SENARAI KANDUNGAN DOKUMEN TENDER SEKSYEN 1 BAHAGIAN A a) Senarai dokumen wajib yang perlu dikemukakan oleh pentender Bagi tujuan penilaian tender 1 PERKARA MUKA SURAT

b) Mendapatkan maklumat tambahan dokumenwajib bagi tujuan Penilaian perolehan kerja c) Senarai semakan mengemukakan tender untuk kegunaan pretender

1-2 1-7 1-2 1-17 B1-B6 1-2 & 1 -2

d) Kenyataan tender ( tender notice ) e) Arahan kepada pretender Appendix B ( EMP ) Peringatan Mengenai Kesalahan Rasuah & Surat Akuan Pembida

f)

BAHAGIAN B a) Borang tender ( JKR 203B-Pind. 5/2008 ) b) Boring-borang maklumat yang perlu dilengkapi oleh petender ( lampiran A1-A10 ) 1-10 A1/1/4-A10/1/1

BAHAGIAN C a) Surat setuju terima tender ( JKR203D-Pind. 1/2011 ) BAHAGIAN D a) Standard form of contract PWD form 203A ( rev.1/2010 ) b) Special provision to the conditions of contract Variation in prices of materials 1- 6 & 50 - 53 1-5

ACPC2-1ACPC2-27

CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT, PULAU PINANG.

SENARAI KANDUNGAN SEKSYEN PERKARA MUKA SURAT

BAHAGIAN F a) Method Of Measurement And Pricing Factors a) Bills of quantity i. Summary of bills of quantities ii. Bills of quantities MM1/1 MM 11/6

1/1 BQ8 BQ 12

b) Daywork rates ( labour and plants ) c) Proposed programme of works

SPA / 1 - 7 SPC / 1 SPD / 1 SPE / 1 SPF / 1 SPG / 1 1-3

d) Contractors management and site supervisory staff e) f) Registration of workers Particulars of registered sub-contractors

g) List of construction plants h) Appendix A

CADANGAN PEMBINAAN JALAN SAMBUNGAN DI JALAN BUNGA HINAI DENGAN JALAN BUNGA KACA PIRING SEKITAR SRJK ( C ) HUN BIN, DAERAH TIMUR LAUT, PULAU PINANG.

SENARAI KANDUNGAN SEKSYEN II BAHAGIAN F PERKARA MUKA SURAT

a)

Appendix 1 E Computer System And Other Requirement

S1E-1 S1E-5 S1F/1/4 S1F/4/4 SIG /1/1 SIH /1/1 1-2 1-2

b) Appendix 1 F Fitting And Furniture For P.D. Offices c) Appendix 1G Programme Using Critical Path Method ( CPM )

d) Appendix 1H As Build Drawings And Road Assets Inventory e) III f) Borang Jaminan Untuk Bon Perlaksanaan ( Lampiran B ) Borang Jaminan Untuk Bayaran Pendahuluan ( Lampiran C )

BAHAGIAN F a) Senarai Lukisan 1-2

b) Lukisan