You are on page 1of 30

SIARAN KHAS

Special Release 2
SABAH & SARAWAK

(UNTUK KERJA-KERJA PEMBINAAN BANGUNAN


DAN STRUKTUR)
(For Building and Structural Works)
(Julai 2017=100)

SEPTEMBER
SEPTEMBER 2019

Pemakluman/Announcement:

Dimaklumkan bahawa Kerajaan Malaysia telah mengisytiharkan Hari Statistik Negara


(MyStats Day) pada 20 Oktober setiap tahun. Tema sambutan MyStats Day adalah
“Data Berkualiti, Kehidupan Sejahtera”.

Please be informed that the Government of Malaysia has declared National Statistics
Day on October 20 each year. MyStats Day theme is “Better Data, Better lives”.

JABATAN PERANGKAAN MALAYSIA


DEPARTMENT OF STATISTICS, MALAYSIA

Tarikh:
Date: 10 October
Oktober
2019
Diterbitkan dan dicetak oleh/Published and printed by:

Jabatan Perangkaan Malaysia


Blok C6, Kompleks C,
Pusat Pentadbiran Kerajaan Persekutuan,
62514 Putrajaya,
Malaysia.

Tel. : 03-8885 7000


Faks/ Fax : 03-8888 9248
Portal : http://www.dosm.gov.my
Facebook : www.facebook.com/StatsMalaysia
Twitter : https://twitter.com/StatsMalaysia

Harga/ Price: RM5.00

Hakcipta terpelihara.

Tiada bahagian daripada terbitan ini boleh diterbitkan semula, disimpan untuk pengeluaran atau ditukar
dalam apa-apa bentuk atau alat apa jua pun kecuali setelah mendapat kebenaran daripada Jabatan
Perangkaan Malaysia.

Pengguna yang mengeluarkan sebarang maklumat dari terbitan ini sama ada yang asal atau diolah
semula hendaklah meletakkan kenyataan: “Sumber: Jabatan Perangkaan Malaysia”.

All rights reserved.

No part of this publication may reproduced or distributed in any form or by any means or stored in
database without the prior written permission from Department of Statistics, Malaysia.

Users reproducing content of this publication with or without adaption should quote the following:
“Source: Department of Statistics, Malaysia.”

ISSN: 1985-4293
KANDUNGAN
CONTENTS

Muka surat
Page

Ringkasan penemuan ii
Summary of findings

Jadual 1A : Indeks kos bahan binaan bangunan (Julai 2017=100) mengikut kategori 1
bangunan dan kawasan (tanpa bar keluli)
Table 1A : Buildings materials cost index (July 2017=100) by category of building and
region (without steel bars)

Jadual 1B : Indeks kos bahan binaan bangunan (Julai 2017=100) mengikut kategori 5
bangunan dan kawasan (termasuk bar keluli)
Table 1B : Buildings materials cost index (July 2017=100) by category of building and
region (with steel bars)

Jadual 2 : Indeks harga seunit bagi: 9


Table 2 : Unit price index for:
- Batu bata & dinding/Bricks & wall
- Kaca/Glass
- Batu baur/Aggregates
- Bahan siling/Ceiling materials
- Bahan bumbung/Roofing materials
- Cat/Paints
- Pasir/Sand
- Bahan kerja paip/Plumbing materials
- Jubin lantai & dinding/Floor & wall tiles
- Lengkapan kebersihan/Sanitary fittings
- Keratan keluli & logam/Steel & metal sections
- Kayu/Timber
- Papan lapis/Plywood
- Konkrit sedia bancuh/Ready mix concrete
- Barang besi/Ironmongeries

Lampiran A Jadual faktor pelarasan (Indeks tanpa bar keluli) 14


Appendix A Adjustment factor table (Index without steel bars)

Lampiran B Jadual faktor pelarasan (Indeks termasuk bar keluli) 15


Appendix B Adjustment factor table (Index with steel bars)

Lampiran C Contoh mengira indeks lama IKB (Julai 2012=100) dengan 16


menggunakan indeks baru IKB (Julai 2017=100)
Appendix C Example for calculating the old BCI (July 2012=100) using the
new index BCI (July 2017=100)

Nota teknikal 17
Technical notes

Sasaran Tarikh Pengumuman Siaran Khas 2 (Untuk Kerja-kerja Pembinaan Bangunan 19


dan Struktur), Sabah & Sarawak, 2019
Scheduled of Release Dates for Special Release 2 (For Building and Structural Works),
Sabah & Sarawak, 2019

i
RINGKASAN PENEMUAN
SUMMARY OF FINDINGS
RINGKASAN PENEMUAN

INDEKS KOS BAHAN BINAAN BANGUNAN (JULAI 2017=100)


SEPTEMBER 2019

Sabah

Indeks Kos Bahan Binaan Bangunan (IKB) (tanpa bar keluli & termasuk bar keluli) bagi
hampir semua kategori bangunan di Kota Kinabalu menurun antara 0.1 dan 0.3 peratus
pada September 2019 berbanding bulan sebelumnya. Manakala, IKB (tanpa bar keluli
& termasuk bar keluli) di Sandakan dan Tawau kekal tidak berubah kecuali IKB (tanpa bar
keluli) bagi Bangunan (K.T.) satu tingkat di Sandakan yang meningkat 0.1 peratus.
(Jadual 1A & 1B)

Indeks harga seunit bahan binaan yang menyumbang kepada perubahan IKB di Sabah
adalah Simen di Kota Kinabalu (-1.0 mata); Besi di Kota Kinabalu (0.2 mata); Keratan keluli
dan logam di Kota Kinabalu (-0.1 mata) dan Jubin lantai dan dinding di Sandakan
(0.7 mata). (Jadual 2)

Sarawak

Indeks Kos Bahan Binaan Bangunan (IKB) (termasuk bar keluli) bagi hampir semua kategori
bangunan di Sibu menurun antara 0.1 dan 0.8 peratus pada September 2019. Namun, IKB
(tanpa bar keluli & termasuk bar keluli) di Kuching dan Miri kekal seperti bulan sebelumnya.
(Jadual 1A & 1B)

Indeks harga seunit bahan binaan yang menunjukkan perubahan di Sarawak ialah Besi di
Sibu (-1.8 mata). (Jadual 2)

ii
SUMMARY OF FINDINGS

BUILDING MATERIAL COST INDEX (JULY 2017=100)


SEPTEMBER 2019

Sabah

The Building Material Cost Index (BCI) (without steel bars & with steel bars) for almost all
categories of building in Kota Kinabalu decreased between 0.1 and 0.3 per cent in
September 2019 as compared to the previous month. However, the BCI (without steel bars
& with steel bars) in Sandakan and Tawau remained unchanged except for BCI (without
steel bars) for Single storey (R.C.) building in Sandakan increased by 0.1 per cent.
(Table 1A & 1B)

The unit price indices of building materials that contributed to the BCI changes in Sabah
were Cement in Kota Kinabalu (-1.0 points); Steel in Kota Kinabalu (0.2 points); Steel and
metal sections in Kota Kinabalu (-0.1 points) and Floor and wall tiles in Sandakan
(0.7 points). (Table 2)

Sarawak

The Building Material Cost Index (BCI) (with steel bars) for almost all categories of building
in Sibu decreased between 0.1 and 0.8 per cent in September 2019. However, BCI (without
steel bars & with steel bars) in Kuching and Miri remained unchanged as in the previous
month. (Table 1A & 1B)

The unit price indices of building materials that showed changes in Sarawak were Steel in
Sibu (-1.8 points). (Table 2)

iii
INDEKS KOS BAHAN BINAAN BANGUNAN
(JULAI 2017=100)
SABAH DAN SARAWAK

BUILDING MATERIALS COST INDEX


(JULY 2017=100)
SABAH AND SARAWAK

(INDEKS TANPA BAR KELULI)


(INDEX WITHOUT STEEL BARS)
Jadual 1A: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan (tanpa bar keluli)
Table 1A: Building materials cost index by category of building and region (without steel bars)

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Kategori bangunan Tempoh
Sabah Sarawak
Category of building Period
G H I J K L

(1) Bangunan (K.T.) 2018 Dis 101.6 98.1 99.4 101.8 98.0 98.1
Satu Tingkat 2019 Jan 101.6 98.5 99.5 101.7 98.1 98.2
Single - Storey (R.C.) Feb 101.7 98.6 99.5 102.0 98.1 98.2
Building Mac 102.0 98.7 99.7 102.3 98.1 98.2
Apr 102.4 99.2 99.9 102.4 98.1 98.5
Mei 102.5 99.3 100.3 103.0 98.1 98.5
Jun 102.8 99.5 100.5 102.8 98.1 98.3
Jul 103.0 99.5 100.6 102.6 98.2 98.3
Ogo 103.0 99.7 100.6 102.6 98.2 98.3
Sep 102.8 99.8 100.6 102.6 98.2 98.3
Okt
Nov
Dis

(2) Bangunan (K.T.) 2018 Dis 101.5 98.0 99.4 101.1 97.9 97.8
2−4 Tingkat 2019 Jan 101.5 98.4 99.5 101.1 97.9 97.8
(Berbumbung Rata) Feb 101.7 98.5 99.5 101.2 97.9 97.8
2−4 Storey (R.C.) Mac 102.1 98.6 99.7 101.5 97.9 97.8
Building (Flat Roof) Apr 102.5 99.0 100.0 101.6 97.9 98.2
Mei 102.6 99.2 100.4 102.2 97.9 98.2
Jun 102.8 99.3 100.6 102.0 97.9 97.9
Jul 103.0 99.4 100.7 102.0 98.1 97.9
Ogo 103.0 99.5 100.7 102.0 98.2 97.9
Sep 102.7 99.5 100.7 102.0 98.2 97.9
Okt
Nov
Dis

(3) Bangunan (K.T.) 2018 Dis 101.3 97.9 99.2 101.5 97.9 97.9
2−4 Tingkat 2019 Jan 101.3 98.3 99.3 101.4 98.0 97.9
(Berbumbung Curam) Feb 101.5 98.4 99.3 101.7 98.0 97.9
2−4 Storey (R.C.) Mac 101.8 98.5 99.6 101.9 98.0 97.9
Building (Pitched Roof) Apr 102.2 99.0 99.9 102.1 98.0 98.2
Mei 102.4 99.2 100.3 102.7 98.0 98.2
Jun 102.6 99.4 100.6 102.5 98.0 98.0
Jul 102.9 99.5 100.6 102.4 98.2 98.0
Ogo 102.9 99.6 100.6 102.4 98.2 98.0
Sep 102.6 99.6 100.6 102.4 98.2 98.0
Okt
Nov
Dis

Nota/Note:
(1) K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
(2) Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100) /
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year

* Lihat nota kaki di hujung Jadual 1A/See footnotes at end of Table 1A

1
Jadual 1A: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan (tanpa bar keluli)(samb.)
Table 1A: Building materials cost index by category of building and region (without steel bars)(cont'd)

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Kategori bangunan Tempoh
Sabah Sarawak
Category of building Period
G H I J K L

(4) Bangunan (K.T.) 2018 Dis 101.5 97.9 99.0 101.5 97.9 97.9
5 Tingkat dan Lebih 2019 Jan 101.5 98.3 99.1 101.4 98.0 97.9
(Untuk Penginapan) Feb 101.8 98.4 99.1 101.7 98.0 97.9
5 Storey and Above Mac 102.0 98.5 99.3 101.9 98.0 97.9
(R.C.) Building Apr 102.4 99.0 99.6 102.1 98.0 98.2
(For Accommodation) Mei 102.5 99.1 99.9 102.7 98.0 98.2
Jun 102.7 99.2 100.1 102.5 98.0 98.0
Jul 102.9 99.3 100.2 102.4 98.2 98.0
Ogo 102.9 99.4 100.2 102.4 98.2 98.0
Sep 102.6 99.4 100.2 102.4 98.2 98.0
Okt
Nov
Dis

(5) Bangunan (K.T.) 2018 Dis 101.9 97.7 99.0 101.5 97.9 97.9
5 Tingkat dan Lebih 2019 Jan 101.9 98.1 99.1 101.4 98.0 97.9
(Untuk Pejabat) Feb 102.0 98.1 99.1 101.7 98.0 97.9
5 Storey and Above Mac 102.2 98.2 99.3 101.9 98.0 97.9
(R.C.) Building Apr 102.5 98.5 99.4 102.1 98.0 98.2
(For Office) Mei 102.5 98.6 99.7 102.7 98.0 98.2
Jun 102.7 98.7 99.8 102.5 98.0 98.0
Jul 102.9 98.8 99.9 102.4 98.2 98.0
Ogo 102.9 98.9 99.9 102.4 98.2 98.0
Sep 102.6 98.9 99.9 102.4 98.2 98.0
Okt
Nov
Dis

(6) Bangunan Kayu 2018 Dis 99.3 98.0 98.6 101.0 99.1 99.3
Timber Building 2019 Jan 99.3 98.1 98.6 100.9 99.1 99.3
Feb 99.5 98.2 98.8 101.1 99.1 99.3
Mac 100.0 98.7 99.3 101.3 99.1 99.3
Apr 101.0 99.8 100.3 101.4 99.1 99.5
Mei 101.4 100.2 100.9 101.7 99.1 99.5
Jun 101.9 100.7 101.3 101.6 99.1 99.5
Jul 102.2 100.9 101.5 101.6 99.2 99.5
Ogo 102.2 101.1 101.5 101.6 99.2 99.5
Sep 102.2 101.1 101.5 101.6 99.2 99.5
Okt
Nov
Dis

Nota/Note:
(1) K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
(2) Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100) /
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year

* Lihat nota kaki di hujung Jadual 1A/See footnotes at end of Table 1A

2
Jadual 1A: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan (tanpa bar keluli)(samb.)
Table 1A: Building materials cost index by category of building and region (without steel bars)(cont'd)

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Kategori bangunan Tempoh
Sabah Sarawak
Category of building Period
G H I J K L
(7) Cerucuk Kayu 2018 Dis 97.5 97.5 97.5 n.a. n.a. n.a.
Timber Piling 2019 Jan 97.5 97.5 97.5 n.a. n.a. n.a.
Feb 97.8 97.8 97.8 n.a. n.a. n.a.
Mac 98.5 98.5 98.5 n.a. n.a. n.a.
Apr 100.2 100.2 100.2 n.a. n.a. n.a.
Mei 100.9 100.9 100.9 n.a. n.a. n.a.
Jun 101.6 101.6 101.6 n.a. n.a. n.a.
Jul 102.0 102.0 102.0 n.a. n.a. n.a.
Ogo 102.0 102.0 102.0 n.a. n.a. n.a.
Sep 102.0 102.0 102.0 n.a. n.a. n.a.
Okt
Nov
Dis

(8) Cerucuk K.T. 2018 Dis 103.5 95.1 99.3 101.4 97.2 96.8
R.C. Piling 2019 Jan 103.5 98.0 99.3 101.3 97.2 96.8
Feb 103.7 98.6 99.3 101.2 97.2 96.8
Mac 104.8 98.7 99.3 101.3 97.2 96.8
Apr 104.8 99.4 98.5 101.3 97.2 97.4
Mei 104.9 99.4 98.6 101.5 97.2 97.4
Jun 104.9 99.4 98.6 101.4 97.2 96.8
Jul 104.9 99.4 98.6 101.3 97.6 96.8
Ogo 104.9 99.4 98.6 101.3 97.6 96.8
Sep 104.8 99.4 98.6 101.3 97.6 96.8
Okt
Nov
Dis

(9) Kerangka Besi 2018 Dis 102.7 103.5 100.8 102.3 98.2 98.2
Satu Tingkat 2019 Jan 102.7 103.7 100.8 102.1 98.2 98.2
(Bangunan) Feb 102.8 103.7 100.8 102.6 98.2 98.2
Single Storey Mac 103.0 103.7 100.9 103.0 98.2 98.2
Steel Frame Apr 103.3 103.9 101.0 103.1 98.2 98.4
(Building) Mei 103.3 103.9 101.2 103.8 98.2 98.5
Jun 103.4 103.9 101.3 103.5 98.2 98.3
Jul 103.5 103.9 101.3 103.3 98.4 98.3
Ogo 103.5 104.2 101.3 103.3 98.4 98.3
Sep 103.4 104.2 101.3 103.3 98.4 98.3
Okt
Nov
Dis
Nota/Note:
(1) K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
(2) Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100) /
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year
(3) n.a. = Tidak diperoleh/Not available

* Lihat nota kaki di hujung Jadual 1A/See footnotes at end of Table 1A

3
Jadual 1A: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan (tanpa bar keluli)(samb.)
Table 1A: Building materials cost index by category of building and region (without steel bars)(cont'd)

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Kategori bangunan Tempoh
Sabah Sarawak
Category of building Period
G H I J K L
(10) Kerangka Besi 2018 Dis 103.2 107.3 99.9 n.a. n.a. n.a.
Satu Tingkat 2019 Jan 103.2 107.3 99.9 n.a. n.a. n.a.
(Menara Sahaja) Feb 103.3 107.3 99.9 n.a. n.a. n.a.
Single Storey Mac 103.4 107.4 99.9 n.a. n.a. n.a.
Steel Frame Apr 103.7 107.4 99.9 n.a. n.a. n.a.
(Tower Only) Mei 103.7 107.4 99.9 n.a. n.a. n.a.
Jun 103.7 107.4 99.9 n.a. n.a. n.a.
Jul 103.7 107.4 99.9 n.a. n.a. n.a.
Ogo 103.7 107.4 99.9 n.a. n.a. n.a.
Sep 103.6 107.4 99.9 n.a. n.a. n.a.
Okt
Nov
Dis

Nota/Note:
(1) Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100) /
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year
(2) n.a. = Tidak diperoleh/Not available

* Kawasan/Region
G = Kota Kinabalu J = Kuching
H = Sandakan K = Sibu
I = Tawau L = Miri

4
INDEKS KOS BAHAN BINAAN BANGUNAN
(JULAI 2017=100)
SABAH DAN SARAWAK

BUILDING MATERIALS COST INDEX


(JULY 2017=100)
SABAH AND SARAWAK

(INDEKS TERMASUK BAR KELULI)


(INDEX WITH STEEL BARS)
Jadual 1B: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan (termasuk bar keluli)
Table 1B: Building materials cost index by category of building and region (with steel bars)

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Kategori bangunan Tempoh
Sabah Sarawak
Category of building Period
G H I J K L

(1) Bangunan (K.T.) 2018 Dis 102.2 99.9 101.0 104.5 99.6 98.9
Satu Tingkat 2019 Jan 102.2 100.2r 101.0r 104.2r 99.4r 98.9r
Single - Storey (R.C.) Feb 102.3 100.2 100.9 104.5 99.5 98.9
Building Mac 102.5 100.4 100.9 104.7 99.1 98.9
Apr 102.6 100.7 101.0 105.0 99.3 99.2
Mei 103.1 100.8 101.3 105.4 99.4 99.2
Jun 103.0r 100.7 101.5 105.2 99.5 99.1
Jul 103.1 100.8 101.5 105.1 99.2 99.1
Ogo 103.1 100.7 101.5 105.1 99.3 99.1
Sep 102.9 100.7 101.5 105.1 98.9 99.1
Okt
Nov
Dis

(2) Bangunan (K.T.) 2018 Dis 102.2 100.0 101.1 103.9 99.4 98.6
2−4 Tingkat 2019 Jan 102.2 100.3r 101.2r 103.7r 99.2r 98.6r
(Berbumbung Rata) Feb 102.4 100.3 101.1 103.8 99.4 98.6
2−4 Storey (R.C.) Mac 102.6 100.5 101.1 104.0 99.0 98.6
Building (Flat Roof) Apr 102.7 100.8 101.1 104.3 99.2 98.9
Mei 103.1 100.8 101.4 104.7 99.3 98.9
Jun 103.0r 100.7 101.7 104.6 99.3 98.7
Jul 103.1 100.8 101.7 104.4 99.2 98.7
Ogo 103.1 100.6 101.7 104.4 99.2 98.7
Sep 102.9 100.6 101.7 104.4 98.8 98.7
Okt
Nov
Dis

(3) Bangunan (K.T.) 2018 Dis 101.9 99.5 100.7 104.0 99.3 98.6
2−4 Tingkat 2019 Jan 101.9 99.8r 100.7r 103.8r 99.1r 98.6r
(Berbumbung Curam) Feb 102.0 99.9 100.6 104.0 99.3 98.6
2−4 Storey (R.C.) Mac 102.2 100.1 100.7 104.2 99.0 98.6
Building (Pitched Roof) Apr 102.4 100.5 100.9 104.5 99.1 98.9
Mei 102.9 100.5 101.2 105.0 99.2 98.9
Jun 102.8r 100.6 101.4 104.8 99.2 98.7
Jul 103.0 100.6 101.4 104.7 99.1 98.7
Ogo 103.0 100.5 101.4 104.7 99.1 98.7
Sep 102.8 100.5 101.4 104.7 98.8 98.7
Okt
Nov
Dis

Nota/Note:
(1) K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
(2) Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100)
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year
(3) r = Kemaskini/Revised
* Lihat nota kaki di hujung Jadual 1B/See footnotes at end of Table 1B

5
Jadual 1B: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan (termasuk bar keluli) (samb.)
Table 1B: Building materials cost index by category of building and region (with steel bars) (cont'd)

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Kategori bangunan Tempoh
Sabah Sarawak
Category of building Period
G H I J K L

(4) Bangunan (K.T.) 2018 Dis 102.2 100.1 101.0 104.0 99.4 98.6
5 Tingkat dan Lebih 2019 Jan 102.3 100.4r 101.0r 103.8r 99.2r 98.7r
(Untuk Penginapan) Feb 102.4 100.4 100.9 104.0 99.3 98.7
5 Storey and Above Mac 102.6 100.6 100.9 104.3 99.0 98.7
(R.C.) Building Apr 102.6 100.9 100.9 104.5 99.2 98.9
(For Accommodation) Mei 103.2 100.9 101.2 105.0 99.2 98.9
Jun 103.0r 100.8 101.3 104.8 99.3 98.7
Jul 103.0 100.9 101.3 104.7 99.1 98.7
Ogo 103.0 100.6 101.3 104.7 99.1 98.7
Sep 102.8 100.6 101.3 104.7 98.8 98.7
Okt
Nov
Dis

(5) Bangunan (K.T.) 2018 Dis 102.6 100.3 101.2 104.2 99.4 98.7
5 Tingkat dan Lebih 2019 Jan 102.6 100.5r 101.3r 103.9r 99.2r 98.7r
(Untuk Pejabat) Feb 102.6 100.6 101.2 104.1 99.4 98.7
5 Storey and Above Mac 102.8 100.7 101.1 104.4 99.0 98.7
(R.C.) Building Apr 102.7 100.9 101.0 104.6 99.2 99.0
(For Office) Mei 103.3 100.8 101.2 105.1 99.3 99.1
Jun 103.0r 100.7 101.3 104.9 99.3 98.7
Jul 103.1 100.7 101.3 104.8 99.2 98.7
Ogo 103.1 100.4 101.3 104.8 99.2 98.7
Sep 102.8 100.4 101.3 104.8 98.8 98.7
Okt
Nov
Dis

(6) Bangunan Kayu 2018 Dis 99.4 98.2 98.8 101.4 99.2 99.3
Timber Building 2019 Jan 99.4 98.3r 98.8r 101.3r 99.3r 99.4r
Feb 99.6 98.4 98.9 101.5 99.3 99.4
Mac 100.1 98.9 99.4 101.7 99.3 99.4
Apr 101.1 99.9 100.4 101.8 99.3 99.6
Mei 101.5 100.4 100.9 102.1 99.3 99.6
Jun 101.9r 100.8 101.4 102.0 99.3 99.5
Jul 102.3 101.0 101.6 101.9 99.3 99.5
Ogo 102.3 101.2 101.6 101.9 99.3 99.5
Sep 102.2 101.2 101.6 101.9 99.2 99.5
Okt
Nov
Dis

Nota/Note:
(1) K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
(2) Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100)
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year
(3) r = Kemaskini/Revised
* Lihat nota kaki di hujung Jadual 1B/See footnotes at end of Table 1B

6
Jadual 1B: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan (termasuk bar keluli) (samb.)
Table 1B: Building materials cost index by category of building and region (with steel bars) (cont'd)

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Kategori bangunan Tempoh
Sabah Sarawak
Category of building Period
G H I J K L

(7) Cerucuk Kayu 2018 Dis 97.5 97.5 97.5 n.a. n.a. n.a.
Timber Piling 2019 Jan 97.5 97.5 97.5 n.a. n.a. n.a.
Feb 97.8 97.8 97.8 n.a. n.a. n.a.
Mac 98.5 98.5 98.5 n.a. n.a. n.a.
Apr 100.2 100.2 100.2 n.a. n.a. n.a.
Mei 100.9 100.9 100.9 n.a. n.a. n.a.
r
Jun 101.6 101.6 101.6 n.a. n.a. n.a.
Jul 102.0 102.0 102.0 n.a. n.a. n.a.
Ogo 102.0 102.0 102.0 n.a. n.a. n.a.
Sep 102.0 102.0 102.0 n.a. n.a. n.a.
Okt
Nov
Dis

(8) Cerucuk K.T. 2018 Dis 104.4 102.8 104.6 107.6 101.1 99.1
R.C. Piling 2019 Jan 104.4 104r 104.6r 107.3r 100.5r 99.1r
Feb 104.5 104.3 104.3 107.2 100.9 99.1
Mac 104.8 104.3 103.8 107.3 100.0 99.1
Apr 104.2 104.6 102.9 107.6 100.5 99.5
Mei 105.4 104.2 102.9 107.7 100.6 99.5
r
Jun 104.4 103.8 102.9 107.6 100.7 99.1
Jul 104.2 103.8 102.8 107.4 100.2 99.1
Ogo 104.2 102.9 102.8 107.4 100.2 99.1
Sep 104.0 102.9 102.8 107.4 99.4 99.1
Okt
Nov
Dis

(9) Kerangka Besi 2018 Dis 102.8 103.7 101.1 103.4 98.8 98.5
Satu Tingkat 2019 Jan 102.8 103.9r 101.1r 103.1r 98.7r 98.5r
(Bangunan) Feb 102.9 103.9 101.1 103.6 98.8 98.5
Single Storey Mac 103.1 103.9 101.1 103.9 98.7 98.5
Steel Frame Apr 103.3 104.0 101.1 104.1 98.7 98.7
(Building) Mei 103.4 104.0 101.4 104.8 98.8 98.7
Jun 103.4r 104.0 101.5 104.5 98.8 98.6
Jul 103.5 104.1 101.5 104.3 98.8 98.6
Ogo 103.5 104.2 101.5 104.3 98.8 98.6
Sep 103.4 104.2 101.5 104.3 98.6 98.6
Okt
Nov
Dis

Nota/Note:
(1) K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
(2) Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100)
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year
(3) r = Kemaskini/Revised
(4) n.a. = Tidak diperoleh/Not available
* Lihat nota kaki di hujung Jadual 1B/See footnotes at end of Table 1B
7
Jadual 1B: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan (termasuk bar keluli) (samb.)
Table 1B: Building materials cost index by category of building and region (with steel bars) (cont'd)

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Kategori bangunan Tempoh
Sabah Sarawak
Category of building Period
G H I J K L
(10) Kerangka Besi 2018 Dis 103.3 107.3 100.0 n.a. n.a. n.a.
Satu Tingkat 2019 Jan 103.3 107.4r 100.0r n.a. n.a. n.a.
(Menara Sahaja) Feb 103.3 107.4 100.0 n.a. n.a. n.a.
Single Storey Mac 103.4 107.4 100.0 n.a. n.a. n.a.
Steel Frame Apr 103.7 107.4 100.0 n.a. n.a. n.a.
(Tower Only) Mei 103.7 107.4 100.0 n.a. n.a. n.a.
Jun 103.7r 107.4 100.0 n.a. n.a. n.a.
Jul 103.7 107.4 100.0 n.a. n.a. n.a.
Ogo 103.7 107.4 100.0 n.a. n.a. n.a.
Sep 103.6 107.4 100.0 n.a. n.a. n.a.
Okt
Nov
Dis

Nota/Note:
(1) Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100)
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year
(2) n.a. = Tidak diperoleh/Not available
(3) r = Kemaskini/Revised

* Kawasan/Region
G = Kota Kinabalu J = Kuching
H = Sandakan K = Sibu
I = Tawau L = Miri

8
INDEKS HARGA SEUNIT
BAHAN BINAAN BANGUNAN
(JULAI 2017=100)
SABAH DAN SARAWAK

UNIT PRICE INDEX FOR


BUILDING MATERIALS
(JULY 2017=100)
SABAH AND SARAWAK
Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,
cat, pasir, bahan kerja paip, jubin lantai & dinding, lengkapan kebersihan, keratan keluli & logam,
kayu, papan lapis, konkrit sedia bancuh dan barang besi
Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, paints, plywood, sand,
plumbingfloor
materials,
& wall tiles, sanitary fittings, steel & metal sections, timber, plywood, ready mix concrete and ironmongery

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Bahan Tempoh
Sabah Sarawak
Item Period
G H I J K L
Bahan binaan
Building materials
(1) Batu Bata & 2018 Dis 100.4 101.1 109.4 101.1 101.4 97.7
Dinding 2019 Jan 100.6 101.1 109.4 101.3 101.4 97.7
Bricks & Wall Feb 100.9 101.1 109.4 101.5 101.4 97.7
Mac 101.9 101.1 109.4 101.5 101.4 97.7
Apr 102.6 101.1 109.4 102.5 101.4 97.7
Mei 102.7 101.1 111.2 103.4 101.4 97.7
Jun 103.0 101.1 112.3 102.3 101.4 97.7
Jul 103.9 101.1 112.3 102.3 101.4 97.7
Ogo 103.9 101.1 112.3 102.3 101.6 97.7
Sep 103.9 101.1 112.3 102.3 101.6 97.7
Okt
Nov
Dis

(2) Kaca 2018 Dis 100.8 96.3 100.0 98.2 103.2 96.7
Glass 2019 Jan 100.8 96.3 100.0 98.2 103.2 96.7
Feb 100.8 96.3 100.0 98.2 103.2 96.7
Mac 100.8 96.3 100.0 98.2 103.4 96.7
Apr 100.8 96.3 100.0 98.2 103.4 96.7
Mei 100.8 96.3 100.0 99.7 103.4 96.7
Jun 100.8 96.3 100.0 99.7 103.4 96.7
Jul 100.8 96.3 100.0 99.7 103.4 96.7
Ogo 100.8 96.5 100.0 99.7 103.4 96.7
Sep 100.8 96.5 100.0 99.7 103.4 96.7
Okt
Nov
Dis

(3) Batu Baur 2018 Dis 100.2 100.0 100.1 98.0 96.9 98.6
Aggregates 2019 Jan 100.2 100.0 100.1 98.0 96.9 98.6
Feb 100.2 100.0 100.1 98.0 96.9 98.6
Mac 100.5 100.0 100.1 98.0 96.9 98.6
Apr 101.4 100.0 100.1 99.0 96.9 98.6
Mei 101.4 100.0 100.1 99.0 96.9 98.6
Jun 101.4 100.0 100.1 99.0 96.9 98.6
Jul 101.0 100.0 100.1 99.0 96.9 98.6
Ogo 101.0 100.0 100.1 99.0 96.9 98.6
Sep 101.0 100.0 100.1 99.0 96.9 98.6
Okt
Nov
Dis

Nota/Note:
Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100) /
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year
* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

9
Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,
cat, pasir, bahan kerja paip, jubin lantai & dinding, lengkapan kebersihan, keratan keluli & logam,
kayu, papan lapis, konkrit sedia bancuh dan barang besi
Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, paints, plywood, sand,
plumbingfloor
materials,
& wall tiles, sanitary fittings, steel & metal sections, timber, plywood, ready mix concrete and ironmongery

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Bahan Tempoh
Sabah Sarawak
Item Period
G H I J K L
Bahan binaan
Building materials

(4) Bahan Siling 2018 Dis 99.3 96.9 100.0 102.2 100.0 97.4
Ceiling Materials 2019 Jan 99.3 96.9 100.0 102.2 100.0 98.1
Feb 99.3 96.9 100.0 102.2 100.0 98.1
Mac 98.2 96.9 100.0 102.2 100.0 98.1
Apr 98.2 96.9 100.0 102.2 100.0 98.1
Mei 98.2 96.9 100.0 102.2 100.0 98.1
Jun 98.7 96.9 100.0 102.2 100.0 98.1
Jul 100.3 96.9 100.0 102.2 100.0 98.1
Ogo 100.3 96.9 100.0 102.2 100.0 98.1
Sep 100.3 96.9 100.0 102.2 100.0 98.1
Okt
Nov
Dis

(5) Bahan Bumbung 2018 Dis 103.2 98.2 100.0 102.1 98.1 99.9
Roofing Materials 2019 Jan 103.2 98.2 100.0 102.1 98.1 100.0
Feb 103.2 98.2 100.0 102.1 98.1 100.0
Mac 103.2 98.2 100.0 102.1 98.1 99.9
Apr 103.2 98.2 100.0 102.0 98.1 99.9
Mei 103.2 98.2 100.0 102.0 98.1 99.9
Jun 103.2 98.2 100.0 102.0 98.1 99.9
Jul 103.2 98.2 100.0 102.0 98.1 99.9
Ogo 103.2 99.6 100.0 102.0 98.1 99.9
Sep 103.2 99.6 100.0 102.0 98.1 99.9
Okt
Nov
Dis

(6) Cat 2018 Dis 100.7 100.0 100.6 101.4 98.6 98.7
Paints 2019 Jan 100.0 100.0 100.6 101.4 99.2 98.7
Feb 100.3 100.0 100.6 101.4 99.2 98.7
Mac 100.5 100.0 102.0 102.3 99.2 98.7
Apr 100.5 100.0 103.9 102.7 99.2 99.7
Mei 99.6 100.0 104.9 102.8 99.2 99.2
Jun 99.6 100.0 104.9 102.7 99.2 99.1
Jul 99.6 100.0 104.9 102.7 99.2 99.1
Ogo 99.6 100.0 104.9 102.7 99.2 99.1
Sep 99.6 100.0 104.9 102.7 99.2 99.1
Okt
Nov
Dis

Nota/Note:
Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100) /
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year
* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

10
Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,
cat, pasir, bahan kerja paip, jubin lantai & dinding, lengkapan kebersihan, keratan keluli & logam,
kayu, papan lapis, konkrit sedia bancuh dan barang besi
Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, paints, plywood, sand,
plumbingfloor
materials,
& wall tiles, sanitary fittings, steel & metal sections, timber, plywood, ready mix concrete and ironmongery

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Bahan Tempoh
Sabah Sarawak
Item Period
G H I J K L
Bahan binaan
Building materials

(7) Pasir 2018 Dis 100.0 100.0 100.0 103.4 100.0 97.0
Sand 2019 Jan 100.0 100.0 100.0 103.4 100.0 97.0
Feb 103.2 100.0 100.0 105.0 100.0 97.0
Mac 103.2 100.0 100.0 105.0 100.0 97.0
Apr 103.2 100.0 100.0 107.8 100.0 97.0
Mei 103.2 100.0 100.0 110.7 100.0 97.0
Jun 103.2 100.0 100.0 113.6 100.0 97.0
Jul 103.2 100.0 100.0 113.6 100.0 97.0
Ogo 103.2 100.0 100.0 113.6 100.0 97.0
Sep 103.2 100.0 100.0 113.6 100.0 97.0
Okt
Nov
Dis

(8) Bahan Kerja Paip 2018 Dis 104.1 101.9 101.9 99.4 100.4 95.5
Plumbing Materials 2019 Jan 104.1 103.1 101.9 99.5 100.5 95.5
Feb 104.1 102.3 101.9 99.3 100.5 95.5
Mac 104.1 102.3 102.3 99.3 100.7 95.5
Apr 105.0 103.5 102.3 99.7 100.7 99.2
Mei 105.0 104.6 102.4 99.8 100.7 101.4
Jun 104.9 104.6 102.4 99.6 100.7 101.4
Jul 104.7 104.6 102.4 99.6 100.7 101.4
Ogo 104.7 104.6 102.4 99.6 100.7 101.4
Sep 104.7 104.6 102.4 99.6 100.7 101.4
Okt
Nov
Dis

(9) Jubin Lantai 2018 Dis 107.7 97.0 98.5 96.5 94.8 98.6
& Dinding 2019 Jan 108.0 97.0 100.4 96.5 94.8 98.6
Floor & Feb 108.3 97.0 100.4 96.5 94.8 98.6
Wall Tiles Mac 108.1 97.0 100.4 96.5 94.8 98.6
Apr 108.1 97.0 100.4 97.0 94.8 98.6
Mei 108.0 97.0 100.4 98.8 94.8 98.6
Jun 108.0 97.0 100.4 98.8 94.8 98.6
Jul 108.0 97.0 100.4 98.6 94.8 98.6
Ogo 108.0 97.0 100.4 98.6 94.8 98.6
Sep 108.0 97.0 100.4 98.6 94.8 98.6
Okt
Nov
Dis

Nota/Note:
Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100) /
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year
* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

11
Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,
cat, pasir, bahan kerja paip, jubin lantai & dinding, lengkapan kebersihan, keratan keluli & logam,
kayu, papan lapis, konkrit sedia bancuh dan barang besi
Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, paints, plywood, sand,
plumbingfloor
materials,
& wall tiles, sanitary fittings, steel & metal sections, timber, plywood, ready mix concrete and ironmongery

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Bahan Tempoh
Sabah Sarawak
Item Period
G H I J K L
Bahan binaan
Building materials
(10) Lengkapan 2018 Dis 103.8 99.0 100.0 101.8 98.1 96.0
Kebersihan 2019 Jan 103.8 99.0 100.0 101.8 98.1 96.0
Sanitary Fittings Feb 103.8 99.0 100.0 101.8 98.1 96.0
Mac 103.4 99.6 100.0 101.8 98.1 96.0
Apr 103.5 100.1 100.0 101.8 98.1 96.0
Mei 103.5 100.1 100.0 101.8 98.1 96.0
Jun 103.5 100.1 100.0 101.8 98.1 96.0
Jul 103.5 100.1 100.0 101.8 98.1 96.0
Ogo 103.5 101.2 100.0 101.8 98.1 96.0
Sep 103.5 101.2 100.0 101.8 98.1 96.0
Okt
Nov
Dis

(11) Keratan Keluli & 2018 Dis 103.4 108.0 100.0 106.2 98.7 98.7
Logam 2019 Jan 103.4 108.0 100.0 105.4 98.7 98.7
Steel & Metal Feb 103.3 108.0 100.0 107.0 98.7 98.7
Sections Mac 103.5 108.0 100.0 107.9 98.7 98.7
Apr 103.7 108.0 100.0 107.7 98.7 98.7
Mei 103.7 108.0 100.0 109.2 98.7 98.7
Jun 103.7 108.0 100.0 108.4 98.7 98.7
Jul 103.7 108.0 100.0 107.9 98.7 98.7
Ogo 103.7 108.0 100.0 107.9 98.7 98.7
Sep 103.6 108.0 100.0 107.9 98.7 98.7
Okt
Nov
Dis

(12a) Kayu 2018 Dis 97.5 97.5 97.5 100.0 100.0 100.0
Timber 2019 Jan 97.5 97.5 97.5 100.0 100.0 100.0
Feb 97.8 97.8 97.8 100.0 100.0 100.0
Mac 98.5 98.5 98.5 100.0 100.0 100.0
Apr 100.2 100.2 100.2 100.0 100.0 100.0
Mei 100.9 100.9 100.9 100.0 100.0 100.0
Jun 101.6 101.6 101.6 100.0 100.0 100.0
Jul 102.0 102.0 102.0 100.0 100.0 100.0
Ogo 102.0 102.0 102.0 100.0 100.0 100.0
Sep 102.0 102.0 102.0 100.0 100.0 100.0
Okt
Nov
Dis

Nota/Note:
Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100) /
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year
* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

12
Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,
cat, pasir, bahan kerja paip, jubin lantai & dinding, lengkapan kebersihan, keratan keluli & logam,
kayu, papan lapis, konkrit sedia bancuh dan barang besi
Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, paints, plywood, sand,
plumbingfloor
materials,
& wall tiles, sanitary fittings, steel & metal sections, timber, plywood, ready mix concrete and ironmongery

(Julai 2017=100)
(July 2017=100)
Kawasan*
Region
Bahan Tempoh
Sabah Sarawak
Item Period
G H I J K L
Bahan binaan
Building materials
(12b) Papan Lapis 2018 Dis 100.0 100.0 100.0 100.0 100.0 100.0
Plywood 2019 Jan 100.0 100.0 100.0 100.0 100.0 100.0
Feb 100.0 100.0 100.0 100.0 100.0 100.0
Mac 100.0 100.0 100.0 100.0 100.0 100.0
Apr 100.0 100.0 100.0 100.0 100.0 100.0
Mei 100.0 100.0 100.0 100.0 100.0 100.0
Jun 100.0 100.0 100.0 100.0 100.0 100.0
Jul 100.0 100.0 100.0 100.0 100.0 100.0
Ogo 100.0 100.0 100.0 100.0 100.0 100.0
Sep 100.0 100.0 100.0 100.0 100.0 100.0
Okt
Nov
Dis

(13) Konkrit Sedia Bancuh 2018 Dis 104.2 94.3 100.0 100.7 96.6 96.1
Ready Mix Concrete 2019 Jan 104.2 98.1 100.0 100.7 96.6 96.1
Feb 104.2 98.9 100.0 100.3 96.6 96.1
Mac 105.7 98.9 100.0 100.3 96.6 96.1
Apr 105.7 99.8 98.9 100.3 96.6 96.9
Mei 105.7 99.8 98.9 100.3 96.6 96.9
Jun 105.7 99.8 98.9 100.3 96.6 96.1
Jul 105.7 99.8 98.9 100.3 97.2 96.1
Ogo 105.7 99.8 98.9 100.3 97.2 96.1
Sep 105.7 99.8 98.9 100.3 97.2 96.1
Okt
Nov
Dis

(14) Barang Besi 2018 Dis 102.2 97.9 100.0 105.8 100.8 100.0
Ironmongery 2019 Jan 102.9 97.9 100.0 105.8 100.8 100.0
Feb 102.9 97.9 100.0 109.0 100.8 100.0
Mac 102.9 97.9 100.0 112.5 100.8 100.0
Apr 102.9 97.9 100.0 113.3 100.8 100.0
Mei 102.9 97.9 100.0 113.3 100.8 100.0
Jun 102.9 97.9 100.0 113.3 100.8 100.0
Jul 102.9 97.9 100.0 113.3 100.8 100.0
Ogo 102.9 97.9 100.0 113.3 100.8 100.0
Sep 102.9 97.9 100.0 113.3 100.8 100.0
Okt
Nov
Dis

Nota/Note:
Mulai penerbitan Julai 2018, Indeks Kos Bahan Binaan Bangunan menggunakan tahun asas (Julai 2017=100) /
Starting from July 2018, Building Materials Cost Index is using (July 2017=100) as a base year

* Kawasan/Region
G = Kota Kinabalu J = Kuching
H = Sandakan K = Sibu
I = Tawau L = Miri
13
LAMPIRAN
APPENDIX
Lampiran A
Appendix A

Jadual faktor pelarasan (Indeks tanpa bar keluli)


Adjustment factor table (Index without steel bars)

Faktor pelarasan mengikut kawasan*


Kategori Adjustment factor by region*
Category Sabah Sarawak
G H I J K L

1. Bangunan (K.T.) Satu Tingkat 1.0458 1.0747 1.0323 1.0768 1.0634 1.0501
Single Storey (R.C.) Building

2. Bangunan (K.T.) 2−4 Tingkat 1.0448 1.0537 1.0303 1.0880 1.0857 1.0574
(Berbumbung Rata)
2−4 Storey (R.C.) Building (Flat Roof)

3. Bangunan (K.T.) 2−4 Tingkat 1.0418 1.0567 1.0283 1.0889 1.0777 1.0553
(Berbumbung Curam)
2−4 Storey (R.C.) Building (Pitched Roof)

4. Bangunan (K.T.) 5 Tingkat dan 1.0408 1.0467 1.0273 1.0889 1.0776 1.0543
Lebih (Untuk Penginapan)
5 Storey and Above (R.C.) Building
(For Accommodation)

5. Bangunan (K.T.) 5 Tingkat 1.0387 1.0498 1.0304 1.0929 1.0797 1.0543


dan Lebih (Untuk Pejabat)
5 Storey and Above (R.C.) Building
(for Office)

6. Bangunan Kayu 1.0150 1.0391 1.0090 1.0389 1.0355 1.0353


Timber Buildings

7. Cerucuk Kayu 1.0000 1.0000 1.0000 n.a. n.a. n.a.


Timber Piling

8. Cerucuk (K.T) 1.0158 1.0000 1.0634 1.0929 1.0772 1.0393


(R.C.) Piling

9. Kerangka Besi 1.0208 1.0490 1.0179 1.0659 1.0317 1.0225


Satu Tingkat (Bangunan)
Single Storey Steel (Building)

10. Kerangka Besi Satu Tingkat 1.0138 1.0084 1.0170 n.a. n.a. n.a.
(Menara Sahaja)
Single Storey Steel (Tower Only)

Nota/Note:
K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
n.a. = Tidak diperoleh/Not available
* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

14
Lampiran B
Appendix B

Jadual faktor pelarasan (Indeks termasuk bar keluli)


Adjustment factor table (Index with steel bars)

Faktor pelarasan mengikut kawasan*


Kategori Adjustment factor by region*
Category Sabah Sarawak
G H I J K L

1. Bangunan (K.T.) Satu Tingkat 1.0187 1.0584 1.0179 1.0565 1.0431 1.0508
Single Storey (R.C.) Building

2. Bangunan (K.T.) 2−4 Tingkat 1.0167 1.0386 1.0149 1.0674 1.0547 1.0580
(Berbumbung Rata)
2−4 Storey (R.C.) Building (Flat Roof)

3. Bangunan (K.T.) 2−4 Tingkat 1.0188 1.0437 1.0159 1.0704 1.0509 1.0570
(Berbumbung Curam)
2−4 Storey (R.C.) Building (Pitched Roof)

4. Bangunan (K.T.) 5 Tingkat 1.0098 1.0326 1.0109 1.0693 1.0499 1.0560


dan Lebih (Untuk Penginapan)
5 Storey and Above (R.C.) Building
(For Accommodation)

5. Bangunan (K.T.) 5 Tingkat dan 1.0039 1.0325 1.0109 1.0712 1.0508 1.0560
Lebih (Untuk Pejabat)
5 Storey and Above (R.C.) Building
(for Office)

6. Bangunan Kayu 1.0130 1.0380 1.0080 1.0357 1.0334 1.0363


Timber Buildings

7. Cerucuk Kayu 1.0000 1.0000 1.0000 n.a. n.a. n.a.


Timber Piling

8. Cerucuk (K.T) 0.9472 0.9885 0.9971 1.0426 1.0215 1.0487


(R.C.) Piling

9. Kerangka Besi 1.0178 1.0479 1.0159 1.0593 1.0253 1.0255


Satu Tingkat (Bangunan)
Single Storey Steel (Building)

10. Kerangka Besi Satu Tingkat 1.0108 1.0084 1.0160 n.a. n.a. n.a.
(Menara Sahaja)
Single Storey Steel (Tower Only)

Nota/Note:
K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
n.a. = Tidak diperoleh/Not available
* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

15
NOTA TEKNIKAL
TECHNICAL NOTES
Lampiran C
Appendix C

Contoh pengiraan indeks IKB Example for calculating the old BCI
(Julai 2012=100) dengan menggunakan (July 2012=100) using the new index
indeks baru IKB (Julai 2017=100) BCI (July 2017=100)

(i) Contoh mengira indeks lama (tanpa bar (i) Example for calculating the old index
keluli) bagi bulan Julai 2017 untuk kategori (without steel bars) for the month of July
Bangunan (K.T) Satu Tingkat bagi 2017 for Single-Storey (R.C) Building in
kawasan Kota Kinabalu adalah seperti Kota Kinabalu is as follows:
berikut:

j
I lama Julai 2017 = FP (seperti di Old j I for July 2017 = AF (as in
Lampiran A) x j I baru Julai 2017 Appendix A) x new j I for July 2017

iaitu, Indeks lama Julai 2017: i.e. old Index for July 2017:
= 1.0458 x 100.1 = 1.0458 x 100.1
= 104.6846 = 104.6846
= 104.7 = 104.7

(ii) Contoh mengira indeks lama (termasuk (ii) Example for calculating the old index
bar keluli) bagi bulan July 2017 untuk (with steel bars) for the month of July
kategori Cerucuk K.T bagi kawasan Miri 2017 for R.C Piling in Miri is as follows:
adalah seperti berikut:

j
I lama July 2017 = FP (seperti di Old j I for July 2017 = AF (as in
Lampiran B) x j I baru July 2017 Appendix B) x new j I for July 2017

iaitu, Indeks lama Julai 2017: i.e. old Index for July 2017:
= 1.0393 x 98.6 = 1.0393 x 98.6
= 102.4750 = 102.4750
= 102.5 = 102.5

di mana, where,
FP = Faktor Pelarasan AF = Adjustment Factor
j
j
I = Indeks bagi kategori bangunan j I = Index for building category j
j = 1, …… j = 1, ……

16
Nota teknikal Indeks Kos Bahan Binaan Technical notes on Building Materials
Bangunan Sabah dan Sarawak Cost Index for Sabah and Sarawak
(Julai 2017=100) (July 2017=100)

Indeks Kos Bahan Binaan Bangunan (IKB) The Building Materials Cost Index (BCI) is an
adalah suatu indeks yang dibentuk untuk index designed to measure the average rate of
mengukur kadar perubahan purata harga 15 change in prices for 15 selected building
bahan binaan terpilih yang digunakan dalam 10 materials utilized in 10 building categories in
kategori bangunan di Sabah untuk 3 kawasan Sabah for 3 regions, namely Kota Kinabalu,
iaitu Kota Kinabalu, Sandakan dan Tawau serta Sandakan and Tawau and 8 building
8 kategori bangunan di Sarawak untuk 3 categories in Sarawak for 3 regions, namely
kawasan iaitu Kuching, Sibu dan Miri. IKB Kuching, Sibu and Miri. The BCI is based on
dibentuk berasaskan formula Laspeyres. the Laspeyres formula.

IKB digunakan dalam Pelaksanaan Syarat The BCI is used in Special Provisions to the
Perubahan Harga dalam kontrak-kontrak kerja Conditions of Contract (Variation of Price) in
bangunan kerajaan sahaja. Spesifikasi dan government building contracts only. The
pemberat untuk 15 bahan binaan terpilih specifications and weightage for 15 selected
mengikut kategori bangunan disediakan oleh building materials according to building
Jabatan Kerja Raya (JKR). categories are provided by Public Works
Department (JKR).

Bermula penerbitan Julai 2018, indeks ini Starting from July 2018 publication, the series
berasaskan kepada tahun asas yang ditukar is based on the revised base year which has
daripada (Julai 2012=100) kepada been changed from (July 2012=100) to
(Julai 2017=100) serta pemilihan spesifikasi (July 2017=100) as well as the selection of
bahan binaan dan pemberat yang dikemaskini new building material specifications and
oleh JKR. weightage updated by JKR.

Bagi kontrak-kontrak yang telah ditandatangani For contracts signed before July 2018, please
sebelum Julai 2018, sila lihat ‘Jadual Faktor refer to the ‘Adjustment Factor Table’
Pelarasan’ (Lampiran A dan B) dan ‘Contoh (Appendix A and B) and the ‘Example for
mengira Indeks Lama Kos Bahan Binaan calculating The Old Building Materials Cost
Bangunan’ (Lampiran C) untuk panduan dalam Index’ (Appendix C) for the implementation of
Pelaksanaan Syarat Perubahan Harga. Bagi the Variation of Price. For contracts
kontrak-kontrak mulai Julai 2018 dan commencing July 2018 and thereafter, the new
seterusnya, indeks baru hendaklah digunakan index is to be used without any further
terus tanpa sebarang pelarasan. adjustment.

17
Pengiraan perubahan indeks Index change calculation

IKB mengukur perubahan harga dari suatu The BCI measures price changes from a
tempoh rujukan yang ditetapkan, iaitu designated period, i.e. (July 2017=100).
(Julai 2017=100).

Pergerakan IKB dari satu bulan ke satu bulan Movements of the BCI from one month to
yang lain dinyatakan sebagai perubahan another are expressed as percentage changes
peratus dan bukan perubahan mata indeks rather than changes in index points because
(index points) kerana perubahan mata indeks index point changes are affected by the level
dipengaruhi oleh aras indeks yang berkaitan of the index in relation to its base period while
dengan tempoh asasnya, manakala perubahan percentage changes are not. The following
peratus tidak mempunyai pengaruh sedemikian. example illustrates the computation of index
Contoh berikut menunjukkan cara pengiraan point and percentage changes.
perubahan peratus mata indeks dan perubahan
peratus.

Perubahan Mata Indeks Index Point Change

Indeks Kos Bahan Binaan Bangunan 130.5 Building Materials Cost Index 130.5
Tolak indeks sebelumnya 129.3 Less previous index 129.3
1.2 1.2

Perubahan Peratus Percentage Change


Perubahan mata indeks dibahagi dengan Index point difference divided by the previous
indeks sebelumnya, didarab dengan 100. index, multiplied by 100.

18
Sasaran Tarikh Pengumuman Siaran Khas 2
(Untuk Kerja-Kerja Pembinaan Bangunan dan Struktur), Sabah & Sarawak, 2019
Scheduled Release Dates for Special Release 2
(For Building and Structural Works), Sabah & Sarawak, 2019

Tahun Bulan Rujukan Tahun Tarikh Pengumuman


Year Reference Month Year Release Date

Januari 12 Februari
2019 January 2019 12 February

Februari 11 Mac
February 11 March

Mac 10 April
March 10 April

April 10 Mei
April 10 May

Mei 10 Jun
May 10 Jun

Jun 10 Julai
June 10 July

Julai 09 Ogos
July 09 August

Ogos 10 September
August 10 September

September 10 Oktober
September 10 October

Oktober 11 November
October 11 November

November 10 Disember
November 10 December

Disember 10 Januari
December 2020 10 January

19