You are on page 1of 1

220 KV Bus Bar-I

1.Equipment information
Controling C.B D1Q1,D2Q1,D3Q1,D4Q1
Capacity 2000A PTW NO Dated 11/1/2022

2.Differential Relay Testing


Make Siemens Type 7SG1102

2.1 Differential Test:

Mode Setting(I) Observed Time Time Remarks


amp. (SETTING ) (Observed )
R-N 0.7 0.69 0 msec 35 msec
Y-N 0.7 0.7 0 msec 34 msec
B-N 0.7 0.71 0 msec 35 msec
Rmarks
3.Bus Wire Ct Supervision Testing:
Make Siemens Type 7SG1102

3.1 Differential Test:


Mode Setting(I) Observed Time Time Remarks
amp. (SETTING ) (Observed )
R-N 0.02 0.02 5 sec 5.01 sec
Y-N 0.02 0.021 5 sec 5.0 sec
B-N 0.02 0.021 5 sec 5.01 sec

3.2 Misc. Checks


VAJ: OK Indication OK CB Trip OK
Rmarks

Test Inspector Assitant Manager (P&I) Assitant Manager (P&I)


220 KV Grid Station Okara 220 KV Grid Station Okara 500 KV Grid Station Yousafwala

Deputy Manager Executive Engineer (P&I)


220 KV Grid Station Okara 500 KV Grid Station Yousafwala