You are on page 1of 1

QUALITY CONTROL REPORT (SUMMARY) PTD-09

Project Detail Engineers Information


Wayleave Number: Firm Name

Project Number: Professional Engineer Name Surname ECSA Reg no:

Road Name: Email

Section Description
Ch to CH 0 TO 270 Signature Cell number

Depending on extend of works use the report sheet per Street or specific section. All related lab test results must accompanied each summary report for east reference.
Actual Classification Results Testing frequency Acceptance Control Compaction Testing frequency
Layer information Engineers Specification One test per - 800m² with min of 2 per day One test per - 800m² with min of 2 per section of road

Depth Voids in BD Material MVD (Rice) Voids in BD Material MVD (Rice) MVD (Rice)
(mm) Layer Layer Description TRH 8 Material Type Description Binder (%) Mix (5) (kg/m3) (kg/m3) Binder (%) Mix (5) (kg/m3) (kg/m3) CHAINAGE (m) Core Thickness (kg/m3) Field Compaction (%)

RHS 36.92
50/70 4.8 2.336 2.453
LHS 28.44
(AC) CONTINIOUSLY
30 Surface ASPHLAT SURFACING MEDIUM 5 4.80% 2.336 2.453
GRADED

Actual Classification Results of Material used on site


(Min of one test per 1500m² or 2 per lot or Field Density (Minimum 4 of
Layer information Engineers Specification Section) tests per lot or section of road)
Depth Material Group Description before TRH 14 Classification (Indicate your Layer Thickness
(mm) Layer treatment TRH 14 Material Type Field Compaction Classification result of material tested on site) CHAINAGE (m) measured on site MOD (kg / m3) Field Compaction (%)

CH 200 CENTRE 150 87.7


You Must indicate what clasification the material complied of G1 or G2 …......and have CH 150 LHS 150 87.3
a relavent lab test result for it. CH 100 RHS 150 88.1
CH 50 CENTRE 150 2650 88.2
150 Base Graded Crushed Stone G2 86 - 88% OF APPARENT DENSITY

CH 30 RHS 150 97.3


You Must indicate what clasification the material complied of C4 or C3 …...and have a CH 70 CENTRE 150 101.9
relavent lab test result for it. CH 110 LHS 150 100.6
Stabilized CH 170 CENTRE 150 2150 102
150 Natural Gravels C4 95% - 97% MOD AASHTO DENSITY
Subbase

150 Selected Gravel Soil G6 93% - 95% MOD AASHTO DENSITY

NA Selected Gravel Soil G7 93% - 95% MOD AASHTO DENSITY


CH 30 RHS 150 93.5
CH 70 RHS 150 94.3
93,5 94,3 94,0 94,3 98,0
CH 110 LHS 150 94
CH 200 RHS 150 2175 98
CH 60 RHS 150 96.1
CH 100 LHS 150 95
96,0 95,0 95,0 92,1
CH 140 RHS 150 95
CH 180 CENTRE 150 2142 92.1
150 Pioneer Layer Modified Pioneer Layer G7 90% - 93% MOD AASHTO DENSITY