Aker Powergas Pvt Ltd Operating System Procedure Number G-INST-004.285-A-01 Control Object Check List for Rupture Disc Sheet 1 of 5
Group Head-Instruments
Control Object Check List Checklist approved for use by:
Aker Powergas Pvt Ltd
for Rupture Disc Issued date: 15.03.2011
1.17 Whether all revision marks on revised document and index are in place. X X
a General Standards X
b Norms X
c Contractual Requirements X
d Licensor documents X
1.20 Whether Site conditions are enclosed. X
Aker Powergas Pvt Ltd Operating System Procedure Number G-INST-004.285-A-01 Control Object Check List for Rupture Disc Sheet 2 of 5
Group Head-Instruments
Control Object Check List Checklist approved for use by:
Aker Powergas Pvt Ltd
for Rupture Disc Issued date: 15.03.2011
2.6 Whether the requirement of Holder and it's material are mentioned. X X
Aker Powergas Pvt Ltd Operating System Procedure Number G-INST-004.285-A-01 Control Object Check List for Rupture Disc Sheet 3 of 5
Group Head-Instruments
Control Object Check List Checklist approved for use by:
Aker Powergas Pvt Ltd
for Rupture Disc Issued date: 15.03.2011
2.13 Whether the requirement of Jack screw, Studs & nuts is specified. X
3 Interface checks
3.1 Process
3.1.1 Whether latest revision of P&IDs and DCNs/CMS have been referred X X
Aker Powergas Pvt Ltd Operating System Procedure Number G-INST-004.285-A-01 Control Object Check List for Rupture Disc Sheet 4 of 5
Group Head-Instruments
Control Object Check List Checklist approved for use by:
Aker Powergas Pvt Ltd
for Rupture Disc Issued date: 15.03.2011
N.A.
3.4 Electrical
N.A.
3.5 Civil
N.A.
3.6 Vessels
N.A.
3.7 Mechanical
N.A.
3.8 Construction
N.A.
Aker Powergas Pvt Ltd Operating System Procedure Number G-INST-004.285-A-01 Control Object Check List for Rupture Disc Sheet 5 of 5