Professional Documents
Culture Documents
1
Contents
Damaging components of RCC
building.
2
Why damage occures?
Lack of Lack of Strength
Lack of Ductility
Design Deficiency
–Strength Improper Design
(Failure to understand failure mechanism)
–Ductility Improper Planning & Calculation
How to identify
– l8hfOgdf ck"0f{tf
– lgdf{0fdf ck"0f{tf Lack of Proper Detailing
Lack of Quality Assurance
3
;dfg gfksf] j:t' sf] Ifdtf km/s x'g ;S5
b'a} tTj ;dfg gfksf eP klg dha"tL tyf s7f]/tf eg] leGg 5g\
Different Stiffness – Different Strength
Square Section Column – Good Stiffness- Increasing Strength
4
nrstf (Ductility)
nrstfM j:t'sf] Ps u'0f, h; cg';f/ h'g 7]Ug ;Sg]
eGbf jl9 zlQm nufPdf ef+lrg cufl8 tlGsG5 Mh:t}
kmnfd
vDaf / blngsf] hf]gL{ dha"t x'g g;Sbf cfsl:ds ?kdf hf]gL{ eTs]sf]
•Strengthening Beam- Column joint
6
blng / vDafsf] ck"0f{ hf]gL{
sf/0f c;/
Deficient detailing of reinforcing bars at beam-column joint
7
808Lsf] a+UofO (Bar buckling)
8
58 a+fluPsf] sf/0f Iflt M u'0f:t/ <
Inappropriate
10 lapping position & large spacing of lateral ties
xfd|f] cg'ej s] 5 <
11
k/tbf/ eTsfO (Pancake Damage)
12
l/+ux? aLrsf] b"/L
14
808Lsf] lg/Gt/tf vf]O <
15
vDafsf] sdhf]/ c+s'z
16
l/+ux?aLr b"/Lsf] l;kmfl/;
Two legged lateral ties - spaced at a
distance of 4 inch c/c – at least from 2
feet up and down of beam-column
joint in a column.
17
k|rng M vK6\ofO / l/+ux?
Lapping – at one level – Not correct
18
vDafdf 808L vK6\ofpg] tl/sf
Ps 7fp+df %) k|ltzt
eGbf sd 808L dfq
vK6\ofpg]
prfOsf] aLrlt/
kfg]{
19
l/+usf] agf]6
!#%)
tie beam
21
blngdf s}r
+ L k|efj (Shear failure of beam)
NSET/PK
24
Column width – at least 20 times the diameter
of largest beam bar.
ljd/sf]nd hf]gL{sf] l86]lnª
ljd lkn/sf]
hf]gL{df 808L
/fVg] tl/sf
26
blng / vDafsf] hf]gL{
Column
Beam
vDafdf
27
blngsf] 808Lsf] c+s'z
blng / vDafsf] leqL hf]gL{
1'-0"
1 1/2"
1'-0"
9"
9"
1 1/2"
BEAM
COLUMN
29
ljdsf] l/Ë uf‘:g] tl/sf
30
sf]dn tNnf
31
9nfg k|md
] df sf]dn tNnfsf] k|efj
32
sf]dn tNnfsf] Iflt
drift drift
Brick infill
Weak
columns
34
5f]6f] vDaf k|efj
35
5f]6f] vDaf k|efj
36
zLtn hf]gL{ (Cold Joint)
37
zLtn hf]gL{
38
s}r
+ L uf+7f]
To provide the shear key a
piece of wood is placed on the
top of the column immediately
after column casting is
completed. Then it is removed
after one day.
40
uf/f]df lnG6n / l;n Aof08sf] k|of]u
41
el/Psf] uf/f]df nufpg] k6\6Lx?
1'-1"
3"6"1'-1"
A
B B
A
9"
4'-6"
3"
A
3"
SECTION AT A-A
2'-9"
A
ELEVATION OF WALL
9"
1'-0"
42
uf/f]sf] ufF;
43
uf/f]sf] ufF;
44
sf}zL uf/f]sf] ufF;
9"
4'-0"
3'-0"
9"
C C
3"
5"
1'-0"
9"
45
cGo ljifox?
s';L{ blngsf] cefj (Plinth tie beam)
47
sf7 xf] ls 9nfg <(Wrong Construction Practice)
48
lgdf{0fsf] unt tl/sf
49
xfd|f] cg'ej s] xf] <
Casting beam and slab separately
doesn’t make the structure
monolithic and hence beam and
slab acts as separate units during
earthquake shaking which is
undesirable
50
s+lqm6sf] u'0f:t/
51
Ifltu|:t e¥ofË
52
e¥ofËdf 808L /fVg] tl/sf
53
hudf blng
husf] txdf vDafx?nfO{
blngn] hf]8\bf M
54
hudf 6fOljd
55
;f+w hf]l8Psf] lkn/df hu /fVg] tl/sf
56
s';L{ uf/f] / s';L{ blng
;a} s';L{ blngx? s';L{ uf/f]dfly
kg]{ u/L lgdf{0f ug'{k5{
s';L{ uf/f]sf] hldg d'lgsf] ulx/fO{
$%) ld=ld= jf !=% lkm6 jf
cfjZostf cg';f/
s';L{sf] prfO – $%) ld=ld= jf
!=% lkm6 jf cfjZostf cg';f/
57
;'wf/sf] cfjZostf
– hudf blng
– u'0f:t/ lgoGq0f
58