You are on page 1of 1

KTU 

Library
04 Production

3. FORM ISO  7. QOSHE 
1. KTU 1367‐ 4. HARBOUR 
2. BARGE PPC  5. KPI 6. MEETING MANAGEMENT 
1368 TUG 33 M
DEPARTMENT SYSTEM

MPV CARGO  COMMISSIONING  CNC 


COMMISSIONING 1. KTU‐1410 PUNCH LIST MP Loading HAIAROIR
GEARLESS STATUS WORKSHOP

Elictrical Panel Line 
Gaerless MPV‐ Goal  Weekly 
2. KTU‐1411 Welding 
DWG Comment Achievement Presentation
Parameter

Hull
HVAC [Viking  Risk & 
3. KTU‐1482 2021 KPI PER MONTH 2021 2022
Airtech] Opportunity

Piping KTU‐1367  2022 MOM 2022 MOM 2023


Work 
Production Sch  4. KTU‐1483
Instruction
Ready to Print

Mech 5. KTU‐1507

Piping FOTO

Production  KTU‐TJR 
Schedule ‐ 1368 Presentation

Schedule

You might also like