You are on page 1of 6

Sharad Institute Of Technology Polytechnic

Shri Shamrao Patil (Yadravkar) Educational & Charitable Trust’s

Sharad Institute Of Technology Polytechnic,


Yadrav

DEPARTMENT OF COMPUTER
ENGINEERING

MICRO PROJECT DAIRY


IN

FOR

Emerging Trends in Information Technology[22618]

T.Y – 2022-23
Sharad Institute Of Technology Polytechnic

ShriShamraoPatil (Yadravkar) Educational &Charitable Trust’s

SHARAD INSTITUTE OFTECHNOLOGY,


POLYTECHNIC, YADRAV.

CERTIFICATE
This is to certify that,

Name of the candidate Roll No


1) Hurejiya Razzaq Mulla. 34015
2) Revati Sudhir Nirmale. 34017
3) Priyanka Navanath Kamble 34008

Date:- 20-4-2023

Place:-yadrav.

Ms.V.S.Kole Mr.R.M.Patil
(project guide) (HOD)
Sharad Institute Of Technology Polytechnic

Project Diary

Name of Student :- ROLL NO.:-


1) Revati Sudhir Nirmale 34017
2) Priyanka Navanath Kamble 34008

3) Hurejiya Razzaq Mulla. 34015

SR.NO Date Work done Hours Students Guide sign

sign

1 6-2-2023 At first we 30 min


made the

group of 3
members.

2 8-2-2023 Searched 1 hour


Project

Subject.

3 10-8-2023 We took
suggestions

from our
guide for

selecting our
project

4 After 1 hour
selection of

project topic
12-2-2023
Sharad Institute Of Technology Polytechnic

wise

searched the
basic

information
related to

5 Then the 1 hour


collection of
14-2-2023 30 min
information
was done

6 14-2-2023 Later we 1 hour


visited to our

guide for
suggesting us

some more
information

on topic and
some

corrections in
collected

information.

7 16-2-2023 If there was 1 hour


some

corrections
then it was

corrected.

8 18-2-2023 After 30 min


correcting it,
we

again visited
Sharad Institute Of Technology Polytechnic

our guide

to show the

corrections.

9 20-2-2023 Then we 1 hour


started

searching
some more

information
on the

topic (for
gaining some

more
knowledge).

10 22-2-2023 We had a 30 min


visit to our

guide after
searching

some
information.

11 24-2-2023 Some 40 min


suggestions

were guided
and we

tried to make
it correct

as per the
guide.

requirement.

12 26-2-2023 After making 45 min


Sharad Institute Of Technology Polytechnic

some

changes we
again had

a visit to our
guide.

13 28-2-2023 Then by that 40 min


time, we

made the
project

report.

14 14-4-23-3- We had 1 hour


2023 visited to our

guide to
present our

project.

15 20-4-2023 Then we 1 hour


finally

submitted our
project

and project
report till

this date.