WISH LIST

CTR 88 KAJI Compressor Station Flar e System


Improvement
No Discipline Topic Detail Wish List Clarification
1 Process Fluid data Kaji and Kaji satelite fluid (insitu wells and
incoming) composition data

2 Process Operating data Kaji and Kaji satellite operating log data

3 Process Operating data Kaji and Kaji satellite production forecast

4 Process Equipment data Flare system (flare header, flare KOD, flare
stack, flare tip) data

5 Process Equipment data PSV (test certificate) data

6 Process Equipment data Control Valve data

7 Process Equipment data Restriction Orifice Data

8 Process Existing Document Native file (CAD) of latest/ as-built PFD,


P&ID, SAFE Chart.

9 Process Environmental data for Wind speed, humidity, prevailing wind,


Safety Kaji Compressor ambient temperature, solar radiation
station area

10 Process Existing flare stack Stack Diameter, height


Safety specification/datasheet

11 Process Existing Safety Existing Safety Philosophy/ Design Basis,


Safety Document Flare Radiation study, Flare area layout (if
any)

12 Instrument Instrument Company Standard Specification of


Specification Instrument Design and Installation

13 Instrument Existing Datasheet Existing Instrument Datasheet installed at


Flare System (including instrument list)
14 Instrument Operating Narrative Existing control & safety narrative for Kaji
Compressor Station

15 Instrument ICS Existing Drawing 1. Existing drawing for Control and Safety
System Architecture Diagram (note: we
need the baseline of architecture diagram
and update it to the CTR 88 Kaji
Compressor Station Flare System
Improvement).
2. Exisiting instrument location plan layout
drawing (note: we need to update it to CTR
88 if there is any additional item of
instrument devices).
3. Existing tubing or cable tray routing layout
(note: this existing drawing will become
baseline to update tubing/tray route at CTR
88 Kaji Compressor Station Flare System
Improvement).
4. Existing wiring and termination diagram.

16 Instrument Control Architecture Drawing schematic indicating overall control


& safety system of Kaji Station.

17 Piping Drawing Data - Native (Autocad) Plot Plan Existing Butuh Native File (Autocad)
- Native (Autocad) Piping Plan Existing untuk mempercepat
- MES Update/ Terbaru pekerjaan, jika dari PDF
- K.O. Drum GA Drawing maka harus redraw dengan
( Jika menggunakan K.O. Drum Existing ) durasi waktu yang agak
lama.

18 Civil Calculation Data - Topography & Soil Data

19 Electrical Drawing Data - Existing single line diagram


- Existing lighting layout
- Existing grounding layout
- Existing cable tray and cable layout

20 Mechanical Project atau - Specification Pressure Vessel Spec


coorporate standrd - Specification Painting
specification - Specification Flare Package
- Specification API Pump, baik type API
610 dan atau maupun API 674/5
- Specification non-API Pump (ASME)
untuk pit sum pump
21 Mechanical Datasheet peralatan • Data Sheet Flare Package Existing, PDF
existing & Native File (ms office; excel /word)
• Data Sheet KO Drum Pump – Existing,
PDF & Native File (ms office; excel /word)
• Data Sheet KO Drum – Existing, PDF &
Native File (ms office; excel /word)

22 Mechanical Drawing data • GA Drawing Vendor Data KO Drum –


Existing (PDF)
• GA Darwing Sump Pit Existing
• GA Darwing Vendor Data KO Drum
Pump
• GA Drawing Vendor Data Pit Sump
Pump

23 Mechanical Project standard • Pressure Vessel Standard Drawings


Drawings

24 Mechanical Others • Approved Manufacturere List (AML)

Contact Person Medco Team (PIC)

PIC Nama Alamat Email No. HP (WA)


Process Engineer
Process Safety Engineer
Piping
Mechanical Arief Budiman
Instrument
Electrical
Civil
Dokon
Project Control