You are on page 1of 9

BILL OF QUANTITY (BQ)

PEKERJAAN PENGADAAN UNIT PERTASHOP 3 K


(NAMA VENDOR)

NO.

I
A

2
3
4
5
6

SUBTOTAL-I
B
1

3
4
5
6
7
8
9
10
11

SUBTOTAL-II
C

3
4

7
8
9

SUBTOTAL-Ill
D
1
2

SUB TOTAL -IV


JUMLAH TOTAL
JUMLAH MATERIAL+ JASA
KEUNTUNGAN & RESIKO 10%
JUMLAH
DIBULATKAN
TERBILANG:

Jakarta, September 2020

(Nama)
(Jabatan)
BILL OF QUANTITY (BQ)
PEKERJAAN PENGADAAN UNIT PERTASHOP 3 KL GE
(NAMA VENDOR)

URAIAN PEKERJAAN

II
PEKERJAAN TANGKI
Tangki Double Wall Kapasitas 3 KL Follow Standar UL 142 + Thermal Insulation
Dimensi Tangki Outer: 1400 x 1880 x 180 0mm = 3,5 Kl
MildSteel A36 atau SS400 tebal 6 mm double wall tank
Include:
* Loading Port Dia 2"
* Suction Port Dia 1-1/2"
* Emergency Vent Port Dia 6"
* Dipping Port Dia 2"
* PV Vent Port Dia 2"
* Manual Tonk Gouge Port 2"
* Leakage For Insulation Concrote Port Dia.1"
* Leakage Detection Dia 1"
* Emboss Serial No. Per Tangki
* Foot Tonk with Nut and Bolt
Perlite Insulating Concrete Fire Protection tebal 75 mm (Heat Insulation)
Sublasting & Finishing Outer Tank Cat Epoxy warna Putih
Internal Tank Fluid Level - Volume Table /Tabel Tangki
Emergency Vent, Diameter 6'', 260000 scfh, Primary and secondary tank
Manual Tank Gauge

SUBTOTAL-I
PEKERJAAN MECHANICAL (PERPIPAAN)
a. Inlet Pipe to Tank with accessories terpasang
* Pipa Black Steel Sch.40 Dia. 2"
* Incl. Camlock Type A Dia 2" w/ cover
* Incl. Tee Connection with dropline/extension pipe perforated
* Termasuk Equipment Support Pipa Lengkap (Isolation Oil Resistant, Bracket, dll)
b. Outlet Pipe to Dispenser with Accessories terpasang
* Pipa Black Steel Sch.40 Dia.1-1/2"
* Termosuk Equipment Support Pipa Lengkap (Isolation Oil Resistant, Bracket, dll)

Flange, Gasket Oil Resistant (•setara klingrit), bounding cable for flange, Elbow, Socket, Plug (Steel Oil Resistant)

Overfill Prevention Valve Dia 2"


Foot Valve Dia 1-1/2" (Steel Oil Resistant)
Ball Valve Dia 2" (Steel Oil Resistant)
Check Valve Dia. 2" Threded
Ball Valve Dia 1-1/2" (Steel Oil Resistant)
Ball Valve Dia 1-1/2" (Steel Oil Resistant) tipe Three Piece
PV Vent Flame Arrester Dia 2" with extension pipe blacksteel sch.40
Anti Siphon Valve Dia .1-1/2"Outlet Pipe
Emergency Shut off valve (Inlet: Female dan Outlet: Male)

SUBTOTAL-II
PEKERJAAN COMPARTMENT
Compartment Dimensi Luar 1900 x 2200 x 2200 mm dan Accessories Terpasang
Rangka Utama Container (Frame dan Based)
* IWF 150 X 75 X 7mm
* Hollow 100 x 100 x 2,3mm
* Hollow 50 x 50 x 2,3mm
* CNP 200 x 75mm tebal 3.2
* H beam 100
Dinding, Alas & Atap Container
* Plat Dinding tebal 2 mm Incl. ventilasi pada sisi container with nut and bolt (Khusus area Tangki)
* Plat Bordes tebal 3,2 mm (alas bandwall kemiringan 1 Derajat)
* Dudukan Dispenser, incl. dinding dan dop drain bandwall
* Name Plate Unit (Fabrikator, Serial No. dan Tahun Produksi)
Rolling Door Aluminium berkisi partial perforated with box plat metal
Lifting Lug 4 titik corner

Sandblasting Finishing Interior dan Exterior warna Putih & Hitam standar dan Merah Pantone Pertamina 186 C

Acrilic (Sign Produk) dan sticker unit (setara 3M), Pertashop, produk, dilarang merokok & zona berbahaya (kanan, kiri
dan belakang) serta ketentuan rambu lainnya
Tangga Knockdown
Wadah Tumpahan Detachable with Ball Valve (wadah tumpahan) loading
Pekerjaan Listplang Kanopi Keliling
* Hollow 30x30x1,5
* Siku 60x60
* ACP Warna Merah Pantone Pertamina 186 C
*Aluminium Plat Warna Putih bagian bawah canopy
*Cutting sticker scotlite list keliling dan background logo Pertamina Putih
* Stickering logo Pertamina
*Sealant dan finishing cat duco
* Plat Aluminium penutup bagian dalam listplang

SUBTOTAL-Ill
PEKERJAAN ELECTRICAL
Kabel NYFGBY 4 x 2,5mm Incl. Accessories terpasang
* Untuk Koneksi lampu dan Dispenser
Kabel Conduit (Flexible & Pipe) metal & Gland Cable metal terpasang
Pemasangan Bonding Dispenser dan Tangki ke Body Container, Copper Rod 5/8" @1 batang dan kabel grounding
BC 35mm
Lampu Explotion Proof dan aksesoris terpasang

SUB TOTAL -IV


JUMLAH TOTAL
JUMLAH MATERIAL+ JASA
KEUNTUNGAN & RESIKO 10%
JUMLAH
DIBULATKAN
TERBILANG:

Jakarta, September 2020

(Nama)
(Jabatan)

Keterangan : yang diarsir warna kuning di suply oleh PT. LPT

Informasi yang harus disediakan oleh Vendor :


1. Kemampuan per bulan berapa unit?
2. Jadwal produksi sampai selesai dari PO yang diterbitkan
3. Apakah mempunyai Bending mesin ? Brp unit?
4. Apakah mempunyai Shearing mesin? Brp unit?
5. Apakah mempunyai alat Plasma Cutter? Brp unit?
6. Apakah mempunyai welding mesin? Brp unit?
7. Berapa luas area workshop?
8. Apakah jalan menuju workshop bisa dilalui trailer?
F QUANTITY (BQ)
UNIT PERTASHOP 3 KL GENERASI 3
MA VENDOR)

HARGA SATUAN JUMLAH HARGA


SAT. VOL MATERIAL JASA MATERIAL JASA
(Rp.) (Rp.) (Rp.) (Rp.)
Ill IV V VI VII VIII

Kg 1,518.17

Set 1.00
Set 1.00
Set 2.00
Set 1.00
Set 1.00
Set 1.00
Set 3.00
Set 1.00
Set 1.00
Set 1.00
Kg 1,050.00
m2 17.07
Set 1.00
Set 2.00
Set 1.00

Set 1.00
Set 2.00
Set 1.00
Ls 1.00

Set 1.00
Ls 1.00

Ls 1.00

Pcs 1.00
Pcs 1.00
Pcs 1.00
Pcs 1.00
Pcs 1.00
Pcs 1.00
Set 1.00
Pcs 1.00
Set 1.00

Kg 140.35
Kg 83.94
Kg 125.91
Kg 43.00
Kg 77.50

Kg 363.19
Kg 15.23
Ls 1.00
Pcs 1.00
m2 3.06
Titik 4.00

unit 1.00

Ls 1.00

Unit 1.00
Set 1.00
m' 12.10

m 10.00
Ls 1.00

Ls 1.00

Unit 1.00