1.4 Whether HOLD Control log report has been prepared if applicable? G-ENGG-009.001-F X
Whether spares have been specified as per Project Spare requirement
1.5 X X
philosophy?
MR shall have S2 issue only if project demands.
Whether Requisition has been issued for client's comments (if
1.6 X X (Ensure all the checkpoints under S3 have been
applicable)? Whether client's comments have been incorporated?
addressed)
Aker Powergas Pvt Ltd Operating System Procedure Number G-INST-004.231-A-01 Control Object Check List for Displacement Type Level Transmitter Sheet 1 of 6
Group Head-Instruments
Control Object Check List Checklist approved for use by:
Aker Powergas Pvt Ltd
for Displacer Type Level Instrument Issued date: 15.03.2011
- Licensor documents X X
1.11 Whether "site conditions" document enclosed? X X
Aker Powergas Pvt Ltd Operating System Procedure Number G-INST-004.231-A-01 Control Object Check List for Displacement Type Level Transmitter Sheet 2 of 6
Group Head-Instruments
Control Object Check List Checklist approved for use by:
Aker Powergas Pvt Ltd
for Displacer Type Level Instrument Issued date: 15.03.2011
Whether the correct measurement range & unit based on IPDS / Vessel
2.16 X X
datasheet/Vessel drawing/Instrument Level sketches is specified.
Aker Powergas Pvt Ltd Operating System Procedure Number G-INST-004.231-A-01 Control Object Check List for Displacement Type Level Transmitter Sheet 3 of 6
Group Head-Instruments
Control Object Check List Checklist approved for use by:
Aker Powergas Pvt Ltd
for Displacer Type Level Instrument Issued date: 15.03.2011
Switch
Aker Powergas Pvt Ltd Operating System Procedure Number G-INST-004.231-A-01 Control Object Check List for Displacement Type Level Transmitter Sheet 4 of 6
Group Head-Instruments
Control Object Check List Checklist approved for use by:
Aker Powergas Pvt Ltd
for Displacer Type Level Instrument Issued date: 15.03.2011
Aker Powergas Pvt Ltd Operating System Procedure Number G-INST-004.231-A-01 Control Object Check List for Displacement Type Level Transmitter Sheet 5 of 6
Group Head-Instruments
Control Object Check List Checklist approved for use by:
Aker Powergas Pvt Ltd
for Displacer Type Level Instrument Issued date: 15.03.2011
3.6.1 Check Nozzle size, rating, with latest revision of Vessel Drawings. X X
3.6.3 Whether Center to Center distance checked with latest Vessel dwgs. X X
3.7 Mechanical
N.A.
3.8 Construction
N.A.
Summary notes, action points etc
Aker Powergas Pvt Ltd Operating System Procedure Number G-INST-004.231-A-01 Control Object Check List for Displacement Type Level Transmitter Sheet 6 of 6