1 Base Unit BWP Ply Gloss Gloss 13.5 3 40.5 1450.0 58,725
2 Overhead BWR Ply Gloss Gloss 10.5 2 21.0 1450.0 30,450
Storage
3 Loft BWR Ply Gloss Gloss 16 2.5 40.0 750.0 30,000
Subtotal 1,19,175
(A)
B MBR
1 Wardrobe MR Ply Gloss 7 7 49.0 1300.0 63,700
- Sliding
2 Sliding 1.0 12000.0 12,000
Track
3 Loft MR Ply Gloss 11.5 2.5 28.8 748.7 21,563
4 Mirror 1.5 5 7.5 900.0 6,750
Panelling
5 King size MR Ply Gloss 6 6.5 39.0 1350.0 52,650
Cot with
Storage
6 Side Table MR Ply Gloss 1.5 1.5 4.5 1350.0 6,075
- 2NO.
Subtotal 1,62,738
(B)
C BEDROO
M2
1 Wardrobe MR Ply Gloss 7 7 49.0 1300.0 63,700
- Hinged
2 Loft MR Ply Gloss 11.5 2.5 28.8 748.7 21,563
3 Foldable MR Ply Gloss 4 3 12.0 950.0 11,400
Study
Table
4 Mirror on MR Ply Gloss 2 5 10.0 900.0 9,000
Shutter
Subtotal 1,05,663
(C)
D DINING
1 Pooja Unit MR Ply Gloss 2 7 14.0 1300.0 18,200
(a) Kitchen Bottom/Wall Unit : 16mm BWP (ISI 710 Grade Ply).
(b) All Other Places : 16mm MR (Archid/Neemply/Equivalent).
(c) Fittings : soft closure( Kitchen base unit, TV Unit, Hinged Wardrobes) Ebco/Equivalent/ rest are normal closures.
(d) SS Handles : ranges to 130 - 160/-
(e) Laminate : 0.8mm inner portion (Croma/equivalent), outer portion - 1mm (Croma/equivalent).
Payment Terms
(a) 10% Booking Advance for detailed design discussion.
(b) 40% shall be payable within 2 Working Days after design Sign-off.
(c) 40% shall be payable after supply of material on-site.
(d) 10% shall be paid on completion of 80% of the Project.
Quotation Validity
(a) This is a tentative estimate valid for 15 days.
(b) The final cost of the project shall be finalised subject to the actual site measurements, change in scope of work, design &
finishes.
(c) The final estimate shall be shared upon design finalization by SISA Interiors Designer.
(d) The quotation is inclusive of transportation & Design charges. Exclusive of Taxes (GST)
(e) Actual labour charge will be charged if the house is in the higher floor and when there is no lift facility.
(f) Any Additional Civil work or electrical work will cost extra (as per actuals).
Site Pre-requisite
(a) Flooring works, plastering and a single coat of paint must be completed on-site before the commencement of work by SISA
Interiors
(b) The final coat of paint, if any should be done after completion of the Interior works as hand marks and stains on the wall
will be unavoidable due to civil works, electrical, plumbing, carpentry and false ceiling work.
Work in Progress
(a) Any complimentary gifts are provided, thus the facility charges and transportation of the charges of the same will be
charged extra if asked to do.
(b) Any other extra work done apart from the details mentioned in the quotation, then the additional work payment has to be
done by the client.
(c) For any additional requirements or suggestions or changes in the work site, the client has to discuss with SISA Interiors
Repersentative at the site (Site Engineer) or with the operation team.
(d) No direct instructions to be given to the labours working in the site from the client.
(e) Customer in liable to pay the agreed sum without any dispute once they accept with us.
45 Days Promise
We promise to complete your project within 45 days from the final approval of design (design sign off) & payment of your
second instalment.
(e) Laminate : 0.8mm inner portion (Croma/equivalent), outer portion - 1mm (Croma/equivalent).
Payment Terms
(a) 10% Booking Advance for detailed design discussion.
(b) 40% shall be payable within 2 Working Days after design Sign-off.
(c) 40% shall be payable after supply of material on-site.
(d) 10% shall be paid on completion of 80% of the Project.
Quotation Validity
(a) This is a tentative estimate valid for 15 days.
(b) The final cost of the project shall be finalised subject to the actual site measurements, change in scope of work, design &
finishes.
(c) The final estimate shall be shared upon design finalization by SISA Interiors Designer.
(d) The quotation is inclusive of transportation & Design charges. Exclusive of Taxes (GST)
(e) Actual labour charge will be charged if the house is in the higher floor and when there is no lift facility.
(f) Any Additional Civil work or electrical work will cost extra (as per actuals).
Site Pre-requisite
(a) Flooring works, plastering and a single coat of paint must be completed on-site before the commencement of work by SISA
Interiors
(b) The final coat of paint, if any should be done after completion of the Interior works as hand marks and stains on the wall
will be unavoidable due to civil works, electrical, plumbing, carpentry and false ceiling work.
Work in Progress
(a) Any complimentary gifts are provided, thus the facility charges and transportation of the charges of the same will be
charged extra if asked to do.
(b) Any other extra work done apart from the details mentioned in the quotation, then the additional work payment has to be
done by the client.
(c) For any additional requirements or suggestions or changes in the work site, the client has to discuss with SISA Interiors
Repersentative at the site (Site Engineer) or with the operation team.
(d) No direct instructions to be given to the labours working in the site from the client.
(e) Customer in liable to pay the agreed sum without any dispute once they accept with us.
45 Days Promise
We promise to complete your project within 45 days from the final approval of design (design sign off) & payment of your
second instalment.
Cancellation Policy
We at SISA Interiors strive for 100% customer satisfaction. However, if you wish to not go ahead with the services of SISA
Interiors the cancellation & refund policies are as follows.
(a) 10% booking advance paid shall be 100% refundable up to 48 hrs from the time of booking made.
(b) Beyond 48hrs of order booking, 50% of the amount paid will be refunded.
(c) If any advance paid less then 10% will not be refunded.
Sl No. Product Material Finish Dimensions Quantity Rate/ Amount (₹)
Name (feet) (sqft) Unit
Length Height
A KITCHEN
Subtotal 125,300
(B)
C BEDROO
M2
1 Wardrobe MR Ply Gloss 54.0 1050.0 56,700
- Hinged
2 Loft MR Ply Gloss 18.0 700.0 12,600
3 Foldable MR Ply Gloss 0.0 0.0 3,000
Study
Table
Subtotal 72,300
(C)
D DINING
1 Pooja Unit MR Ply Gloss 56.0 1000.0 56,000
Utility
Storage
box
Bottom &
Top 14 950 13300
Folding
Bed cum
bench 35000
Bathroom
Vanity
box 22 950 20900
Subtotal 86,300
(F)
Total (Exc. GST) 444,950
GST 18% 80091
Total 525041
Discount 25% 111237.5
Final Amount 333,713
Rate/Unit Amount (₹)
1150.0 42,550
1000.0 18,000
650.0 20,800
81,350 81,350
900.0 50,400
650.0 17,550
800.0 40,000
750.0 6,000
113,950 113,950
900.0 48,600
650.0 11,700
0.0 3,000
63,300 63,300
850.0 47,600
47,600 47,600
850.0 10,200
10,200 10,200
800 14400
800 11200
35000
800 17600
78,200 78,200
394,600 394,600
18% 71028
465628
Sl No. Product Material Finish Dimensions Quantity Rate/ Amount Total
Name (feet) (sqft) Unit (₹) Amount
Length Height
A KITCHEN
Total 285600.00