Component Level Item Name Quantity Needed Unit Cost/ Unit Total Cost Description
0 Solar Powered Grass Cutter 1 pcs - Rp4.438.000,00 Make
1 Solar Power 1 pcs - Rp3.378.000,00 Make
2 Solar Panel 1 pcs Rp2.000.000,00 Rp2.000.000,00 Buy
2 Battery 1 pcs Rp1.378.000,00 Rp1.378.000,00 Buy
1 Handle 1 pcs - Rp80.000,00 Make
2 Rubber 1 pcs Rp60.000,00 Rp60.000,00 Buy
2 Handle Tube 1 pcs Rp20.000,00 Rp20.000,00 Buy
1 Machine 1 pcs - Rp320.000,00 Make
2 Wire 1 m^2 Rp20.000,00 Rp20.000,00 Buy
2 Mechanical Components 1 pcs Rp300.000,00 Rp300.000,00 Buy
1 Body 1 pcs - Rp660.000,00 Make
2 Wheels 4 pcs Rp65.000,00 Rp260.000,00 Buy
2 Switch Button 1 pcs Rp50.000,00 Rp50.000,00 Buy
2 Mulching Blade 1 pcs Rp100.000,00 Rp100.000,00 Buy
2 Body Cover 1 pcs Rp250.000,00 Rp250.000,00 Buy