Professional Documents
Culture Documents
Site is located at Barangay San Vicente, Municipality of Lilo-an, Province of Cebu. About 6.5 kilometers
from Poblacion Proper. Site is covered with native grass with trees along its vicinity. Visual Appearance of the
soil is Weathered Limestone or Anapog. Area of project site is
Site is 60% in critical slope with 50% to 80 % slope percentage (See attached Topographic survey)
MOSQUEDA SURVEYING OFFICE
Geodetic Surveying & Engineering Services
Cebu Main office: Hillsview Village, Tisa, Cebu City
Tel. No. (032) 262-0038
Email @ mosquedasurveying_main@yahoo.com / mosqueda.surveying1985@gmail.com
Follow us on Facebook Fan Page @moskesurvey
Lilo-an Office: Poblacion Lilo-an, Cebu (Near Lilo-an, Municipal Hall)
Balamban Office: Brgy. Cambuhawe, Balamban, Cebu
Reduce the critical slope by Cut & Fill to 30% maximum slope percentage. A total Cut Volume of
427 907.58 cu m. and fill volume of 608 385 .00 cu m.
Original Ground
Surface
Finish Ground
Surface
Note: This Analysis does not include slope stability test and not a basis for safe surface certification
Milagros C. Mosqueda
Geodetic Engineer
Lic. Number: 3460
Date Reg.: February 6, 1985