Table of Contents
1. Purpose
2. Scope
3. Roles And Responsibilities
4. Definitions
5. Reference Standards
6. Acronyms / Abbreviations
7. Resources Including Manpower, Material, Tools & Equipment
8. Significant Hazards Identified
9. Interfacing Activities
10. Procedures
11. Emergency Procedures
12. HSEQ
13. Managing Changes
14. Reference Documents
15. Attachments
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007
1. Purpose
The purpose of this method statement is to define the methodology to be adopted for
Demolition Works for Project Mirfa 2 – RO Plant 120 MIGD Capacity and provide details on
Construction Methodology, Quality Management System and Safety & Environmental
procedure that will be adopted.
The purpose of this method statement is to outline the materials, labor and workmanship
required to undertake the activity in a safe and controlled manner, complying with all relevant
standards and codes of practice.
2. Scope
This method statement covers the various steps involved in the Demolition works with the
project:
Survey and Marking Works
Demolition Works
1.1.1 The Project Directors will lead the Project Manager and Site Manager in managing the overall
project team to ensure the satisfactory and timely completion of the project with safety and
Quality. They shall be the focal point from Contractor to Owner.
1.1.2 The Project Director is accountable for the operational planning, and implementation of OSH
Construction Management Plan for this project.
1.1.3 Shall ensure that the project team have adequate resources to carry out their duties and
responsibilities in accordance with this Project OSH Construction Management Plan.
1.1.4 Shall establish and maintain a direct line of communication with the Project HSE Manager.
1.1.5 Shall monitor the site operation to ensure they are conducted in accordance with the Site HSE
Management Plan and take urgent and appropriate action to prevent unsafe working practices or
other infringements of statutory of the safety plan requirements.
1.2.1 Shall ensure all activities are in accordance with the relevant contract specification and
approved procedure / method statements.
1.2.2 Shall be overall responsible for execution of works and effective use of resources & manpower.
1.2.3 Shall communicate to all functions the importance of meeting Owner, Legal and Regulatory
requirements, Standards and Project Specifications.
1.2.4 Shall carry out construction related activities in accordance with the Project QHSE plan and
procedures.
1.2.5 Shall attend to QHSE observations and non-conforming activities raised and ensure corrective
action plans are in place.
1.2.6 Shall Manage and control all sub-contractors assigned to the project.
1.2.7 Shall ensure that everyone, including subcontractors, comply with the requirements of the
Project OSH Construction Management Plan.
1.2.8 Shall ensure all-necessary work procedures, method statements and work instructions are
prepared, reviewed, and issued for safe operation of the works on site.
1.2.9 Shall ensure to attend a Management Meetings.
1.2.10 Shall monitor the site operation to ensure they are conducted in accordance with the Site OSH
Construction Management Plan and take urgent and appropriate action to prevent unsafe
working practices or other infringements.
1.2.11 Shall establish and maintain a direct line of communication with the HSE Manager.
1.3.10 Is responsible for implementing, reviewing, and updating the OSH Construction Management
Plan.
1.4.2 Shall monitor & guide the project team on implementing the safety practices required by site.
1.4.4 Shall liaise with subcontractors and foremen to ensure they follow the safety standards required
under the OSH Construction Management Plan.
1.4.5 Shall assist with the safety aspects for risk assessments and planning duties as required.
1.4.6 Shall assist with the promotion of HSE on site. • Shall carry out weekly regular inspections and
review findings with supervisors and follow-up on corrective action taken.
1.5.12 Shall co-operate closely with the HSE personnel to ensure that proper assistance and surveillance
of safety matters from the field supervision team.
1.5.13 Shall ensure that subcontractor’s duties are performed by competent and experienced personnel
and in sufficient number.
1.5.14 Shall be accountable to the Project Manager for the implementation of the OSH Construction
Management Plan and the operational planning of all areas under their control.
1.5.15 Shall establish and maintain a direct line of communication with the HSE team.
1.5.16 Shall ensure that all workers under their control comply with the OSH Construction Management
Plan.
1.5.17 Shall regularly review the health and safety procedures in coordination with the HSE team to
ensure that they adequately cover site operations and where necessary carry out risk assessments
and develop further appropriate procedures to control those risks.
1.5.18 Shall coordinate with HSE staff and/or EHS Authority and ensure remedial action is taken as
necessary.
1.5.19 Shall not permit the operation of any plant unless both the plant and operator are suitably
certified, confirm by HSE staff.
1.7.1 Supervisor & Team Co-ordinate with the project engineer for work activities and ensure they are
done in accordance with the relevant Contract specification and the approved Procedure/Method
statements.
1.7.4 Shall ensure that their subordinates and workers receive clear instructions relating to the work
that they are carrying out.
1.7.5 Shall ensure that the workplace is maintained in a safe and tidy condition.
1.7.6 Shall assist in giving toolbox talks.
1.7.7 Shall take prompt action to rectify unsafe conditions.
1.7.8 Shall provide full co-operation to the HSE staff and comply with their recommendations.
1.7.9 Shall ensure that all necessary safety devices and personal protective equipment (PPE) are
provided and used properly.
1.7.10 Shall be familiar with the Emergency Response Plan and ensure that they are known to their
subordinates and implement those procedures as required.
1.7.11 Shall promote HSE awareness through leading by example.
1.8.6 Shall carry out their work efficiently and in compliance with project specifications, regulations,
and safety standards.
1.9.1 Every person employed on the project is legally required to take reasonable care for the health
and safety of themselves and others that may be affected by their actions or omissions at work.
1.9.2 Co-operate with their employer to enable them to comply with the requirements of the project.
1.9.3 No person shall intentionally or recklessly interfere with or misuse anything provided for safety,
health or welfare under the relevant statutory provisions.
1.9.4 All personnel shall wear or use the appropriate safety equipment or clothing and use the
appropriate safety devices.
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007
1.9.5 All personnel shall familiarize themselves with the relevant requirements of the Site OSH
Construction Management Plan.
1.9.6 All personnel shall report any accidents and damage to property or equipment to their immediate
supervisor, irrespective of whether persons are injured.
1.9.7 All personnel are encouraged to make suggestions to improve health and safety to their
supervisor and the HSE staff.
1.11 Subcontractor
1.11.1 Shall be responsible for executing specific portions of the project as outlined in their contract.
1.11.2 Shall carry out their work efficiently and in compliance with project specifications, regulations,
and safety standards.
4. Definitions
Project : Mirfa 2 – 120 MIGD RO IWP
5. Reference Standard
6. Acronyms / Abbreviations
Project Manager
Construction Manager
Project/Site Engineer
QA/QC Engineer
HSE Engineer / Officer
Supervisor/Foreman
Surveyor
Skilled / Unskilled Workers
7.2 Plant / Tools and equipment
Grinder
Jack hammer
Excavator, Excavator Trencher & Excavator Rock Breaker
Shovel / Wheel Loader
Coring Machine
Concrete cutting machine
Compressor
Generator
Six Wheel / Dump Truck
Mobile Crane
MCG Cylinders
Gas Cutting Tools & Accessories
Petrol Engine Pipe Cutter
Manlift
Guide Rail / Pulley
Survey Equipment
Safety Barriers
Hand tools (Hammer, carpentry tools, drills…)
Weel barrow
Dive Station
9. Interfacing Activities
Any discrepancy shall be updated; all concerned parties to be notified immediately. The work
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007
10. Procedures
10.1 Activities prior to commencement of works
10.1.1 Obtain all necessary approvals prior to proceed with the works (i.e. pre-
qualification for subcontractor / supplier if required).
10.1.2 Wherever NOCs and permits are required from relevant authorities the same
shall be obtained prior to proceed with the works on site.
10.1.3 Ensure all operatives have completed the site safety induction and have
understood the scope and work procedure as detailed in this method statement.
10.2 Survey and Marking Works
10.2.1 Reconnaissance of project site – to undertake a full visual and photographic inspection.
10.2.2 The conditions of the existing permanent structures, utilities and subsurface
obstructions shall be surveyed and recorded before commencing demolition activities.
10.2.3 Check existing “As built” drawings for any buried services.
10.2.4 Survey the work area to identify any safety hazards All live utilities should be
protected from any damages and dust ingression.
10.2.5 Work area should also be surveyed based on required movement of vehicles /
demolition equipment.
10.2.6 Ensure / verify by visual inspection that hazardous materials have been removed before
proceeding with the building demolition operations. If there are some loose
items on site which affect the concrete cutting work, we will arrange labor to clean it
immediately.
10.2.7 For fencing area to be demolished, any end of the determined fence area to be
demolished shall be marked prior to work.
10.2.8 For structures to be demolished, the R/C elements to be cut/broken/removed should be
clearly marked before any cutting / coring / breaking (using any tools mentioned in
section 7.2) works starts. All the RC elements will be done by breaking method using
small robot breakers and big 22T excavators fitted with jack hammers.
10.2.9 Clearance to installed overhead MEP services should be checked.
10.3.9 For existing trenches, edge protection should be provided and control measures to
be observed during demolition works to avoid falling into open area / confined
spaces. Also, identify the risks in working at demolished edge of trenches and
surrounding areas such as access / possible water ingress to prevent any
casualties.
10.3.10 For existing asphalt, ensure that the marked area shall be cut at a required
depth of 30-40cm using the excavator trencher and are free from debris (i.e.
rocks, pebbles etc.). The fragments of asphalt shall be kept and handled
properly as it will be reused on construction of temporary roadworks.
10.3.11 For Existing CS Pipes, Petrol Engine Pipe cutter, Gas Cutter & MCG
Cylinders shall be used by competent persons to cut the pipes into segments
prior to removing out from ground by crane.
10.3.12For coring works, holes will be drilled either in the wall or slab where drop-in anchors
will be inserted in the holes and the stand of the coring machine will be bolted into the
anchors fixed in the hole. Coring machine will be fixed to stand, and required core bits
will be mounted on the machine. The machine will be connected to water and power
connection and will be equipped to start the coring works. Housekeeping & cleaning
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007
10.3.17During the process of demolition, the area will be sprinkled with water to minimize
dust. The dust suppression process should be followed simultaneously with demolition
process.
10.3.18The existing landscaping, nearby structures if any, in the demolition area will be
protected.
10.3.19The debris will be removed from the site area using shovel and loaded in a six- wheel
truck.
10.3.20The loaded debris shall be transported from site and disposed in municipality approved
area.
10.3.21The areas affected by excavation during demolition shall be backfilled as per the
contract specification and approved MS/RA with reference no. 224020-C2-W0-
ANC-6000-GB-WZZ-005 and ITP with reference no. 224020-C2-W0-ANC-6000-
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007
10.3.30Starting from Stage 1, demolition of old intake slab shall commence with a rock
breaker to enlarge any existing opening in the intake slab to allow for the proper
backfill of the intake area for the section.
10.3.31Under no circumstance, will any personal enter the old intake for safety reasons.
10.3.32Once the demolition for the first stage is complete, then the backfilling may proceed.
10.3.33Demolitions and backfilling Stages for the subsequent stages can commence once the
earlier stages are complete until the full backfilling of the old intake structure up to
the location of the stoplogs.
10.3.34As discussed and agreed the contractor shall be responsible for applying protective
concrete between the stoplog and the existing wall to prevent the outflow of debris or
backfill material into the sea, thereby mitigating any potential environmental and
operational impact on the existing MIPCO plant.
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007
In case of any HSE incidents requiring an emergency response, the procedures as stated in
the HSE plan shall be followed. Third party trained first aiders and fire fighter shall be
available to respond for any emergency that may arise during the works. The emergency
contact numbers will be communicated to all employees. The risk assessment for the
activity shall be communicated to employees.
Police 999
Fire 997
Ambulance 998
12. HSEQ
In-order to achieve the targeted objective ‘zero lost time injury’ the work crew will be provided
awareness training to follow the safe work procedures. The method statement and risk
assessment shall be in place of the work and shall be strictly followed without any short falls.
Toolbox talk training shall be provided to the work team prior to start of works. Personal
protective equipment requirements shall always follow, and all personnel involved in works
shall wear company's coverall, safety helmet& safety shoes. In addition to the above PPEs
respiratory masks, ear protector equipment, aprons, safety goggle, etc. shall be used as
necessary. All works shall be carried out in line with the contract specific requirements.
Any changes for the work plan need to be well communicated with all work crew. Any changes
for the method statement need to be approved before being used on site.
15. Attachments
RISK ASSESSMENT
RISK ASSESSMENT
Content Summary
Baseline Risk Residual Risk
SN Activity Page
S L BR RL S L BR RL
01 Mobilization of People, Vehicles, Materials and Equipment to site 3 2 6 M 3 1 3 L 01
02 Manual Handling 3 2 6 M 3 1 3 L 01
03 Mechanical Lifting Operation 4 3 12 H 4 1 4 M 03
04 Working with Air compressors and Jack Hammers. 4 3 12 H 4 1 4 M 04
05 Use of Portable Power tools. (Electric & Pneumatic) 4 3 12 H 4 1 4 M 05
06 Working nearby road /traffic. 4 2 8 H 4 1 4 M 05
07 Working in Bad Weather – Heat, Strong Wind, Heavy Rain, Thick Fog etc. 3 3 9 H 3 1 3 L 06
08 Housekeeping 3 2 6 M 3 1 3 L 07
Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H
Residual Risk
Residual Risk
Baseline Risk
Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks
Likelihood
Risk Level
Level
Severity Ensure EWEC Permit along with Al Nasr internal
permit and TBT available at site.
EWEC Permit is valid within the specified work
location only.
Wear PPEs (Cover all, high visibly jacket, hard hat,
Safety Goggle, Escape hood, Personal Gas
Monitor, Safety Shoe- As per area requirement.
All vehicles and equipment’s should have valid
third-party certificate.
Vehicle & Machinery
All drivers must be holders of valid UAE driving
Mobilization of People, Movement
Personnel injury license.
1 Vehicles, Materials and Possible presents of 3 2 6 M 3 1 3 L
Damage to assets Always maintain High supervision
Equipment to site reptiles.
Use only approved tracks/ route.
Certified First Aider shall be mobilized along with
manpower
Emergency procedures to be Cascaded.
Stay away from line of fire
All vehicles and equipment’s should have
inspection and approval if required by the client
(As per area requirement).
Equipment movement without banks man is
Strictly prohibited at site.
Form: ALNASR-HSMP-F.02.01 rev04 Page 1 of 9
RISK ASSESSMENT
Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H
Residual Risk
Residual Risk
Baseline Risk
Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks
Likelihood
Risk Level
Level
Severity
If found any species reports to concerned
authorities. Do not kill /attack the endangered
species.
Plan route and establish clear communications
Predetermine lay down area for equipment’s
Place all materials and equipment at least 2
meters away from edge of excavation.
Equipment’s and machineries shall be inspected
by authorized personnel- before commencing
work.
Equipment’s & machineries should be restricted
over underground services.
Use appropriate/adequate safety awareness
signage’s to restrict the equipment movement
over underground utilities services.
All the requirements that stated in approved
MSRA must be strictly followed and effectively
implemented
Ensure that PTW, Approved MSRA are in place
and TBT prior to start the activities.
Bending twisting the Handling load to be limited
body, neck, arms, or Seek assistance if load is too heavy for one
wrists person to lift.
overreaching, Proper handling procedure to be followed
Personnel injuries
lifting, pushing, Loads to be lifted close to the body.
2 Manual Handling Property damage 3 2 6 M 3 1 3 L
pulling, carrying, Manual handling training should be for all
very fast movements, workers
or exerting force Awareness posters to be displayed at site
while in an awkward Adequate training for manual handling
posture Ensure traffic management plan is in place and
followed.
Toolbox talks to be conducted.
Close monitoring of manual handling by
supervision
Avoid using heavy manual Handling.
Form: ALNASR-HSMP-F.02.01 rev04 Page 2 of 9
RISK ASSESSMENT
Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H
Residual Risk
Residual Risk
Baseline Risk
Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks
Likelihood
Risk Level
Level
Severity
Internal HSE Training for manual handling
techniques.
Avoid lifting manual for than 25 kg/ person.
All persons involved in the activity should be
provided with PPE such as HV vest, Hard Hat,
Safety shoes, Hand gloves, coverall, eye
protection and task specific PPE.
Use strong stable and suitable equipment.
Ensure crane/excavator and operators are third
party certified.
If lifting is done by an excavator, ensure presence of
check valve.
Lifting equipment shall be positioned, installed
correctly and the ground condition shall be
checked.
Crane toppling. Presence of lifting supervisor should be ensured.
High wind conditions. Safe working load indicator shall be checked.
Load striking Ensure lifting operations are planned, supervised,
something whilst Fatalities. and carried out in safe manner by competent
being moved Injuries. people
Mechanical Lifting Check the requirements are met for lifting
3 horizontally Equipment damages 4 3 12 H 4 1 4 M
Operation equipment and for lifting persons
Failure of lifting Serious injuries.
tackles/ slings. Material damage. Periodic examination/testing of lifting equipment
Collapse of jib shall be done and shall be certified.
Material falling from Outriggers must be extended.
height Planned lifting operations.
Avoid lifting operation in high wind conditions.
Precautionary measures shall be taken if overhead
or side obstructions – adjacent buildings, other
structures, and overhead power line.
Communication system should be in place to
ensure sufficient coordination between pick up
and lay down.
Ensure lifting is planned.
Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H
Residual Risk
Residual Risk
Baseline Risk
Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks
Likelihood
Risk Level
Level
Severity
The area shall be restricted for unauthorized entry.
Valid third-party certificate for lifting tackles/ sling.
Sling/tackles rated for the load.
Visual inspection shall be carried out prior to the
operation.
Proper supervision & rigging procedure.
Ropes and wires must be protected from sharp
edges of any load.
No knots or hitches are to be made in slings or
lifting ropes.
Never drag ropes or wires over the ground.
Avoid overload.
Safe working load/radius indicators and automatic
safe load indicators shall be fixed.
Check the load is located within the load radius
capacity of the crane
Ensures that the load always remains level and does
not allow it to tilt and check the location of lifting
points securing the load to the crane.
The lifting points must be sufficiently strong to take
the load.
Planned lifting operation.
Taglines shall be used to guide material while
lifting. Taglines should be without knots.
Check the load indicator.
Safety latch condition to be proper.
Slings to be inspected and checked for certificate.
Waste must be lifted out in correct 3rd party
certified receptacles
Failure of compressed Fatality or serious
HSE induction and training.
Working with Air air hose& fittings. personnel injuries like
Adequate communication of method statement
4 compressors and Jack Noise and dust cut injury fracture. 4 3 12 H 4 1 4 M
& risk assessment to work force.
Hammers. generation, Oil Spills Loss of hearing due to
Adequate competent supervision.
from compressor noise, Dust inhalation.
Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H
Residual Risk
Residual Risk
Baseline Risk
Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks
Likelihood
Risk Level
Level
Severity
Fire hazard to Environmental Correct use PPE (safety shoes, coverall, hand
compressor. Pollution. gloves, safety harness, anti-vibration hand
Vibration form jack Loss of life and gloves/aprons, ear plug/muff, nose mask etc.
hammers. property due to fire. Daily toolbox talk (daily hazard identification &
Hand Arm Vibration briefing)
syndrome (white Daily checking and periodic maintenance of
finger) compressor& jack hammer and fitting,
Use of whip check arrestors/joint locks to stop
sudden failure of compressed air hose joints.
Minimize the exposure time and proper usage of
ear protection muffler/plugs.
Adequate water sprinkling for duct suppression.
Proper maintenance of the equipment.
Appropriate fire extinguisher must be provided.
Minimize the exposure time.
Rotate/provide rest time for vibrator operator to
reduce the effect of HAV.
For the installation of SMDB and DBs, the
required electric power tools & accessories
should be inspected, color coded, tagged by a
competent electrician prior to use.
The power tools to be visually checked /
inspected by the user daily to ensure that those
Electrical shock Electrocution, are in good & safe working condition.
Trip hazard, fire, The electrical power tools to be connected with
Use of portable
Injury by contact major/ minor body ELCB.
5 Power tools. 4 3 12 H 4 1 4 M
power tools, injuries to operatives, The electrical cables / extension cords to be
(Electric & Pneumatic)
Pinch point, Fatality, routed / elevated properly.
Electrical overload. serious accident The power tools to be disconnected while not in
use
Trained & competent person to be deployed to
use the power tools.
The power tools should not be used in wet area.
Tools should only be used for their designed
purpose.
Form: ALNASR-HSMP-F.02.01 rev04 Page 5 of 9
RISK ASSESSMENT
Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H
Residual Risk
Residual Risk
Baseline Risk
Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks
Likelihood
Risk Level
Level
Severity
Wear correct PPE for tool and task.
Only 110 volts to be used at site
The power tool should have industrial type.
The power tool to be stored properly after use &
should not be left unattended at site.
Appropriate guards / covers must be fitted to
avoid contact with moving parts.
Traffic management for the control and
management of traffic at road works
A permit to work should be obtained if required
Proper barricading, information boards/caution
boards, reflectors and flashing lights (nighttime)
Serious injuries, should be provided at both end of the road
Traffic accidents
Working nearby road fatalities. crossing area.
6 Working unsafely, too 4 2 8 H 4 1 4 M
/traffic. Damage to vehicles All persons involved in the activity should be
close to the public.
and property provided with PPE such as HV vest, Hard Hat,
Safety shoes, and task specific PPE.
Segregate pedestrians from working area by
barriers.
Appoint pedestrian controllers to guide
pedestrians away from the work area.
Ensure that PTW, Approved MSRA are in place
and TBT prior to start the activities.
Weakness and wet In case of heavy wind all lifting activities must be
skin (Sweating) stopped.
Headache, Dizziness All loose material must be secured properly with
falling materials.
or Fainting heavy objects.
Working in Bad Weather – Excavation collapse
Thirst, Nausea or Do not stand near or under the electrical poles or
7 Heat, Strong Wind, Heavy Environmental hazard 3 3 9 H 3 1 3 L
Vomiting OH lines.
Rain, Thick Fog etc. High Humidity
Collapse In case of heavy rain work will be suspended until
Excessive Heat
Sweating heavily the rain stop.
Personnel injuries All personnel will move to rest area if resting
Property damage shelters are not enough stand by buses will be
arranged.
All power tools must be kept in safe place.
Form: ALNASR-HSMP-F.02.01 rev04 Page 6 of 9
RISK ASSESSMENT
Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H
Residual Risk
Residual Risk
Baseline Risk
Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks
Likelihood
Risk Level
Level
Severity
All Electrical DB’s and connecting cables are
secured and cover properly
If rain stop, prior to enter any excavations &
manholes, re inspection must be done by a
competent supervisor and HSE advisor
All light vehicles must be stopped if the visibility
is less than 100 meters
All heavy vehicles must be stop if the visibility is
less than 150 meter “Weather alerts/flash must
be share with all drivers, keep a safe distance
while driving.
Monitoring of environment with Thermal Work
Limit (TWL) meter.
Heat Stress Management Plan in place.
Complying with UAE summer working hour
restrictions 12:30 – 15:00
Provide potable drinking water with cooler
facility and electrolyte replacement supplements.
Rest areas with cooling facility
Sun block and full body clothing to be worn
Safety officer & supervisors shall monitor the
conditions regularly
Monitor workers on site for signs of heat stress
Heat stress training to all site personnel
Persons suffering from suspected heat stress
must be evacuated immediately to medical
facility by ambulance
All persons involved in the activity should be
provided with PPE such as HV vest, Hard Hat,
Safety shoes, Hand gloves, Coverall, eye
protection and task specific PPE
Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H
Residual Risk
Residual Risk
Baseline Risk
Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks
Likelihood
Risk Level
Level
Severity
Dust. Area to be cleared of clutter and dispose of
Pinch points. properly.
Sharp cable insulation Proper Waste segregation shall be followed.
material. Provision of bins on suitable locations.
Back injuries.
8 Housekeeping. Bare protruding 3 2 6 M All waste shall be properly dumped in 3 1 3 L
Hand injuries
conductors. municipality approved area.
Manual Handling. All waste shall be collected from the site and
Improper disposal of properly disposed.
material. Proper PPE e.g., Hand gloves shall be used.
SEVERITY
LIKELIHOOD Negligible (1) Marginal (2) Significant (3) Serious (4) Catastrophic (5)
Rare (1) 1 2 3 4 5
Possible (2) 2 4 6 8 10
Likely (3) 3 6 9 12 15
Often (4) 4 8 12 16 20
Almost Certain (5) 5 10 15 20 25
15 – 25 Extreme Risk (E) Activity or industry should not proceed in current form
Activity or industry should be modified to include remedial planning and action and be subject to detailed OSH assessment. Work can proceed
subject to:
- Emergency response provisions have been put in place
8 – 12 High Risk (H) - Risk assessment being reviewed regularly to identify changes in work conditions and/or opportunities to reduce the risk further
- Project Manager or Plant Manager approval on risk assessment is required
- Competent supervision is required during the execution of the activity
Activity can operate subject to management and or modification. Work can proceed subject to:
4–6 Moderate Risk (M) - Risk assessment being reviewed regularly to identify changes in work conditions and/or opportunities to reduce the risk further
- Competent supervision is required during the execution of the activity
1-3 Low Risk (L) No immediate action required unless escalation of risk is possible. Additional controls not required.
REFERENCE DRAWINGS
12 11 10 9 8 7 6 3 2 1
L L
B
1 2 3 4 5 6 78 9 10 11
(+4.900)
RAMP
RAMP
K K
E 3400x700mm
E
D2 4150x2200mm
STEEL GATE 1700X700mm WALL OPENING D4 2000x2200mm AS
AS PER AS BUILT SURVEY FOR SNAD TRAP LOUVERS PER AS BUILT SURVEY
Door Width = 0mm Door BOTTOM EL=0+550 FROM FF EL Door Width = 1890mm Door
Height =0 Height = 2140
AS PER AS BUILT SURVEY
1650X650mm WALL OPENING
3400x700mm
J J
AS PER AS BUILT SURVEY
1650X650mm WALL OPENING
1700X700mm WALL OPENING FOR
SNAD TRAP LOUVERS BOTTOM
EL=0+550 FROM FF EL
10855mm
I A I
RAMP AS PER AS BUILT SURVEY
AS PER AS BUILT SURVEY
A
3400x700mm
Door Width = 1890mm Door 3340X650mm WALL OPENING
Height = 1920
D1 2000x2000mm
(+4.900)
(+5.100)
H C C H
3400x700mm
G G
10870mm
1700X700mm WALL OPENING FOR
SNAD TRAP LOUVERS BOTTOM
EL=0+550 FROM FF EL
AS PER AS BUILT SURVEY
1650X650mm WALL OPENING
F F
3400x700mm
1700X700mm WALL OPENING FOR
SNAD TRAP LOUVERS BOTTOM
EL=0+550 FROM FF EL
AS PER AS BUILT SURVEY
Door Width = 790mm Door
Height = 2140
X X
D3 900x2000mm 3400x700mm
A A
E 150mm Ø PVC PIPE E
(+4.900)
1 2 3 4 5 6 78 9 10 11
B
D D
GROUND FLOOR PLAN A1 ISSUED FOR INFORMATION - 15.12.2022 RMR M.T A.E
REV
DESCRIPTION STATUS DATE DRAWN CHECKED APPROVED
+4.600
B B
TITLE
N:2669544.450
E:749038.940
N NORTH N
W E
GATE
S
W E
CCTV
N:2670174.050
E:748785.290
OWNER ENGINEER:
ILF CONSULTING ENGINEERS
SKY TOWER UNIT 36-01,36th FLOOR AL REEM
CCTV
OWNER:
N:2670054.400
E:748644.840
Porta cabin
ENGIE SOLUTIONS
MIDDLE EAST
CCTV
Container
LIGHT.POL
EPC CONTRACTOR:
AL-NASR
SIDEM
60 INCH U/G PIPE
CONSULTANT:
27.897
AMGD
1
TRANSFORMER AREA
TEMP.SHED
EXISTING
SUBSTATION
EXISTING
DESIGNER:
HEVY VECHILE
SHED
ARTELIA
Tel. No: +971 04 886 5690
7.834
1
Fax No: +971 04 886 5691
CONC.TANK WITH
GRILL ON TOP
PROJECT NAME :
CONC.TANK
Ex.WATER
TANK
CONC.SLAB
N:2670018.220
E:748552.710
ZONE :
AL MARFA
SECTOR NO :
PLOT NO :
AL MANTEQA AL HAMRA
P68
PROJECT DESCRIPTION :
COMPPRRSOR
ROOM
MIRFA 2 REVERSE OSMOSIS (RO) PLANT -
INDEPENDENT WATER PROJECT
:2669410.170
E:748716.720
NSFORMER
ROOM
TANK
DRAWING TITLE :
DRAWING NO :
REVISION NO:
224020-C2-W0-ANC-0000-CG-WZZ-PRO-007
A
31-03-2023 1:100
Conc.Support
224020 A1
SCALE 1:25
0 1 2 3 4 5m
SCALE 1:100
W
E:748645.450
N:2670117.800
E:748783.452 E:748785.290
N NORTH
S
N:2670116.533
PLANT
E
E:748672.471 E:748678.815
E:748552.710 N:2670075.347
E:748644.840 N:2670072.813
N:2670018.220 N:2670054.400
E:748674.522 11KV S/S E:748680.762
E:748551.345 E:748643.663 N:2670067.659 N:2670070.278
N:2670017.004 E:748588.360 N:2670053.507
N:2670024.564
E:748701.468
E:748585.780
E:748591.663 N:2670072.979
E:748580.638 N:2670025.793
N:2670020.377 CCTV
N:2670022.504
E:748590.948
N:2670018.253 MATERIAL
E:748594.033
E:748705.305
STORAGE
N:2670019.526
E:748586.085 N:2670063.440
E:748585.994 N:2670009.324 N:2670019.232 CCTV
E:748587.416
N:2670011.050
E:748668.638
E:748572.422 N:2670059.686
E:748587.775 N:2670010.198
E:748592.211
N:2670002.752 E:748672.880
E:748592.457
E:748561.817 N:2670050.162
N:2669995.636 N:2670002.231 LIGHT.POLE.FOUND
N:2669991.334
E:748589.213 E:748594.021
N:2670001.516 N:2670002.862
E:748590.682
E:748574.011 E:748594.888
N:2669997.885
N:2669992.240 N:2670000.758
E:748597.786
E:748574.303 N:2670001.951
N:2669991.285
E:748596.695
N:2670000.269 E:748686.165
E:748597.066
E:748725.716
N:2670000.122 N:2670032.475
N:2670048.467
Container
Container
E:748582.123 E:748603.543
E:748604.895
N:2669984.160 Porta cabin E:748689.600 CHEMICAL
N:2669984.604 N:2670015.614 STORAGE
E:748582.999
N:2669969.518 N:2669972.370
E:748629.987
E:748582.743 N:2669970.786
N:2669991.596
E:748734.935
E:748630.532 E:748644.862 E:748687.961 N:2670025.787
N:2669990.352 N:2669997.459 E:748645.440 E:748695.336
N:2670013.370
N:2669996.447
CONC.TANK WITH E:748688.870 N:2670009.844 E:748721.654 E:748722.924
GRILL ON TOP N:2670013.106 N:2670018.159 N:2670019.175
E:748693.487
N:2670005.767 E:748722.043
N:2670017.270
E:748693.004
N:2670003.327
E:748724.221
E:748694.305 E:748721.754
E:748586.679 N:2670016.485 N:2670015.986
N:2670005.519
N:2669948.544 60 INCH U/G PIPE E:748831.486
E:748582.522 N:2670049.391
E:748743.677
N:2670012.372
E:748583.855
N:2669943.744
E:748596.408 E:748603.207 N:2669938.388
N:2669938.060 N:2669940.667 E:748604.202
GATE
E:748607.902
E:748587.451 E:748598.094 N:2669936.857
N:2669934.430
N:2669934.437
E:748604.095
N:2669936.728 E:748610.887
E:748607.918 N:2669938.048
N:2669935.071
E:748611.431
N:2669936.798
E:748629.556
Ex.WATER E:748615.604
TANK
E:748606.149
N:2669885.970 N:2669889.846
TEMP.Gas
Cylinder
Storage
LOW VOLTAGE
S/S & CONTROL
ROOM
E:748624.498 E:748635.603
E:748550.484
E:748550.484N:2669805.466 N:2669835.822
N:2669840.336
CONC.TANK E:748649.558
CONC.SLAB N:2669845.992
E:748584.373
E:748589.358
N:2669720.979 N:2669722.690
E:748622.037
N:2669642.399
E:748624.802
E:748617.192 N:2669641.175 E:748681.906
N:2669640.231 E:748625.403 N:2669665.911
E:748617.535 N:2669639.599
N:2669639.696
E:748682.420 E:748743.888
E:748618.665 N:2669685.182
N:2669636.856 N:2669664.711
TRANSFORMER
ROOM N:2669668.535 E:748715.975 E:748716.636
E:748630.305
TANK N:2669669.574 N:2669669.824
N:2669638.933 E:748703.218
TEMP.SHED
HEVY VECHILE
EXISTING WORK SHED
SHOP
COMPPRRSOR E:748637.990
ROOM
E:748711.053
E:748751.896
E:748627.857 N:2669649.328 N:2669665.749
N:2669613.825
N:2669619.798
E:748967.7
E:748632.611 E:748958.704
E:748725.097 E:748725.803
N:2669740.556 N:2669744
N:2669615.720 N:2669646.986 N:2669647.399
E:748633.277
N:2669611.175 E:748804.963
############ CCTV
E:748728.722 ############# N:2669665.551 GATE
E:748634.343 N:2669637.567 E:748762.093 E:748805.829 E:748962.187
N:2669611.630 N:2669649.139 E:748764.776 ############ N:2669666.848 N:2669731.257 E:748971.3
N:2669650.206 #############
N:2669735
E:748765.080 ############
E:748729.562 N:2669647.889 #############
N:2669637.937
E:748766.670 E:748806.706
N:2669643.843 N:2669666.830
E:748730.432
N:2669633.788
E:748731.169 E:748760.985
N:2669633.910 N:2669647.823
E:748761.934
E:748732.363 N:2669645.680
N:2669626.614
E:748739.344 E:748765.109
E:748732.958
N:2669643.277
N:2669626.913 N:2669630.428 E:748796.299 N:2669640.779
E:748769.349
N:2669641.785 E:748779.203 N:2669634.014
E:748779.700 N:2669632.760
EXISTING HIGH
E:748738.532 E:748741.238 VOLTAGE
N:2669615.239 N:2669616.410
SUBSTATION
E:748780.900
E:748797.409
N:2669629.786
N:2669639.859
E:748747.291 E:748798.062
E:748744.218 E:748777.483
N:2669609.332 N:2669636.678
E:748781.606
N:2669621.634 N:2669628.006 E:748799.453
E:748741.303 N:2669635.079
N:2669608.191
N:2669609.361
E:748739.695 E:748778.684
N:2669603.589 E:748780.326
N:2669619.446
EXISTING
E:748742.055 N:2669618.768
N:2669604.542
E:748797.375
TRANSFORMER AREA N:2669610.776
E:748785.961
E:748660.798 E:748788.934
N:2669543.130
E:748790.527
N:2669605.266 N:2669594.287
E:748779.458 E:748794.625
N:2669589.846 N:2669596.238
E:748770.306
N:2669586.113N:2669593.577 E:748769.359
E:748788.847
N:2669585.614
E:748791.356 N:2669591.838
E:748793.983 N:2669588.554
E:748793.181 N:2669588.305
E:748772.830 N:2669580.137
pport
Conc.Su
E:748790.240 N:2669585.797
E:748761.458
N:2669560.421
E:748762.491
N:2669560.327
E:748760.439 E:748764.217
E:748671.586 N:2669551.937 N:2669553.431 E:748802.123 E:748996.054
E:748690.022 E:748789.098
N:2669568.828 N:2669647.332
E:748765.153 N:2669563.562
N:2669516.549
N:2669523.276 N:2669553.802
EXISTING
SUBSTATION
E:749038.940
N:2669544.450
E:748716.720
N:2669410.170
0
0
0.25
1
SCALE 1:25
SCALE 1:100
0.5
2
0.75
3
1 1.25m
4
5m
REV No.
224020-C2-W0-ANC-6000-CG-WWZ-SK-005
EPC CONTRACTOR:
PROJECT ID :
DRAWING NO :
DRAWING TITLE :
PROJECT DESCRIPTION :
PROJECT NAME :
DESIGNER:
CONSULTANT:
CLIENT:
OFFICIAL USE ONLY :
SUBMISSION DATE :
SECTOR NO :
OWNER:
OWNER ENGINEER:
LAND KEY :
ZONE :
GENERAL NOTES :
A1
B
ILF CONSULTING ENGINEERS
SKY TOWER UNIT 36-01,36th FLOOR AL REEM
ENGIE SOLUTIONS
SIDEM
Tel. No: +971 04 886 5690
ARTELIA
AMGD
AL-NASR
(EWEC)
(EXISTING UTILITIES TO BE REMOVE)
DESCRIPTION
224020
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
AutoCAD
SHX
SHX
Text
AutoCAD
SHX
Text
AutoCAD
AutoCAD
SHX
SHX
Text
Text
AutoCAD
AutoCAD
SHX
Text
AutoCAD
AutoCAD
SHX
SHX
Text
Text
AutoCAD
SHX
Text
AutoCAD
SHX
Text
SHX
Text
SHX
SHX
Text
SHX
SHX
Text
Text
SHX
Text
Text
SHX
Text
Text
Text
AutoCAD
Text
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
SHX
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
Text
SHX
AutoCAD
SHX
AutoCAD
SHX
SHX
AutoCAD
SHX
SHX
AutoCAD
Text
SHX
SHX
AutoCAD
SHX
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
Text
SHX
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
Text
SHX
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
Text
SHX
AutoCAD
Text
SHX
SHX
SHX
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
AutoCAD
Text
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
SHX
AutoCAD
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
SHX
SHX
Text
SHX
Text
SHX
Text
Text
SHX
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
Text
SHX
Text
SHX
Text
SHX
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
- Height Datum : Abudhabi Municipality Datum
- Plan Datum
- Map Projection : UTM 39 NORTH
PROJECT CO-ORDINATES SYSTEM
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
13:19:44
13:19:44
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
13:19:45
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:45
2023-03-30
13:19:44
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
13:19:44
2023-03-30
13:19:44
13:19:44
13:19:44
13:19:44
13:19:44
13:19:44
13:19:44
13:19:44
13:19:44
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
13:19:39
2023-03-30
2023-03-30
2023-03-30
13:19:39
13:19:44
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
13:19:38
13:19:41
13:19:38
2023-03-30
13:19:38
2023-03-30
13:19:44
13:19:37
13:19:38
13:19:40
13:19:41
13:19:44
2023-03-30
13:19:39
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:37
13:19:40
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:40
13:19:41
13:19:42
13:19:40
13:19:37
13:19:42
13:19:37
13:19:38
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:44
13:19:37
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:39
13:19:40
13:19:41
13:19:39
13:19:41
2023-03-30
13:19:42
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:42
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:41
13:19:42
13:19:43
2023-03-30
13:19:39
2023-03-30
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:39
13:19:42
2023-03-30
13:19:38
13:19:44
2023-03-30
2023-03-30
13:19:37
13:19:39
13:19:40
13:19:41
2023-03-30
2023-03-30
13:19:37
13:19:39
13:19:42
13:19:37
13:19:41
13:19:42
2023-03-30
13:19:37
2023-03-30
13:19:43
2023-03-30
13:19:43
13:19:41
2023-03-30
2023-03-30
13:19:44
13:19:41
13:19:44
13:19:41
2023-03-30
13:19:38
2023-03-30
2023-03-30
13:19:40
13:19:41
13:19:42
2023-03-30
2023-03-30
13:19:37
13:19:43
2023-03-30
13:19:39
13:19:41
13:19:43
2023-03-30
2023-03-30
2023-03-30
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:39
2023-03-30
13:19:38
13:19:40
2023-03-30
2023-03-30
2023-03-30
13:19:37
13:19:38
13:19:41
13:19:42
2023-03-30
13:19:41
2023-03-30
2023-03-30
13:19:43
13:19:41
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:41
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
13:19:37
2023-03-30
13:19:39
13:19:41
2023-03-30
2023-03-30
2023-03-30
13:19:37
2023-03-30
13:19:37
13:19:38
13:19:42
2023-03-30
2023-03-30
13:19:40
2023-03-30
13:19:43
2023-03-30
13:19:41
2023-03-30
2023-03-30
13:19:40
2023-03-30
2023-03-30
13:19:38
13:19:44
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
13:19:38
13:19:39
2023-03-30
13:19:42
13:19:40
13:19:42
2023-03-30
13:19:37
13:19:40
2023-03-30
13:19:38
13:19:39
13:19:43
2023-03-30
13:19:39
2023-03-30
2023-03-30
13:19:37
13:19:38
13:19:41
2023-03-30
13:19:38
13:19:44
2023-03-30
13:19:39
13:19:40
13:19:44
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:39
2023-03-30
13:19:38
2023-03-30
13:19:39
2023-03-30
13:19:38
2023-03-30
13:19:39
13:19:42
2023-03-30
13:19:39
13:19:42
2023-03-30
13:19:38
13:19:41
2023-03-30
13:19:37
13:19:40
13:19:43
2023-03-30
13:19:37
2023-03-30
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:44
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:41
2023-03-30
13:19:38
2023-03-30
13:19:37
13:19:38
13:19:41
2023-03-30
13:19:42
13:19:44
2023-03-30
13:19:37
13:19:38
13:19:40
13:19:44
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:40
2023-03-30
13:19:37
13:19:43
2023-03-30
13:19:38
2023-03-30
13:19:37
13:19:40
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:38
13:19:41
2023-03-30
13:19:38
13:19:44
13:19:38
13:19:39
13:19:40
13:19:44
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:38
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:40
13:19:41
13:19:42
2023-03-30
2023-03-30
13:19:37
13:19:43
2023-03-30
13:19:37
13:19:38
13:19:40
2023-03-30
13:19:37
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:40
13:19:37
13:19:39
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
13:19:44
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:42
13:19:44
2023-03-30
13:19:39
13:19:40
2023-03-30
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:41
13:19:42
13:19:44
13:19:37
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:42
13:19:43
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
13:19:44
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:42
13:19:44
2023-03-30
13:19:37
13:19:39
13:19:40
13:19:41
13:19:44
2023-03-30
13:19:37
2023-03-30
13:19:37
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:42
2023-03-30
13:19:37
13:19:42
2023-03-30
13:19:41
13:19:42
2023-03-30
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:39
13:19:40
13:19:42
13:19:43
2023-03-30
13:19:38
13:19:39
13:19:42
13:19:43
2023-03-30
13:19:40
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:44
2023-03-30
13:19:39
13:19:44
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
2023-03-30
13:19:41
13:19:44
13:19:40
13:19:41
2023-03-30
13:19:38
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:42
13:19:39
13:19:40
2023-03-30
13:19:42
2023-03-30
13:19:41
13:19:43
2023-03-30
13:19:39
2023-03-30
13:19:40
2023-03-30
13:19:39
13:19:42
2023-03-30
2023-03-30
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:43
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:44
2023-03-30
2023-03-30
13:19:40
13:19:42
2023-03-30
13:19:37
13:19:42
2023-03-30
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:39
13:19:41
13:19:43
2023-03-30
13:19:39
13:19:41
2023-03-30
13:19:39
13:19:41
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:40
13:19:41
13:19:43
2023-03-30
13:19:39
13:19:40
13:19:41
13:19:43
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:40
2023-03-30
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:43
13:19:44
2023-03-30
13:19:39
13:19:42
2023-03-30
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:42
13:19:44
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:43
2023-03-30
13:19:37
13:19:40
13:19:41
13:19:43
2023-03-30
2023-03-30
13:19:39
13:19:40
13:19:44
2023-03-30
13:19:37
13:19:44
2023-03-30
2023-03-30
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:39
13:19:41
13:19:42
2023-03-30
2023-03-30
13:19:37
13:19:43
13:19:44
13:19:37
13:19:38
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:39
13:19:40
2023-03-30
13:19:38
13:19:40
13:19:42
2023-03-30
13:19:42
2023-03-30
13:19:38
13:19:39
2023-03-30
13:19:39
13:19:42
13:19:43
13:19:44
2023-03-30
13:19:39
13:19:41
2023-03-30
13:19:38
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:44
13:19:38
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:39
13:19:42
2023-03-30
13:19:37
13:19:41
13:19:42
13:19:39
13:19:42
2023-03-30
13:19:37
13:19:39
13:19:42
13:19:43
2023-03-30
13:19:37
13:19:39
13:19:40
13:19:41
13:19:39
13:19:40
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:42
2023-03-30
13:19:38
13:19:40
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:40
13:19:41
13:19:43
2023-03-30
13:19:40
2023-03-30
2023-03-30
13:19:41
13:19:44
2023-03-30
13:19:37
2023-03-30
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:42
2023-03-30
13:19:40
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
13:19:43
13:19:40
13:19:41
13:19:43
2023-03-30
13:19:39
2023-03-30
13:19:39
2023-03-30
13:19:38
13:19:39
13:19:42
2023-03-30
13:19:37
13:19:39
2023-03-30
13:19:39
13:19:43
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:43
2023-03-30
13:19:39
13:19:41
2023-03-30
13:19:40
13:19:44
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:39
2023-03-30
13:19:37
13:19:41
13:19:42
2023-03-30
13:19:42
2023-03-30
13:19:43
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:43
2023-03-30
2023-03-30
13:19:41
13:19:42
2023-03-30
13:19:39
13:19:40
13:19:42
2023-03-30
13:19:38
2023-03-30
13:19:43
13:19:39
2023-03-30
13:19:39
2023-03-30
13:19:40
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:42
13:19:39
2023-03-30
2023-03-30
13:19:38
13:19:40
13:19:43
2023-03-30
13:19:40
13:19:42
2023-03-30
13:19:39
13:19:40
13:19:42
13:19:38
13:19:39
2023-03-30
13:19:43
2023-03-30
13:19:38
13:19:43
2023-03-30
13:19:40
2023-03-30
13:19:40
13:19:41
13:19:44
13:19:41
2023-03-30
13:19:37
2023-03-30
13:19:37
13:19:38
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:40
2023-03-30
13:19:38
2023-03-30
13:19:38
13:19:40
13:19:43
2023-03-30
2023-03-30
13:19:38
2023-03-30
13:19:41
13:19:42
13:19:40
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:43
2023-03-30
13:19:40
13:19:43
2023-03-30
13:19:39
13:19:40
13:19:43
2023-03-30
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:40
13:19:44
2023-03-30
13:19:38
13:19:40
2023-03-30
13:19:40
13:19:42
13:19:40
13:19:42
2023-03-30
13:19:40
2023-03-30
13:19:37
13:19:39
13:19:40
13:19:43
2023-03-30
13:19:40
13:19:43
2023-03-30
13:19:37
13:19:42
2023-03-30
13:19:42
2023-03-30
13:19:38
2023-03-30
13:19:37
13:19:40
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:43
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
13:19:38
2023-03-30
13:19:38
13:19:40
13:19:42
2023-03-30
13:19:38
13:19:40
13:19:42
2023-03-30
2023-03-30
13:19:38
13:19:43
2023-03-30
13:19:39
2023-03-30
13:19:38
2023-03-30
13:19:40
13:19:42
2023-03-30
2023-03-30
2023-03-30
13:19:43
2023-03-30
13:19:38
13:19:39
2023-03-30
13:19:38
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:42
13:19:41
13:19:42
2023-03-30
13:19:41
2023-03-30
13:19:38
13:19:40
13:19:43
2023-03-30
13:19:43
13:19:38
13:19:42
13:19:38
13:19:38
13:19:40
13:19:41
13:19:43
13:19:40
13:19:38
13:19:40
13:19:44
13:19:38
13:19:44
13:19:37
13:19:38
13:19:39
13:19:38
13:19:41
13:19:42
13:19:37
13:19:43
13:19:40
13:19:38
13:19:38
13:19:39
13:19:42
13:19:42
13:19:38
13:19:39
13:19:43
13:19:37
13:19:40
13:19:38
13:19:44
13:19:38
13:19:40
13:19:38
13:19:40
13:19:44
13:19:37
13:19:40
13:19:42
13:19:40
13:19:42
13:19:38
13:19:39
13:19:40
13:19:37
13:19:39
13:19:43
13:19:37
13:19:40
13:19:43
13:19:40
13:19:40
13:19:42
13:19:38
13:19:42
13:19:43
13:19:44
13:19:38
13:19:40
13:19:37
13:19:39
13:19:40
13:19:43
13:19:44
13:19:38
13:19:40
13:19:37
13:19:38
13:19:40
13:19:43
13:19:44
13:19:37
13:19:38
13:19:40
13:19:43
13:19:44
13:19:37
13:19:38
13:19:39
13:19:40
13:19:39
13:19:40
13:19:44
13:19:43
13:19:44
13:19:40
13:19:43
13:19:40
13:19:37
13:19:38
13:19:39
13:19:43
13:19:44
STATUS
PRE
PRE
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
08-12-2022 RMR
14-03-2023
DATE
- HV
- SEWER
- CABLE
EXISTING
- EXISTING
- CONCRETE
- TILE
PIPELINE
- ASPHALT
- CONCRETE
CONCRETE
GATE
FOOT
-FENCE
MHS
MANHOLE
- CCTV
-LIGHT
CABLE
LPF
PATH
--ROAD
STREET
LP
- TREE
--CAMERA
ROAD
FIRE
SUPPORT
FHB
POLE
-TRENCH
FIRE
FH
SEWER
-MHW
MANHOLE
-LIGHT
HYDRANT
SIGN
- FOUNDATION
HYDRANT
MANHOLE
MANHOLE
MHMH-(1.2x0.20x1m)
MANHOLE
BOARD
CONTROL
ET - BOLLARDS
WATER
BOXUNKNOWN
UNKNOWN
ETISALAT
CABIN
- SEW.MH
- MHS
--3.819
3.836
3.874
3.810
-3.914
3.947
3.741
3.819
3.973
3.850-3.926
-3.823
3.868
3.818
3.962
3.953
3.955
3.838
3.851
3.834
3.085
4.075
3.846
3.9523.785
3.822
3.840
-3.950
4.794
3.987
MH
3.884
3.985
3.9923.790
-4.027
3.915
4.069
MH
3.8283.803
3.830
3.808
MH
3.892-4.064
3.910
3.919
3.749
3.806
MH
3.878
3.886
4.048
3.910
3.834
3.970
3.901
3.843
MH
3.879
4.044
3.993
3.977
3.982
3.9533.813
3.8413.758
3.839
-4.236
3.964
3.945
3.961-3.802
3.828
3.944
3.973
3.953
3.839
3.967
4.064
MH
3.746
3.816
4.257
3.823
4.034
MH SEW.MH
-3.890
-4.248
3.815
3.798
3.723
3.809
3.989
3.963
3.936
3.990
4.063
4.0243.824
SEW.MH
3.814
3.860
--3.946
3.801
5.027
MH
3.940MHS
3.782
3.826
3.795
MHS
-3.961
2.958
MH SEW.MH
MHS
3.896
MH
3.881
MH
3.908
MH3.809
3.838
3.755
--MHS
-4.245
4.274
ET -3.952
3.859
3.877
4.255
LPMHS
3.828
3.804
3.835
-3.798
3.835
-3.803
3.9493.816
3.811
3.770
-4.272
4.257-3.912
-3.794
4.2553.812
3.856
3.801
3.960
MH-3.810
3.838
-3.790
FHB-3.803
3.811
3.834
-FH
4.226 -3.779
-3.800
3.793
4.2703.812
3.847
-0.071
4.751
4.155-4.319
3.905
3.997
3.9543.810
3.836
3.812
MHS
3.773
3.784
3.836
4.227-3.817
3.939-4.038
3.898
3.877
4.309
MH
LP 3.823
3.851
3.812
4.308-3.819
3.787
3.841
3.805
3.831
4.2743.829
3.846
3.803
--3.786
4.707-13.678
3.797
4.7223.799
3.841
3.797
--3.963
3.807
3.844
3.796
-4.694
4.734
3.804
FHB
4.693
4.1413.795
3.882FH
3.857
-3.821
3.790
-3.617
3.871
3.750
3.924-3.817
5.272
3.937
3.860
3.800
3.994
MH
LP
3.9523.811
3.856
3.830
--3.856
3.819
3.842
3.810
3.792-3.969
3.818
3.822
3.807
3.801
3.939
3.673
MH
3.9063.805
-3.908
3.848
LP 3.770
3.830
-3.816
-3.959
3.794
3.936
3.825
3.829
MH
3.964
3.830
3.987
3.833
3.726-3.780
3.937
3.908
3.835
3.964-3.899
3.848
3.773
3.763
3.870
3.9853.817
3.854
3.827
FH
-3.956
3.987
3.956
3.938
3.960
3.790
MH 3.799
3.841
3.811
-3.972
3.777
3.748
3.823
3.774
3.985
3.963
3.973
4.814
8.120
MH
3.904
MH -3.866
3.797
MH
MHE
3.886
3.8223.854
-4.023
3.813
3.816
-3.914
3.922
3.848
3.817
3.991
MH -4.307
3.957
3.964
3.938
3.571
3.920
3.938
MH
3.7983.801
3.796
3.862
3.815
3.813
3.967
3.993
3.946
3.858
4.030
3.823
3.837
4.011
3.786
3.962
3.949
4.028
3.945
4.010
4.009
MH
3.605-3.828
10.845
3.939
3.489
3.960
3.9663.798
3.796
3.814
-MH
3.430
3.550
3.982
3.963
3.965
4.006
MH
MH
MH -3.789
3.708
4.021
3.926
MH
3.9903.788
3.804
3.806
-3.950
3.890
3.930-3.793
3.823
3.970
3.946
3.970
3.060
MH
3.843
4.300
3.980
3.948
3.974
4.008
3.934
3.914
3.973
3.957
3.942
3.8153.814
3.804
-3.880
3.981
LP
MH
3.982
MH
4.032
3.943
3.933
3.812
MH 3.791
3.840
3.788
-3.841
-4.262
3.960
3.954
3.909
3.827
3.902
3.916
3.952
4.006
3.956
3.877
3.785
3.979
3.978
3.963
MH
3.815
3.771
3.796
3.945
3.935
3.959
4.9703.800
3.820
3.855
3.784
-3.774
3.905
3.934
4.779
3.881
ET
4.296
MH
3.503
3.941
3.973
3.961
3.818
3.956
3.795
LP -3.792
3.867
3.837
-3.940
3.957
3.812
3.818
4.967
5.003
3.938
3.9373.788
3.814
3.795
-3.969
2.838
3.886
4.028
3.882
3.958
3.792
MH 3.828
3.838
3.827
3.853
3.806
3.817
3.819
-3.803
4.058
3.3843.849
3.780
3.809
3.792
-MH
3.808
1.806
3.865
3.798
3.0433.788
-MH
3.812
4.849
3.968
MH
3.796
3.446
4.669
3.821
3.818
4.304
3.582
2.788
3.891
3.790
3.841
3.859
3.773
3.811
3.927
3.956
MH -3.895
3.991
3.825
3.939
3.984
LP
MH 3.847
3.855
3.842
3.837
3.848
3.379
3.865
3.838
-4.769
3.833
3.813
-3.988
3.833
3.850
3.836
-3.821
3.948
3.931
3.988
LPF 3.809
3.847
3.848
3.808
3.845
3.846
3.778
3.830
3.871
3.794
-3.970
FH
3.838
3.837
-3.899
3.7823.865
3.813
3.795
3.892
0.000
3.979
3.764
3.812
3.829
3.885-3.844
3.939
3.806
MH 3.755
3.784
MH 3.837
3.810
-3.814
3.945
3.960
3.952
4.253
4.268
4.194
MH -3.894
3.960
ETMH 3.804
3.785
-MH
3.815
0.000
3.788
3.881
3.952
3.969
MH 3.820
3.871
3.824
-MH
3.790
-3.872
3.795
3.809
3.9973.890
3.880
-3.899
3.790
3.886
0.000
ET -3.801
3.891
3.8833.822
3.844
-3.977
3.805
3.760
-MH
3.955
LP 3.788
-3.794
3.811
-3.596
3.875
MH 3.794
3.794
3.854
-3.830
3.947
3.873
3.894
3.9483.832
-3.944
3.871
3.865
3.884
-3.734
3.813-3.976
3.905
3.862
3.877
3.900
3.946
3.9873.805
3.824
3.837
3.830
-3.936
3.756
3.799
-3.904
3.829
3.868
3.918
3.7763.804
3.790
3.802
3.429
MH -3.951
3.813
3.936
3.9093.769
-3.982
3.888
3.902
3.827
3.892
3.813
3.981
3.945
3.9493.825
3.844
3.821
-3.932
3.952
3.873
3.922-3.894
3.764
3.953
LPF
3.979
3.956
3.977
MH
3.961
3.966
3.942
4.186
3.929
3.916
3.806
LP 3.809
3.891
3.840
3.818
-3.997
3.751
-3.838
3.816
3.797
0.000
3.855
3.824
3.842
3.862
3.872
4.001
4.202
3.966
3.978
3.937
3.9413.829
3.842
3.826
3.849
3.806
-MH
3.785
3.9473.765
-LP
3.934
3.998
3.959
MH 3.751
3.800
-4.002
3.744
3.903
3.770
3.837
3.874
3.9453.781
-3.957
3.822
3.919
3.820
3.978
3.842
3.796
3.928
3.994
3.944
ET
MH
3.957
MH 3.835
3.814
3.826
-3.825
3.8073.866
3.806
-3.975
3.799
-3.797
3.807
3.845
3.793
3.813
-3.798
3.999
3.788
3.962
3.964
MH 3.799
3.843
-3.764
3.800
-3.878
3.835
3.831
3.999
MH -3.808
3.907
3.809
3.8203.747
3.807
3.789
3.812
3.815
-3.980
3.975
3.969
4.010
MH
LP
3.807
LPF-3.977
3.812
3.856
3.800
3.829
3.795
-3.975
3.827
3.849
3.842
3.865
MH 3.811
3.834
-3.809
3.801
3.833
3.806
-4.005
3.844
3.979
3.851
3.959
ET
3.844
3.789
3.894
MH
3.793
3.807
MH 3.825
3.744
-3.811
3.808
-3.967
3.972
LP
3.8263.720
3.776
3.752
-MH
3.661
4.113
3.969
MH
3.807
3.950-3.766
3.796
3.673
3.743
3.751
3.801
3.941
3.921
3.9803.800
3.808
3.850
3.829
-3.809
3.782
3.736
3.849
-FHB
3.9823.828
-3.964
0.000
3.9643.797
3.805
-3.762
-3.989
3.825
3.794
3.874
3.972
3.912
MH
3.980
LP -3.912
3.792
3.837
3.811
3.781
3.837
-3.963
3.8013.786
-FHB
3.863FH
-3.950
3.7843.769
3.763
3.784
3.792
--3.777
3.796
ET
3.957
3.996 3.836
3.802
3.834
-3.801
3.8053.807
-3.839
3.806
3.841
3.8233.823
-MH
FH
3.837
-LP
3.854
3.9813.776
3.820
-3.785
3.630
LP 3.799
3.801
3.793
-MH
3.7883.780
3.796
3.838
3.745
-MH
-3.850
3.7633.808
3.852
3.831
-LP
3.782
3.980-3.814
3.769
3.897
3.531FH
3.810
3.860
3.820
3.829
3.821
-3.978
3.8003.792
3.794
3.790
3.774
3.778
-4.096
3.8323.792
3.841
3.791
3.873
3.856
3.976
3.972-3.960
-3.966
3.845
ET
3.914
3.925
3.9643.816
3.840
3.810
-4.010
-3.693
4.066
3.842
3.930
3.842
3.853
3.927
3.871
4.047
3.940
3.976
3.924-3.888
3.838
3.863
3.810
-3.960
3.8573.792
-FHB
3.817
-4.055
3.789
3.808
-4.035
3.831
4.104
3.843
3.755
3.823
3.794
ET 3.773
3.793
3.776
-3.706
-3.802
3.940
0.000
3.947
3.7863.827
-3.795
3.772
3.839
3.797
3.935
3.869
3.8583.846
3.814
-3.736
3.856
LP 3.810
FH
-3.807
3.801
3.846
3.830
--3.794
3.950
MH
MHW3.786
3.825
-3.813
3.796
-4.453
3.8233.785
3.761
3.788
4.120
3.982
MH
3.760
3.975
3.9053.849
3.786
-LP
3.798
3.813
3.849
3.806
-3.824
3.866
3.842
3.8513.828
3.852
-MH
3.825
3.919
3.743-3.807
3.759
3.819
--3.965
3.973
4.491 3.793
3.796
3.784
3.768
-3.988
3.846
-3.803
3.703
3.888
3.7653.785
3.842
3.818
-3.984
3.809
3.832
3.856
3.830
-3.844
3.750
4.176-3.846
3.7953.785
3.760
3.797
-3.741
-3.807
3.942
4.054
4.058
4.1203.799
3.771
3.789
3.800
-3.978
3.8333.820
3.845
3.793
-3.922
3.830
3.847-3.762
3.967
LP 3.819
3.832
3.806
-3.738
3.914
ET -3.805
FH
3.844
-3.805
3.760
-3.803
3.785
3.827
3.779
-3.837
3.747
-3.967
-3.791
3.820
3.8223.793
3.803
3.806
3.819
3.815
-3.797
3.8793.816
3.848
-3.795
3.911
3.8313.812
3.810
-3.734
3.918
3.814
3.801
LP
3.8303.860
-3.809
3.7293.813
-3.674
3.802
ET
3.829
3.842
3.822
LPF
MH 3.839
3.806
3.756
3.797
-3.774
3.826
3.787-3.795
3.7923.801
3.818
3.797
-3.756
3.717
3.835
3.740
3.821
3.793
3.7963.777
3.813
3.815
3.785
3.778
3.765
3.797
3.788
3.794
3.804
3.807
-3.808
3.825
FHB
3.839
3.778
3.783FH
3.793
3.803
3.813
3.866
3.796
3.788
3.839
3.778
3.791
3.770
3.807
3.782
3.772
3.777
3.776
3.773
3.720
3.766
3.764
3.748
3.743
3.733
3.814
3.806
-FH
3.645
3.704
3.790-FH
3.816
3.718
3.772
3.903
3.9273.784
3.827
3.757
3.710
3.800
3.781
MH
3.822
3.859
3.785
3.8043.836
3.835
3.817
3.811
3.813
3.801
3.805
3.816
3.819
3.828
3.847
3.848
3.860
3.862
3.824
3.822
3.821
3.833
3.834
3.823
3.843
3.828
3.838
3.845
3.830
3.884
3.844
3.802
3.827
3.816
3.836
3.819
3.835
3.821
3.807
3.840
3.780
3.821
3.800
3.767
3.822
3.987
3.969
1. 3.857 ALL DIMENSIONS AND
3.812
3.781
3.753
3.795
3.790
3.796
3.807
3.808
3.809
3.772
3.784
3.777
3.765
3.748
3.755
3.776
3.762
3.779
3.801
3.804
3.810
3.818
3.770
3.791
3.774
3.789
3.786
3.782
3.785
3.800
3.788
3.793
3.798
3.796
3.809
4.059
3.925
4.020
3.891
3.866
3.826
3.831
3.851
3.844
3.846
3.799
3.784
3.949
4.010
4.051
LPF
LP
MH
3.830
3.748
3.939
3.864
3.854
3.606
3.898
3.806
3.763
3.758
3.780
3.865
3.876
3.964
: WGS 84
ONLY ROUND
SQUAREELECTRICITY CHAINAGES ARE IN METRES
DRAWN CHECKED APPROVED
FLS
DRAWING SIZE :
REVISION NO:
SCALE :
MT
W
1:100
N
S
EA
P68
W E
W E
E:748645.450
N:2670117.800
E:748785.290
E:748783.452
E:748643.860 N:2670172.984 N:2670174.050
N:2670116.533
PROJECT CO-ORDINATES SYSTEM
AutoCAD SHX Text - Map Projection : UTM 39 NORTH
- Plan Datum : WGS 84
2023-03-30 13:19:46
13:19:45 GENERAL NOTES : - Height Datum : Abudhabi Municipality Datum
--------------------------------------------
AutoCAD SHX Text
3.866
3.845
3.606
2023-03-30 13:19:48
--------------------------------------------
1. ALL DIMENSIONS AND
CHAINAGES ARE IN METRES
UNLESS ALL DIMENSIONS AND
CHAINAGES ARE IN METRES
E:748678.815
E:748552.710 E:748672.471 N:2670075.347
N:2670018.220 E:748644.840 N:2670072.813
AutoCAD
UNLESSSHX Text
N:2670054.40
STATED
Text OTHERWISE.
0 E:748674.522 11KV S/S E:748680.762
AutoCAD SHX
E:748551.345
E:748643.663 N:2670067.659 N:2670070.278
N:2670017.004
N:2670053.507
E:748701.468 2023-03-30 13:19:46
E:748585.780
N:2670020.377
N:2670072.979
2023-03-30
AutoCAD 13:19:46
SHX Text
E:748588.360 CCTV AutoCAD
--------------------------------------------
AutoCAD SHX
SHX Text
Text
B ISSUED FOR INFORMATION PRE 14-03-2023 FLS EA EA
N:2670024.564
AutoCAD
--------------------------------------------
2023-03-30SHX SHX Text
13:19:45
13:19:46
E:748591.663
AutoCAD
2023-03-30
2023-03-30 13:19:45
13:19:46
Text
13:19:45
2023-03-30 3.888 13:19:45
13:19:46
N:2670025.793
E:748580.638
AutoCAD
2023-03-30 SHX Text
13:19:45
13:19:46
13:19:47
A1 ISSUED FOR INFORMATION PRE 08-12-2022 RMR MT AE
-------------------------------------------- 3.975
N:2670022.504 E:748668.638
N:2670059.686
MATERIA
--------------------------------------------
2023-03-30
-------------------------------------------- 13:19:45
13:19:46 REV No. DESCRIPTION STATUS DATE DRAWN CHECKED APPROVED
L
E:748705.305
N:2670063.440
--------------------------------------------
2023-03-30
AutoCAD
--------------------------------------------
AutoCAD SHX
13:19:46
SHX Text
Text
4.120
4.055
E:748590.948 N:2670018.253
AutoCAD 3.937
3.959 SHX Text CLIENT
STORAGE
--------------------------------------------
E:748586.085
3.863
3.794
3.743
3.919
3.979
3.766
3.673
3.939
N:2670019.232 CCTV
3.982
E:748672.880
2023-03-30 13:19:46
E:748585.994 N:2670009.324
--------------------------------------------
AutoCAD 3.830
3.869
3.925 SHX Text :
E:748587.416
N:2670050.162
N:2670011.050
E:748592.211 N:2670002.752 E:748592.457
AutoCAD
2023-03-30
AutoCAD
2023-03-30 LP
4.066
4.058
MH SHX
13:19:46
SHX Text
13:19:45
Text
13:19:45
13:19:46
N:2670002.231
AutoCAD
AutoCAD 3.944
3.980 SHX
SHX Text
Text
EMIRATES WATER
--------------------------------------------
AutoCAD
2023-03-30 SHX
13:19:46
Text
E:748572.422 E:748594.021 N:2670002.862
--------------------------------------------
N:2669991.334
AutoCAD
2023-03-30
--------------------------------------------
--------------------------------------------
AutoCAD
2023-03-30
-------------------------------------------- LP
4.096
3.796
4.054
3.874
4.047 SHX
13:19:45
13:19:46
13:19:48
SHX Text
13:19:45
Text
13:19:46
E:748574.011 E:748594.888
--------------------------------------------
-------------------------------------------
2023-03-30
AutoCAD
--------------------------------------------
AutoCAD
2023-03-30 4.035
4.453
4.491
3.873
3.888
3.914
4.176
3.846
3.796 13:19:48
SHX
13:19:45
SHX Text
13:19:46
13:19:48
Text
OWNER ENGINEER:
--------------------------------------------
------------------------------------------- 3.809
4.005
N:2669992.240 N:2670000.758
E:748597.786
AutoCAD
2023-03-30
-------------------------------------------- 3.807 SHX Text
13:19:46
13:19:48
13:19:45 ILF CONSULTING ENGINEERS
------------------------------------------- 3.825
E:748574.303
AutoCAD
2023-03-30 SHX
13:19:45
13:19:46
13:19:48
Text
N:2670001.951
-------------------------------------------- 3.807
LPF
LP
N:2669991.285
AutoCAD
2023-03-30
-2023-03-30
AutoCAD
--------------------------------------------
------------------------------------------- 3.826
3.853
3.750
3.765
3.788
3.856
3.851 SHX
13:19:45
13:19:46
SHX Text
13:19:45
13:19:46
Text SKY TOWER UNIT 36-01,36th FLOOR AL REEM
3.866
3.879
3.842
3.897
3.703 13:19:48
E:748596.695
AutoCAD
-AutoCAD 3.806
3.789
3.796
3.778
3.793
3.784
3.850
3.856
3.796
3.844
3.842
3.813
3.795
3.782
3.797
3.837
3.802 SHX Text
N:2670032.475
2023-03-30
-------------------------------------------- 13:19:45
13:19:46
N:2670000.269
E:748686.165 E:748725.716
2023-03-30
--------------------------------------------
------------------------------------------- MH SHX Text
13:19:46
P.O. Box 73250 Abu Dhabi United Arab Emirates
3.809
E:748597.066
N:2670048.467
AutoCAD
---------------------------------------------
2023-03-30
--------------------------------------------
AutoCAD BOLLARDS
3.908
3.962 SHX
SHX Text
13:19:45
13:19:48
Text
4.010
N:2670000.122
2023-03-30
-------------------------------------------
AutoCAD
2023-03-30
---------------------------------------------
------------------------------------------- 3.784 SHX Text
13:19:45
13:19:46
2023-03-30 3.964 13:19:46
13:19:48 OWNER:
Container
AutoCAD SHX Text
Container
CONTROL
2023-03-30
---------------------------------------------
AutoCAD
--------------------------------------------
AutoCAD
2023-03-30 3.814
3.945
3.956
3.857
3.931
3.796
3.747
3.771
3.768
3.788
3.776
3.774
3.780
3.792
3.829
3.738
3.743
3.736
3.939
3.801
3.785
3.741
MH
3.850
3.912 SHX
SHX CABIN
13:19:45
13:19:48
Text
13:19:48
Text
-------------------------------------------- 3.808
3.762
FHB
3.823
3.807
E:748689.600
N:2670015.614
2023-03-30
AutoCAD
-2023-03-30
-------------------------------------------- FH
3.835
3.832
3.825
4.296
4.304
3.791
3.807
4.307
4.300 SHX
13:19:46
Text ENGIE SOLUTIONS
3.924
ET
E:748582.123
AutoCAD SHX
13:19:45
Text
E:748604.895
--------------------------------------------
-------------------------------------------- 3.797
MANHOLE ETISALAT
E:748603.543
3.905
3.777
3.922
3.914
3.919
3.940 13:19:46
N:2669972.370
AutoCAD
--------------------------------------------
------------------------------------------- SHX Text
N:2669984.160 N:2669984.604
ELECTRICITY
2023-03-30 13:19:45
13:19:48 MIDDLE EAST
Porta cabin CHEMICAL
E:748582.999 E:748582.743 E:748629.987
N:2669991.596
STORAGE
2023-03-30
AutoCAD
-------------------------------------------
2023-03-30
AutoCAD
--------------------------------------------
MANHOLE
2023-03-30 3.820
3.780
MH SHX
13:19:46
SHX Text
13:19:45
13:19:46
Text
UNKNOWN
13:19:46
LP
N:2669970.786
N:2669969.518
AutoCAD SHX
13:19:45
Text
E:748734.935
E:748630.532 E:748644.862
E:748645.440
N:2670025.787
--------------------------------------------
2023-03-30
----------------------------------------------
2023-03-30
-------------------------------------------
AutoCAD
2023-03-30 3.871
3.856
3.798
3.865
3.807
3.812
3.781
3.784
3.930
3.835 SHX
3.849
13:19:48
13:19:45
13:19:46
13:19:48
SHX Text
13:19:45
13:19:46
13:19:48
-------------------------------------------- 3.831
4.104
MH
E:748687.961
N:2669990.352
EPC CONTRACTOR:
AutoCAD SHX Text
N:2669997.459
2023-03-30
--------------------------------------------- MANHOLE 13:19:45
13:19:46
UNKNOWN
N:2669996.447 E:748695.336
AutoCAD Text
N:2670013.370
2023-03-30
-------------------------------------------- 3.976 13:19:48
CONC.TANK WITH
SQUARE
AutoCAD SHX Text
N:2670009.844
-------------------------------------------
E:748721.654
--------------------------------------------
E:748688.870 E:748722.924
------------------------------------------- 3.927
GRILL ON TOP
AutoCAD
-------------------------------------------- 4.010 SHX Text
N:2670018.159
N:2670013.106 N:2670019.175
AL-NASR
E:748693.487
2023-03-30
AutoCAD
--------------------------------------------
--------------------------------------------
2023-03-30
AutoCAD SIGN BOARD
3.948 13:19:46
SHX
13:19:45
Text
13:19:46
SHX Text
--------------------------------------------
2023-03-30 LPF 13:19:46
13:19:48
E:748722.043
ROUND
AutoCAD SHX
13:19:45
Text
N:2670005.767
E:748693.004 N:2670017.270
-------------------------------------------
2023-03-30
AutoCAD
2023-03-30
-2023-03-30
-AutoCAD 3.813
3.952
3.805
3.949
3.793
3.969
3.804
3.797
MHW
3.813
MANHOLE
13:19:46
13:19:48
SHX
13:19:45
Text
13:19:46
13:19:45
13:19:46
13:19:48
WATER SIDEM
--------------------------------------------
N:2670003.327
E:748586.679 E:748694.305
E:748721.754
2023-03-30
---------------------------------------------
2023-03-30
--------------------------------------------
-------------------------------------------
2023-03-30
AutoCAD 3.826 SHX
3.960
3.957
3.961
3.818
3.975
3.972
3.966
3.922
3.976
3.956
3.963
Text
13:19:45
13:19:48
13:19:45
13:19:46
SHX
13:19:45
13:19:46
Text
--------------------------------------------
--------------------------------------------
N:2670016.485
FH
N:2669948.544 N:2670005.519
60 INCH U/G PIPE
2023-03-30
AutoCAD
-------------------------------------------
--------------------------------------------
2023-03-30
AutoCAD
--------------------------------------------
------------------------------------------- SHX
13:19:46
FIRE HYDRANT
SHX Text
E:748831.486
13:19:45
13:19:46
Text
13:19:48
N:2670049.391 CONSULTANT:
--------------------------------------------
AutoCAD
------------------------------------------- 3.854
3.820 SHX Text
E:748724.221
E:748582.522
---------------------------------------------
AutoCAD
--------------------------------------------
2023-03-30 3.967
FIRE
FHB
LP
3.960 SHX
13:19:46
HYDRANT Text BOX
13:19:48
N:2669947.078
MH
4.120
3.988
N:2670015.986
AMGD
AutoCAD
---------------------------------------------
--------------------------------------------
2023-03-30 3.831
3.788
3.964
3.815
3.794
3.802
3.891
3.982
MH
3.907
3.794
FH SHX
13:19:45
Text
13:19:46
13:19:48
--3.965
AutoCAD
-------------------------------------------
-2023-03-30
AutoCAD
2023-03-30 3.814
3.984
4.058
3.947
3.806
4.032 SHX
13:19:45
SHX Text
13:19:45
13:19:46
Text
3.978
3.966
4.021
E:748743.677
N:2670012.372
AutoCAD
--------------------------------------------
------------------------------------------- TREE
MHW
3.942
3.940
4.253 13:19:46
SHX
13:19:45
Text
E:748583.855
N:2669943.744 2023-03-30
--------------------------------------------
AutoCAD
2023-03-30
--------------------------------------------
-------------------------------------------
2023-03-30 3.809
3.927
FHB
LP
3.693
FH 13:19:48
SHX
13:19:45
13:19:46
Text
13:19:48
13:19:45
13:19:46
13:19:48
E:748596.408 E:748603.207
E:748604.202
-AutoCAD
--------------------------------------------
AutoCAD
-------------------------------------------
--------------------------------------------
2023-03-30
-------------------------------------------- 3.822
3.795
4.268
STREET
LP
3.835
3.846
3.734 13:19:45
LIGHT
SHX
SHX Text
13:19:48
Text DESIGNER:
------------------------------------------- 3.804
3.800
4.194
N:2669938.388
2023-03-30 13:19:48
N:2669938.060 N:2669940.667
--------------------------------------------
-------------------------------------------- 3.843
GATE
Conc.Support
AutoCAD
--------------------------------------------
-LIGHT
-------------------------------------------
--------------------------------------------
2023-03-30
AutoCAD 3.798
ET
3.744
3.751
LPF
ET
MH
3.809
3.997
3.979 SHX
POLE
SHX Text
FOUNDATION
13:19:48
Text
ARTELIA
E:748607.902 N:2669936.857
AutoCAD
-AutoCAD
-------------------------------------------
2023-03-30
AutoCAD
-------------------------------------------- 3.967
3.862
3.886
3.783
3.978
FH
LPF
3.550
3.987
LP
MH
3.605
3.816
CCTV
SHX
SHX Text
13:19:46
13:19:48
13:19:45
SHX
CAMERAText
Text
Tel. No: +971 04 886 5690
3.827
3.782
E:748587.451
2023-03-30 3.760
3.842
3.630
3.899 13:19:46
13:19:48
E:748598.094 N:2669934.430
Fax No: +971 04 886 5691
-AutoCAD 3.812
3.790
3.793
3.800
3.796
3.785
3.794
3.769
3.808
3.811
3.804
3.814
3.801
3.763
3.777
3.817
3.802
3.973
3.826
3.823
3.814 SHX
13:19:47
Text
13:19:45
13:19:46
E:748604.095 N:2669936.728
N:2669934.437
ONLY
AutoCAD
2023-03-30
-2023-03-30
--------------------------------------------
AutoCAD
-------------------------------------------
2023-03-30 3.956
3.785
SHX
13:19:48
SHX Text
13:19:48
Text
13:19:45
13:19:46
P.O. Box No:18271 Dubai,
--------------------------------------------- MHS
MANHOLE SEWER
U.A.E.
2023-03-30
E:748610.887 N:2669938.048
AutoCAD
--------------------------------------------
--------------------------------------------
2023-03-30
--------------------------------------------
2023-03-30 3.848 SHX 13:19:45
13:19:46
Text
13:19:48
13:19:45
13:19:46
-------------------------------------------
E:748607.918
PROJECT NAME :
N:2669935.071
2023-03-30
AutoCAD
CONCRETE
-------------------------------------------
--------------------------------------------
AutoCAD SHX
13:19:45
13:19:46
SHX Text
SUPPORT
Text (1.2x0.20x1m)
E:748611.431 N:2669936.798
--3.797
2023-03-30
--------------------------------------------
2023-03-30
-------------------------------------------
AutoCAD 3.803
3.793
3.761
3.773
3.790
3.799
3.763
3.800
3.781
3.769
3.794
3.785
3.804
3.796
3.815
3.805
3.796
3.798
3.760
3.842
3.773
3.821
3.774
3.792 13:19:45
13:19:48
13:19:47
SHX Text
--------------------------------------------
2023-03-30
---------------------------------------------
-------------------------------------------
AutoCAD
-AutoCAD
2023-03-30 3.837
3.938
3.808
3.970
3.966
CONCRETE
3.782
3.797 13:19:46
13:19:45
13:19:48
SHX ROAD
Text
13:19:45
13:19:48
-------------------------------------------- 3.823
3.980
3.829 SHX Text
--------------------------------------------
2023-03-30
AutoCAD
-------------------------------------------
2023-03-30 3.811
3.946
3.914
--------------------------------------------ASPHALT
3.799
LPF
3.780
3.800
3.961
3.902
MH
3.973
3.943
13:19:45
SHX ROAD
Text
13:19:48
MIRFA 2 - 120 MIGD RO IWP
---------------------------------------------
-------------------------------------------
2023-03-30 3.812
3.930
3.847
3.809
TILE
-------------------------------------------- FOOT13:19:47
PATH
-2023-03-30
AutoCAD
-AutoCAD 3.828
MH
3.786
------------------------------------------- SHX Text
13:19:48
-AutoCAD 3.788
3.834
CONCRETE
-------------------------------------------
2023-03-30 MH SHX CABLE TRENCH
Text
13:19:48
AutoCAD
-2023-03-30 3.960
------------------------------------------- SHX
SHX Text
Text ZONE :
-- EXISTING
AutoCAD
2023-03-30 3.847
3.855
3.849
-------------------------------------------
2023-03-30 SHX FENCE
13:19:47
13:19:48
Text
13:19:48
13:19:46
13:19:48
AutoCAD
2023-03-30 EXISTING
3.789 SHX
3.833
3.797 GATE
Text
13:19:46 AL
-------------------------------------------
--------------------------------------------
AutoCAD SEWERSHX SHX Text
PIPELINE
--------------------------------------------
-------------------------------------------
AutoCAD
2023-03-30
AutoCAD Text
13:19:47
SHX Text
MARFA
-------------------------------------------
AutoCAD
-2023-03-30
AutoCAD
--AutoCAD 3.838
3.842
3.848
HV
3.774 SHX
CABLE Text
13:19:48
SHX Text SECTOR NO : PLOT NO :
E:748629.556
AutoCAD
2023-03-30
2023-03-30
AutoCAD
2023-03-30
3.821
3.765
LPF
-------------------------------------------SHX
13:19:46
SHX
SHX Text
13:19:47
Text
13:19:46
Text
13:19:45
-2023-03-30
AutoCAD 3.857 SHX Text
N:2669895.500
-------------------------------------------
AutoCAD SHX
13:19:45
Text
Ex.WATER
2023-03-30
AutoCAD
2023-03-30
AutoCAD 3.837
3.780
3.808 13:19:47
SHX
13:19:45
--------------------------------------------- Text
13:19:46
SHX Text
--------------------------------------------
E:748606.149
N:2669885.970
E:748615.604
2023-03-30 13:19:45
13:19:47
13:19:48
13:19:46
--------------------------------------------
AutoCAD
2023-03-30 SHX
13:19:45
Text
---------------------------------------------
3.791
3.822
3.778
N:2669889.846
2023-03-30
AutoCAD 13:19:45
SHX
-------------------------------------------
2023-03-30 MH Text
13:19:45
AutoCAD
2023-03-30
AutoCAD
AutoCAD
2023-03-30 3.908
MH SHX
--------------------------------------------
SHX
--------------------------------------------
-------------------------------------------
3.938 SHX Text
13:19:45
Text
Text
13:19:45
PROJECT DESCRIPTION :
--------------------------------------------
2023-03-30
AutoCAD 3.969
4.028
--------------------------------------------
MH
3.882 13:19:45
SHX
--------------------------------------------
2023-03-30 MH
3.827
3.848
3.845 Text
13:19:46
13:19:47
---------------------------------------------
AutoCAD
2023-03-30 3.946
3.870
4.006
MH SHX
13:19:48
Text
TEMP.Gas
2023-03-30 3.770
3.905 13:19:46
---------------------------------------------
3.785
3.824
3.972
4.028
Cylinder
2023-03-30
AutoCAD LP
3.985
--------------------------------------------
3.818 13:19:46
SHX
13:19:45
--------------------------------------------
2023-03-30
AutoCAD 3.582 SHX Text
13:19:47
------------------------------------------- Text
AutoCAD 3.993
3.384 SHX
-------------------------------------------
2023-03-30 Text
13:19:45
AutoCAD
2023-03-30
2023-03-30 MH
--------------------------------------------
3.963
3.571 SHX
13:19:45
13:19:46
Text
13:19:48
-------------------------------------------- MIRFA 2 REVERSE OSMOSIS (RO) PLANT -
LOW VOLTAGE AutoCAD
2023-03-30
--AutoCAD LPF
4.011
4.814
3.818
3.815
3.862
3.810 SHX
13:19:47
SHX Text
13:19:46
Text
-------------------------------------------- INDEPENDENT WATER PROJECT
S/S & CONTROL
AutoCAD
2023-03-30 SHX Text
13:19:45
--------------------------------------------
ROOM
AutoCAD
2023-03-30
AutoCAD 8.120
4.669
10.845 SHX Text
-------------------------------------------
2023-03-30 1.806 13:19:46
--------------------------------------------
13:19:45
SHX
13:19:46
13:19:47
Text
2023-03-30 MH 13:19:47
--------------------------------------------
2023-03-30
AutoCAD
-AutoCAD 3.945
3.973
3.987
3.864
MH
3.813
3.800 SHX
3.860 13:19:46
13:19:47
13:19:45
--------------------------------------------
SHX Text
--------------------------------------------
2023-03-30
AutoCAD 3.964
MH 13:19:45
SHX Text
-------------------------------------------
Text
--------------------------------------------
AutoCAD SHX Text
--------------------------------------------
-------------------------------------------
AutoCAD
2023-03-30 2.838
MHE SHX
13:19:46
Text
--------------------------------------------
2023-03-30
-AutoCAD
AutoCAD
2023-03-30 2.788
3.846
3.985
3.043
3.958 13:19:47
13:19:46
SHX
SHX Text
13:19:47
Text DRAWING TITLE :
2023-03-30
AutoCAD 3.489
4.779
3.808
3.848
4.262 13:19:46
---------------------------------------------
3.810 SHX Text
-------------------------------------------
-------------------------------------------
2023-03-30
2023-03-30
AutoCAD 4.849 SHX 13:19:46
13:19:46
Text
E:748550.484
E:748624.498
N:2669835.822
E:748635.603
-------------------------------------------
--------------------------------------------
AutoCAD
2023-03-30 13.678
LPF SHX Text
13:19:47 CIVIL
--------------------------------------------
3.778
N:2669840.336
N:2669805.466
AutoCAD 3.379 SHX Text
----------------------------------------------
3.812 13:19:45 EXISTING SITE SURVEY RO PLANT AREA
AutoCAD
2023-03-30
2023-03-30 3.810
3.847
3.806 SHX
13:19:46
13:19:47
Text
13:19:46
3.446
CONC.TANK E:748649.558
CONC.SLAB N:2669845.992
-------------------------------------------
AutoCAD
2023-03-30
AutoCAD 3.812 SHX Text
13:19:45
13:19:46
SHX Text
13:19:46 (EXISTING UTILITIES TO BE REMOVE)
---------------------------------------------
2023-03-30
AutoCAD FH
-------------------------------------------
3.790 SHX
13:19:47
Text
--------------------------------------------
2023-03-30 13:19:46
13:19:47
-2023-03-30
AutoCAD
2023-03-30 3.853
3.830
3.865 SHX Text
--------------------------------------------
13:19:45
13:19:47
13:19:47
SHEET 1 OF 2
---------------------------------------------
AutoCAD
AutoCAD
2023-03-30
3.828
3.804
MH
3.867
3.777
3.748
3.924
4.010
3.939
LPF SHX
SHX Text
Text
--------------------------------------------
-------------------------------------------
13:19:45
13:19:47
AutoCAD
AutoCAD
2023-03-30 3.835
3.834
3.886
3.060 SHX
SHX Text
--------------------------------------------
Text
-------------------------------------------
13:19:45
13:19:47
AutoCAD
2023-03-30
AutoCAD
2023-03-30 4.023
3.503
3.823
3.920 SHX
13:19:47
Text
13:19:45
13:19:46
---------------------------------------------
3.806
3.871
3.838
3.817
3.952
3.936 SHX
13:19:47
Text
DRAWING NO : REVISION NO:
AutoCAD
2023-03-30 3.858
3.774
3.782
3.824 13:19:46
SHX
13:19:47
Text
13:19:45
13:19:46
--------------------------------------------
-2023-03-30
AutoCAD
2023-03-30
AutoCAD
3.785 SHX
13:19:45
13:19:47
SHX Text
-------------------------------------------
AutoCAD SHX Text
--------------------------------------------
13:19:45
13:19:46
Text 224020-C2-W0-ANC-6000-CG-WWZ-SK-005 A
-------------------------------------------
2023-03-30
AutoCAD
AutoCAD MH
--------------------------------------------
3.947 13:19:46
-------------------------------------------
SHX
13:19:47
SHX Text
--------------------------------------------
13:19:45
Text
-------------------------------------------
2023-03-30
AutoCAD
2023-03-30
AutoCAD MH
3.926
3.617
3.947
MH 13:19:46
13:19:47
--------------------------------------------
3.809
3.833
3.794 13:19:45
---------------------------------------------
SHX
13:19:45
13:19:46
Text
13:19:47
SHX Text
---------------------------------------------
2023-03-30
2023-03-30 3.801
--------------------------------------------
AutoCAD 3.819
3.780
3.892
3.814 SHX
13:19:47
Text
13:19:45
13:19:46 SUBMISSION DATE : SCALE :
--------------------------------------------
AutoCAD
2023-03-30
AutoCAD
2023-03-30
MH
3.821
3.804
3.764
3.836 SHX Text
--------------------------------------------
-------------------------------------------
3.818
3.673 13:19:45
13:19:46
--------------------------------------------
SHX
13:19:47
Text
-------------------------------------------
13:19:46
13:19:45
13:19:47
AutoCAD
2023-03-30
2023-03-303.812
3.784
3.803
3.790
3.789
3.801
3.823
3.790
3.779
3.786
3.781
3.720
3.756
3.760
3.804
3.816
3.770
3.795
3.829
3.773
3.811
3.809
3.813
SHX Text
-------------------------------------------
13:19:45
---------------------------------------------
13:19:45
-------------------------------------------- 14.03-2023 1:100
AutoCAD 3.816
3.795
3.819
3.800
3.785
3.792
3.820
3.837
3.819
ET
3.800
3.788
3.818
-2023-03-30
3.807
3.789
3.765 SHX Text
--------------------------------------------
2023-03-30
3.801
3.809
3.785
3.830
3.755
3.770 13:19:47
13:19:45
13:19:47
--------------------------------------------
3.779
--------------------------------------------
13:19:45
13:19:46
3.799
--------------------------------------------
---------------------------------------------
3.818 13:19:46
3.827
3.797
3.819
3.825
3.817
3.820
3.837
3.776
3.807
3.800
3.799
3.805
3.810
3.806
3.854
3.830
3.857
3.846
3.836
3.834
3.816
3.838
3.839
3.874
3.829
3.792
MH
2023-03-30
-------------------------------------------
3.785
3.790
3.708
3.795
3.763
3.921
3.773
-AutoCAD
3.785 SHX Text
3.747
3.751
3.755
3.786
3.752
3.804
3.788
3.813
3.805
3.790
3.784
3.803
3.770
3.758 SHX
--------------------------------------------
3.760
3.794
3.789
3.821
3.776
--------------------------------------------
3.769
3.729
3.797
3.771
3.759
3.755
3.717
3.746
AutoCAD
3.756 Text
PROJECT ID : DRAWING SIZE :
3.808
3.718
--------------------------------------------
3.819
2023-03-30 13:19:46
13:19:47
-2023-03-30
3.810
3.762
3.780
MH
3.741
-AutoCAD
3.733 SHX
3.710
3.758 13:19:46 224020 A1
Text
--------------------------------------------
-------------------------------------------
MH
--------------------------------------------
2023-03-30 13:19:45
13:19:47 OFFICIAL USE ONLY :
3.776
3.816
MH
-AutoCAD
3.743 13:19:46
MH SHX Text
-------------------------------------------
--------------------------------------------
2023-03-30 13:19:47
13:19:45
13:19:46
-3.763
3.755
3.748
3.805
3.757 OFFICIAL USE ONLY :
--------------------------------------------
-------------------------------------------
-3.839
3.840
3.786
3.777
3.816
3.720
3.766
3.813
3.765
3.748
3.764
3.801
3.891
3.868
3.910
3.915
3.962
4.069
MH
3.085
4.075
MATCH LINE A-A
E:748584.373 E:748589.358
N:2669720.979 N:2669722.690
0 0.25
0.5 0.75
1 1.25m
S
C
A
L
E
1
:
2
5
0 1 2
3 4
5m
S
C
A
L
E
1
:
1
0
0
LAND KEY :
PLANT
N NORTH
MATCH LINE A-A N
W E
W E
S
AutoCAD
AutoCAD SHX
SHX Text
Text
AutoCAD
AutoCAD SHX SHX Text
Text
AutoCAD
2023-03-30 SHX Text
13:19:53
2023-03-30
2023-03-30 13:19:48
13:19:50
2023-03-30
2023-03-30SHX
AutoCAD 13:19:49
13:19:50
Text
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
---------------------------------------------
2023-03-30 3.776
3.807
3.773
MH
13:19:53
AutoCAD MH
3.949
3.964 SHX Text
-------------------------------------------
PROJECT CO-ORDINATES SYSTEM
- Map Projection : UTM 39 NORTH
- Plan Datum : WGS 84
2023-03-30
- 3.788 3.777 13:19:53
3.821 GENERAL NOTES : - Height Datum : Abudhabi Municipality Datum
AutoCAD
-------------------------------------------
AutoCAD SHX
SHX Text
Text
AutoCAD
AutoCAD SHX
SHX Text
Text
2023-03-30
2023-03-30
-AutoCAD 3.804
3.826
3.772 13:19:53
13:19:49
AutoCAD
2023-03-30 SHX
SHX Text
13:19:53
Text
2023-03-30
AutoCAD
------------------------------------------- 13:19:50
SHX Text
E:748622.037
N:2669642.399
--------------------------------------------
AutoCAD SHX
2023-03-30
2023-03-30
AutoCAD
--------------------------------------------
AutoCAD
SHX
13:19:50
Text
13:19:51
13:19:49
13:19:50
13:19:52
13:19:51
SHX Text
Text
E:748617.192 E:748624.802
--------------------------------------------
AutoCAD
2023-03-30
AutoCAD
-2023-03-30 3.782
3.826
3.809 SHX
13:19:51
13:19:52
13:19:53
SHX Text
Text
13:19:49
13:19:50
--------------------------------------------
AutoCAD SHX
13:19:48
Text
N:2669640.231
E:748617.535 N:2669641.175 E:748681.906
2023-03-30
2023-03-30
AutoCAD
1.
2023-03-30 3.767
--------------------------------------------
-------------------------------------------
AutoCAD ALL13:19:51
SHX
13:19:49
13:19:50
13:19:52
Text
13:19:48
13:19:51
SHX
13:19:50
Text
DIMENSIONS AND
-------------------------------------------
3.876
N:2669639.696 E:748625.403
N:2669639.599 E:748682.420
2023-03-30
AutoCAD 3.785
-------------------------------------------
2023-03-30 SHX
13:19:50
Text
13:19:49
13:19:48
--------------------------------------------
AutoCAD SHX Text
N:2669664.711
3.793
E:748743.888
E:748618.665 N:2669685.182
2023-03-30
-AutoCAD
2023-03-30 3.813
3.808
3.830
--------------------------------------------
-------------------------------------------
AutoCAD 3.805
3.824
3.801
3.810
3.811
3.800
3.829
3.822
3.795
3.788
3.796
3.794
3.811
3.797
3.832
-------------------------------------------- 13:19:48
SHX
13:19:49
Text
13:19:50
SHX
13:19:49
13:19:53
Text
CHAINAGES
---------------------------------------------
AutoCAD
2023-03-30 SHX ARE
13:19:49
13:19:53
Text IN METRES
N:2669636.856
TRANSFORMER
E:748630.305 E:748703.218
AutoCAD
2023-03-30 3.839
3.856
3.852
3.846
3.863
3.860
3.825
3.843
3.842
3.837
3.844
3.814
3.808
3.835
3.807
--------------------------------------------
---------------------------------------------
AutoCAD
2023-03-30
AutoCAD FH
3.831
-------------------------------------------
LP SHX Text
13:19:50
SHX
13:19:49
SHX Text
13:19:49
Text
3.820
3.792
N:2669638.933 N:2669668.535
ROOM
E:748715.975 E:748716.636
-2023-03-30
2023-03-30 3.828
3.830
3.838
3.823
3.744
3.799
3.826
3.824
3.801
3.813
3.795
--------------------------------------------
3.751
3.750
FHB
3.843
3.798
3.813
3.787
FH
3.806
-------------------------------------------
AutoCAD 3.844
3.778
--------------------------------------------
-------------------------------------------
UNLESS
AutoCAD FHB
3.706 13:19:49
13:19:50
SHX
ALL
SHX Text
13:19:49
DIMENSIONS AND
13:19:50
Text
3.774
TANK
--------------------------------------------
3.935 13:19:49
N:2669669.574
AutoCAD
2023-03-30 SHX
13:19:48
13:19:50
Text
N:2669669.824
ET 13:19:49
EXISTING WORK
2023-03-30
--------------------------------------------
-2023-03-30 FH
-------------------------------------------- 13:19:48
13:19:50
13:19:50
13:19:51
3.961
LP
TEMP.SHED
AutoCAD SHX
13:19:53
Text
SHOP
-2023-03-30 3.756
3.807
3.704
HEVY VECHILE
SHED
AutoCAD 3.836
--------------------------------------------
CHAINAGES SHX
---------------------------------------------
2023-03-30 3.770
-------------------------------------------
AutoCAD 3.844 13:19:49
SHX Text
ARE
13:19:48
13:19:51
Text
13:19:48
13:19:49 IN METRES
E:748637.990
-------------------------------------------
AutoCAD
2023-03-30
AutoCAD 3.994
3.937
3.997
3.973 SHX
--------------------------------------------
3.955
3.954
3.967
--------------------------------------------
SHX Text
13:19:49
13:19:51
Text
-------------------------------------------
4.694
4.693
4.734
4.722
4.309
4.751
4.272
4.707
4.308
4.227
4.270
4.226
4.257
4.245
4.255
4.274
4.248
4.236
COMPPRRSOR
N:2669619.798
2023-03-30
--------------------------------------------
2023-03-30 MH 13:19:49
13:19:49
13:19:50
UNLESS 3.940
3.953 STATED OTHERWISE.
ROOM
E:748627.857
E:748711.053
N:2669649.328
E:748751.896
---------------------------------------------
2023-03-30
-2023-03-30 FH
FHB
3.952
3.786
3.903
FH
3.945
3.990
3.967
3.596
3.531
3.834
3.838
MH
3.938
3.674 13:19:49
13:19:50
13:19:49
13:19:50
13:19:53
---------------------------------------------
N:2669665.749
N:2669613.825
AutoCAD
AutoCAD 3.807 SHX
3.914
3.950
3.835
3.791 SHX Text
--------------------------------------------
3.942 Text
--------------------------------------------
AutoCAD 3.836
MH
3.959 SHX
--------------------------------------------
AutoCAD MH
3.987
3.944 SHX Text
Text
E:748632.611
--------------------------------------------
-------------------------------------------
2023-03-30
AutoCAD
2023-03-30
AutoCAD 3.819
3.970
3.961 SHX
13:19:50
SHX Text
13:19:49
13:19:50
Text
E:748958.704
B ISSUED FOR INFORMATION
PRE 14-03-2023 FLS EA EA
2.958
E:748725.097 E:748725.803 E:748967.778
N:2669615.720 N:2669646.986 N:2669647.399
2023-03-30
AutoCAD
2023-03-30 3.851
3.850
3.989
3.843 13:19:49
13:19:50
13:19:51
SHX Text
13:19:53
N:2669740.556 N:2669744.010
E:748633.277
N:2669611.175
E:748804.963 AutoCAD
2023-03-30 4.794
3.973
3.936 SHX
13:19:49
13:19:50
13:19:51
---------------------------------------------
AutoCAD
2023-03-30
AutoCAD 3.815
3.985
3.778
3.819
3.800 SHX
SHX Text
13:19:48
Text
13:19:49
13:19:50
-------------------------------------------- Text
A1 ISSUED FOR INFORMATION PRE 08-12-2022 RMR MT AE
E:748634.343 E:748728.722
############ N:2669665.551
--------------------------------------------
-------------------------------------------
2023-03-30 13:19:48
13:19:50
13:19:49
13:19:50
-------------------------------------------
2023-03-30
AutoCAD SHX
-------------------------------------------- Text
13:19:49
13:19:50
CCTV REV No. DESCRIPTION STATUS DATE DRAWN CHECKED APPROVED
-------------------------------------------
############# E:748805.829 GATE
2023-03-30
AutoCAD SHX
13:19:52
Text
E:748762.093 E:748962.187
13:19:48
13:19:50
13:19:51
E:748729.562
0.071
N:2669637.567
2023-03-30 13:19:52
N:2669611.630 E:748971.361
--------------------------------------------
E:748764.776 N:2669666.848
13:19:49
13:19:51 CLIENT
############ N:2669731.257
3.964
3.800
3.822
N:2669637.937 N:2669649.139
N:2669650.206 #############
AutoCAD 3.969
3.960
5.027
3.992 SHX
--------------------------------------------
-AutoCAD MHS SHX Text
Text
N:2669735.056
E:748730.432
E:748765.080
N:2669647.889
############
AutoCAD
2023-03-30
AutoCAD
2023-03-30
-2023-03-30 3.801
3.991
MH
--------------------------------------------
3.831
4.030
3.884
3.979
4.064
3.946
3.846
4.141
4.319
3.796
3.834
3.827
3.963
5.272
MH
3.901
3.866
3.940
SEW.MH SHX
13:19:53
--------------------------------------------
3.785 SHX Text
--------------------------------------------
3.740 13:19:52
Text
--------------------------------------------
:
AutoCAD 3.868
3.890
3.908 SHX Text
-------------------------------------------
N:2669633.788
--------------------------------------------
2023-03-30 3.960
3.896
3.964 13:19:50
13:19:51 EMIRATES WATER
E:748766.670
13:19:48
13:19:50
13:19:51
N:2669643.843
2023-03-30
AutoCAD MH
3.879
3.839
3.934
3.891 SHX
13:19:50
13:19:51
13:19:52
Text
-------------------------------------------
E:748760.985 E:748806.706
13:19:49
E:748731.169
2023-03-30
AutoCAD 3.878 SHX
13:19:50
13:19:51
13:19:52
Text
-------------------------------------------
3.823 & ELECTRICITY Co.
N:2669647.823 N:2669666.830
3.865
3.802
N:2669633.910
-2023-03-30
AutoCAD
-AutoCAD 3.822
3.828
3.925
3.842
3.814
3.819
3.820
3.803
3.798
3.772
3.792
3.745
3.736
3.795
3.832
3.824
3.788
3.815
3.827
3.811
3.797
3.823
3.800
3.812
3.828
3.814 13:19:49
13:19:50
SHX
13:19:48
13:19:51
Text
13:19:49
13:19:50
--------------------------------------------
2023-03-30 3.764
3.860
3.882
3.823
3.939
3.798
3.841
3.831
3.816
3.795
3.801
3.799
3.821
3.833
3.848
3.825
3.806
3.809 13:19:51 (EWEC)
E:748761.934
N:2669645.680
AutoCAD SHX
SHX Text
--------------------------------------------
2023-03-30 13:19:50
13:19:53
13:19:49
13:19:51
Text
--------------------------------------------
-------------------------------------------
3.785
E:748732.363
N:2669626.614 E:748739.344
2023-03-30
AutoCAD
2023-03-30
AutoCAD 3.846
3.845
3.846
3.827
3.838
3.836
3.849
3.834
3.866
3.844
3.871
3.850
3.862
3.854
3.841
3.851
3.847
3.856
3.835
3.860
3.840 13:19:50
13:19:53
--------------------------------------------
3.839
--------------------------------------------
SHX
13:19:49
SHX Text
13:19:50
---------------------------------------------
3.848 Text
2023-03-30 13:19:48
13:19:50
E:748765.109
OWNER ENGINEER:
13:19:49
--------------------------------------------
N:2669630.428
AutoCAD
2023-03-30 SHX
13:19:50
13:19:51
Text
E:748732.958
3.827
3.776
N:2669643.277
-------------------------------------------
2023-03-30
AutoCAD SHX
13:19:49
13:19:51
Text
N:2669626.913
E:748769.349
E:748796.299
N:2669640.779
--------------------------------------------
2023-03-30
AutoCAD
AutoCAD
2023-03-30 4.020
LP
3.806
3.820
3.793
3.795
3.838
3.793
3.785
3.786
3.796
3.802
3.782
3.811
3.806
3.825
3.794
3.836
3.791
3.813
3.817
3.830
3.799
3.812
3.801
3.804
3.824
3.809
3.837
3.894
3.803
3.734
3.816
3.822
3.786
3.842
MH
3.963
3.785
3.859
3.877
3.851
3.972
3.829
3.906
3.843
3.873
3.839
3.833
3.779
3.935
3.824 13:19:50
SHX
13:19:48
13:19:49
Text
----------------------------------------------
-------------------------------------------
3.828 13:19:50
-------------------------------------------
--------------------------------------------
3.806 SHX
13:19:51
Text ILF CONSULTING ENGINEERS
N:2669641.785 E:748779.203
AutoCAD
2023-03-30
2023-03-30 3.862
3.830
3.748
3.928
3.933
3.873
3.881
3.957
3.842
3.952
3.841
3.944
3.937
3.837
3.989
3.877
3.950
3.957
3.792 13:19:49
--------------------------------------------
3.892
3.872 SHX Text
-------------------------------------------
MH 13:19:49
--------------------------------------------
3.825
3.981 13:19:48
13:19:51
13:19:53
---------------------------------------------
3.881
3.789 13:19:48
13:19:49
N:2669634.014
EXISTING HIGH E:748779.700
2023-03-30
AutoCAD
2023-03-30 MH
4.769
3.836 SHX
13:19:50
Text
--------------------------------------------
3.946
3.936
3.949
3.945
3.904 13:19:50
---------------------------------------------
-AutoCAD 3.777
3.952
3.794
3.905
3.804
3.926
3.796
3.848
3.859
4.048
MHS SHX Text
SKY TOWER UNIT 36-01,36th FLOOR AL REEM
MH
4.038
P.O. Box 73250 Abu Dhabi United Arab Emirates
2023-03-30 13:19:49
13:19:50
E:748741.238 N:2669632.760
4.064
3.936
E:748738.532 VOLTAGE
-AutoCAD MH
SEW.MH
--------------------------------------------
3.957
3.830
N:2669616.410
4.034
3.904
3.909 SHX Text
-------------------------------------------
N:2669615.239
13:19:50
SUBSTATION
2023-03-30
AutoCAD 3.806
3.902
MH
3.977 SHX
13:19:51
Text
--------------------------------------------
3.999
4.010
3.874
E:748780.900
4.027
--------------------------------------------
3.872
0.000
MH
3.822
N:2669629.786 E:748797.409
N:2669639.859
AutoCAD
2023-03-30 3.980
3.855 SHX Text
13:19:51
--------------------------------------------
OWNER:
E:748744.218
E:748747.291
N:2669609.361 E:748798.062 AutoCAD
2023-03-30
2023-03-30
AutoCAD 3.959
3.956
3.981
3.941
3.790
MH
3.964
3.788
3.816
SHX
SHX Text
13:19:51
13:19:49
13:19:50
13:19:53
13:19:51
Text
---------------------------------------------
13:19:49 ENGIE SOLUTIONS
2023-03-30 MH
3.762 13:19:50
E:748777.483
3.939
E:748781.606 N:2669636.678
4.024 13:19:49
N:2669609.332
N:2669621.634 N:2669628.006
E:748799.453
2023-03-30
AutoCAD
2023-03-30 MH
3.982 SHX
13:19:51
Text
--------------------------------------------
13:19:49
13:19:51
13:19:48
13:19:50 MIDDLE EAST
--------------------------------------------
3.950
3.994
E:748741.303
2023-03-30 13:19:51
--------------------------------------------
E:748739.695
AutoCAD SHX
13:19:50
Text
E:748778.684
--------------------------------------------
AutoCAD 3.980
3.941
3.975 SHX Text
N:2669603.589 E:748780.326
2023-03-30 13:19:51
13:19:53
N:2669618.768
AutoCAD 3.969
3.937 SHX
13:19:48
13:19:49
Text
N:2669619.446
---------------------------------------------
3.776
3.827
3.795
3.963
3.938
MH
EXISTING
AutoCAD
2023-03-30
2023-03-30
AutoCAD 3.982
3.951 SHX
13:19:51
Text
13:19:48
13:19:49
SHX Text
EPC CONTRACTOR:
3.970
TRANSFORMER AREA
--------------------------------------------
2023-03-30
AutoCAD
2023-03-30
AutoCAD MH
3.977
3.972
3.945
3.966
4.009 SHX
13:19:49
13:19:50
13:19:51
Text
13:19:50
SHX
13:19:49
Text
--------------------------------------------
-------------------------------------------
5.003
4.970 AL-NASR
E:748657.424 E:748745.018 E:748747.591 E:748784.579 AutoCAD
2023-03-30
2023-03-30
AutoCAD
2023-03-30 4.113
MH
3.978
3.978
4.967
3.918
3.911
4.051
3.950
MH SHX Text
13:19:50
--------------------------------------------
13:19:51
--------------------------------------------
SHX
13:19:50
Text
13:19:49
13:19:51
--------------------------------------------
3.880
3.950
N:2669551.429
AutoCAD
2023-03-30
2023-03-30
AutoCAD 3.998
3.997 SHX
13:19:53
Text
-------------------------------------------
13:19:51
--------------------------------------------
SHX
13:19:48
13:19:50
Text SIDEM
-AutoCAD 3.753
3.802
3.894
--------------------------------------------
LP
0.000
3.932 SHX Text
13:19:48
13:19:50
--------------------------------------------
2023-03-30
AutoCAD 3.909
4.008
3.982
MH
3.934
3.903 13:19:49
13:19:51
SHX Text
--------------------------------------------
2023-03-30
-3.962
2023-03-30 4.044
3.851
FH 13:19:48
13:19:50
-------------------------------------------
2023-03-30
AutoCAD 3.953
MH
3.929 SHX
13:19:49
Text
--------------------------------------------
3.968 13:19:50
13:19:48
13:19:49
13:19:51 CONSULTANT:
--------------------------------------------
3.772 13:19:50
E:748797.375 N:2669610.776
2023-03-30 13:19:49
13:19:51
E:748796.720
E:748785.961
E:748790.527 N:2669594.287
2023-03-30
AutoCAD
AutoCAD
2023-03-30 3.806
3.818
3.877
3.927
3.885 SHX
13:19:49
13:19:51
Text
--------------------------------------------
2023-03-30 MH
3.988 13:19:48
13:19:49
13:19:50
13:19:51
13:19:52
--------------------------------------------
3.822 SHX
SHX Text
13:19:53
--------------------------------------------
AMGD
3.957
E:748794.625
AutoCAD Text
---------------------------------------------
3.781
N:2669605.266
E:748779.458 N:2669589.846
AutoCAD
AutoCAD
2023-03-30 3.796
3.844
3.956
MH SHX
SHX Text
--------------------------------------------
3.993 13:19:52
Text
--------------------------------------------
MH
3.822
E:748660.798 E:748770.306 N:2669586.113 N:2669596.238
2023-03-30
AutoCAD 13:19:49
SHX Text
E:748769.359 N:2669585.761
-------------------------------------------
MH
N:2669543.130
2023-03-30
2023-03-30 3.999
3.888
3.954 13:19:49
13:19:50
13:19:48
13:19:50
13:19:52
AutoCAD
2023-03-30
AutoCAD
2023-03-30 3.965
3.910
3.868
3.905
3.886
3.960
3.974
3.812
MH
3.980
4.002
3.883
3.821
3.859
3.975
3.916
3.841
3.959
3.875
3.899
3.895
3.922 SHX
13:19:49
13:19:51
SHX Text
13:19:52
13:19:48
13:19:49
13:19:50
13:19:51
Text
-------------------------------------------
3.827 13:19:49
13:19:50
13:19:51
2023-03-30 3.790
0.000
3.892 13:19:52
E:748795.660
--------------------------------------------
3.786
3.812
3.792
E:748778.614 E:748789.870
AutoCAD SHX
13:19:49
13:19:51
Text
E:748749.897
----------------------------------------------
3.795
3.803
3.807
3.810
3.799
3.796
3.820
3.837
3.890
3.884
3.809
3.793
3.801
3.805
3.806
3.831
3.816
3.814
3.813
3.818
3.819
3.919
3.820
3.823
3.831
3.829
3.828
3.815
E:748752.252
3.884
3.866
N:2669577.669
13:19:49
N:2669578.768
E:748771.736 N:2669580.019 E:748788.847
N:2669585.614
E:748791.356
-------------------------------------------
AutoCAD
2023-03-30
2023-03-30
AutoCAD 3.830
3.826
3.835
3.838
3.836
3.844
3.814
3.855
3.880
3.865
3.891
3.845
3.833
3.828
3.841
3.852
3.840
3.846
3.849
3.842
3.832
3.860
SHX
13:19:51
Text
--------------------------------------------
13:19:48
-------------------------------------------
13:19:51
--------------------------------------------
SHX Text
---------------------------------------------
DESIGNER:
--------------------------------------------
N:2669591.838
E:748793.983
-------------------------------------------
2023-03-30
AutoCAD
AutoCAD 3.788
3.800
3.912
2023-03-30
AutoCAD SHX
13:19:50
13:19:51
SHX
SHX Text
13:19:49
-------------------------------------------
Text
13:19:49
13:19:48
13:19:50
13:19:51
Text
ARTELIA
--------------------------------------------
LP
----------------------------------------------
3.819
3.912
N:2669588.554
AutoCAD
AutoCAD FH
3.782
3.790
3.787
3.796
3.811
3.798
3.784
3.838
3.872
3.871
3.840
3.797
3.807
3.808
3.810
3.809
3.806
3.823
3.817
3.801
3.821
3.805
3.945
3.816
2023-03-303.812
3.825
3.960
3.947
FHB
3.822 SHX Text
13:19:49
SHX Text
Tel. No: +971 04 886 5690
3.826
3.854
3.871
3.898
3.784
3.793
3.833
3.886
3.847
3.858
3.955
3.815
3.877
3.807
3.809
2023-03-30
3.918
3.900
3.891
3.894 13:19:52
E:748793.181
N:2669588.305
AutoCAD3.954
3.792
LP
3.952
3.948
3.942
-2023-03-30
3.790
3.977
3.957
3.830 SHX Text
--------------------------------------------
13:19:50
Fax No: +971 04 886 5691
3.830
3.976
3.849
3.793
E:748772.830 N:2669580.137
E:748790.240 N:2669585.797
3.813
3.854
3.807 13:19:51
---------------------------------------------
-------------------------------------------
--------------------------------------------
3.956
3.807
P.O. Box No:18271 Dubai,
AutoCAD
2023-03-30
3.842
3.825
3.816
AutoCAD
2023-03-30 SHX
13:19:50
Text
13:19:49
SHX
13:19:53
Text
E:748761.458
3.817
-------------------------------------------
3.970
2023-03-30
AutoCAD
3.984
3.987
4.001 SHX
13:19:49
13:19:51
Text
13:19:50
--------------------------------------------
U.A.E.
N:2669560.421 E:748762.491
N:2669560.327
3.661
3.977
3.726
3.764
3.969
AutoCAD
3.826
2023-03-30
-2023-03-30
FH SHX Text
13:19:49
--------------------------------------------
3.821
3.981
AutoCAD SHX Text
13:19:49
-------------------------------------------
AutoCAD SHX
13:19:51
13:19:52
Text
PROJECT NAME :
E:748764.217
3.645
--------------------------------------------
-AutoCAD
3.803
-------------------------------------------
AutoCAD
3.801
3.845
2023-03-30 SHX
SHX Text
13:19:48
13:19:50
Text
3.990
N:2669553.431
3.801
E:748802.123
E:748690.022
AutoCAD SHX Text
E:748671.586
--------------------------------------------
3.829
E:748789.098
2023-03-30 13:19:50
N:2669568.828
3.916
N:2669563.562
2023-03-30 13:19:50
--------------------------------------------
--------------------------------------------
N:2669516.549 E:748765.153
3.988
MHS
N:2669523.276
4.006 13:19:48
13:19:50
13:19:51
N:2669553.802
2023-03-30
3.844
3.973
3.865
-2023-03-30 13:19:52
13:19:48
SEW.MH13:19:51
2023-03-30 13:19:49
13:19:50
--------------------------------------------
13:19:48 MIRFA 2 - 120 MIGD
E:748760.439
-------------------------------------------- 13:19:49
3.979
--------------------------------------------
N:2669551.937
3.822
E:748801.162
N:2669568.440
--------------------------------------------
3.800
--------------------------------------------
3.856
3.814
3.838
3.941
-------------------------------------------- RO IWP AL MARFA
--------------------------------------------
MH
E:748798.020
3.939
E:748789.726
-3.963
0.000
MH
N:2669567.169
E:748762.840 E:748796.416
3.987
MH
3.788
3.828
3.894
3.956
3.793
3.749
3.881
4.202
4.059
3.949
3.947
3.794
3.818
3.969
3.898
3.914
3.952
3.878
3.789
3.890
3.899
3.813
4.186
N:2669552.873
3.429
EXISTING SUBSTATION
ZONE :
SECTOR NO : PLOT NO :
PROJECT DESCRIPTION :
AutoCAD
AutoCAD SHX
SHX Text
Text
2023-03-30
2023-03-30 13:19:53
13:19:50
-------------------------------------------
------------------------------------------- MIRFA 2 REVERSE OSMOSIS (RO) PLANT -
INDEPENDENT WATER PROJECT
-- MHS
SEW.MH
DRAWING TITLE :
CIVIL
EXISTING SITE SURVEY RO PLANT AREA
(EXISTING UTILITIES TO BE REMOVE)
SHEET 2 OF 2
E:748716.720
N:2669410.170 224020-C2-W0-ANC-6000-CG-WWZ-SK-005 A
LEGEND FOR EXISTING UTILITY SUBMISSION DATE : SCALE :
--------------------------------------------
-------------------------------------------
- FHB
FIRE HYDRANT BOX
--LIGHT
TREE
Conc.Support
CONCRETE
MHSCABLE
STREET
TILE
CONCRETE
EXISTING
SEWER
HV
LP
CCTV
MANHOLE
LPF
ASPHALT
FOOT
POLE
CAMERA
PIPELINE
LIGHT
ROAD
FENCE
GATE
SUPPORT
SEWER
PATH
ROAD
CABLE
FOUNDATIONTRENCH
(1.2x0.20x1m)
ONLY 0 0.25 0.5 0.75 1 1.25m
SCALE 1:25
0 1 2 3 4 5m
SCALE 1:100
Mirfa 2 RO Plant Document number :
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007
1. INTRODUCTION
Bureau Veritas (BV) has been appointed by AL Nasr Contracting Co. LLC. for
carrying out the third party services for Condition Assessment for the five (5)
buildings located at Mirfa 2 RO Plant Project, Al Mirfa, Abu Dhabi, UAE as
mentioned below:
• Workshop building
• 33kv switchgear building
• 220kv switchgear building
• Chemical Store (Building D)
• Low Voltage & Control Room Building
This report presents the outcome of the visual survey (i.e., investigation, testing,
analysis & reporting) conducted by Bureau Veritas Engineers, to the condition of the
five (5) buildings related to MIRFA RO Plant Project Al Mirfa, Abu Dhabi – UAE.
In order to be able to fulfil the purpose of the mission, Bureau Veritas proposed
scope of work will be as follows:
Based on the findings of the visual inspection, Bureau Veritas will develop a
sampling and testing program to be carried out on the existing structure.
After analyzing the results of the visual survey, the documents review and the
results of tests, Bureau Veritas, will recommend general guidelines and
methodologies to be implemented for the repair of the structure.
2.5. Reporting
Upon completion of all inspections and tests, Bureau Veritas will submit a
comprehensive report detailing the condition of the slab structures and facilities
and other findings. This report will include:
In accordance with the scope of work highlighted above, the investigation only
concentrates on the Workshop building, 33kV Switchgear Substation Building,
220kV Switchgear Substation Building, Chemical Store Building (Building D) and
Low Voltage & Control Room Building, at Al Mirfa, Abu Dhabi, UAE.
The AIR COMPRESSOR BUILDING Comprises of the ground floor Air compressor
room, LV switchboard, I & C equipment room and automation panel room. The first
floor comprises of the D.C. distribution room and battery room. The air compressor
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
<0o0>
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
The visual inspection has covered all concrete foundation pedestal located as
per drawing 3740-C-0-UST-C-100 Rev 07 and 3740-C-0-UST-C-101 Rev 11. Visual
survey conducted for the external pedestals from grid 1–6 / grid A-D with
protruding top portions only as other concrete pedestal is same level to slab on
grade. The overall visual inspection on the column pedestal foundations at these
areas indicated that generally they are in good condition. The concrete columns,
beams and walls from grid 6-15 / grid A-D which encloses the storerooms,
workshop areas, computer rooms and offices are generally in good conditions
except on localized delaminated column areas, localized delaminated walls and
localized wall cracks. Cracks were noticed on the floor slab.
The steel structure of the workshop is in good condition (no corrosion were noticed)
except at some locations mainly at the connections rust was noticed. The
coating for the steel structure is fading.
The visual inspection has covered all concrete columns and beams located as
per drawing 3740-C-0-USU-C-102 Rev.09 and 3740-C-0-USU-C-108 Rev.3. Visual
survey conducted for all columns and beams indicated that generally they are in
good condition except on localized areas where concrete spall was noticed
mainly in the floor slab. The walls both internal and external sides and the slab
soffit are visually in good condition except two localized areas on the soffit
slab , also localized cracks and paint peeling off.
Water proofing tiles delaminated with exposed steel reinforcement at different
locations.
The visual inspection has covered all concrete columns and beams located as
per drawing 3740-C-0-UAA-C-207 Rev.06 and 3740-C-0-UAA-C-201 Rev.3, 3740-C-0-
UAA- C-210 Rev.07.
Visual survey conducted for all Ground floor columns and slab indicated that
generally they are in good condition except on localized areas where concrete
delamination or spall was noticed. The walls both internal and external sides
and the slab soffit are visually in good condition apart from localized cracks and
generally paint peeling offs.
Visual survey conducted for all Roof beams and slab soffit indicated that
generally they are in good condition. The top slab is visually in good condition.
We noticed that all the columns of the basement are delaminated /spalled the
height of the damaged is varying from 05m to1.9 M from the floor slab. The size of
the columns is 400mm x 400 mm.
Also, Delamination and spalling of concrete with exposed rusted steel were
noticed on the perimeter retaining wall with average height of 1m above floor slab.
Concrete delamination on columns similar to the Concrete delamination on walls similar to the
basement columns basement wall
Concrete delamination on columns similar to the Concrete delamination on walls similar to the
basement columns basement wall
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
The visual inspection has covered all concrete foundation pedestal located as
per drawing 3740-A-X-UTF-C-100 Rev.6, 3740-A-X-UTF-C-021 Rev.6 and 3740-A-X-
UTF-C-
020 Rev.7. The overall visual inspection on the perimeter concrete columns and
beams at these areas indicated that generally they are in good condition except
on some localized cracks and delamination with hollow sound. The slab-on-grade is
visually in good condition except on some locations where cracks and
delamination with hollow sound is noted. The steel columns, beams and roof frames
are generally in good condition.
Listed under Annex C, hereafter, are the tests carried out by the Arab Center for
Engineering Studies (ACES), as per Bureau Veritas recommendations. ACES report
ref. AD. SPR23000021_Rev.0 dated 10th January 2023, is attached under Annex C.
The results of these tests can be summarized as follows.
CHEMICAL STORAGEBUILDING
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
- Few voids of small and medium size noted at all the core samples.
The determined bulk density of the core samples is 2340 kg/m³, 2380 kg/m³,
2370 kg/m³, 2360 kg/m³, 2370 kg/m³, 2340 kg/m³, 2380 kg/m³, 2330 kg/m³
and 2340 kg/m³. The average is 2356 kg/m3. The commonly accepted
averages are around 2320 kg/m3 as per ACI 318M14 section 2.3.
The estimated cube compressive strength for the cores obtained in column
and slab are 32.7 N/mm², 34.6 N/mm², 36.5 N/mm², 37.8 N/mm², 33.4 N/mm²,
26.6 N/mm², 37.9 N/mm², 33.2 N/mm², and 29.7 N/mm². The average is about.
33.6 N/mm².
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
WORKSHOP BUILDING
The determined bulk density of the core samples is 2370 kg/m³, 2380 kg/m³
and 2320 kg/m³. The average is 2356 kg/m 3. The commonly accepted
averages are around 2320 kg/m3 as per ACI 318M14 section 2.3.
The estimated cube compressive strength for the cores obtained in column
and slab are 29.7 N/mm², 38.2 N/mm² and 28.1 N/mm².The average is about
32 N/mm².
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
The determined bulk density of the core samples is 2400 kg/m³, 2430 kg/m³,
2410 kg/m³, 2420 kg/m³, 2480 kg/m³, 2400 kg/m³, 2450 kg/m³, 2430 kg/m³,
and 2430 kg/m³. The average is 2416 kg/m 3. The commonly accepted
averages are around 2320 kg/m3 as per ACI 318M14 section 2.3.
The determined bulk density of the core samples is 2370 kg/m³, 2350
kg/m³and 2400 kg/m³. The average is 2373 kg/m3. The commonly
accepted averages are around 2320 kg/m3 as per ACI 318M14 section 2.3.
Depth of carbonation measured shows that all the results are Nil except
one location 5mm.
WORKSHOP BUILDING
Depth of carbonation measured shows Nil for all the tested locations.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
Depth of carbonation measured shows Nil for all the tested locations.
Depth of carbonation measured shows Nil for all the tested locations.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
Similarly, the Sulphate content is determined for three depth increments (0- 25
mm, 25 – 50 mm & 50 – 75 mm). The results are provided as a percentage by
weight of concrete and as a percentage by weight of cement. The results
obtained are as follows.
WORKSHOP BUILDING
Chloride content varies between 0.04% (0.27%), 0.03% (0.21%) and 0.01%
(0.07%) by weight of concrete (by weight of cement) on first increment of
depth 0-25 mm. An average of 0.03% (0.18%) is computed.
Chloride content varies between 0.02% (0.14%), 0.03% (0.21%) and 0.01%
(0.07%) by weight of concrete (by weight of cement) on second increment of
depth 25-50 mm. An average of 0.02% (0.14%) is computed.
Chloride content varies between 0.02% (0.14%), 0.02% (0.14%) and 0.01%
(0.07%) by weight of concrete (by weight of cement) on third increment
of depth 50-75 mm. An average of 0.02% (0.12%) is computed.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
Similarly, the Sulphate content is determined for three depth increments (0- 25
mm, 25 – 50 mm & 50 – 75 mm). The results are provided as a percentage by
weight of concrete and as a percentage by weight of cement. The results
obtained are as follows.
Similarly, the Sulphate content is determined for three depth increments (0- 25
mm, 25 – 50 mm & 50 – 75 mm). The results are provided as a percentage by
weight of concrete and as a percentage by weight of cement. The results
obtained are as follows.
(3.21%), 0.47% (3.21%), 0.43% (2.94%), 0.34% (2.33%), 0.41% (2.80%), 0.36%
(2.46%), and 0.46% (3.15%) by weight of concrete (by weight of
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
Chloride content varies between 0.01% (0.07%), 0.01% (0.07%) and 0.07%
(0.48%) by weight of concrete (by weight of cement) on first increment of
depth 0-25 mm. An average of 0.03% (0.21%) is computed.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
Chloride content varies between 0.01% (0.07%), 0.01% (0.07%) and 0.07%
(0.48%) by weight of concrete (by weight of cement) on second increment of
depth 25-50 mm. An average of 0.03% (0.21%) is computed.
Chloride content varies between 0.01% (0.07%), 0.01% (0.07%) and 0.04%
(0.48%) by weight of concrete (by weight of cement) on third increment
of depth 50-75 mm. An average of 0.02% (0.14%) is computed.
Similarly, the Sulphate content is determined for three depth increments (0- 25
mm, 25 – 50 mm & 50 – 75 mm). The results are provided as a percentage by
weight of concrete and as a percentage by weight of cement. The results
obtained are as follows.
To evaluate the conditions of the reinforcing steel in the structure, Nine (9)
half- cell potential tests were carried out at Nine (9) different locations, at the 4
buildings Below outcome of these test are as follows.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
No corrosion is established for all tested location as per ACES test results.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
WORKSHOP BUILDING
No corrosion is established for all tested location as per ACES test results.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
33KV BUILDING
No corrosion is established for all tested location as per ACES test results.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
No corrosion is established for all tested location as per ACES test result
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
To evaluate the conditions of the structural steel members, twenty (20) ultrasonic
tests were carried out for 2 buildings at twenty (20) different locations, below
outcome of these test are as follows.
WORKSHOP BUILDING
Structural steel members at column are still in good condition for all
tested location as per ACES test results.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
Structural steel members at column is still in good condition for all tested
location as per ACES test results.
To evaluate the conditions of the structural steel members welding joints, twenty
(20) magnetic particle inspection tests were carried out for 2 buildings at twenty
(20) different locations, below outcome of these test are as follows.
The average density of the tested concrete samples is more than the
commonly accepted averages.
The above means that steel reinforcement in four building is still chemically
protected from corrosion by the alkaline nature of the concrete as well as
by its relatively high electrical resistance.
The results of chloride content in all four building test locations are lower than
the allowable limits of 0.3% by weight of cement at first, second and third
increment.
The results for sulphate content are in generally within the allowable limit
of 4.0% by weight of cement in all tested locations.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.
The results obtained by the tests shows Structural steel members at column
and beam is still in good condition for all tested location.
The results obtained by the tests shows Welded structural steel members
at column and beam has no cracks, pinholes and other discontinuities
observe for all tested location.
At the MIRFA RO Plant, Al Mirfa, Abu Dhabi, UAE may be concluded by the
following observations.
Based on visual survey and testing, it may be stated that, in general, the
structural condition of the buildings is in good condition, with some
exceptions
Concentration of chlorides below the allowable limits for all tested locations.
It is recommended that: