COOKING OIL REPACKAGING FACTORY

ADDRESS: LOT 41 & 42, SENDAYAN NEGERI SEMBILAN


ESTIMATED MACHINERY TEST & RUN DATE: 17.5.2023

No. Description of works; Qty


Lot 42

1 Filling room
i. To supply, build, touch-up, and painting drywall. Material: Gypsum board, 1
Front Base comeswith one layer red brick. Side Base comeswith 4 layers red
brick.
(Refer as per drawing no. 1)

2 Plumbing works
i. To check overall water supply connection working properly. 1
3 Painting whole unit with 1 layer undercoat & 2 layer finishing coat) 1
4 Cleaning/dismantle/demolish works. 1
5 Concrete Patching work 1

6 Floor reinforcement works


To hack the existing cement screeding., reconcrete with concrete Grade 25 and 1
reinforced with BRC A7.Quantity is provisional and subjected to remeasurement
of actual work done. Detailed works scope are as follows;
To hack the existing cement screeding.
To lay 1 layer BRC A7 including lapping
To reconcrete with concrete with Grade 25 and trowel to smooth
To cart away all debris, and left over material off the premise
Total Amount (RM)

No. Description of works; Qty


Lot 41

1 Plumbing works
i. To check overall water supply connection working properly. 1

Total Amount (RM)

Total Amount (A+B):


Discount:
Overall Total Amount to be paid:
Unit Unit Price Total Price
RM RM

Unit

Lot
Lot
Lot
Lot

Lot

Unit

Lot

otal Amount (A+B):


Discount:
Amount to be paid: