Installation of Potable Drinking Water Line System with Cooling-and-Heating Dispenser in

Different Areas in Technological University of the Philippines-Visayas


Work Breakdown Structure (WBS)
I. Site Evaluation
a. Investigation of campus geography/landscape
b. determination of possible locations for tank, pumps, water lines and dispensers
II. Designing of the Water Line System
a. Design and Drawings
III. Identifying Suppliers
a. Canvassing of Items
IV. Procurement
a. Pipings, elbows, and fittings,
i. Delivery and Inspection
b. Dispensers, centrifugal pump, and water tank
V. Installation
a. Tank and pump installations
b. Pipe, elbow, fittings, and dispenser installations
VI. Testing and Modifications
a. Pressure/head testing and leakage detection
b. Water quality assessment (Temperature, pH, Turbidity, TDS, Coliform, etc.)
VII. Operation Procedures
a. Pump priming and Dispenser start-up
VIII. Maintenance Procedures
a. Monthly preventive maintenance
i. Water analysis
ii. Pump, tank, and piping maintenance