Professional Documents
Culture Documents
Index
Index
Index
Revision: 2
Effective Date: June 2019
Page 1 of 2
Index A - QCP’s
1. Excavation
1.1. Trenching
1.2. Bedding
1.3. Backfilling
2. Welding
2.1. Pipe
2.2. Fittings
2.3. Specials
2.4. WPS
2.5. PQR
2.6. Welder certificates
3. Non-destructive testing
3.1. Radiographic
3.2. Technician qualifications
4. External coating
4.1. Specifications
4.2. Product material data sheets
5. Internal lining
5.1. Specifications
5.2. Product material data sheets
6. Holiday detection
6.1. External testing
6.1.1. Calibration certificates
6.1.2. Reports
6.2. Internal testing
6.2.1. Calibration certificates
6.2.2. Reports
7. Concrete works
7.1. Chamber specifications
7.2. Reports – concrete tests
8. Backfill
8.1. Specifications – top soil to be used
8.2. Reports – compaction tests
Form #: MIS QM F79
Index
Revision: 2
Effective Date: June 2019
Page 2 of 2
2. Concrete
3. Welding
4. Backfilling
6. Pressure testing
6.1. Procedure
7. Non-destructive testing
8. Cathodic protection
8.1. Procedure
8.2. Installation