You are on page 1of 1

Suez Canal Authority

Dredging Department
Mashhour Dredger
checks for booster pump motor new shaft:
1. The manufacturing material (harder or softer) compared with the old to avoid damage when fitting
couplings
2. New material behavior against seawater and other corrosive materials
3. The new shaft check for deflection
4. Shaft inspection for cracks
5. Twist torque for the new shaft
6. The dynamic balance analysis of the roto with new shaft
7. Inspection for bars damage after shaft installing in the rotor
8. The electrical insulation of the rotor bars and the iron laminations after shaft installation
9. The main shaft dimensions compared with the old shaft
10. The tail shaft dimensions according to drawing
11. The opening for tachometer coupling