Project Name : 100MW PROJECT JAI- (GRIAN)

BIKANER, RAJASTHAN

Owner : M/s. GRIAN ENERGY PRIVATE LIMITED

Owner Consultant : M/S. TATA CONSULTING ENGINEERS LIMITED

EPC: M/s. JAKSON GREEN PRIVATE LIMITED

22111-CV-DWG-0294
Drawing/ Doc Title

Pull out & lateral Load pile marking layout


Drawing/ Doc No.

Rev No. 0

Date: 1/23/2023

Transmittal: TATA-TCE-WTRAN-002829

Sr. No. TCE/Client Comments_23-01-2023_R0 JGPL Reply / Compliance_23-01-2023

1 Please mention SOP Doc No Noted and updated. Load testing is as per IS 2911.4.Kindly refer revised document.
2 Please define failure criteria separately for each type of test Noted and updated. Please refer Cl.no. D (1).Kindly refer revised document.
3 Please revise as per code requirement. Noted.
Please refer Pile Testing Layout for varying depths considered for both cases.
For seven different depths (1.7m, 1.85m, 2m, 2.2m, 2.4m, 2.7m & 3m depths) both 0.15m & 1.35m
4 Kindly specify which pile has 1.35m & which pile has 0,15m? loading distance is considered.
As per discussion with Client, half pile nos. are being tested for 0.15m & other half for 1.35m.
Kindly refer revised document.

0.5MT is considered as per tracker manufacturer's recommendation.


5 0.5 MT can be considered for compression & uplift. For lateral load 0.2MT can be used
However, for lateral load 0.2 MT is updated in the revised document. Kindly refer revised document.
6 Criteria for breakage to be mentioned clearly Please refer Cl.no. D (1) for the same.
7 Pile testing to be done till final breakage load Noted and complied.
Please mentioned allowable deflection limit at pile cap level as per tracker requirement in all relevant Please refer note no.9 of Pile Testing layout for the same. As it is general criteria for every pile depth,
8
tables as well as in this drawing same is mentioned in the notes.
In absence of any basis for pile capacity calculation to finalize the depth of Piles , it is suggested to
9 Noted and same is mentioned in the note no.8 of Pile Testing Layout.Kindly refer revised document.
do pile test till breaking load
Kindly confirm if number of initial pile tests are meeting the numbers as specified in IS 2911 part-4
10 Pile testing nos. are provided as per Client agreement.
and no of routine tests are as per Cl.5.2.
Pile testing layout is prepared irrespective of interior & exterior piles as piles are tested for maximum
Please provide in dwg (plan) about consideration of external & internal piles. failure loads. Extreme case scenario is considered for pile testing. Hence, external & interior layout is
11 Please specify how is the internal & external piles are defined? not required.
On what basis is the depth of pile foundation decided? Also, pile depths are considered as per pre-analysis data provided by tracker manufacturer and is
discussed with Client too.
Kindly confirm which method is beings adopted for pullout & compression? Is it kentledge method or
12 Hydraulic Jack method for Cast-in situ piles is considered for testing.
anchor method
Pile shall be tested for failure loads & capacity of same shall be provided in the Pile Testing report by
13 Capacity calculation of test piles shall be provided
the Vendor.