ID TITLE Revision
Priority Documents
348,367 Fire pump room structural Rev 1
528 Security Room Plan, Elevation & Sections Rev 1
312,331,625 Main Building First Floor structural Rev 0
485 Manhole RC details Rev 0
353, 368 Boundary Wall RCC Details and structural design calculation Rev 0
530**, 531
Security Room" layout and details and structural design Rev 0
calculation
360 EOT Crane Girder and Details Rev 0
312,331,625 Main Building Second Floor Structural Rev 0
350 Roof Truss Details - IDT and ET Rev 0
FF BBS
Balance documents
EOT Crane Maintenance Access Platform & CAT Ladder – Details Design
349 Calculation Rev 1
393 Design Calculations for I beam and Hook at Main building offloading platform Rev 0
393 Design Calculations for I beam and Hook at Fire pump room Rev 0
397 General arrangement of I beam and Hook for Fire Pump Room Rev 0
484 Fire pipe trench GA and RC details Rev 0
535 General arrangement of I beam and Hook for offloading platform Rev 0
576 Structural Design Calculation For Manhole Rev 0
590** Structural Design Calculation for Fire Water tank Foundation Rev 0
591 Structural Design Calculation for Fire pipe trench Rev 0
625** Structural Design Calculation for Main Building - Second floor Rev 0
625 Structural Design Calculation for Main Building - Roof Rev 0
659 Domestic Water tank and booster pump foundation - Layout and RCC Detail Rev 0
660 Domestic Water tank and booster pump foundation - Design Calculation Rev 0
378 Drainage General Notes Rev 0
384 Drainage layout - Sections Rev 0
5-Sep-19
not able to submit after HVAC
17-Oct-19 coordination
17-Oct-19 21-Oct-19
16-Jul-19 29-Oct-19
16-Jul-19 29-Oct-19
22-Sep-19 19-Oct-19
22-Sep-19 19-Oct-19
21-Oct-19
21-Oct-19
21-Oct-19
17-Oct-19
29-Oct-19
a on 28th Oct'19
24th Oct'19
CS from DEWA. Site works are on hold