWN OR MODIFIED IN THE DRAWING"
SLP-1/1B SLP-1/2B SLP-1/3B SLP-1/4B Squad Checking:
☐ Mechanical ☐ Structural ☐ Telecom ☐ Landscape

SLP-1/1R SLP-1/2R SLP-1/3R SLP-1/4R Reviewed By : Kh.S/A.A/AMM Date: 24-1-2022 KEYPLAN


Disclaimer:
SLP-1/1Y SLP-1/2Y SLP-1/3Y SLP-1/4Y 1. Review and approval are for conformance with the information given and the design concept of the Project as
expressed in the Contract Documents.
SLP-1/1B SLP-1/2B SLP-1/3B SLP-1/4B 2. Dar Al Riyadh review and approval of the Contractor’s submittals shall not relieve the Contractor from any obligation
contained in the Contract Documents.
SLP-1/1R SLP-1/2R SLP-1/3R SLP-1/4R 3. No responsibility is assumed for accuracy or completeness of submittal dimensions, quantities or details.
4. The Contractor is responsible to field verify all dimensions prior to fabrication, Construction or installation.
5. Coordinate with all adjacent and/or related contractors, disciplines, other equipment and materials.
SLP-1/1Y SLP-1/2Y SLP-1/3Y SLP-1/4Y
6. Respond to and address all previous comments from Dar Al Riyadh.
7. Comply with the requirements of all required approving authorities and obtain timely approval/consent as necessary.
SLP-1/1B SLP-1/2B SLP-1/3B SLP-1/4B

SLP-1/1R SLP-1/2R SLP-1/3R SLP-1/4R

SLP-1/1Y SLP-1/2Y SLP-1/3Y SLP-1/4Y

SLP-1/2B SLP-1/3B SLP-1/4B

SLP-1/2R SLP-1/4R

SLP-1/2Y SLP-1/4Y

SLP-1/2B SLP-1/4B

SLP-1/2R SLP-1/4R

SLP-1/2Y SLP-1/4Y

SLP-1/2B SLP-1/4B

SLP-1/4R

SLP-1/4Y

SLP-1/4B

SLP-1/4R

SLP-1/4Y

SLP-1/4B

SLP-1/4R

SLP-1/4Y 0 DECEMBER 2021 ISSUED FOR APPROVAL

00
02/17/21 ISSUED FOR APPROVAL

SLP-1/4B REV DATE DESCRIPTION

MINISTRY OF DEFENCE
Earthing ROYAL SAUDI AIR FORCES

ENGINEERING AND WORKS


DEPARTMENT
ENGINEERING AFFAIRS

KING FAISAL AIR ACADEMY


IN MAJMA'A

BURNS & McDONNEL


9400 WARD PARKWAY
KANSAS CITY M O 64114

Dar Al-Riyadh Consultants


P.O. Box 250170, Riyadh 11391-Saudi Arabia
Tel.: (+966-11) 206 00 88
www.daralriyadh.com

JV NAS
P.O. Box 4339, Riyadh 11491-Saudi Arabia
Tel.: (+966-11) 408 51 00
Fax: (+966-11) 405 78 28

PHASE - VI

PRIMARY INFRASTRUCTURE

BACHELOR HOUSING
STREET AND AREA LIGHTING SINGLE LINE DIAGRAM

ARCH'L ICT
SAL OZ HW AKH MJR MH
JMC/WH SNS

1 : 500 DECEMBER 2021

NAS-6-PI11-SL080-1001-SD-01-01 0
NOTES: NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS EXCEPT WHERE OTHERWISE INDICATED.

OVAL 2. GROUND RODS SHALL HAVE 16mm² DIA WITH A LENGTH AS REQUIRED BY SPECIFICATIONS.
R
R APP JOINTING OF GROUND RODS AND WIRE SHALL BE BY EXOTHERMIC WELD.
FO
L 3. 16mm² TAPE COPPER WIRE, 7 STRANDED SHALL BE CONNECTED WITH EXOTHERMIC WELD
N TRO TO 16mm GROUND ROD, PULLING EYES, HANDHOLE FRAMES AND CHANNEL IRONS.
CO
QC
QA/ 4. RESIN FOR SPLICES SHALL BE COLD POUR POLYURETHANE RESIN. EPOXY
RESIN IS NOT PERMITTED, POLYURETHANE RESIN MUST ONLY BE USED FROM
SEALED PRE- PACKS, ONE FOR EACH SPLICE.

5. ADDITIONAL SPUR CABLES MAY, IF REQUIRED, BE TAKEN FROM A "T" SPLICE SUCH
ADDITIONAL SPUR CABLES MAY LEAVE SPLICE ADJACENT TO EITHER FIRST SPUR CABLE
OR EITHER ENTRY OF MAIN CABLE.

6. FOR FULL DETAILS ON SPLICES AND RESIN FILLERS SEE SPECIFICATION.

7. IF DESIRED AN ANGLED SPLICE MAY BE USED IN PLACE OF A "T" SPLICE.

8. SPUR CABLES ARE NOT PERMITTED FROM A THROUGH SPLICE.

50
TOP LAYER OF ASPHALT
9. PREFERRED POSITION FOR A THROUGH SPLICE IS MIDWAY BETWEEN 2 LIGHT POLES.
THE POSITION OF A THROUGH SPLICE MUST BE MARKED BY A CABLE MARKER

80
SECONDARY LAYER OF ASPHALT OR INCISION INTO THE CURB ADJACENT.
FINISHED ROAD / SIDEWALK SURFACE OR FINISHED ROAD / SIDEWALK SURFACE OR 10. ACRYLIC STOVED ENAMEL SHALL BE USED FOR THE PAINTING OF THE WARNING

300
FINAL GROUND LEVEL FINAL GROUND LEVEL MARKER SIGNS.
POLE 1 POLE 2 POLE 3
11. A TERMINATION SPLICE WILL ONLY BE PROVIDED AT THE END OF A CONTRACT
SECTION AND/OR WHERE LATER EXTENSION IS EXPECTED.

12. SPUR CABLE FROM SPLICE TO THE LIGHTING POLE SHALL BE ARMOURED XLPE
WARNING TAPE INSULATED 2x 16mm2.

300

300
REFERENCE DRAWING

750
BACKFILL
DRAWING NO. DESCRIPTION
MCB MCB MCB BACKFILL NAS-1-GE00-CV030-0100-SD-01-01-R00 TYPICAL PLAN & SECTION

WARNING TAPE WARNING TAPE


4 POLES R 4 POLES Y 4 POLES B
TERMINAL BOX TERMINAL BOX TERMINAL BOX
MODEL NAME :

1050
700

700
LEGEND

150

150
R Y B N R Y B N R Y B N

FINE SAND

180

180
L1 RED CONCRETE

100
ENCASEMENT
STREET L2 YELLOW

70

70
LIGHTING
CIRCUIT L3 BLUE

300
110
200 200 150 100 150 4" DIA NEMA TC-6 CONDUIT(TYP.)
N BLACK
(AS PER APPROVED MATERIAL)
400 400

90
TYPICAL CONNECTION OF LIGHTING POLES
ONE CIRCUIT, 3 PHASE, 4 WIRES STREET LIGHTING CABLE TRENCH CONFIGURATION 135 200 135

Provide protection tiles 470


as per tender drawings.
ACKNOWLEDGEMENT:
"I ACKNOWLEDGE THAT THE SPECIFICATION REQUIREMENTS HAVE BEEN MET AND
THAT THE DIMENSIONS, CONDITIONS, AND QUANTITIES HAVE BEEN VERIFIED, AS
SHOWN OR MODIFIED IN THE DRAWING"

SECTION DETAIL FOR LV DUCT BANK - DB12 (1x2) KEYPLAN

FOR THE LUMINAIRE FOR THE LUMINAIRE FOR THE LUMINAIRE


PHASE DESIGNATION PHASE DESIGNATION PHASE DESIGNATION
SEE LIGHTING PLANS SEE LIGHTING PLANS SEE LIGHTING PLANS
BLACK WIRE (N) BLACK WIRE (N) BLACK WIRE (N)

Supervision and Management Services for King Faisal Air Academy


Facilities Relocation and Construction Project, Majmaah
GREEN WIRE (G) GREEN WIRE (G) GREEN WIRE (G)
DOCUMENT / DESIGN REVIEW
RED WIRE (L) RED WIRE (L) RED WIRE (L) ☐ A - Approved - Construction / Fabrication / installation may be undertaken.
☐ B - Approved as noted - Approval does not authorize changes in contract sum or contract time.

☐ C - Revise and Resubmit - Construction / Fabrication / installation may not be undertaken.


PREWIRED LUMINAIRE PREWIRED LUMINAIRE PREWIRED LUMINAIRE
☐ D - Rejected - In resubmitting, limit corrections to the items marked.
- Dar Al Riyadh approval of submitted item is not required or the submittal is not
TERMINAL BLOCK TERMINAL BLOCK SAME FOR POLE WITH TERMINAL BLOCK ☐ E - Not reviewed 0 DECEMBER 2021 ISSUED FOR APPROVAL

00
02/17/21 ISSUED FOR APPROVAL

complying with contract requirements


(SHOWN ILLUSTRATIVELY) (SHOWN ILLUSTRATIVELY) TWO BRACKET ARMS (SHOWN ILLUSTRATIVELY)
☐ Architecture ☐ Interior Design ☐ Civil ☐ Electrical ☐ Survey
Squad Checking:
☐ Mechanical ☐ Structural ☐ Telecom ☐ Landscape REV DATE DESCRIPTION
Reviewed By : Kh.S/A.A/AMM Date: 24-1-2022
Disclaimer:
1. Review and approval are for conformance with the information given and the design concept of the Project as MINISTRY OF DEFENCE
3-4mm² WIRES FOR 1 LUMINAIRE 6-4mm² WIRES FOR 2 LUMINAIRES expressed in the Contract Documents.
2. Dar Al Riyadh review and approval of the Contractor’s submittals shall not relieve the Contractor from any obligation ROYAL SAUDI AIR FORCES
LIGHT POLE LIGHT POLE contained in the Contract Documents.
3. No responsibility is assumed for accuracy or completeness of submittal dimensions, quantities or details.
4. The Contractor is responsible to field verify all dimensions prior to fabrication, Construction or installation.
5. Coordinate with all adjacent and/or related contractors, disciplines, other equipment and materials.
6. Respond to and address all previous comments from Dar Al Riyadh.
7. Comply with the requirements of all required approving authorities and obtain timely approval/consent as necessary.
ENGINEERING AND WORKS
CIRCUIT BREAKER EXCESS DOOR OPENING CIRCUIT BREAKER EXCESS DOOR OPENING DEPARTMENT
ENGINEERING AFFAIRS
CONCRETE COVER WITH
INSCRIPTION "GROUNDING PIT"
GROUNDING LUG
LEAVE ENOUGH WIRE SLACK TO PULL OUT
GROUNDING LUG
LEAVE ENOUGH WIRE SLACK TO PULL OUT KING FAISAL AIR ACADEMY
FUSE HOLDER BOX FOR SERVICING FUSE HOLDER BOX FOR SERVICING
BOLTED TO POLE BOLTED TO POLE IN MAJMA'A
BASE BASE

FOUNDATION FOUNDATION

2#50mm O.D. 2#50mm O.D.


PVC CONDUIT PVC CONDUIT
BURNS & McDONNEL
9400 WARD PARKWAY
OUTGOING LIGHTING KANSAS CITY M O 64114
CU 1x16mm² CABLE 4 CONDUCTORS CU 1x16mm²
GROUNDING GROUNDING
Dar Al-Riyadh Consultants
P.O. Box 250170, Riyadh 11391-Saudi Arabia
Tel.: (+966-11) 206 00 88
www.daralriyadh.com
OUTGOING LIGHTING CABLE 4 CONDUCTORS
TO NEXT POLE
INCOMING LIGHTING
CABLE 4 CONDUCTORS
INCOMING LIGHTING
CABLE 4 CONDUCTORS
JV NAS
P.O. Box 4339, Riyadh 11491-Saudi Arabia
OUTGOING EARTHING CABLE 1 CONDUCTOR OUTGOING EARTHING CABLE 1 CONDUCTOR Tel.: (+966-11) 408 51 00
INCOMING EARTHING INCOMING EARTHING
CABLE 1 CONDUCTOR TO NEXT POLE CABLE 1 CONDUCTOR FROM LAST POLE TO THE EARTH ROD PIT Fax: (+966-11) 405 78 28
COPPER BOND EARTH ROD
3/4ø 3000mm (min) SHALL BE
AS PER APPROVED MATERIAL

PHASE - VI

PRIMARY INFRASTRUCTURE

BACHELOR HOUSING
LIGHTING POLE WIRING DIAGRAM
STREET LIGHTING SYSTEM - MISCELLANEOUS DETAILS

ARCH'L ICT
SAL OZ HW AKH MJR MH
JMC/WH SNS

1 : 500 DECEMBER 2021

NAS-6-PI11-SL030-1003-SD-01-01 0

You might also like