You are on page 1of 5

132/11kV UMMDAMAN SUBSTATION

ID TITLE Revision

Priority Documents
348,367 Fire pump room structural Rev 1
528 Security Room Plan, Elevation & Sections Rev 1
312,331,625 Main Building First Floor structural Rev 0
485 Manhole RC details Rev 0

353, 368 Boundary Wall RCC Details and structural design calculation Rev 0

530**, 531
Security Room" layout and details and structural design Rev 0
calculation
360 EOT Crane Girder and Details Rev 0
312,331,625 Main Building Second Floor Structural Rev 0
350 Roof Truss Details - IDT and ET Rev 0

FF BBS
Balance documents
EOT Crane Maintenance Access Platform & CAT Ladder – Details Design
349 Calculation Rev 1

540 Chain link fencing in Capacitor bank room Rev 0


623 132/11kV Substation Building Fire Scape Route Rev 0
633 132/11kV Substation Building Cable Floor Plan Rev 0
636 132/11kV Substation Building Raised Floor Plan Rev 0
202** Fire Water tank Layout & RC Details Rev 0
312 Main Building Second Floor - Beam layout & details Rev 0
312** Main Building Second Floor - Slab layout & details Rev 0
312** Main Building Second Floor Sectional details Rev 0
314 Main Building Roof- Beam layout & details Rev 0
314 Main Building Roof - Slab layout & details Rev 0
314 Main Building Roof Sectional details Rev 0
331** Main Building - Schedule of Beam and Slab at Second Floor Rev 0
333 Main Building - Schedule of Beam and Slab at Roof Rev 0
337 Structural Design Calculation for Roof Truss - IDT Rev 0
338 Structural Design Calculation for ET Roof Truss Rev 0
342** Septic Tank and Soakaway Plan and Section and RC details Rev 0
343 Structural Design calculation of Storm Water Pits & Collection pits Rev 0
343 Structural Design calculation of neutralization pits Rev 0
354 Structural Details of Storm Water Pits & Collection pits Rev 0
354 Structural Details of Neutralization Pits Rev 0
355 Structural Design Calculation of Septic Tank and Soakaway Rev 0
364 External Cage Ladder and Steel Staircase Details - Main building Rev 0
364 External Cage Ladder Details - Auxiliary buildings Rev 0
368 Structural Design Calculation for Boundary Wall Rev 0
393 Design Calculations for EOT Crane Girder Rev 0

393 Design Calculations for I beam and Hook at Main building offloading platform Rev 0

393 Design Calculations for I beam and Hook at Fire pump room Rev 0
397 General arrangement of I beam and Hook for Fire Pump Room Rev 0
484 Fire pipe trench GA and RC details Rev 0
535 General arrangement of I beam and Hook for offloading platform Rev 0
576 Structural Design Calculation For Manhole Rev 0
590** Structural Design Calculation for Fire Water tank Foundation Rev 0
591 Structural Design Calculation for Fire pipe trench Rev 0
625** Structural Design Calculation for Main Building - Second floor Rev 0
625 Structural Design Calculation for Main Building - Roof Rev 0

659 Domestic Water tank and booster pump foundation - Layout and RCC Detail Rev 0

660 Domestic Water tank and booster pump foundation - Design Calculation Rev 0
378 Drainage General Notes Rev 0
384 Drainage layout - Sections Rev 0

383 Drainage and water supply layout - Roof Plan Rev 0

671 Structural details Front Enclosure - IDT Rev 0


671 Structural details Front Enclosure -ET Rev 0
673 Structural Calculations Front Enclosure - IDT Rev 0
673 Structural Calculations Front Enclosure -ET Rev 0
Submitted to DEWA and awaiting CS
635 132/11kV Substation Building False Ceiling Plan Rev 1
322 Door Elevation & Schedule Rev 1
323 Window Elevation & Schedule Rev 1
302 IDT Compound - Trench arrangement & Foundation details Rev 1
661 ET Compound - Grating details Rev 1
299 Handrail Details Rev 0
356 Steel Gates Details - Main gate Rev 0
356 Steel Gates Details - Sliding gate Rev 0
382 Drainage and water supply layout - First Floor Plan Rev 0
487 Structural general notes Rev 0
11/2/2019
Revised
Initial CS received Submission Date Remarks
submisison from DEWA BY LEAD

16-Oct-19 to be updated as per Discussion with dewa on 28th Oct'19


27-Aug-19 To be updated as per DEWA discussion on 24th Oct'19
20-Oct-19 to be submitted urgently after receiveing CS from DEWA. Site works
incl holding tank

Most priority require


urgently within 2 days

5-Sep-19
not able to submit after HVAC
17-Oct-19 coordination

17-Oct-19 21-Oct-19
16-Jul-19 29-Oct-19
16-Jul-19 29-Oct-19
22-Sep-19 19-Oct-19
22-Sep-19 19-Oct-19
21-Oct-19
21-Oct-19
21-Oct-19
17-Oct-19
29-Oct-19
a on 28th Oct'19
24th Oct'19
CS from DEWA. Site works are on hold