You are on page 1of 73

Mirfa 2 RO Plant Document number :

PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

METHOD STATEMENT & RISK ASSESSMENT (MSRA)


Rev: H Date: 22/0/2024
FOR DEMOLITION WORKS

Order Number: N/A Status: GFE

METHOD STATEMENT & RISK ASSESSMENT (MSRA) FOR


DEMOLITION WORKS

H 22/02/2024 Seventh Issue MS FS HA


G 08/01/2024 Seventh Issue CM EA HA
F 30/10/2023 Sixth Issue PC EA HA
E 21/08/2023 Fifth Issue PC EA HA
D 11/05/2023 Fourth Issue IS EA AE
C 30/03/2023 Third Issue IS EA AE
B 14/03/2023 Second Issue IS EA AE
A 22/10/2022 First Issue CM PM DPD
REV DATE DESCRIPTION PREPD CHKD APPD
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status : GFE

Order Numbers : N/A Page 2 of 16

REVISION LOG

Rev. Revised
Revised Page Description
No. Date

A 22/10/2022 - First Issue

Second Issue. Comments Incorporated. Bold and


B 14/03/2023 -
Italic.

C 30/03/2023 - Third Issue. Comments Incorporated. Bold and


Italic.

D 11/05/2023 - Fourth Issue. Comments Incorporated. Bold and


Italic.
E 21/08/2023 - Comments are answered in the CRS sheet
F 30/10/2023 - Sixth Issue. Comments Incorporated. Bold and
Italic.
G 08/01/2024 - Seventh Issue. Comments Incorporated. Bold and
Italic. 10.3.23 /10.3.24/10.3.25/10.3.26 and 7.2
H 22/01/2024 - Comments incorporated in Clause 10.3.34 have been
included in this MSRA, highlighted in bold and italic
letters.
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status : GFE

Order Numbers : N/A Page 3 of 16

Table of Contents

1. Purpose
2. Scope
3. Roles And Responsibilities
4. Definitions
5. Reference Standards
6. Acronyms / Abbreviations
7. Resources Including Manpower, Material, Tools & Equipment
8. Significant Hazards Identified
9. Interfacing Activities
10. Procedures
11. Emergency Procedures
12. HSEQ
13. Managing Changes
14. Reference Documents
15. Attachments
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 4 of 19

1. Purpose
The purpose of this method statement is to define the methodology to be adopted for
Demolition Works for Project Mirfa 2 – RO Plant 120 MIGD Capacity and provide details on
Construction Methodology, Quality Management System and Safety & Environmental
procedure that will be adopted.

The purpose of this method statement is to outline the materials, labor and workmanship
required to undertake the activity in a safe and controlled manner, complying with all relevant
standards and codes of practice.

2. Scope
This method statement covers the various steps involved in the Demolition works with the
project:
 Survey and Marking Works
 Demolition Works

3. Roles And Responsibilities


A competent team is assigned to the project according to its requirements.

1.1 Project Director

1.1.1 The Project Directors will lead the Project Manager and Site Manager in managing the overall
project team to ensure the satisfactory and timely completion of the project with safety and
Quality. They shall be the focal point from Contractor to Owner.

1.1.2 The Project Director is accountable for the operational planning, and implementation of OSH
Construction Management Plan for this project.

1.1.3 Shall ensure that the project team have adequate resources to carry out their duties and
responsibilities in accordance with this Project OSH Construction Management Plan.

1.1.4 Shall establish and maintain a direct line of communication with the Project HSE Manager.

1.1.5 Shall monitor the site operation to ensure they are conducted in accordance with the Site HSE
Management Plan and take urgent and appropriate action to prevent unsafe working practices or
other infringements of statutory of the safety plan requirements.

1.2 Project Manager


Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 5 of 19

1.2.1 Shall ensure all activities are in accordance with the relevant contract specification and
approved procedure / method statements.
1.2.2 Shall be overall responsible for execution of works and effective use of resources & manpower.
1.2.3 Shall communicate to all functions the importance of meeting Owner, Legal and Regulatory
requirements, Standards and Project Specifications.
1.2.4 Shall carry out construction related activities in accordance with the Project QHSE plan and
procedures.
1.2.5 Shall attend to QHSE observations and non-conforming activities raised and ensure corrective
action plans are in place.
1.2.6 Shall Manage and control all sub-contractors assigned to the project.
1.2.7 Shall ensure that everyone, including subcontractors, comply with the requirements of the
Project OSH Construction Management Plan.
1.2.8 Shall ensure all-necessary work procedures, method statements and work instructions are
prepared, reviewed, and issued for safe operation of the works on site.
1.2.9 Shall ensure to attend a Management Meetings.
1.2.10 Shall monitor the site operation to ensure they are conducted in accordance with the Site OSH
Construction Management Plan and take urgent and appropriate action to prevent unsafe
working practices or other infringements.

1.2.11 Shall establish and maintain a direct line of communication with the HSE Manager.

1.3 Project HSE Manager


1.3.1 Shall conduct site visits and inspections for monitoring of HSE compliance as per the project
OSH Construction Management Plan and other legal requirements.
1.3.2 Shall carry out audits to ensure the effectiveness of the implemented Safety & Health Plan.
1.3.3 Shall ensure to Conduct HSE Meetings
1.3.4 Shall conduct the Welfare Committee meeting to get the feedback from the workers about any
complaints and suggestions.
1.3.5 Shall be empowered to STOP IMMEDIATELY any unsafe or non-complying work activity on
site and instruct employees or any subcontractor to take immediate corrective action.
1.3.6 Shall prepare the health and safety training programs.
1.3.7 Shall prepare and update the emergency response plans.
1.3.8 Shall check all work procedures and method statements before the activity is commenced to
ensure that safety aspects (risks/hazards) of the operations are covered.
1.3.9 Shall issue non-conformance reports for serious irregularities observed on site.
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 6 of 19

1.3.10 Is responsible for implementing, reviewing, and updating the OSH Construction Management
Plan.

1.4 HSE Advisors

1.4.1 Report to the HSE Manager/HSE Engineer.

1.4.2 Shall monitor & guide the project team on implementing the safety practices required by site.

1.4.3 Shall arrange induction safety training as required.

1.4.4 Shall liaise with subcontractors and foremen to ensure they follow the safety standards required
under the OSH Construction Management Plan.

1.4.5 Shall assist with the safety aspects for risk assessments and planning duties as required.

1.4.6 Shall assist with the promotion of HSE on site. • Shall carry out weekly regular inspections and
review findings with supervisors and follow-up on corrective action taken.

1.5 Construction Manager/Project Engineer/Site Engineer


1.5.1 Shall be responsible for the overall site operation activities.
1.5.2 Shall ensure appropriate procedures are followed by all the involved personnel taking into
consideration that all relevant shop drawings, reference drawing, statutory benchmarks and
reference points and methodologies are correctly utilized.
1.5.3 Shall be directing the Project Engineers and Site Engineers towards planned target dates of work
completion.
1.5.4 Shall be the primary contact for all project matters that arise in the field.
1.5.5 Shall be responsible for construction, planning, execution and monitoring along with the Project
Managers.
1.5.6 Planning of resources required for construction and review of project requirements.
1.5.7 Project Engineer, Site Engineer carry out all activities in accordance with the Project procedures,
contract specification and method statements.
1.5.8 Shall communicate to all functions the importance of meeting Owner, Legal and Regulatory
requirements, Standards and Project Specifications
1.5.9 Shall Continually monitor and evaluate the progress of the project against the execution program
and planned schedules.
1.5.10 Shall evaluate workforce that is sufficiently trained and competent to do the work.
1.5.11 Shall Determine risks and opportunities relevant to the project and taking appropriate actions and
evaluating the effectiveness of those actions.
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 7 of 19

1.5.12 Shall co-operate closely with the HSE personnel to ensure that proper assistance and surveillance
of safety matters from the field supervision team.
1.5.13 Shall ensure that subcontractor’s duties are performed by competent and experienced personnel
and in sufficient number.
1.5.14 Shall be accountable to the Project Manager for the implementation of the OSH Construction
Management Plan and the operational planning of all areas under their control.
1.5.15 Shall establish and maintain a direct line of communication with the HSE team.
1.5.16 Shall ensure that all workers under their control comply with the OSH Construction Management
Plan.
1.5.17 Shall regularly review the health and safety procedures in coordination with the HSE team to
ensure that they adequately cover site operations and where necessary carry out risk assessments
and develop further appropriate procedures to control those risks.
1.5.18 Shall coordinate with HSE staff and/or EHS Authority and ensure remedial action is taken as
necessary.
1.5.19 Shall not permit the operation of any plant unless both the plant and operator are suitably
certified, confirm by HSE staff.

1.6 Project Quality Manager and Team


1.6.1 The Project Quality Manager and Team has the authority and responsibility for ensuring that the
requirements of the project quality management system are established.
1.6.2 Shall ensure that all ITP requirements are met and processed as per approved ITP.
1.6.3 Shall ensure all works are conducted as per the approved method statements.
1.6.4 Shall Monitor subcontractors to ensure their compliance with project requirements.
1.6.5 Shall Liaise with the Owner's representatives for the conduct of day-to-day quality related project
activities.
1.6.6 Shall Prepare and log documentation in organized pattern to ease the handing over process.
1.6.7 Shall Participates in the conduct of internal quality audits.
1.7 Site Supervisors, Foremen and Group Leaders

1.7.1 Supervisor & Team Co-ordinate with the project engineer for work activities and ensure they are
done in accordance with the relevant Contract specification and the approved Procedure/Method
statements.

1.7.2 Reports to the Project Engineer / Site Engineer.


1.7.3 Shall be familiar with the safety procedures stated in the OSH Construction Management Plan
relating to the work to be carried out under their supervision.
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 8 of 19

1.7.4 Shall ensure that their subordinates and workers receive clear instructions relating to the work
that they are carrying out.
1.7.5 Shall ensure that the workplace is maintained in a safe and tidy condition.
1.7.6 Shall assist in giving toolbox talks.
1.7.7 Shall take prompt action to rectify unsafe conditions.
1.7.8 Shall provide full co-operation to the HSE staff and comply with their recommendations.
1.7.9 Shall ensure that all necessary safety devices and personal protective equipment (PPE) are
provided and used properly.
1.7.10 Shall be familiar with the Emergency Response Plan and ensure that they are known to their
subordinates and implement those procedures as required.
1.7.11 Shall promote HSE awareness through leading by example.

1.8 Surveyor and Team


1.8.1 Surveyor and Team is responsible for the setting out and required marking with reference to
drawings as per Benchmarks and Control Points.
1.8.2 Shall be responsible for the preparation of survey schedule, addressing specific issues and
characteristics of each location.
1.8.3 Shall generate survey data and reports during the activities.
1.8.4 Shall Liaison with Draftsman/ Auto-Cad Operator with all necessary information for preparation
of shop drawings and later "as built" drawings.
1.8.5 Shall Keep archives and records (level books, sketches) related to survey works.

1.8.6 Shall carry out their work efficiently and in compliance with project specifications, regulations,
and safety standards.

1.9 All Personnel/Labors

1.9.1 Every person employed on the project is legally required to take reasonable care for the health
and safety of themselves and others that may be affected by their actions or omissions at work.
1.9.2 Co-operate with their employer to enable them to comply with the requirements of the project.
1.9.3 No person shall intentionally or recklessly interfere with or misuse anything provided for safety,
health or welfare under the relevant statutory provisions.
1.9.4 All personnel shall wear or use the appropriate safety equipment or clothing and use the
appropriate safety devices.
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 9 of 19

1.9.5 All personnel shall familiarize themselves with the relevant requirements of the Site OSH
Construction Management Plan.
1.9.6 All personnel shall report any accidents and damage to property or equipment to their immediate
supervisor, irrespective of whether persons are injured.
1.9.7 All personnel are encouraged to make suggestions to improve health and safety to their
supervisor and the HSE staff.

1.10 Third Party Independent Testing Laboratory


1.10.1 Shall be responsible for carrying out and reporting all required relevant tests.
1.10.2 Shall carry out their work efficiently and in compliance with project specifications, regulations,
and safety standards.

1.11 Subcontractor
1.11.1 Shall be responsible for executing specific portions of the project as outlined in their contract.
1.11.2 Shall carry out their work efficiently and in compliance with project specifications, regulations,
and safety standards.

4. Definitions
Project : Mirfa 2 – 120 MIGD RO IWP

Owner : M2RO PROJECT COMPANY

Owner Engineer : ILF Consutling Engineers (OE)

EPC Contractor : (SIDEM - ALNASR)

5. Reference Standard

 Mirfa 2 IWP – RO Project – SFR

 EWEC M2 RO Project Part II.A of RFP General Technical Specifications

6. Acronyms / Abbreviations

EPC : Engineering, Procurement and Construction


QMS : Quality Management System
QA/QC : Quality Assurance / Quality Control QHSE
: Quality, Health, Safety and Environment
ISO : International Organization for Standardization
PQP : Project Quality Plan
QCR : Quality Control Records
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 10 of 19

ITP : Inspection and Test Plan


HSE : Health, Safety and Environment
IRF : Inspection request Forms

7. Resources Including Manpower, Material, Tools & Equipment


7.1 Work Force (Office and Work Site)

 Project Manager
 Construction Manager
 Project/Site Engineer
 QA/QC Engineer
 HSE Engineer / Officer
 Supervisor/Foreman
 Surveyor
 Skilled / Unskilled Workers
7.2 Plant / Tools and equipment
 Grinder
 Jack hammer
 Excavator, Excavator Trencher & Excavator Rock Breaker
 Shovel / Wheel Loader
 Coring Machine
 Concrete cutting machine
 Compressor
 Generator
 Six Wheel / Dump Truck
 Mobile Crane
 MCG Cylinders
 Gas Cutting Tools & Accessories
 Petrol Engine Pipe Cutter
 Manlift
 Guide Rail / Pulley
 Survey Equipment
 Safety Barriers
 Hand tools (Hammer, carpentry tools, drills…)
 Weel barrow
 Dive Station

8. Significant Hazards Identified

All significant hazards identified in the Risk assessment.

9. Interfacing Activities

Any discrepancy shall be updated; all concerned parties to be notified immediately. The work
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 11 of 19

shall be supervised by competent supervisors and competent person availability will be


ensured.

10. Procedures
10.1 Activities prior to commencement of works
10.1.1 Obtain all necessary approvals prior to proceed with the works (i.e. pre-
qualification for subcontractor / supplier if required).
10.1.2 Wherever NOCs and permits are required from relevant authorities the same
shall be obtained prior to proceed with the works on site.
10.1.3 Ensure all operatives have completed the site safety induction and have
understood the scope and work procedure as detailed in this method statement.
10.2 Survey and Marking Works
10.2.1 Reconnaissance of project site – to undertake a full visual and photographic inspection.
10.2.2 The conditions of the existing permanent structures, utilities and subsurface
obstructions shall be surveyed and recorded before commencing demolition activities.
10.2.3 Check existing “As built” drawings for any buried services.
10.2.4 Survey the work area to identify any safety hazards All live utilities should be
protected from any damages and dust ingression.
10.2.5 Work area should also be surveyed based on required movement of vehicles /
demolition equipment.
10.2.6 Ensure / verify by visual inspection that hazardous materials have been removed before
proceeding with the building demolition operations. If there are some loose

items on site which affect the concrete cutting work, we will arrange labor to clean it
immediately.
10.2.7 For fencing area to be demolished, any end of the determined fence area to be
demolished shall be marked prior to work.
10.2.8 For structures to be demolished, the R/C elements to be cut/broken/removed should be
clearly marked before any cutting / coring / breaking (using any tools mentioned in
section 7.2) works starts. All the RC elements will be done by breaking method using
small robot breakers and big 22T excavators fitted with jack hammers.
10.2.9 Clearance to installed overhead MEP services should be checked.

10.3 Demolition Works


Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 12 of 19

10.3.1 MEP Clearance to be obtained before starting any demolition work


10.3.2 Prior to start any breaking activities all the MEP services & any other live services to be
checked.
10.3.3 The temporary barriers shall be erected prior to start of demolition work.
10.3.4 Proper and visible signs which restrict unauthorized entry in and around demolition
area should also be posted.
10.3.5 The marked area will be cut to separate from the permanent structure.
10.3.6 Any separated fence area will be demolished using electric jack hammers / grinders
from one end to other.
10.3.7 For buildings such as Chemical Building (refer to attached drawing in Section
15.2), all the external block wall to be demolished before cutting the concrete elements.
10.3.8 If required, cutting and coring will be used to cut the building structure to disconnect
the demolition part of the substation from the part that needs to be retained, so no
vibration coming up from the demolition activities will affect any other existing
structure.

10.3.9 For existing trenches, edge protection should be provided and control measures to
be observed during demolition works to avoid falling into open area / confined
spaces. Also, identify the risks in working at demolished edge of trenches and
surrounding areas such as access / possible water ingress to prevent any
casualties.
10.3.10 For existing asphalt, ensure that the marked area shall be cut at a required
depth of 30-40cm using the excavator trencher and are free from debris (i.e.
rocks, pebbles etc.). The fragments of asphalt shall be kept and handled
properly as it will be reused on construction of temporary roadworks.
10.3.11 For Existing CS Pipes, Petrol Engine Pipe cutter, Gas Cutter & MCG
Cylinders shall be used by competent persons to cut the pipes into segments
prior to removing out from ground by crane.
10.3.12For coring works, holes will be drilled either in the wall or slab where drop-in anchors
will be inserted in the holes and the stand of the coring machine will be bolted into the
anchors fixed in the hole. Coring machine will be fixed to stand, and required core bits
will be mounted on the machine. The machine will be connected to water and power
connection and will be equipped to start the coring works. Housekeeping & cleaning
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 13 of 19

will be done, after cutting.


10.3.13For cutting with diamond blade or wire, 16/20mm holes will be drilled either in the slab
or wall and 12mm /16mm drop-in anchors will be inserted in the hole drilled the bolts
of the guide rail/ pulleys stand will be inserted to the holes and the guide rail/ pulleys
stand will be fixed in the slab or wall. Once the Guide rail is fixed, the wall saw head
will be mounted on the rail and then the diamond blade/wire will be fixed securely to
the wall saw head, after fixing the blade power and water connection will be done and
the same will be connected the hydraulic power pack to equip start cutting works.
10.3.14Roof Sandwich Panels shall be removed by crane, Manlift will be used to attach crane
lifting belt/chain with the hook and to drill the screws out of the panel.
10.3.15When the cutting work is done and the building is separated to two parts, breaking
works will start using 22T breaker by applying a vertical force by excavator/ robot arm.
During this stage and part by part, reinforced steel will be separated from concrete using
mini excavator fitted out with bucket. The results of demolished materials will be
stockpiled in two hips one of Reinforced steel and other one consists of concrete
materials. Steel will be cut by workers using MCG Cylinders, tidy up, loaded into
Containers or Pick up vehicles and taken out of the site.
10.3.16Once the above ground level structure is broken and debris has been cleared, excavation
to be done to expose the substructures of the substation so it can be broken and removed
using the same method.

10.3.17During the process of demolition, the area will be sprinkled with water to minimize
dust. The dust suppression process should be followed simultaneously with demolition
process.
10.3.18The existing landscaping, nearby structures if any, in the demolition area will be
protected.
10.3.19The debris will be removed from the site area using shovel and loaded in a six- wheel
truck.
10.3.20The loaded debris shall be transported from site and disposed in municipality approved
area.
10.3.21The areas affected by excavation during demolition shall be backfilled as per the
contract specification and approved MS/RA with reference no. 224020-C2-W0-
ANC-6000-GB-WZZ-005 and ITP with reference no. 224020-C2-W0-ANC-6000-
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 14 of 19

QQ-WZZ-006 and compacted properly in layer by layers process.


10.3.22The inspections shall be carried out at each point of requirements as per approved ITP
with reference no. 224020-C2-W0-ANC-6000-QQ-WZZ-007 and to be recorded for
further processes.
Special Considerations for the demolition of the old intake
10.3.23For the demolition and backfilling for the existing old intake, the diver shall do a
visual inspection (under water survey) to make sure there is no opening from below
the sea level to prevent the potential outflow of any of the debris / backfill material
into the sea.
10.3.24All safety procedures for the diving as per the MSRA for intake shoring intake area
(MSRA ref. 224020-C2-W0-ANC-6000-GB-WZZ-060) are to be followed.
10.3.25Upon the findings from the underwater survey, any significant opening at the stop log
location shall be closed prior to the commencement of demolition and backfilling
works
10.3.26NOC from MIPCO shall be obtained prior to the commence of the demolition and
backfilling works
10.3.27Proper barricading and signage shall installed to ensure the demolition area is an
exclusion zone.
10.3.28No access for non-authorized personal shall be permitted.
10.3.29The demolition and backfilling works for the old intake shall proceed sequentially in
stages (Stage 1, Stage 2, Stage 3, etc.) from the South to North as indicted in the
figure below.
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 15 of 19

Figure 1 – Demolition and Backfilling stages for the old intake

10.3.30Starting from Stage 1, demolition of old intake slab shall commence with a rock
breaker to enlarge any existing opening in the intake slab to allow for the proper
backfill of the intake area for the section.
10.3.31Under no circumstance, will any personal enter the old intake for safety reasons.
10.3.32Once the demolition for the first stage is complete, then the backfilling may proceed.
10.3.33Demolitions and backfilling Stages for the subsequent stages can commence once the
earlier stages are complete until the full backfilling of the old intake structure up to
the location of the stoplogs.
10.3.34As discussed and agreed the contractor shall be responsible for applying protective
concrete between the stoplog and the existing wall to prevent the outflow of debris or
backfill material into the sea, thereby mitigating any potential environmental and
operational impact on the existing MIPCO plant.
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 16 of 19

11. Emergency Procedures

In case of any HSE incidents requiring an emergency response, the procedures as stated in
the HSE plan shall be followed. Third party trained first aiders and fire fighter shall be
available to respond for any emergency that may arise during the works. The emergency
contact numbers will be communicated to all employees. The risk assessment for the
activity shall be communicated to employees.

In the event of an incident:


 Contact the emergency responds team immediately.
 First aider to attend the victim till the medics arrives.
 Transfer the victim to hospital depending on the severity of the injury.
 Evacuate the site if situation beyond in control due to heavy wind, sandstorm, etc.
 Carry out an accident investigation to find out the cause of the accident.

Emergency Contact Nos:

Police 999
Fire 997
Ambulance 998

12. HSEQ

In-order to achieve the targeted objective ‘zero lost time injury’ the work crew will be provided
awareness training to follow the safe work procedures. The method statement and risk
assessment shall be in place of the work and shall be strictly followed without any short falls.
Toolbox talk training shall be provided to the work team prior to start of works. Personal
protective equipment requirements shall always follow, and all personnel involved in works
shall wear company's coverall, safety helmet& safety shoes. In addition to the above PPEs
respiratory masks, ear protector equipment, aprons, safety goggle, etc. shall be used as
necessary. All works shall be carried out in line with the contract specific requirements.

13. Managing Changes

Any changes for the work plan need to be well communicated with all work crew. Any changes
for the method statement need to be approved before being used on site.

14. Reference Documents

14.1 Contract Specification


Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 17 of 19

14.2 Project Quality Plan


14.3 HSE Plan
14.4 OSH Construction Management Plan
14.5 Abu Dhabi Occupational safety and Health System

15. Attachments

15.1 Risk Assessment


15.2 Condition Assessment for Existing Buildings
15.3 Reference Drawings
Mirfa 2 RO Plant Document number:
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date: 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status: GFE

Order Numbers: N/A Page 18 of 19

RISK ASSESSMENT
RISK ASSESSMENT

Content Summary
Baseline Risk Residual Risk
SN Activity Page
S L BR RL S L BR RL
01 Mobilization of People, Vehicles, Materials and Equipment to site 3 2 6 M 3 1 3 L 01
02 Manual Handling 3 2 6 M 3 1 3 L 01
03 Mechanical Lifting Operation 4 3 12 H 4 1 4 M 03
04 Working with Air compressors and Jack Hammers. 4 3 12 H 4 1 4 M 04
05 Use of Portable Power tools. (Electric & Pneumatic) 4 3 12 H 4 1 4 M 05
06 Working nearby road /traffic. 4 2 8 H 4 1 4 M 05
07 Working in Bad Weather – Heat, Strong Wind, Heavy Rain, Thick Fog etc. 3 3 9 H 3 1 3 L 06
08 Housekeeping 3 2 6 M 3 1 3 L 07

Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H

Baseline Risk Residual Risk

Residual Risk

Residual Risk
Baseline Risk

Likelihood
Residual

Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks

Likelihood

Risk Level

Level
Severity  Ensure EWEC Permit along with Al Nasr internal
permit and TBT available at site.
 EWEC Permit is valid within the specified work
location only.
 Wear PPEs (Cover all, high visibly jacket, hard hat,
Safety Goggle, Escape hood, Personal Gas
Monitor, Safety Shoe- As per area requirement.
 All vehicles and equipment’s should have valid
third-party certificate.
 Vehicle & Machinery
 All drivers must be holders of valid UAE driving
Mobilization of People, Movement
 Personnel injury license.
1 Vehicles, Materials and  Possible presents of 3 2 6 M 3 1 3 L
 Damage to assets  Always maintain High supervision
Equipment to site reptiles.
 Use only approved tracks/ route.
 Certified First Aider shall be mobilized along with
manpower
 Emergency procedures to be Cascaded.
 Stay away from line of fire
 All vehicles and equipment’s should have
inspection and approval if required by the client
(As per area requirement).
 Equipment movement without banks man is
Strictly prohibited at site.
Form: ALNASR-HSMP-F.02.01 rev04 Page 1 of 9
RISK ASSESSMENT

Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H

Baseline Risk Residual Risk

Residual Risk

Residual Risk
Baseline Risk

Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks

Likelihood

Risk Level

Level
Severity
 If found any species reports to concerned
authorities. Do not kill /attack the endangered
species.
 Plan route and establish clear communications
 Predetermine lay down area for equipment’s
 Place all materials and equipment at least 2
meters away from edge of excavation.
 Equipment’s and machineries shall be inspected
by authorized personnel- before commencing
work.
 Equipment’s & machineries should be restricted
over underground services.
 Use appropriate/adequate safety awareness
signage’s to restrict the equipment movement
over underground utilities services.
 All the requirements that stated in approved
MSRA must be strictly followed and effectively
implemented
 Ensure that PTW, Approved MSRA are in place
and TBT prior to start the activities.
 Bending twisting the  Handling load to be limited
body, neck, arms, or  Seek assistance if load is too heavy for one
wrists person to lift.
 overreaching,  Proper handling procedure to be followed
 Personnel injuries
 lifting, pushing,  Loads to be lifted close to the body.
2 Manual Handling  Property damage 3 2 6 M 3 1 3 L
pulling, carrying,  Manual handling training should be for all
 very fast movements, workers
or exerting force  Awareness posters to be displayed at site
while in an awkward  Adequate training for manual handling
posture  Ensure traffic management plan is in place and
followed.
 Toolbox talks to be conducted.
 Close monitoring of manual handling by
supervision
 Avoid using heavy manual Handling.
Form: ALNASR-HSMP-F.02.01 rev04 Page 2 of 9
RISK ASSESSMENT

Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H

Baseline Risk Residual Risk

Residual Risk

Residual Risk
Baseline Risk

Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks

Likelihood

Risk Level

Level
Severity
 Internal HSE Training for manual handling
techniques.
 Avoid lifting manual for than 25 kg/ person.
 All persons involved in the activity should be
provided with PPE such as HV vest, Hard Hat,
Safety shoes, Hand gloves, coverall, eye
protection and task specific PPE.
 Use strong stable and suitable equipment.
 Ensure crane/excavator and operators are third
party certified.
 If lifting is done by an excavator, ensure presence of
check valve.
 Lifting equipment shall be positioned, installed
correctly and the ground condition shall be
checked.
 Crane toppling.  Presence of lifting supervisor should be ensured.
 High wind conditions.  Safe working load indicator shall be checked.
 Load striking  Ensure lifting operations are planned, supervised,
something whilst  Fatalities. and carried out in safe manner by competent
being moved  Injuries. people
Mechanical Lifting  Check the requirements are met for lifting
3 horizontally  Equipment damages 4 3 12 H 4 1 4 M
Operation equipment and for lifting persons
 Failure of lifting  Serious injuries.
tackles/ slings.  Material damage.  Periodic examination/testing of lifting equipment
 Collapse of jib shall be done and shall be certified.
 Material falling from  Outriggers must be extended.
height  Planned lifting operations.
 Avoid lifting operation in high wind conditions.
 Precautionary measures shall be taken if overhead
or side obstructions – adjacent buildings, other
structures, and overhead power line.
 Communication system should be in place to
ensure sufficient coordination between pick up
and lay down.
 Ensure lifting is planned.

Form: ALNASR-HSMP-F.02.01 rev04 Page 3 of 9


RISK ASSESSMENT

Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H

Baseline Risk Residual Risk

Residual Risk

Residual Risk
Baseline Risk

Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks

Likelihood

Risk Level

Level
Severity
 The area shall be restricted for unauthorized entry.
 Valid third-party certificate for lifting tackles/ sling.
 Sling/tackles rated for the load.
 Visual inspection shall be carried out prior to the
operation.
 Proper supervision & rigging procedure.
 Ropes and wires must be protected from sharp
edges of any load.
 No knots or hitches are to be made in slings or
lifting ropes.
 Never drag ropes or wires over the ground.
 Avoid overload.
 Safe working load/radius indicators and automatic
safe load indicators shall be fixed.
 Check the load is located within the load radius
capacity of the crane
 Ensures that the load always remains level and does
not allow it to tilt and check the location of lifting
points securing the load to the crane.
 The lifting points must be sufficiently strong to take
the load.
 Planned lifting operation.
 Taglines shall be used to guide material while
lifting. Taglines should be without knots.
 Check the load indicator.
 Safety latch condition to be proper.
 Slings to be inspected and checked for certificate.
 Waste must be lifted out in correct 3rd party
certified receptacles
 Failure of compressed  Fatality or serious
 HSE induction and training.
Working with Air air hose& fittings. personnel injuries like
 Adequate communication of method statement
4 compressors and Jack  Noise and dust cut injury fracture. 4 3 12 H 4 1 4 M
& risk assessment to work force.
Hammers. generation, Oil Spills  Loss of hearing due to
 Adequate competent supervision.
from compressor noise, Dust inhalation.

Form: ALNASR-HSMP-F.02.01 rev04 Page 4 of 9


RISK ASSESSMENT

Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H

Baseline Risk Residual Risk

Residual Risk

Residual Risk
Baseline Risk

Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks

Likelihood

Risk Level

Level
Severity
 Fire hazard to Environmental  Correct use PPE (safety shoes, coverall, hand
compressor. Pollution. gloves, safety harness, anti-vibration hand
 Vibration form jack  Loss of life and gloves/aprons, ear plug/muff, nose mask etc.
hammers. property due to fire.  Daily toolbox talk (daily hazard identification &
 Hand Arm Vibration briefing)
syndrome (white  Daily checking and periodic maintenance of
finger) compressor& jack hammer and fitting,
 Use of whip check arrestors/joint locks to stop
sudden failure of compressed air hose joints.
 Minimize the exposure time and proper usage of
ear protection muffler/plugs.
 Adequate water sprinkling for duct suppression.
 Proper maintenance of the equipment.
 Appropriate fire extinguisher must be provided.
 Minimize the exposure time.
 Rotate/provide rest time for vibrator operator to
reduce the effect of HAV.
 For the installation of SMDB and DBs, the
required electric power tools & accessories
should be inspected, color coded, tagged by a
competent electrician prior to use.
 The power tools to be visually checked /
inspected by the user daily to ensure that those
 Electrical shock  Electrocution, are in good & safe working condition.
 Trip hazard,  fire,  The electrical power tools to be connected with
Use of portable
 Injury by contact  major/ minor body ELCB.
5 Power tools. 4 3 12 H 4 1 4 M
power tools, injuries to operatives,  The electrical cables / extension cords to be
(Electric & Pneumatic)
 Pinch point,  Fatality, routed / elevated properly.
Electrical overload.  serious accident  The power tools to be disconnected while not in
use
 Trained & competent person to be deployed to
use the power tools.
 The power tools should not be used in wet area.
 Tools should only be used for their designed
purpose.
Form: ALNASR-HSMP-F.02.01 rev04 Page 5 of 9
RISK ASSESSMENT

Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H

Baseline Risk Residual Risk

Residual Risk

Residual Risk
Baseline Risk

Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks

Likelihood

Risk Level

Level
Severity
 Wear correct PPE for tool and task.
 Only 110 volts to be used at site
 The power tool should have industrial type.
 The power tool to be stored properly after use &
should not be left unattended at site.
 Appropriate guards / covers must be fitted to
avoid contact with moving parts.
 Traffic management for the control and
management of traffic at road works
 A permit to work should be obtained if required
 Proper barricading, information boards/caution
boards, reflectors and flashing lights (nighttime)
 Serious injuries, should be provided at both end of the road
 Traffic accidents
Working nearby road  fatalities. crossing area.
6  Working unsafely, too 4 2 8 H 4 1 4 M
/traffic.  Damage to vehicles  All persons involved in the activity should be
close to the public.
and property provided with PPE such as HV vest, Hard Hat,
Safety shoes, and task specific PPE.
 Segregate pedestrians from working area by
barriers.
 Appoint pedestrian controllers to guide
pedestrians away from the work area.
 Ensure that PTW, Approved MSRA are in place
and TBT prior to start the activities.
 Weakness and wet  In case of heavy wind all lifting activities must be
skin (Sweating) stopped.
 Headache, Dizziness  All loose material must be secured properly with
 falling materials.
or Fainting heavy objects.
Working in Bad Weather –  Excavation collapse
 Thirst, Nausea or  Do not stand near or under the electrical poles or
7 Heat, Strong Wind, Heavy  Environmental hazard 3 3 9 H 3 1 3 L
Vomiting OH lines.
Rain, Thick Fog etc.  High Humidity
 Collapse  In case of heavy rain work will be suspended until
 Excessive Heat
 Sweating heavily the rain stop.
 Personnel injuries  All personnel will move to rest area if resting
 Property damage shelters are not enough stand by buses will be
arranged.
 All power tools must be kept in safe place.
Form: ALNASR-HSMP-F.02.01 rev04 Page 6 of 9
RISK ASSESSMENT

Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H

Baseline Risk Residual Risk

Residual Risk

Residual Risk
Baseline Risk

Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks

Likelihood

Risk Level

Level
Severity
 All Electrical DB’s and connecting cables are
secured and cover properly
 If rain stop, prior to enter any excavations &
manholes, re inspection must be done by a
competent supervisor and HSE advisor
 All light vehicles must be stopped if the visibility
is less than 100 meters
 All heavy vehicles must be stop if the visibility is
less than 150 meter “Weather alerts/flash must
be share with all drivers, keep a safe distance
while driving.
 Monitoring of environment with Thermal Work
Limit (TWL) meter.
 Heat Stress Management Plan in place.
 Complying with UAE summer working hour
restrictions 12:30 – 15:00
 Provide potable drinking water with cooler
facility and electrolyte replacement supplements.
 Rest areas with cooling facility
 Sun block and full body clothing to be worn
 Safety officer & supervisors shall monitor the
conditions regularly
 Monitor workers on site for signs of heat stress
 Heat stress training to all site personnel
 Persons suffering from suspected heat stress
must be evacuated immediately to medical
facility by ambulance
 All persons involved in the activity should be
provided with PPE such as HV vest, Hard Hat,
Safety shoes, Hand gloves, Coverall, eye
protection and task specific PPE

Form: ALNASR-HSMP-F.02.01 rev04 Page 7 of 9


RISK ASSESSMENT

Project / Location MIRFA 2 REVERSE OSMOSIS (M2 RO) Doc ID: 224020-C2-W0-ANC-6000-GB-WZZ-007
Main Activity DEMOLITION WORKS Last Updated: 22/02/2024 Rev H

Baseline Risk Residual Risk

Residual Risk

Residual Risk
Baseline Risk

Likelihood
Residual
Residual
Severity
No. Activity Hazard Consequence Control Measure Remarks

Likelihood

Risk Level

Level
Severity
 Dust.  Area to be cleared of clutter and dispose of
 Pinch points. properly.
 Sharp cable insulation  Proper Waste segregation shall be followed.
material.  Provision of bins on suitable locations.
 Back injuries.
8 Housekeeping.  Bare protruding 3 2 6 M  All waste shall be properly dumped in 3 1 3 L
 Hand injuries
conductors. municipality approved area.
 Manual Handling.  All waste shall be collected from the site and
 Improper disposal of properly disposed.
material.  Proper PPE e.g., Hand gloves shall be used.

Form: ALNASR-HSMP-F.02.01 rev04 Page 8 of 9


RISK ASSESSMENT

Prepared by: Name: Position:


Mahmoud Sami Site Engineer
Reviewed by: Name: Position:
Andrias Genevi Project HSE Advisor
Approved: Name: Position:
Haitham Abu Ramadan Project Manager

SEVERITY
LIKELIHOOD Negligible (1) Marginal (2) Significant (3) Serious (4) Catastrophic (5)

Rare (1) 1 2 3 4 5
Possible (2) 2 4 6 8 10
Likely (3) 3 6 9 12 15
Often (4) 4 8 12 16 20
Almost Certain (5) 5 10 15 20 25
15 – 25 Extreme Risk (E) Activity or industry should not proceed in current form
Activity or industry should be modified to include remedial planning and action and be subject to detailed OSH assessment. Work can proceed
subject to:
- Emergency response provisions have been put in place
8 – 12 High Risk (H) - Risk assessment being reviewed regularly to identify changes in work conditions and/or opportunities to reduce the risk further
- Project Manager or Plant Manager approval on risk assessment is required
- Competent supervision is required during the execution of the activity
Activity can operate subject to management and or modification. Work can proceed subject to:
4–6 Moderate Risk (M) - Risk assessment being reviewed regularly to identify changes in work conditions and/or opportunities to reduce the risk further
- Competent supervision is required during the execution of the activity
1-3 Low Risk (L) No immediate action required unless escalation of risk is possible. Additional controls not required.

Form: ALNASR-HSMP-F.02.01 rev04 Page 9 of 9


Mirfa 2 RO Plant Document number :
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: H Date : 22/02/2024


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status : GFE

Order Numbers : N/A Page 20 of 20

REFERENCE DRAWINGS
12 11 10 9 8 7 6 3 2 1

L L

B
1 2 3 4 5 6 78 9 10 11

(+4.900)

RAMP

RAMP
K K
E 3400x700mm
E
D2 4150x2200mm
STEEL GATE 1700X700mm WALL OPENING D4 2000x2200mm AS
AS PER AS BUILT SURVEY FOR SNAD TRAP LOUVERS PER AS BUILT SURVEY
Door Width = 0mm Door BOTTOM EL=0+550 FROM FF EL Door Width = 1890mm Door
Height =0 Height = 2140
AS PER AS BUILT SURVEY
1650X650mm WALL OPENING

3400x700mm
J J
AS PER AS BUILT SURVEY
1650X650mm WALL OPENING
1700X700mm WALL OPENING FOR
SNAD TRAP LOUVERS BOTTOM
EL=0+550 FROM FF EL

AS PER AS BUILT SURVEY


D D

10855mm
I A I
RAMP AS PER AS BUILT SURVEY
AS PER AS BUILT SURVEY
A

3400x700mm
Door Width = 1890mm Door 3340X650mm WALL OPENING
Height = 1920

D1 2000x2000mm

(+4.900)
(+5.100)

H C C H

OPEN SHED CHEMICAL STORE


(+4.900)

3400x700mm
G G

AS PER AS BUILT SURVEY


B B

10870mm
1700X700mm WALL OPENING FOR
SNAD TRAP LOUVERS BOTTOM
EL=0+550 FROM FF EL
AS PER AS BUILT SURVEY
1650X650mm WALL OPENING

F F

3400x700mm
1700X700mm WALL OPENING FOR
SNAD TRAP LOUVERS BOTTOM
EL=0+550 FROM FF EL
AS PER AS BUILT SURVEY
Door Width = 790mm Door
Height = 2140
X X
D3 900x2000mm 3400x700mm
A A
E 150mm Ø PVC PIPE E
(+4.900)

1 2 3 4 5 6 78 9 10 11

B
D D
GROUND FLOOR PLAN A1 ISSUED FOR INFORMATION - 15.12.2022 RMR M.T A.E

REV
DESCRIPTION STATUS DATE DRAWN CHECKED APPROVED

MIRFA - 120MIGD RO IWP


CLIENT OWNER ENGINEER

EMIRATES WATER &


+5.100
C ELECTRICITY Co. C
(EWEC)
+4.900
OWNER EPC CONTRACTOR

+4.600
B B
TITLE

CHEMICAL STORE BUILDING FORMAT


GROUND FLOOR PLAN
0.000 = 4.900 ACD A1
PROJECT NUMBER DOCUMENT NUMBER FOLIO SCALE

SECTION - X-X 3740- USU-C-102-09 4020


A SCALE 1:10 AS BUILT DRAWING REF. No CO- 22
A
224020-ANC-6000-CG-WWZ-AB-SK-015 1/1 1:100
THIS DOCUMENT IS THE PROPERTY OF SIDEM. IT CANNOT BE USED, REPRODUCED,TRANSMITTED AND/OR DISCLOSED WITHOUT PRIOR WRITTEN PERMISSION OF SIDEM
12 11 10 9 8
7 6 3 2 1
LAND KEY :
PLANT

N:2669544.450
E:749038.940
N NORTH N

W E

GATE
S

W E

CCTV
N:2670174.050
E:748785.290

PROJECT CO-ORDINATES SYSTEM


- Map Projection : UTM 39 NORTH
- Plan Datum : WGS 84
GENERAL NOTES : - Height Datum : Abudhabi Municipality Datum

A ISSUED FOR INFORMATION


- 31-03-2023 FLS EA EA
REV No.
DESCRIPTION STATUS DATE DRAWN CHECKED APPROVED
CLIENT:
EMIRATES WATER
& ELECTRICITY Co.
(EWEC)
N:2670117.800
E:748645.450

OWNER ENGINEER:
ILF CONSULTING ENGINEERS
SKY TOWER UNIT 36-01,36th FLOOR AL REEM
CCTV

Container P.O. Box 73250 Abu Dhabi United Arab Emirates

OWNER:
N:2670054.400
E:748644.840

Porta cabin

ENGIE SOLUTIONS
MIDDLE EAST
CCTV

Container
LIGHT.POL

EPC CONTRACTOR:
AL-NASR

SIDEM
60 INCH U/G PIPE

CONSULTANT:

27.897
AMGD

1
TRANSFORMER AREA
TEMP.SHED

EXISTING

SUBSTATION
EXISTING
DESIGNER:

HEVY VECHILE
SHED
ARTELIA
Tel. No: +971 04 886 5690

7.834
1
Fax No: +971 04 886 5691
CONC.TANK WITH
GRILL ON TOP

P.O. Box No:18271 Dubai,


U.A.E.

PROJECT NAME :
CONC.TANK
Ex.WATER
TANK

MIRFA 2 - 120 MIGD RO IWP


GATE

CONC.SLAB
N:2670018.220
E:748552.710

ZONE :

AL MARFA

SECTOR NO :
PLOT NO :
AL MANTEQA AL HAMRA
P68

PROJECT DESCRIPTION :

COMPPRRSOR
ROOM
MIRFA 2 REVERSE OSMOSIS (RO) PLANT -
INDEPENDENT WATER PROJECT

:2669410.170
E:748716.720
NSFORMER
ROOM
TANK
DRAWING TITLE :

LEGEND FOR EXISTING UTILITIES TO BE DEMOLISH


EXISTING UTILITIES TO BE
DEMOLISH/REMOVE
PROGRESS UP TO 31.03.2023

DRAWING NO :
REVISION NO:
224020-C2-W0-ANC-0000-CG-WZZ-PRO-007
A

SUBMISSION DATE : SCALE :

31-03-2023 1:100
Conc.Support

PROJECT ID : DRAWING SIZE :

224020 A1

OFFICIAL USE ONLY :

LEGEND FOR EXISTING UTILITIES TO BE REMOVE


OFFICIAL USE ONLY :

0 0.25 0.5 0.75 1 1.25m

SCALE 1:25

0 1 2 3 4 5m
SCALE 1:100
W
E:748645.450
N:2670117.800
E:748783.452 E:748785.290

LEGEND FOR EXISTING UTILITY


E:748643.860 N:2670172.984 N:2670174.050

N NORTH
S
N:2670116.533

PLANT
E
E:748672.471 E:748678.815
E:748552.710 N:2670075.347
E:748644.840 N:2670072.813
N:2670018.220 N:2670054.400
E:748674.522 11KV S/S E:748680.762
E:748551.345 E:748643.663 N:2670067.659 N:2670070.278
N:2670017.004 E:748588.360 N:2670053.507
N:2670024.564
E:748701.468
E:748585.780
E:748591.663 N:2670072.979
E:748580.638 N:2670025.793
N:2670020.377 CCTV
N:2670022.504
E:748590.948
N:2670018.253 MATERIAL
E:748594.033
E:748705.305
STORAGE
N:2670019.526
E:748586.085 N:2670063.440
E:748585.994 N:2670009.324 N:2670019.232 CCTV
E:748587.416
N:2670011.050
E:748668.638
E:748572.422 N:2670059.686

E:748587.775 N:2670010.198
E:748592.211
N:2670002.752 E:748672.880
E:748592.457
E:748561.817 N:2670050.162
N:2669995.636 N:2670002.231 LIGHT.POLE.FOUND
N:2669991.334
E:748589.213 E:748594.021
N:2670001.516 N:2670002.862
E:748590.682
E:748574.011 E:748594.888
N:2669997.885
N:2669992.240 N:2670000.758
E:748597.786
E:748574.303 N:2670001.951
N:2669991.285
E:748596.695
N:2670000.269 E:748686.165
E:748597.066
E:748725.716
N:2670000.122 N:2670032.475
N:2670048.467

Container
Container
E:748582.123 E:748603.543
E:748604.895
N:2669984.160 Porta cabin E:748689.600 CHEMICAL
N:2669984.604 N:2670015.614 STORAGE
E:748582.999
N:2669969.518 N:2669972.370
E:748629.987
E:748582.743 N:2669970.786
N:2669991.596

E:748734.935
E:748630.532 E:748644.862 E:748687.961 N:2670025.787
N:2669990.352 N:2669997.459 E:748645.440 E:748695.336
N:2670013.370
N:2669996.447
CONC.TANK WITH E:748688.870 N:2670009.844 E:748721.654 E:748722.924
GRILL ON TOP N:2670013.106 N:2670018.159 N:2670019.175
E:748693.487
N:2670005.767 E:748722.043
N:2670017.270
E:748693.004
N:2670003.327
E:748724.221
E:748694.305 E:748721.754
E:748586.679 N:2670016.485 N:2670015.986
N:2670005.519
N:2669948.544 60 INCH U/G PIPE E:748831.486
E:748582.522 N:2670049.391
E:748743.677
N:2670012.372

E:748583.855
N:2669943.744
E:748596.408 E:748603.207 N:2669938.388
N:2669938.060 N:2669940.667 E:748604.202
GATE

E:748607.902
E:748587.451 E:748598.094 N:2669936.857
N:2669934.430
N:2669934.437
E:748604.095
N:2669936.728 E:748610.887
E:748607.918 N:2669938.048
N:2669935.071
E:748611.431
N:2669936.798

E:748629.556

Ex.WATER E:748615.604
TANK
E:748606.149
N:2669885.970 N:2669889.846

TEMP.Gas
Cylinder
Storage

LOW VOLTAGE
S/S & CONTROL
ROOM

E:748624.498 E:748635.603
E:748550.484
E:748550.484N:2669805.466 N:2669835.822
N:2669840.336
CONC.TANK E:748649.558
CONC.SLAB N:2669845.992

E:748584.373
E:748589.358
N:2669720.979 N:2669722.690

E:748622.037
N:2669642.399
E:748624.802
E:748617.192 N:2669641.175 E:748681.906
N:2669640.231 E:748625.403 N:2669665.911
E:748617.535 N:2669639.599
N:2669639.696

E:748682.420 E:748743.888
E:748618.665 N:2669685.182
N:2669636.856 N:2669664.711

TRANSFORMER
ROOM N:2669668.535 E:748715.975 E:748716.636
E:748630.305
TANK N:2669669.574 N:2669669.824
N:2669638.933 E:748703.218
TEMP.SHED

HEVY VECHILE
EXISTING WORK SHED
SHOP

COMPPRRSOR E:748637.990
ROOM
E:748711.053
E:748751.896
E:748627.857 N:2669649.328 N:2669665.749
N:2669613.825
N:2669619.798

E:748967.7
E:748632.611 E:748958.704
E:748725.097 E:748725.803
N:2669740.556 N:2669744
N:2669615.720 N:2669646.986 N:2669647.399
E:748633.277
N:2669611.175 E:748804.963
############ CCTV
E:748728.722 ############# N:2669665.551 GATE
E:748634.343 N:2669637.567 E:748762.093 E:748805.829 E:748962.187
N:2669611.630 N:2669649.139 E:748764.776 ############ N:2669666.848 N:2669731.257 E:748971.3
N:2669650.206 #############
N:2669735
E:748765.080 ############
E:748729.562 N:2669647.889 #############
N:2669637.937
E:748766.670 E:748806.706
N:2669643.843 N:2669666.830
E:748730.432
N:2669633.788
E:748731.169 E:748760.985
N:2669633.910 N:2669647.823

E:748761.934
E:748732.363 N:2669645.680
N:2669626.614
E:748739.344 E:748765.109
E:748732.958
N:2669643.277
N:2669626.913 N:2669630.428 E:748796.299 N:2669640.779

E:748769.349
N:2669641.785 E:748779.203 N:2669634.014
E:748779.700 N:2669632.760

EXISTING HIGH
E:748738.532 E:748741.238 VOLTAGE
N:2669615.239 N:2669616.410
SUBSTATION
E:748780.900
E:748797.409
N:2669629.786
N:2669639.859
E:748747.291 E:748798.062
E:748744.218 E:748777.483
N:2669609.332 N:2669636.678
E:748781.606
N:2669621.634 N:2669628.006 E:748799.453
E:748741.303 N:2669635.079
N:2669608.191
N:2669609.361
E:748739.695 E:748778.684
N:2669603.589 E:748780.326
N:2669619.446
EXISTING
E:748742.055 N:2669618.768
N:2669604.542
E:748797.375
TRANSFORMER AREA N:2669610.776
E:748785.961

E:748745.018 E:748784.579 E:748796.720


E:748747.591
N:2669589.845 N:2669604.681 N:2669610.817
N:2669590.964
E:748657.424
N:2669551.429

E:748660.798 E:748788.934

N:2669543.130
E:748790.527
N:2669605.266 N:2669594.287
E:748779.458 E:748794.625
N:2669589.846 N:2669596.238
E:748770.306
N:2669586.113N:2669593.577 E:748769.359

N:2669585.761 E:748752.252 E:748795.660 N:2669596.101


E:748749.897 N:2669578.768 E:748778.614 E:748789.870
N:2669577.669 E:748771.736 N:2669580.019 N:2669589.244 N:2669591.738

E:748788.847
N:2669585.614

E:748791.356 N:2669591.838
E:748793.983 N:2669588.554
E:748793.181 N:2669588.305

E:748772.830 N:2669580.137

pport
Conc.Su
E:748790.240 N:2669585.797
E:748761.458
N:2669560.421
E:748762.491
N:2669560.327

E:748760.439 E:748764.217
E:748671.586 N:2669551.937 N:2669553.431 E:748802.123 E:748996.054
E:748690.022 E:748789.098
N:2669568.828 N:2669647.332
E:748765.153 N:2669563.562
N:2669516.549
N:2669523.276 N:2669553.802

E:748762.840 E:748789.726 E:748796.416 E:748801.162


N:2669552.873 N:2669563.888 N:2669566.515 N:2669568.440
E:748798.020
N:2669567.169

EXISTING
SUBSTATION

E:749038.940
N:2669544.450

E:748716.720
N:2669410.170
0
0

0.25
1

SCALE 1:25
SCALE 1:100

0.5
2

0.75
3

1 1.25m
4
5m

REV No.
224020-C2-W0-ANC-6000-CG-WWZ-SK-005

EPC CONTRACTOR:
PROJECT ID :

DRAWING NO :

DRAWING TITLE :

PROJECT DESCRIPTION :

PROJECT NAME :

DESIGNER:

CONSULTANT:

CLIENT:
OFFICIAL USE ONLY :

OFFICIAL USE ONLY :

SUBMISSION DATE :

SECTOR NO :

OWNER:

OWNER ENGINEER:

LAND KEY :
ZONE :

GENERAL NOTES :
A1
B
ILF CONSULTING ENGINEERS
SKY TOWER UNIT 36-01,36th FLOOR AL REEM
ENGIE SOLUTIONS

P.O. Box 73250 Abu Dhabi United Arab Emirates


U.A.E.
P.O. Box No:18271 Dubai,
Fax No: +971 04 886 5691

SIDEM
Tel. No: +971 04 886 5690
ARTELIA

AMGD

AL-NASR

& ELECTRICITY Co.


EMIRATES WATER
MIDDLE EAST
HAMRA
AL MANTEQA AL

ISSUED FOR INFORMATION


ISSUED FOR INFORMATION
EXISTING SITE SURVEY RO PLANT AREA

MIRFA 2 REVERSE OSMOSIS (RO) PLANT -

(EWEC)
(EXISTING UTILITIES TO BE REMOVE)

INDEPENDENT WATER PROJECT


14.03-2023

DESCRIPTION
224020

MIRFA 2 - 120 MIGD RO IWP


MARFA
AL
CIVIL

AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
AutoCAD
SHX
Text
AutoCAD
SHX
Text
AutoCAD
AutoCAD
SHX
SHX
Text
AutoCAD
SHX
Text
AutoCAD
AutoCAD
SHX
SHX
Text
Text
AutoCAD
AutoCAD
SHX
Text
AutoCAD
AutoCAD
SHX
SHX
Text
Text
AutoCAD
SHX
Text
AutoCAD
SHX
Text
SHX
Text
SHX
SHX
Text
SHX
SHX
Text
Text
SHX
Text
Text
SHX
Text
Text
Text
AutoCAD
Text
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
SHX
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
Text
SHX
AutoCAD
SHX
AutoCAD
SHX
SHX
AutoCAD
SHX
SHX
AutoCAD
Text
SHX
SHX
AutoCAD
SHX
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
Text
SHX
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
Text
SHX
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
Text
SHX
AutoCAD
Text
SHX
SHX
SHX
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
AutoCAD
Text
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
SHX
AutoCAD
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
AutoCAD
Text
SHX
SHX
AutoCAD
Text
AutoCAD
Text
SHX
AutoCAD
Text
SHX
Text
SHX
SHX
SHX
Text
SHX
Text
SHX
Text
Text
SHX
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
SHX
Text
Text
SHX
Text
SHX
Text
SHX
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
Text
- Height Datum : Abudhabi Municipality Datum
- Plan Datum
- Map Projection : UTM 39 NORTH
PROJECT CO-ORDINATES SYSTEM

2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
13:19:44
13:19:44
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
13:19:45
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:45
2023-03-30
13:19:44
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
13:19:44
2023-03-30
13:19:44
13:19:44
13:19:44
13:19:44
13:19:44
13:19:44
13:19:44
13:19:44
13:19:44
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
13:19:39
2023-03-30
2023-03-30
2023-03-30
13:19:39
13:19:44
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
13:19:38
13:19:41
13:19:38
2023-03-30
13:19:38
2023-03-30
13:19:44
13:19:37
13:19:38
13:19:40
13:19:41
13:19:44
2023-03-30
13:19:39
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:37
13:19:40
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:40
13:19:41
13:19:42
13:19:40
13:19:37
13:19:42
13:19:37
13:19:38
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:44
13:19:37
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:39
13:19:40
13:19:41
13:19:39
13:19:41
2023-03-30
13:19:42
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:42
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:41
13:19:42
13:19:43
2023-03-30
13:19:39
2023-03-30
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:39
13:19:42
2023-03-30
13:19:38
13:19:44
2023-03-30
2023-03-30
13:19:37
13:19:39
13:19:40
13:19:41
2023-03-30
2023-03-30
13:19:37
13:19:39
13:19:42
13:19:37
13:19:41
13:19:42
2023-03-30
13:19:37
2023-03-30
13:19:43
2023-03-30
13:19:43
13:19:41
2023-03-30
2023-03-30
13:19:44
13:19:41
13:19:44
13:19:41
2023-03-30
13:19:38
2023-03-30
2023-03-30
13:19:40
13:19:41
13:19:42
2023-03-30
2023-03-30
13:19:37
13:19:43
2023-03-30
13:19:39
13:19:41
13:19:43
2023-03-30
2023-03-30
2023-03-30
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:39
2023-03-30
13:19:38
13:19:40
2023-03-30
2023-03-30
2023-03-30
13:19:37
13:19:38
13:19:41
13:19:42
2023-03-30
13:19:41
2023-03-30
2023-03-30
13:19:43
13:19:41
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:41
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
13:19:37
2023-03-30
13:19:39
13:19:41
2023-03-30
2023-03-30
2023-03-30
13:19:37
2023-03-30
13:19:37
13:19:38
13:19:42
2023-03-30
2023-03-30
13:19:40
2023-03-30
13:19:43
2023-03-30
13:19:41
2023-03-30
2023-03-30
13:19:40
2023-03-30
2023-03-30
13:19:38
13:19:44
2023-03-30
2023-03-30
2023-03-30
2023-03-30
2023-03-30
13:19:38
13:19:39
2023-03-30
13:19:42
13:19:40
13:19:42
2023-03-30
13:19:37
13:19:40
2023-03-30
13:19:38
13:19:39
13:19:43
2023-03-30
13:19:39
2023-03-30
2023-03-30
13:19:37
13:19:38
13:19:41
2023-03-30
13:19:38
13:19:44
2023-03-30
13:19:39
13:19:40
13:19:44
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:39
2023-03-30
13:19:38
2023-03-30
13:19:39
2023-03-30
13:19:38
2023-03-30
13:19:39
13:19:42
2023-03-30
13:19:39
13:19:42
2023-03-30
13:19:38
13:19:41
2023-03-30
13:19:37
13:19:40
13:19:43
2023-03-30
13:19:37
2023-03-30
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:44
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:41
2023-03-30
13:19:38
2023-03-30
13:19:37
13:19:38
13:19:41
2023-03-30
13:19:42
13:19:44
2023-03-30
13:19:37
13:19:38
13:19:40
13:19:44
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:40
2023-03-30
13:19:37
13:19:43
2023-03-30
13:19:38
2023-03-30
13:19:37
13:19:40
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:38
13:19:41
2023-03-30
13:19:38
13:19:44
13:19:38
13:19:39
13:19:40
13:19:44
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:38
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:40
13:19:41
13:19:42
2023-03-30
2023-03-30
13:19:37
13:19:43
2023-03-30
13:19:37
13:19:38
13:19:40
2023-03-30
13:19:37
13:19:41
2023-03-30
13:19:37
13:19:38
13:19:40
13:19:37
13:19:39
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
13:19:44
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:42
13:19:44
2023-03-30
13:19:39
13:19:40
2023-03-30
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:41
13:19:42
13:19:44
13:19:37
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:42
13:19:43
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
13:19:44
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:42
13:19:44
2023-03-30
13:19:37
13:19:39
13:19:40
13:19:41
13:19:44
2023-03-30
13:19:37
2023-03-30
13:19:37
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:42
2023-03-30
13:19:37
13:19:42
2023-03-30
13:19:41
13:19:42
2023-03-30
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:39
13:19:40
13:19:42
13:19:43
2023-03-30
13:19:38
13:19:39
13:19:42
13:19:43
2023-03-30
13:19:40
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:44
2023-03-30
13:19:39
13:19:44
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
2023-03-30
13:19:41
13:19:44
13:19:40
13:19:41
2023-03-30
13:19:38
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:42
13:19:39
13:19:40
2023-03-30
13:19:42
2023-03-30
13:19:41
13:19:43
2023-03-30
13:19:39
2023-03-30
13:19:40
2023-03-30
13:19:39
13:19:42
2023-03-30
2023-03-30
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:43
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:44
2023-03-30
2023-03-30
13:19:40
13:19:42
2023-03-30
13:19:37
13:19:42
2023-03-30
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:39
13:19:41
13:19:43
2023-03-30
13:19:39
13:19:41
2023-03-30
13:19:39
13:19:41
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:40
13:19:41
13:19:43
2023-03-30
13:19:39
13:19:40
13:19:41
13:19:43
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:40
2023-03-30
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:43
13:19:44
2023-03-30
13:19:39
13:19:42
2023-03-30
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:40
13:19:42
13:19:44
2023-03-30
13:19:38
13:19:39
13:19:40
13:19:41
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:43
2023-03-30
13:19:37
13:19:40
13:19:41
13:19:43
2023-03-30
2023-03-30
13:19:39
13:19:40
13:19:44
2023-03-30
13:19:37
13:19:44
2023-03-30
2023-03-30
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:39
13:19:41
13:19:42
2023-03-30
2023-03-30
13:19:37
13:19:43
13:19:44
13:19:37
13:19:38
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:39
13:19:40
2023-03-30
13:19:38
13:19:40
13:19:42
2023-03-30
13:19:42
2023-03-30
13:19:38
13:19:39
2023-03-30
13:19:39
13:19:42
13:19:43
13:19:44
2023-03-30
13:19:39
13:19:41
2023-03-30
13:19:38
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:44
13:19:38
13:19:41
13:19:44
2023-03-30
13:19:37
13:19:39
13:19:42
2023-03-30
13:19:37
13:19:41
13:19:42
13:19:39
13:19:42
2023-03-30
13:19:37
13:19:39
13:19:42
13:19:43
2023-03-30
13:19:37
13:19:39
13:19:40
13:19:41
13:19:39
13:19:40
13:19:42
2023-03-30
13:19:38
13:19:39
13:19:42
2023-03-30
13:19:38
13:19:40
13:19:42
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
2023-03-30
13:19:40
13:19:41
13:19:43
2023-03-30
13:19:40
2023-03-30
2023-03-30
13:19:41
13:19:44
2023-03-30
13:19:37
2023-03-30
13:19:39
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:42
2023-03-30
13:19:40
2023-03-30
13:19:37
13:19:38
13:19:39
13:19:41
13:19:43
13:19:40
13:19:41
13:19:43
2023-03-30
13:19:39
2023-03-30
13:19:39
2023-03-30
13:19:38
13:19:39
13:19:42
2023-03-30
13:19:37
13:19:39
2023-03-30
13:19:39
13:19:43
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:43
2023-03-30
13:19:39
13:19:41
2023-03-30
13:19:40
13:19:44
2023-03-30
13:19:40
13:19:41
2023-03-30
13:19:39
2023-03-30
13:19:37
13:19:41
13:19:42
2023-03-30
13:19:42
2023-03-30
13:19:43
2023-03-30
13:19:37
13:19:39
13:19:41
13:19:43
2023-03-30
2023-03-30
13:19:41
13:19:42
2023-03-30
13:19:39
13:19:40
13:19:42
2023-03-30
13:19:38
2023-03-30
13:19:43
13:19:39
2023-03-30
13:19:39
2023-03-30
13:19:40
13:19:44
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:38
13:19:39
13:19:41
13:19:42
13:19:39
2023-03-30
2023-03-30
13:19:38
13:19:40
13:19:43
2023-03-30
13:19:40
13:19:42
2023-03-30
13:19:39
13:19:40
13:19:42
13:19:38
13:19:39
2023-03-30
13:19:43
2023-03-30
13:19:38
13:19:43
2023-03-30
13:19:40
2023-03-30
13:19:40
13:19:41
13:19:44
13:19:41
2023-03-30
13:19:37
2023-03-30
13:19:37
13:19:38
13:19:40
13:19:41
13:19:42
2023-03-30
13:19:38
13:19:40
2023-03-30
13:19:38
2023-03-30
13:19:38
13:19:40
13:19:43
2023-03-30
2023-03-30
13:19:38
2023-03-30
13:19:41
13:19:42
13:19:40
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:43
2023-03-30
13:19:40
13:19:43
2023-03-30
13:19:39
13:19:40
13:19:43
2023-03-30
13:19:39
13:19:41
13:19:44
2023-03-30
13:19:40
13:19:44
2023-03-30
13:19:38
13:19:40
2023-03-30
13:19:40
13:19:42
13:19:40
13:19:42
2023-03-30
13:19:40
2023-03-30
13:19:37
13:19:39
13:19:40
13:19:43
2023-03-30
13:19:40
13:19:43
2023-03-30
13:19:37
13:19:42
2023-03-30
13:19:42
2023-03-30
13:19:38
2023-03-30
13:19:37
13:19:40
2023-03-30
13:19:38
13:19:40
13:19:41
13:19:43
2023-03-30
2023-03-30
13:19:44
2023-03-30
13:19:44
2023-03-30
13:19:38
2023-03-30
13:19:38
13:19:40
13:19:42
2023-03-30
13:19:38
13:19:40
13:19:42
2023-03-30
2023-03-30
13:19:38
13:19:43
2023-03-30
13:19:39
2023-03-30
13:19:38
2023-03-30
13:19:40
13:19:42
2023-03-30
2023-03-30
2023-03-30
13:19:43
2023-03-30
13:19:38
13:19:39
2023-03-30
13:19:38
2023-03-30
13:19:44
2023-03-30
2023-03-30
13:19:42
13:19:41
13:19:42
2023-03-30
13:19:41
2023-03-30
13:19:38
13:19:40
13:19:43
2023-03-30
13:19:43
13:19:38
13:19:42
13:19:38
13:19:38
13:19:40
13:19:41
13:19:43
13:19:40
13:19:38
13:19:40
13:19:44
13:19:38
13:19:44
13:19:37
13:19:38
13:19:39
13:19:38
13:19:41
13:19:42
13:19:37
13:19:43
13:19:40
13:19:38
13:19:38
13:19:39
13:19:42
13:19:42
13:19:38
13:19:39
13:19:43
13:19:37
13:19:40
13:19:38
13:19:44
13:19:38
13:19:40
13:19:38
13:19:40
13:19:44
13:19:37
13:19:40
13:19:42
13:19:40
13:19:42
13:19:38
13:19:39
13:19:40
13:19:37
13:19:39
13:19:43
13:19:37
13:19:40
13:19:43
13:19:40
13:19:40
13:19:42
13:19:38
13:19:42
13:19:43
13:19:44
13:19:38
13:19:40
13:19:37
13:19:39
13:19:40
13:19:43
13:19:44
13:19:38
13:19:40
13:19:37
13:19:38
13:19:40
13:19:43
13:19:44
13:19:37
13:19:38
13:19:40
13:19:43
13:19:44
13:19:37
13:19:38
13:19:39
13:19:40
13:19:39
13:19:40
13:19:44
13:19:43
13:19:44
13:19:40
13:19:43
13:19:40
13:19:37
13:19:38
13:19:39
13:19:43
13:19:44
STATUS
PRE
PRE

-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
--------------------------------------------
-------------------------------------------
08-12-2022 RMR
14-03-2023
DATE

- HV
- SEWER
- CABLE
EXISTING
- EXISTING
- CONCRETE
- TILE
PIPELINE
- ASPHALT
- CONCRETE
CONCRETE
GATE
FOOT
-FENCE
MHS
MANHOLE
- CCTV
-LIGHT
CABLE
LPF
PATH
--ROAD
STREET
LP
- TREE
--CAMERA
ROAD
FIRE
SUPPORT
FHB
POLE
-TRENCH
FIRE
FH
SEWER
-MHW
MANHOLE
-LIGHT
HYDRANT
SIGN
- FOUNDATION
HYDRANT
MANHOLE
MANHOLE
MHMH-(1.2x0.20x1m)
MANHOLE
BOARD
CONTROL
ET - BOLLARDS
WATER
BOXUNKNOWN
UNKNOWN
ETISALAT
CABIN
- SEW.MH
- MHS
--3.819
3.836
3.874
3.810
-3.914
3.947
3.741
3.819
3.973
3.850-3.926
-3.823
3.868
3.818
3.962
3.953
3.955
3.838
3.851
3.834
3.085
4.075
3.846
3.9523.785
3.822
3.840
-3.950
4.794
3.987
MH
3.884
3.985
3.9923.790
-4.027
3.915
4.069
MH
3.8283.803
3.830
3.808
MH
3.892-4.064
3.910
3.919
3.749
3.806
MH
3.878
3.886
4.048
3.910
3.834
3.970
3.901
3.843
MH
3.879
4.044
3.993
3.977
3.982
3.9533.813
3.8413.758
3.839
-4.236
3.964
3.945
3.961-3.802
3.828
3.944
3.973
3.953
3.839
3.967
4.064
MH
3.746
3.816
4.257
3.823
4.034
MH SEW.MH
-3.890
-4.248
3.815
3.798
3.723
3.809
3.989
3.963
3.936
3.990
4.063
4.0243.824
SEW.MH
3.814
3.860
--3.946
3.801
5.027
MH
3.940MHS
3.782
3.826
3.795
MHS
-3.961
2.958
MH SEW.MH
MHS
3.896
MH
3.881
MH
3.908
MH3.809
3.838
3.755
--MHS
-4.245
4.274
ET -3.952
3.859
3.877
4.255
LPMHS
3.828
3.804
3.835
-3.798
3.835
-3.803
3.9493.816
3.811
3.770
-4.272
4.257-3.912
-3.794
4.2553.812
3.856
3.801
3.960
MH-3.810
3.838
-3.790
FHB-3.803
3.811
3.834
-FH
4.226 -3.779
-3.800
3.793
4.2703.812
3.847
-0.071
4.751
4.155-4.319
3.905
3.997
3.9543.810
3.836
3.812
MHS
3.773
3.784
3.836
4.227-3.817
3.939-4.038
3.898
3.877
4.309
MH
LP 3.823
3.851
3.812
4.308-3.819
3.787
3.841
3.805
3.831
4.2743.829
3.846
3.803
--3.786
4.707-13.678
3.797
4.7223.799
3.841
3.797
--3.963
3.807
3.844
3.796
-4.694
4.734
3.804
FHB
4.693
4.1413.795
3.882FH
3.857
-3.821
3.790
-3.617
3.871
3.750
3.924-3.817
5.272
3.937
3.860
3.800
3.994
MH
LP
3.9523.811
3.856
3.830
--3.856
3.819
3.842
3.810
3.792-3.969
3.818
3.822
3.807
3.801
3.939
3.673
MH
3.9063.805
-3.908
3.848
LP 3.770
3.830
-3.816
-3.959
3.794
3.936
3.825
3.829
MH
3.964
3.830
3.987
3.833
3.726-3.780
3.937
3.908
3.835
3.964-3.899
3.848
3.773
3.763
3.870
3.9853.817
3.854
3.827
FH
-3.956
3.987
3.956
3.938
3.960
3.790
MH 3.799
3.841
3.811
-3.972
3.777
3.748
3.823
3.774
3.985
3.963
3.973
4.814
8.120
MH
3.904
MH -3.866
3.797
MH
MHE
3.886
3.8223.854
-4.023
3.813
3.816
-3.914
3.922
3.848
3.817
3.991
MH -4.307
3.957
3.964
3.938
3.571
3.920
3.938
MH
3.7983.801
3.796
3.862
3.815
3.813
3.967
3.993
3.946
3.858
4.030
3.823
3.837
4.011
3.786
3.962
3.949
4.028
3.945
4.010
4.009
MH
3.605-3.828
10.845
3.939
3.489
3.960
3.9663.798
3.796
3.814
-MH
3.430
3.550
3.982
3.963
3.965
4.006
MH
MH
MH -3.789
3.708
4.021
3.926
MH
3.9903.788
3.804
3.806
-3.950
3.890
3.930-3.793
3.823
3.970
3.946
3.970
3.060
MH
3.843
4.300
3.980
3.948
3.974
4.008
3.934
3.914
3.973
3.957
3.942
3.8153.814
3.804
-3.880
3.981
LP
MH
3.982
MH
4.032
3.943
3.933
3.812
MH 3.791
3.840
3.788
-3.841
-4.262
3.960
3.954
3.909
3.827
3.902
3.916
3.952
4.006
3.956
3.877
3.785
3.979
3.978
3.963
MH
3.815
3.771
3.796
3.945
3.935
3.959
4.9703.800
3.820
3.855
3.784
-3.774
3.905
3.934
4.779
3.881
ET
4.296
MH
3.503
3.941
3.973
3.961
3.818
3.956
3.795
LP -3.792
3.867
3.837
-3.940
3.957
3.812
3.818
4.967
5.003
3.938
3.9373.788
3.814
3.795
-3.969
2.838
3.886
4.028
3.882
3.958
3.792
MH 3.828
3.838
3.827
3.853
3.806
3.817
3.819
-3.803
4.058
3.3843.849
3.780
3.809
3.792
-MH
3.808
1.806
3.865
3.798
3.0433.788
-MH
3.812
4.849
3.968
MH
3.796
3.446
4.669
3.821
3.818
4.304
3.582
2.788
3.891
3.790
3.841
3.859
3.773
3.811
3.927
3.956
MH -3.895
3.991
3.825
3.939
3.984
LP
MH 3.847
3.855
3.842
3.837
3.848
3.379
3.865
3.838
-4.769
3.833
3.813
-3.988
3.833
3.850
3.836
-3.821
3.948
3.931
3.988
LPF 3.809
3.847
3.848
3.808
3.845
3.846
3.778
3.830
3.871
3.794
-3.970
FH
3.838
3.837
-3.899
3.7823.865
3.813
3.795
3.892
0.000
3.979
3.764
3.812
3.829
3.885-3.844
3.939
3.806
MH 3.755
3.784
MH 3.837
3.810
-3.814
3.945
3.960
3.952
4.253
4.268
4.194
MH -3.894
3.960
ETMH 3.804
3.785
-MH
3.815
0.000
3.788
3.881
3.952
3.969
MH 3.820
3.871
3.824
-MH
3.790
-3.872
3.795
3.809
3.9973.890
3.880
-3.899
3.790
3.886
0.000
ET -3.801
3.891
3.8833.822
3.844
-3.977
3.805
3.760
-MH
3.955
LP 3.788
-3.794
3.811
-3.596
3.875
MH 3.794
3.794
3.854
-3.830
3.947
3.873
3.894
3.9483.832
-3.944
3.871
3.865
3.884
-3.734
3.813-3.976
3.905
3.862
3.877
3.900
3.946
3.9873.805
3.824
3.837
3.830
-3.936
3.756
3.799
-3.904
3.829
3.868
3.918
3.7763.804
3.790
3.802
3.429
MH -3.951
3.813
3.936
3.9093.769
-3.982
3.888
3.902
3.827
3.892
3.813
3.981
3.945
3.9493.825
3.844
3.821
-3.932
3.952
3.873
3.922-3.894
3.764
3.953
LPF
3.979
3.956
3.977
MH
3.961
3.966
3.942
4.186
3.929
3.916
3.806
LP 3.809
3.891
3.840
3.818
-3.997
3.751
-3.838
3.816
3.797
0.000
3.855
3.824
3.842
3.862
3.872
4.001
4.202
3.966
3.978
3.937
3.9413.829
3.842
3.826
3.849
3.806
-MH
3.785
3.9473.765
-LP
3.934
3.998
3.959
MH 3.751
3.800
-4.002
3.744
3.903
3.770
3.837
3.874
3.9453.781
-3.957
3.822
3.919
3.820
3.978
3.842
3.796
3.928
3.994
3.944
ET
MH
3.957
MH 3.835
3.814
3.826
-3.825
3.8073.866
3.806
-3.975
3.799
-3.797
3.807
3.845
3.793
3.813
-3.798
3.999
3.788
3.962
3.964
MH 3.799
3.843
-3.764
3.800
-3.878
3.835
3.831
3.999
MH -3.808
3.907
3.809
3.8203.747
3.807
3.789
3.812
3.815
-3.980
3.975
3.969
4.010
MH
LP
3.807
LPF-3.977
3.812
3.856
3.800
3.829
3.795
-3.975
3.827
3.849
3.842
3.865
MH 3.811
3.834
-3.809
3.801
3.833
3.806
-4.005
3.844
3.979
3.851
3.959
ET
3.844
3.789
3.894
MH
3.793
3.807
MH 3.825
3.744
-3.811
3.808
-3.967
3.972
LP
3.8263.720
3.776
3.752
-MH
3.661
4.113
3.969
MH
3.807
3.950-3.766
3.796
3.673
3.743
3.751
3.801
3.941
3.921
3.9803.800
3.808
3.850
3.829
-3.809
3.782
3.736
3.849
-FHB
3.9823.828
-3.964
0.000
3.9643.797
3.805
-3.762
-3.989
3.825
3.794
3.874
3.972
3.912
MH
3.980
LP -3.912
3.792
3.837
3.811
3.781
3.837
-3.963
3.8013.786
-FHB
3.863FH
-3.950
3.7843.769
3.763
3.784
3.792
--3.777
3.796
ET
3.957
3.996 3.836
3.802
3.834
-3.801
3.8053.807
-3.839
3.806
3.841
3.8233.823
-MH
FH
3.837
-LP
3.854
3.9813.776
3.820
-3.785
3.630
LP 3.799
3.801
3.793
-MH
3.7883.780
3.796
3.838
3.745
-MH
-3.850
3.7633.808
3.852
3.831
-LP
3.782
3.980-3.814
3.769
3.897
3.531FH
3.810
3.860
3.820
3.829
3.821
-3.978
3.8003.792
3.794
3.790
3.774
3.778
-4.096
3.8323.792
3.841
3.791
3.873
3.856
3.976
3.972-3.960
-3.966
3.845
ET
3.914
3.925
3.9643.816
3.840
3.810
-4.010
-3.693
4.066
3.842
3.930
3.842
3.853
3.927
3.871
4.047
3.940
3.976
3.924-3.888
3.838
3.863
3.810
-3.960
3.8573.792
-FHB
3.817
-4.055
3.789
3.808
-4.035
3.831
4.104
3.843
3.755
3.823
3.794
ET 3.773
3.793
3.776
-3.706
-3.802
3.940
0.000
3.947
3.7863.827
-3.795
3.772
3.839
3.797
3.935
3.869
3.8583.846
3.814
-3.736
3.856
LP 3.810
FH
-3.807
3.801
3.846
3.830
--3.794
3.950
MH
MHW3.786
3.825
-3.813
3.796
-4.453
3.8233.785
3.761
3.788
4.120
3.982
MH
3.760
3.975
3.9053.849
3.786
-LP
3.798
3.813
3.849
3.806
-3.824
3.866
3.842
3.8513.828
3.852
-MH
3.825
3.919
3.743-3.807
3.759
3.819
--3.965
3.973
4.491 3.793
3.796
3.784
3.768
-3.988
3.846
-3.803
3.703
3.888
3.7653.785
3.842
3.818
-3.984
3.809
3.832
3.856
3.830
-3.844
3.750
4.176-3.846
3.7953.785
3.760
3.797
-3.741
-3.807
3.942
4.054
4.058
4.1203.799
3.771
3.789
3.800
-3.978
3.8333.820
3.845
3.793
-3.922
3.830
3.847-3.762
3.967
LP 3.819
3.832
3.806
-3.738
3.914
ET -3.805
FH
3.844
-3.805
3.760
-3.803
3.785
3.827
3.779
-3.837
3.747
-3.967
-3.791
3.820
3.8223.793
3.803
3.806
3.819
3.815
-3.797
3.8793.816
3.848
-3.795
3.911
3.8313.812
3.810
-3.734
3.918
3.814
3.801
LP
3.8303.860
-3.809
3.7293.813
-3.674
3.802
ET
3.829
3.842
3.822
LPF
MH 3.839
3.806
3.756
3.797
-3.774
3.826
3.787-3.795
3.7923.801
3.818
3.797
-3.756
3.717
3.835
3.740
3.821
3.793
3.7963.777
3.813
3.815
3.785
3.778
3.765
3.797
3.788
3.794
3.804
3.807
-3.808
3.825
FHB
3.839
3.778
3.783FH
3.793
3.803
3.813
3.866
3.796
3.788
3.839
3.778
3.791
3.770
3.807
3.782
3.772
3.777
3.776
3.773
3.720
3.766
3.764
3.748
3.743
3.733
3.814
3.806
-FH
3.645
3.704
3.790-FH
3.816
3.718
3.772
3.903
3.9273.784
3.827
3.757
3.710
3.800
3.781
MH
3.822
3.859
3.785
3.8043.836
3.835
3.817
3.811
3.813
3.801
3.805
3.816
3.819
3.828
3.847
3.848
3.860
3.862
3.824
3.822
3.821
3.833
3.834
3.823
3.843
3.828
3.838
3.845
3.830
3.884
3.844
3.802
3.827
3.816
3.836
3.819
3.835
3.821
3.807
3.840
3.780
3.821
3.800
3.767
3.822
3.987
3.969
1. 3.857 ALL DIMENSIONS AND
3.812
3.781
3.753
3.795
3.790
3.796
3.807
3.808
3.809
3.772
3.784
3.777
3.765
3.748
3.755
3.776
3.762
3.779
3.801
3.804
3.810
3.818
3.770
3.791
3.774
3.789
3.786
3.782
3.785
3.800
3.788
3.793
3.798
3.796
3.809
4.059
3.925
4.020
3.891
3.866
3.826
3.831
3.851
3.844
3.846
3.799
3.784
3.949
4.010
4.051
LPF
LP
MH
3.830
3.748
3.939
3.864
3.854
3.606
3.898
3.806
3.763
3.758
3.780
3.865
3.876
3.964
: WGS 84

ONLY ROUND
SQUAREELECTRICITY CHAINAGES ARE IN METRES
DRAWN CHECKED APPROVED

FLS
DRAWING SIZE :

REVISION NO:
SCALE :

UNLESS ALL DIMENSIONS AND


PLOT NO :

MT

W
1:100

N
S
EA
P68

CHAINAGES ARE IN METRES


E
A1

UNLESS STATED OTHERWISE.


AE
EA
LAND KEY :
PLANT
N NORTH N

W E

W E

E:748645.450
N:2670117.800
E:748785.290
E:748783.452
E:748643.860 N:2670172.984 N:2670174.050
N:2670116.533
PROJECT CO-ORDINATES SYSTEM
AutoCAD SHX Text - Map Projection : UTM 39 NORTH
- Plan Datum : WGS 84
2023-03-30 13:19:46
13:19:45 GENERAL NOTES : - Height Datum : Abudhabi Municipality Datum

--------------------------------------------
AutoCAD SHX Text
3.866
3.845
3.606
2023-03-30 13:19:48
--------------------------------------------
1. ALL DIMENSIONS AND
CHAINAGES ARE IN METRES
UNLESS ALL DIMENSIONS AND
CHAINAGES ARE IN METRES
E:748678.815
E:748552.710 E:748672.471 N:2670075.347
N:2670018.220 E:748644.840 N:2670072.813

AutoCAD
UNLESSSHX Text
N:2670054.40

STATED
Text OTHERWISE.
0 E:748674.522 11KV S/S E:748680.762

AutoCAD SHX
E:748551.345
E:748643.663 N:2670067.659 N:2670070.278
N:2670017.004
N:2670053.507
E:748701.468 2023-03-30 13:19:46
E:748585.780
N:2670020.377
N:2670072.979
2023-03-30
AutoCAD 13:19:46
SHX Text
E:748588.360 CCTV AutoCAD
--------------------------------------------
AutoCAD SHX
SHX Text
Text
B ISSUED FOR INFORMATION PRE 14-03-2023 FLS EA EA
N:2670024.564
AutoCAD
--------------------------------------------
2023-03-30SHX SHX Text
13:19:45
13:19:46
E:748591.663
AutoCAD
2023-03-30
2023-03-30 13:19:45
13:19:46
Text
13:19:45
2023-03-30 3.888 13:19:45
13:19:46
N:2670025.793
E:748580.638
AutoCAD
2023-03-30 SHX Text
13:19:45
13:19:46
13:19:47
A1 ISSUED FOR INFORMATION PRE 08-12-2022 RMR MT AE
-------------------------------------------- 3.975
N:2670022.504 E:748668.638
N:2670059.686
MATERIA
--------------------------------------------
2023-03-30
-------------------------------------------- 13:19:45
13:19:46 REV No. DESCRIPTION STATUS DATE DRAWN CHECKED APPROVED
L
E:748705.305
N:2670063.440
--------------------------------------------
2023-03-30
AutoCAD
--------------------------------------------
AutoCAD SHX
13:19:46
SHX Text
Text
4.120
4.055
E:748590.948 N:2670018.253

AutoCAD 3.937
3.959 SHX Text CLIENT
STORAGE

--------------------------------------------
E:748586.085

AutoCAD SHX Text


E:748594.033 N:2670019.526

3.863
3.794
3.743
3.919
3.979
3.766
3.673
3.939
N:2670019.232 CCTV

3.982
E:748672.880
2023-03-30 13:19:46
E:748585.994 N:2670009.324

--------------------------------------------
AutoCAD 3.830
3.869
3.925 SHX Text :
E:748587.416
N:2670050.162
N:2670011.050
E:748592.211 N:2670002.752 E:748592.457
AutoCAD
2023-03-30
AutoCAD
2023-03-30 LP
4.066
4.058
MH SHX
13:19:46
SHX Text
13:19:45
Text
13:19:45
13:19:46
N:2670002.231
AutoCAD
AutoCAD 3.944
3.980 SHX
SHX Text
Text
EMIRATES WATER
--------------------------------------------
AutoCAD
2023-03-30 SHX
13:19:46
Text
E:748572.422 E:748594.021 N:2670002.862

LEGEND FOR EXISTING UTILITY E:748561.817


N:2669995.636
E:748587.775 N:2670010.198
E:748589.213 N:2670001.516 2023-03-30
AutoCAD
--------------------------------------------
2023-03-30
AutoCAD
--------------------------------------------
2023-03-30
AutoCAD 3.996 SHX
13:19:46
SHX Text
13:19:46
Text
13:19:45
13:19:46
SHX Text
& ELECTRICITY Co.
E:748590.682 N:2669997.885
2023-03-30
AutoCAD
2023-03-30 13:19:45
13:19:46
13:19:48
SHX Text
13:19:45
(EWEC)
LIGHT.POLE.FOUND

--------------------------------------------
N:2669991.334

AutoCAD
2023-03-30
--------------------------------------------
--------------------------------------------
AutoCAD
2023-03-30
-------------------------------------------- LP
4.096
3.796
4.054
3.874
4.047 SHX
13:19:45
13:19:46
13:19:48
SHX Text
13:19:45
Text
13:19:46
E:748574.011 E:748594.888

--------------------------------------------
-------------------------------------------
2023-03-30
AutoCAD
--------------------------------------------
AutoCAD
2023-03-30 4.035
4.453
4.491
3.873
3.888
3.914
4.176
3.846
3.796 13:19:48
SHX
13:19:45
SHX Text
13:19:46
13:19:48
Text
OWNER ENGINEER:
--------------------------------------------
------------------------------------------- 3.809
4.005
N:2669992.240 N:2670000.758
E:748597.786
AutoCAD
2023-03-30
-------------------------------------------- 3.807 SHX Text
13:19:46
13:19:48
13:19:45 ILF CONSULTING ENGINEERS
------------------------------------------- 3.825
E:748574.303

AutoCAD
2023-03-30 SHX
13:19:45
13:19:46
13:19:48
Text
N:2670001.951

-------------------------------------------- 3.807
LPF
LP
N:2669991.285

AutoCAD
2023-03-30
-2023-03-30
AutoCAD
--------------------------------------------
------------------------------------------- 3.826
3.853
3.750
3.765
3.788
3.856
3.851 SHX
13:19:45
13:19:46
SHX Text
13:19:45
13:19:46
Text SKY TOWER UNIT 36-01,36th FLOOR AL REEM
3.866
3.879
3.842
3.897
3.703 13:19:48
E:748596.695

AutoCAD
-AutoCAD 3.806
3.789
3.796
3.778
3.793
3.784
3.850
3.856
3.796
3.844
3.842
3.813
3.795
3.782
3.797
3.837
3.802 SHX Text
N:2670032.475

2023-03-30
-------------------------------------------- 13:19:45
13:19:46
N:2670000.269
E:748686.165 E:748725.716
2023-03-30
--------------------------------------------
------------------------------------------- MH SHX Text
13:19:46
P.O. Box 73250 Abu Dhabi United Arab Emirates
3.809
E:748597.066
N:2670048.467
AutoCAD
---------------------------------------------
2023-03-30
--------------------------------------------
AutoCAD BOLLARDS
3.908
3.962 SHX
SHX Text
13:19:45
13:19:48
Text
4.010
N:2670000.122

2023-03-30
-------------------------------------------
AutoCAD
2023-03-30
---------------------------------------------
------------------------------------------- 3.784 SHX Text
13:19:45
13:19:46
2023-03-30 3.964 13:19:46
13:19:48 OWNER:

Container
AutoCAD SHX Text

Container
CONTROL
2023-03-30
---------------------------------------------
AutoCAD
--------------------------------------------
AutoCAD
2023-03-30 3.814
3.945
3.956
3.857
3.931
3.796
3.747
3.771
3.768
3.788
3.776
3.774
3.780
3.792
3.829
3.738
3.743
3.736
3.939
3.801
3.785
3.741
MH
3.850
3.912 SHX
SHX CABIN
13:19:45
13:19:48
Text
13:19:48
Text
-------------------------------------------- 3.808
3.762
FHB
3.823
3.807
E:748689.600
N:2670015.614
2023-03-30
AutoCAD
-2023-03-30
-------------------------------------------- FH
3.835
3.832
3.825
4.296
4.304
3.791
3.807
4.307
4.300 SHX
13:19:46
Text ENGIE SOLUTIONS
3.924
ET
E:748582.123

AutoCAD SHX
13:19:45
Text
E:748604.895

--------------------------------------------
-------------------------------------------- 3.797
MANHOLE ETISALAT
E:748603.543

3.905
3.777
3.922
3.914
3.919
3.940 13:19:46
N:2669972.370

AutoCAD
--------------------------------------------
------------------------------------------- SHX Text
N:2669984.160 N:2669984.604

ELECTRICITY
2023-03-30 13:19:45
13:19:48 MIDDLE EAST
Porta cabin CHEMICAL
E:748582.999 E:748582.743 E:748629.987
N:2669991.596
STORAGE
2023-03-30
AutoCAD
-------------------------------------------
2023-03-30
AutoCAD
--------------------------------------------
MANHOLE
2023-03-30 3.820
3.780
MH SHX
13:19:46
SHX Text
13:19:45
13:19:46
Text
UNKNOWN
13:19:46
LP
N:2669970.786
N:2669969.518
AutoCAD SHX
13:19:45
Text
E:748734.935
E:748630.532 E:748644.862
E:748645.440
N:2670025.787
--------------------------------------------
2023-03-30
----------------------------------------------
2023-03-30
-------------------------------------------
AutoCAD
2023-03-30 3.871
3.856
3.798
3.865
3.807
3.812
3.781
3.784
3.930
3.835 SHX
3.849
13:19:48
13:19:45
13:19:46
13:19:48
SHX Text
13:19:45
13:19:46
13:19:48
-------------------------------------------- 3.831
4.104
MH
E:748687.961
N:2669990.352
EPC CONTRACTOR:
AutoCAD SHX Text
N:2669997.459

2023-03-30
--------------------------------------------- MANHOLE 13:19:45
13:19:46
UNKNOWN
N:2669996.447 E:748695.336

AutoCAD Text
N:2670013.370

2023-03-30
-------------------------------------------- 3.976 13:19:48
CONC.TANK WITH

SQUARE
AutoCAD SHX Text
N:2670009.844

-------------------------------------------
E:748721.654

--------------------------------------------
E:748688.870 E:748722.924

------------------------------------------- 3.927
GRILL ON TOP

AutoCAD
-------------------------------------------- 4.010 SHX Text
N:2670018.159
N:2670013.106 N:2670019.175
AL-NASR
E:748693.487
2023-03-30
AutoCAD
--------------------------------------------
--------------------------------------------
2023-03-30
AutoCAD SIGN BOARD
3.948 13:19:46
SHX
13:19:45
Text
13:19:46
SHX Text
--------------------------------------------
2023-03-30 LPF 13:19:46
13:19:48
E:748722.043

ROUND
AutoCAD SHX
13:19:45
Text
N:2670005.767
E:748693.004 N:2670017.270

-------------------------------------------
2023-03-30
AutoCAD
2023-03-30
-2023-03-30
-AutoCAD 3.813
3.952
3.805
3.949
3.793
3.969
3.804
3.797
MHW
3.813
MANHOLE
13:19:46
13:19:48
SHX
13:19:45
Text
13:19:46
13:19:45
13:19:46
13:19:48
WATER SIDEM
--------------------------------------------
N:2670003.327

E:748586.679 E:748694.305
E:748721.754
2023-03-30
---------------------------------------------
2023-03-30
--------------------------------------------
-------------------------------------------
2023-03-30
AutoCAD 3.826 SHX
3.960
3.957
3.961
3.818
3.975
3.972
3.966
3.922
3.976
3.956
3.963
Text
13:19:45
13:19:48
13:19:45
13:19:46
SHX
13:19:45
13:19:46
Text
--------------------------------------------
--------------------------------------------
N:2670016.485

FH
N:2669948.544 N:2670005.519
60 INCH U/G PIPE
2023-03-30
AutoCAD
-------------------------------------------
--------------------------------------------
2023-03-30
AutoCAD
--------------------------------------------
------------------------------------------- SHX
13:19:46
FIRE HYDRANT
SHX Text
E:748831.486

13:19:45
13:19:46
Text
13:19:48
N:2670049.391 CONSULTANT:
--------------------------------------------
AutoCAD
------------------------------------------- 3.854
3.820 SHX Text
E:748724.221
E:748582.522

---------------------------------------------
AutoCAD
--------------------------------------------
2023-03-30 3.967
FIRE
FHB
LP
3.960 SHX
13:19:46
HYDRANT Text BOX
13:19:48
N:2669947.078

MH
4.120
3.988
N:2670015.986
AMGD
AutoCAD
---------------------------------------------
--------------------------------------------
2023-03-30 3.831
3.788
3.964
3.815
3.794
3.802
3.891
3.982
MH
3.907
3.794
FH SHX
13:19:45
Text
13:19:46
13:19:48
--3.965
AutoCAD
-------------------------------------------
-2023-03-30
AutoCAD
2023-03-30 3.814
3.984
4.058
3.947
3.806
4.032 SHX
13:19:45
SHX Text
13:19:45
13:19:46
Text
3.978
3.966
4.021
E:748743.677
N:2670012.372

AutoCAD
--------------------------------------------
------------------------------------------- TREE
MHW
3.942
3.940
4.253 13:19:46
SHX
13:19:45
Text
E:748583.855
N:2669943.744 2023-03-30
--------------------------------------------
AutoCAD
2023-03-30
--------------------------------------------
-------------------------------------------
2023-03-30 3.809
3.927
FHB
LP
3.693
FH 13:19:48
SHX
13:19:45
13:19:46
Text
13:19:48
13:19:45
13:19:46
13:19:48
E:748596.408 E:748603.207
E:748604.202
-AutoCAD
--------------------------------------------
AutoCAD
-------------------------------------------
--------------------------------------------
2023-03-30
-------------------------------------------- 3.822
3.795
4.268
STREET
LP
3.835
3.846
3.734 13:19:45
LIGHT
SHX
SHX Text
13:19:48
Text DESIGNER:
------------------------------------------- 3.804
3.800
4.194
N:2669938.388

2023-03-30 13:19:48
N:2669938.060 N:2669940.667

--------------------------------------------
-------------------------------------------- 3.843
GATE
Conc.Support

AutoCAD
--------------------------------------------
-LIGHT
-------------------------------------------
--------------------------------------------
2023-03-30
AutoCAD 3.798
ET
3.744
3.751
LPF
ET
MH
3.809
3.997
3.979 SHX
POLE
SHX Text
FOUNDATION
13:19:48
Text
ARTELIA
E:748607.902 N:2669936.857
AutoCAD
-AutoCAD
-------------------------------------------
2023-03-30
AutoCAD
-------------------------------------------- 3.967
3.862
3.886
3.783
3.978
FH
LPF
3.550
3.987
LP
MH
3.605
3.816
CCTV
SHX
SHX Text
13:19:46
13:19:48
13:19:45
SHX
CAMERAText
Text
Tel. No: +971 04 886 5690

3.827
3.782
E:748587.451
2023-03-30 3.760
3.842
3.630
3.899 13:19:46
13:19:48
E:748598.094 N:2669934.430
Fax No: +971 04 886 5691
-AutoCAD 3.812
3.790
3.793
3.800
3.796
3.785
3.794
3.769
3.808
3.811
3.804
3.814
3.801
3.763
3.777
3.817
3.802
3.973
3.826
3.823
3.814 SHX
13:19:47
Text
13:19:45
13:19:46
E:748604.095 N:2669936.728
N:2669934.437

ONLY
AutoCAD
2023-03-30
-2023-03-30
--------------------------------------------
AutoCAD
-------------------------------------------
2023-03-30 3.956
3.785
SHX
13:19:48
SHX Text
13:19:48
Text
13:19:45
13:19:46
P.O. Box No:18271 Dubai,

--------------------------------------------- MHS
MANHOLE SEWER
U.A.E.
2023-03-30
E:748610.887 N:2669938.048

AutoCAD
--------------------------------------------
--------------------------------------------
2023-03-30
--------------------------------------------
2023-03-30 3.848 SHX 13:19:45
13:19:46
Text
13:19:48
13:19:45
13:19:46
-------------------------------------------
E:748607.918
PROJECT NAME :
N:2669935.071
2023-03-30
AutoCAD
CONCRETE
-------------------------------------------
--------------------------------------------
AutoCAD SHX
13:19:45
13:19:46
SHX Text
SUPPORT
Text (1.2x0.20x1m)
E:748611.431 N:2669936.798

--3.797
2023-03-30
--------------------------------------------
2023-03-30
-------------------------------------------
AutoCAD 3.803
3.793
3.761
3.773
3.790
3.799
3.763
3.800
3.781
3.769
3.794
3.785
3.804
3.796
3.815
3.805
3.796
3.798
3.760
3.842
3.773
3.821
3.774
3.792 13:19:45
13:19:48
13:19:47
SHX Text
--------------------------------------------
2023-03-30
---------------------------------------------
-------------------------------------------
AutoCAD
-AutoCAD
2023-03-30 3.837
3.938
3.808
3.970
3.966
CONCRETE
3.782
3.797 13:19:46
13:19:45
13:19:48
SHX ROAD
Text
13:19:45
13:19:48
-------------------------------------------- 3.823
3.980
3.829 SHX Text
--------------------------------------------
2023-03-30
AutoCAD
-------------------------------------------
2023-03-30 3.811
3.946
3.914
--------------------------------------------ASPHALT
3.799
LPF
3.780
3.800
3.961
3.902
MH
3.973
3.943
13:19:45
SHX ROAD
Text
13:19:48
MIRFA 2 - 120 MIGD RO IWP
---------------------------------------------
-------------------------------------------
2023-03-30 3.812
3.930
3.847
3.809
TILE
-------------------------------------------- FOOT13:19:47
PATH
-2023-03-30
AutoCAD
-AutoCAD 3.828
MH
3.786
------------------------------------------- SHX Text
13:19:48
-AutoCAD 3.788
3.834
CONCRETE
-------------------------------------------
2023-03-30 MH SHX CABLE TRENCH
Text
13:19:48
AutoCAD
-2023-03-30 3.960
------------------------------------------- SHX
SHX Text
Text ZONE :
-- EXISTING
AutoCAD
2023-03-30 3.847
3.855
3.849
-------------------------------------------
2023-03-30 SHX FENCE
13:19:47
13:19:48
Text
13:19:48
13:19:46
13:19:48
AutoCAD
2023-03-30 EXISTING
3.789 SHX
3.833
3.797 GATE
Text
13:19:46 AL
-------------------------------------------
--------------------------------------------
AutoCAD SEWERSHX SHX Text
PIPELINE
--------------------------------------------
-------------------------------------------
AutoCAD
2023-03-30
AutoCAD Text
13:19:47
SHX Text
MARFA
-------------------------------------------
AutoCAD
-2023-03-30
AutoCAD
--AutoCAD 3.838
3.842
3.848
HV
3.774 SHX
CABLE Text
13:19:48
SHX Text SECTOR NO : PLOT NO :
E:748629.556
AutoCAD
2023-03-30
2023-03-30
AutoCAD
2023-03-30
3.821
3.765
LPF
-------------------------------------------SHX
13:19:46
SHX
SHX Text
13:19:47
Text
13:19:46
Text
13:19:45
-2023-03-30
AutoCAD 3.857 SHX Text
N:2669895.500

-------------------------------------------
AutoCAD SHX
13:19:45
Text
Ex.WATER

2023-03-30 13:19:47 AL MANTEQA AL HAMRA P68


AutoCAD SHX
--------------------------------------------13:19:45
Text
TANK

2023-03-30
AutoCAD
2023-03-30
AutoCAD 3.837
3.780
3.808 13:19:47
SHX
13:19:45
--------------------------------------------- Text
13:19:46
SHX Text
--------------------------------------------
E:748606.149
N:2669885.970
E:748615.604
2023-03-30 13:19:45
13:19:47
13:19:48
13:19:46
--------------------------------------------
AutoCAD
2023-03-30 SHX
13:19:45
Text
---------------------------------------------
3.791
3.822
3.778
N:2669889.846

2023-03-30
AutoCAD 13:19:45
SHX
-------------------------------------------
2023-03-30 MH Text
13:19:45
AutoCAD
2023-03-30
AutoCAD
AutoCAD
2023-03-30 3.908
MH SHX
--------------------------------------------
SHX
--------------------------------------------
-------------------------------------------
3.938 SHX Text
13:19:45
Text
Text
13:19:45
PROJECT DESCRIPTION :
--------------------------------------------
2023-03-30
AutoCAD 3.969
4.028
--------------------------------------------
MH
3.882 13:19:45
SHX
--------------------------------------------
2023-03-30 MH
3.827
3.848
3.845 Text
13:19:46
13:19:47
---------------------------------------------
AutoCAD
2023-03-30 3.946
3.870
4.006
MH SHX
13:19:48
Text
TEMP.Gas

2023-03-30 3.770
3.905 13:19:46
---------------------------------------------
3.785
3.824
3.972
4.028
Cylinder

AutoCAD 3.430 SHX Text


Storage

2023-03-30
AutoCAD LP
3.985
--------------------------------------------
3.818 13:19:46
SHX
13:19:45
--------------------------------------------
2023-03-30
AutoCAD 3.582 SHX Text
13:19:47
------------------------------------------- Text
AutoCAD 3.993
3.384 SHX
-------------------------------------------
2023-03-30 Text
13:19:45
AutoCAD
2023-03-30
2023-03-30 MH
--------------------------------------------
3.963
3.571 SHX
13:19:45
13:19:46
Text
13:19:48
-------------------------------------------- MIRFA 2 REVERSE OSMOSIS (RO) PLANT -
LOW VOLTAGE AutoCAD
2023-03-30
--AutoCAD LPF
4.011
4.814
3.818
3.815
3.862
3.810 SHX
13:19:47
SHX Text
13:19:46
Text
-------------------------------------------- INDEPENDENT WATER PROJECT
S/S & CONTROL
AutoCAD
2023-03-30 SHX Text
13:19:45
--------------------------------------------
ROOM
AutoCAD
2023-03-30
AutoCAD 8.120
4.669
10.845 SHX Text
-------------------------------------------
2023-03-30 1.806 13:19:46
--------------------------------------------
13:19:45
SHX
13:19:46
13:19:47
Text
2023-03-30 MH 13:19:47
--------------------------------------------
2023-03-30
AutoCAD
-AutoCAD 3.945
3.973
3.987
3.864
MH
3.813
3.800 SHX
3.860 13:19:46
13:19:47
13:19:45
--------------------------------------------
SHX Text
--------------------------------------------
2023-03-30
AutoCAD 3.964
MH 13:19:45
SHX Text
-------------------------------------------
Text
--------------------------------------------
AutoCAD SHX Text
--------------------------------------------
-------------------------------------------
AutoCAD
2023-03-30 2.838
MHE SHX
13:19:46
Text
--------------------------------------------
2023-03-30
-AutoCAD
AutoCAD
2023-03-30 2.788
3.846
3.985
3.043
3.958 13:19:47
13:19:46
SHX
SHX Text
13:19:47
Text DRAWING TITLE :
2023-03-30
AutoCAD 3.489
4.779
3.808
3.848
4.262 13:19:46
---------------------------------------------
3.810 SHX Text
-------------------------------------------
-------------------------------------------
2023-03-30
2023-03-30
AutoCAD 4.849 SHX 13:19:46
13:19:46
Text
E:748550.484
E:748624.498
N:2669835.822
E:748635.603
-------------------------------------------
--------------------------------------------
AutoCAD
2023-03-30 13.678
LPF SHX Text
13:19:47 CIVIL
--------------------------------------------
3.778
N:2669840.336
N:2669805.466
AutoCAD 3.379 SHX Text
----------------------------------------------
3.812 13:19:45 EXISTING SITE SURVEY RO PLANT AREA
AutoCAD
2023-03-30
2023-03-30 3.810
3.847
3.806 SHX
13:19:46
13:19:47
Text
13:19:46
3.446
CONC.TANK E:748649.558
CONC.SLAB N:2669845.992
-------------------------------------------
AutoCAD
2023-03-30
AutoCAD 3.812 SHX Text
13:19:45
13:19:46
SHX Text
13:19:46 (EXISTING UTILITIES TO BE REMOVE)
---------------------------------------------
2023-03-30
AutoCAD FH
-------------------------------------------
3.790 SHX
13:19:47
Text
--------------------------------------------
2023-03-30 13:19:46
13:19:47
-2023-03-30
AutoCAD
2023-03-30 3.853
3.830
3.865 SHX Text
--------------------------------------------
13:19:45
13:19:47
13:19:47
SHEET 1 OF 2
---------------------------------------------
AutoCAD
AutoCAD
2023-03-30
3.828
3.804
MH
3.867
3.777
3.748
3.924
4.010
3.939
LPF SHX
SHX Text
Text
--------------------------------------------
-------------------------------------------
13:19:45
13:19:47
AutoCAD
AutoCAD
2023-03-30 3.835
3.834
3.886
3.060 SHX
SHX Text
--------------------------------------------
Text
-------------------------------------------
13:19:45
13:19:47
AutoCAD
2023-03-30
AutoCAD
2023-03-30 4.023
3.503
3.823
3.920 SHX
13:19:47
Text
13:19:45
13:19:46
---------------------------------------------
3.806
3.871
3.838
3.817
3.952
3.936 SHX
13:19:47
Text
DRAWING NO : REVISION NO:
AutoCAD
2023-03-30 3.858
3.774
3.782
3.824 13:19:46
SHX
13:19:47
Text
13:19:45
13:19:46
--------------------------------------------
-2023-03-30
AutoCAD
2023-03-30
AutoCAD
3.785 SHX
13:19:45
13:19:47
SHX Text
-------------------------------------------
AutoCAD SHX Text
--------------------------------------------
13:19:45
13:19:46
Text 224020-C2-W0-ANC-6000-CG-WWZ-SK-005 A
-------------------------------------------
2023-03-30
AutoCAD
AutoCAD MH
--------------------------------------------
3.947 13:19:46
-------------------------------------------
SHX
13:19:47
SHX Text
--------------------------------------------
13:19:45
Text
-------------------------------------------
2023-03-30
AutoCAD
2023-03-30
AutoCAD MH
3.926
3.617
3.947
MH 13:19:46
13:19:47
--------------------------------------------
3.809
3.833
3.794 13:19:45
---------------------------------------------
SHX
13:19:45
13:19:46
Text
13:19:47
SHX Text
---------------------------------------------
2023-03-30
2023-03-30 3.801
--------------------------------------------
AutoCAD 3.819
3.780
3.892
3.814 SHX
13:19:47
Text
13:19:45
13:19:46 SUBMISSION DATE : SCALE :
--------------------------------------------
AutoCAD
2023-03-30
AutoCAD
2023-03-30
MH
3.821
3.804
3.764
3.836 SHX Text
--------------------------------------------
-------------------------------------------
3.818
3.673 13:19:45
13:19:46
--------------------------------------------
SHX
13:19:47
Text
-------------------------------------------
13:19:46
13:19:45
13:19:47
AutoCAD
2023-03-30
2023-03-303.812
3.784
3.803
3.790
3.789
3.801
3.823
3.790
3.779
3.786
3.781
3.720
3.756
3.760
3.804
3.816
3.770
3.795
3.829
3.773
3.811
3.809
3.813
SHX Text
-------------------------------------------
13:19:45
---------------------------------------------
13:19:45
-------------------------------------------- 14.03-2023 1:100
AutoCAD 3.816
3.795
3.819
3.800
3.785
3.792
3.820
3.837
3.819
ET
3.800
3.788
3.818
-2023-03-30
3.807
3.789
3.765 SHX Text
--------------------------------------------
2023-03-30
3.801
3.809
3.785
3.830
3.755
3.770 13:19:47
13:19:45
13:19:47
--------------------------------------------
3.779
--------------------------------------------
13:19:45
13:19:46
3.799
--------------------------------------------
---------------------------------------------
3.818 13:19:46
3.827
3.797
3.819
3.825
3.817
3.820
3.837
3.776
3.807
3.800
3.799
3.805
3.810
3.806
3.854
3.830
3.857
3.846
3.836
3.834
3.816
3.838
3.839
3.874
3.829
3.792
MH
2023-03-30
-------------------------------------------
3.785
3.790
3.708
3.795
3.763
3.921
3.773
-AutoCAD
3.785 SHX Text
3.747
3.751
3.755
3.786
3.752
3.804
3.788
3.813
3.805
3.790
3.784
3.803
3.770
3.758 SHX
--------------------------------------------
3.760
3.794
3.789
3.821
3.776
--------------------------------------------
3.769
3.729
3.797
3.771
3.759
3.755
3.717
3.746
AutoCAD
3.756 Text
PROJECT ID : DRAWING SIZE :
3.808
3.718
--------------------------------------------
3.819
2023-03-30 13:19:46
13:19:47
-2023-03-30
3.810
3.762
3.780
MH
3.741
-AutoCAD
3.733 SHX
3.710
3.758 13:19:46 224020 A1
Text
--------------------------------------------
-------------------------------------------
MH
--------------------------------------------
2023-03-30 13:19:45
13:19:47 OFFICIAL USE ONLY :
3.776
3.816
MH
-AutoCAD
3.743 13:19:46
MH SHX Text
-------------------------------------------
--------------------------------------------
2023-03-30 13:19:47
13:19:45
13:19:46
-3.763
3.755
3.748
3.805
3.757 OFFICIAL USE ONLY :
--------------------------------------------
-------------------------------------------
-3.839
3.840
3.786
3.777
3.816
3.720
3.766
3.813
3.765
3.748
3.764
3.801
3.891
3.868
3.910
3.915
3.962
4.069
MH
3.085
4.075
MATCH LINE A-A
E:748584.373 E:748589.358
N:2669720.979 N:2669722.690
0 0.25
0.5 0.75
1 1.25m

S
C
A
L
E

1
:
2
5

0 1 2
3 4
5m

S
C
A
L
E

1
:
1
0
0
LAND KEY :
PLANT
N NORTH
MATCH LINE A-A N

W E

W E

S
AutoCAD
AutoCAD SHX
SHX Text
Text
AutoCAD
AutoCAD SHX SHX Text
Text
AutoCAD
2023-03-30 SHX Text
13:19:53
2023-03-30
2023-03-30 13:19:48
13:19:50
2023-03-30
2023-03-30SHX
AutoCAD 13:19:49
13:19:50
Text
-------------------------------------------
--------------------------------------------
--------------------------------------------
--------------------------------------------
---------------------------------------------
2023-03-30 3.776
3.807
3.773
MH
13:19:53
AutoCAD MH
3.949
3.964 SHX Text
-------------------------------------------
PROJECT CO-ORDINATES SYSTEM
- Map Projection : UTM 39 NORTH
- Plan Datum : WGS 84
2023-03-30
- 3.788 3.777 13:19:53
3.821 GENERAL NOTES : - Height Datum : Abudhabi Municipality Datum

AutoCAD
-------------------------------------------
AutoCAD SHX
SHX Text
Text
AutoCAD
AutoCAD SHX
SHX Text
Text
2023-03-30
2023-03-30
-AutoCAD 3.804
3.826
3.772 13:19:53
13:19:49
AutoCAD
2023-03-30 SHX
SHX Text
13:19:53
Text
2023-03-30
AutoCAD
------------------------------------------- 13:19:50
SHX Text
E:748622.037
N:2669642.399
--------------------------------------------
AutoCAD SHX
2023-03-30
2023-03-30
AutoCAD
--------------------------------------------
AutoCAD
SHX
13:19:50
Text
13:19:51
13:19:49
13:19:50
13:19:52
13:19:51
SHX Text
Text
E:748617.192 E:748624.802
--------------------------------------------
AutoCAD
2023-03-30
AutoCAD
-2023-03-30 3.782
3.826
3.809 SHX
13:19:51
13:19:52
13:19:53
SHX Text
Text
13:19:49
13:19:50
--------------------------------------------
AutoCAD SHX
13:19:48
Text
N:2669640.231
E:748617.535 N:2669641.175 E:748681.906
2023-03-30
2023-03-30
AutoCAD
1.
2023-03-30 3.767
--------------------------------------------
-------------------------------------------
AutoCAD ALL13:19:51
SHX
13:19:49
13:19:50
13:19:52
Text
13:19:48
13:19:51
SHX
13:19:50
Text
DIMENSIONS AND
-------------------------------------------
3.876
N:2669639.696 E:748625.403
N:2669639.599 E:748682.420
2023-03-30
AutoCAD 3.785
-------------------------------------------
2023-03-30 SHX
13:19:50
Text
13:19:49
13:19:48
--------------------------------------------
AutoCAD SHX Text
N:2669664.711

3.793
E:748743.888
E:748618.665 N:2669685.182
2023-03-30
-AutoCAD
2023-03-30 3.813
3.808
3.830
--------------------------------------------
-------------------------------------------
AutoCAD 3.805
3.824
3.801
3.810
3.811
3.800
3.829
3.822
3.795
3.788
3.796
3.794
3.811
3.797
3.832
-------------------------------------------- 13:19:48
SHX
13:19:49
Text
13:19:50
SHX
13:19:49
13:19:53
Text
CHAINAGES
---------------------------------------------
AutoCAD
2023-03-30 SHX ARE
13:19:49
13:19:53
Text IN METRES
N:2669636.856

TRANSFORMER
E:748630.305 E:748703.218
AutoCAD
2023-03-30 3.839
3.856
3.852
3.846
3.863
3.860
3.825
3.843
3.842
3.837
3.844
3.814
3.808
3.835
3.807
--------------------------------------------
---------------------------------------------
AutoCAD
2023-03-30
AutoCAD FH
3.831
-------------------------------------------
LP SHX Text
13:19:50
SHX
13:19:49
SHX Text
13:19:49
Text
3.820
3.792
N:2669638.933 N:2669668.535
ROOM
E:748715.975 E:748716.636
-2023-03-30
2023-03-30 3.828
3.830
3.838
3.823
3.744
3.799
3.826
3.824
3.801
3.813
3.795
--------------------------------------------
3.751
3.750
FHB
3.843
3.798
3.813
3.787
FH
3.806
-------------------------------------------
AutoCAD 3.844
3.778
--------------------------------------------
-------------------------------------------
UNLESS
AutoCAD FHB
3.706 13:19:49
13:19:50
SHX
ALL
SHX Text
13:19:49
DIMENSIONS AND
13:19:50
Text
3.774
TANK

--------------------------------------------
3.935 13:19:49
N:2669669.574

AutoCAD
2023-03-30 SHX
13:19:48
13:19:50
Text
N:2669669.824

ET 13:19:49
EXISTING WORK

2023-03-30
--------------------------------------------
-2023-03-30 FH
-------------------------------------------- 13:19:48
13:19:50
13:19:50
13:19:51
3.961
LP

TEMP.SHED
AutoCAD SHX
13:19:53
Text
SHOP

-2023-03-30 3.756
3.807
3.704
HEVY VECHILE
SHED
AutoCAD 3.836
--------------------------------------------
CHAINAGES SHX
---------------------------------------------
2023-03-30 3.770
-------------------------------------------
AutoCAD 3.844 13:19:49
SHX Text
ARE
13:19:48
13:19:51
Text
13:19:48
13:19:49 IN METRES
E:748637.990
-------------------------------------------
AutoCAD
2023-03-30
AutoCAD 3.994
3.937
3.997
3.973 SHX
--------------------------------------------
3.955
3.954
3.967
--------------------------------------------
SHX Text
13:19:49
13:19:51
Text
-------------------------------------------
4.694
4.693
4.734
4.722
4.309
4.751
4.272
4.707
4.308
4.227
4.270
4.226
4.257
4.245
4.255
4.274
4.248
4.236
COMPPRRSOR
N:2669619.798
2023-03-30
--------------------------------------------
2023-03-30 MH 13:19:49
13:19:49
13:19:50
UNLESS 3.940
3.953 STATED OTHERWISE.
ROOM

E:748627.857
E:748711.053
N:2669649.328
E:748751.896
---------------------------------------------
2023-03-30
-2023-03-30 FH
FHB
3.952
3.786
3.903
FH
3.945
3.990
3.967
3.596
3.531
3.834
3.838
MH
3.938
3.674 13:19:49
13:19:50
13:19:49
13:19:50
13:19:53
---------------------------------------------
N:2669665.749
N:2669613.825
AutoCAD
AutoCAD 3.807 SHX
3.914
3.950
3.835
3.791 SHX Text
--------------------------------------------
3.942 Text
--------------------------------------------
AutoCAD 3.836
MH
3.959 SHX
--------------------------------------------
AutoCAD MH
3.987
3.944 SHX Text
Text
E:748632.611
--------------------------------------------
-------------------------------------------
2023-03-30
AutoCAD
2023-03-30
AutoCAD 3.819
3.970
3.961 SHX
13:19:50
SHX Text
13:19:49
13:19:50
Text
E:748958.704
B ISSUED FOR INFORMATION
PRE 14-03-2023 FLS EA EA
2.958
E:748725.097 E:748725.803 E:748967.778
N:2669615.720 N:2669646.986 N:2669647.399
2023-03-30
AutoCAD
2023-03-30 3.851
3.850
3.989
3.843 13:19:49
13:19:50
13:19:51
SHX Text
13:19:53
N:2669740.556 N:2669744.010
E:748633.277
N:2669611.175
E:748804.963 AutoCAD
2023-03-30 4.794
3.973
3.936 SHX
13:19:49
13:19:50
13:19:51
---------------------------------------------
AutoCAD
2023-03-30
AutoCAD 3.815
3.985
3.778
3.819
3.800 SHX
SHX Text
13:19:48
Text
13:19:49
13:19:50
-------------------------------------------- Text
A1 ISSUED FOR INFORMATION PRE 08-12-2022 RMR MT AE

E:748634.343 E:748728.722
############ N:2669665.551

--------------------------------------------
-------------------------------------------
2023-03-30 13:19:48
13:19:50
13:19:49
13:19:50
-------------------------------------------
2023-03-30
AutoCAD SHX
-------------------------------------------- Text
13:19:49
13:19:50
CCTV REV No. DESCRIPTION STATUS DATE DRAWN CHECKED APPROVED

-------------------------------------------
############# E:748805.829 GATE

2023-03-30
AutoCAD SHX
13:19:52
Text
E:748762.093 E:748962.187

13:19:48
13:19:50
13:19:51
E:748729.562

0.071
N:2669637.567

2023-03-30 13:19:52
N:2669611.630 E:748971.361

--------------------------------------------
E:748764.776 N:2669666.848

13:19:49
13:19:51 CLIENT
############ N:2669731.257

3.964
3.800
3.822
N:2669637.937 N:2669649.139
N:2669650.206 #############
AutoCAD 3.969
3.960
5.027
3.992 SHX
--------------------------------------------
-AutoCAD MHS SHX Text
Text
N:2669735.056
E:748730.432
E:748765.080
N:2669647.889
############

AutoCAD
2023-03-30
AutoCAD
2023-03-30
-2023-03-30 3.801
3.991
MH
--------------------------------------------
3.831
4.030
3.884
3.979
4.064
3.946
3.846
4.141
4.319
3.796
3.834
3.827
3.963
5.272
MH
3.901
3.866
3.940
SEW.MH SHX
13:19:53
--------------------------------------------
3.785 SHX Text
--------------------------------------------
3.740 13:19:52
Text
--------------------------------------------
:
AutoCAD 3.868
3.890
3.908 SHX Text
-------------------------------------------
N:2669633.788

--------------------------------------------
2023-03-30 3.960
3.896
3.964 13:19:50
13:19:51 EMIRATES WATER
E:748766.670

AutoCAD SHX Text


#############

13:19:48
13:19:50
13:19:51
N:2669643.843

2023-03-30
AutoCAD MH
3.879
3.839
3.934
3.891 SHX
13:19:50
13:19:51
13:19:52
Text
-------------------------------------------
E:748760.985 E:748806.706

13:19:49
E:748731.169

2023-03-30
AutoCAD 3.878 SHX
13:19:50
13:19:51
13:19:52
Text
-------------------------------------------
3.823 & ELECTRICITY Co.
N:2669647.823 N:2669666.830

3.865
3.802
N:2669633.910

-2023-03-30
AutoCAD
-AutoCAD 3.822
3.828
3.925
3.842
3.814
3.819
3.820
3.803
3.798
3.772
3.792
3.745
3.736
3.795
3.832
3.824
3.788
3.815
3.827
3.811
3.797
3.823
3.800
3.812
3.828
3.814 13:19:49
13:19:50
SHX
13:19:48
13:19:51
Text
13:19:49
13:19:50
--------------------------------------------
2023-03-30 3.764
3.860
3.882
3.823
3.939
3.798
3.841
3.831
3.816
3.795
3.801
3.799
3.821
3.833
3.848
3.825
3.806
3.809 13:19:51 (EWEC)
E:748761.934
N:2669645.680
AutoCAD SHX
SHX Text
--------------------------------------------
2023-03-30 13:19:50
13:19:53
13:19:49
13:19:51
Text
--------------------------------------------
-------------------------------------------
3.785
E:748732.363
N:2669626.614 E:748739.344
2023-03-30
AutoCAD
2023-03-30
AutoCAD 3.846
3.845
3.846
3.827
3.838
3.836
3.849
3.834
3.866
3.844
3.871
3.850
3.862
3.854
3.841
3.851
3.847
3.856
3.835
3.860
3.840 13:19:50
13:19:53
--------------------------------------------
3.839
--------------------------------------------
SHX
13:19:49
SHX Text
13:19:50
---------------------------------------------
3.848 Text
2023-03-30 13:19:48
13:19:50
E:748765.109
OWNER ENGINEER:
13:19:49
--------------------------------------------
N:2669630.428

AutoCAD
2023-03-30 SHX
13:19:50
13:19:51
Text
E:748732.958

3.827
3.776
N:2669643.277

-------------------------------------------
2023-03-30
AutoCAD SHX
13:19:49
13:19:51
Text
N:2669626.913

E:748769.349
E:748796.299
N:2669640.779
--------------------------------------------
2023-03-30
AutoCAD
AutoCAD
2023-03-30 4.020
LP
3.806
3.820
3.793
3.795
3.838
3.793
3.785
3.786
3.796
3.802
3.782
3.811
3.806
3.825
3.794
3.836
3.791
3.813
3.817
3.830
3.799
3.812
3.801
3.804
3.824
3.809
3.837
3.894
3.803
3.734
3.816
3.822
3.786
3.842
MH
3.963
3.785
3.859
3.877
3.851
3.972
3.829
3.906
3.843
3.873
3.839
3.833
3.779
3.935
3.824 13:19:50
SHX
13:19:48
13:19:49
Text
----------------------------------------------
-------------------------------------------
3.828 13:19:50
-------------------------------------------
--------------------------------------------
3.806 SHX
13:19:51
Text ILF CONSULTING ENGINEERS
N:2669641.785 E:748779.203
AutoCAD
2023-03-30
2023-03-30 3.862
3.830
3.748
3.928
3.933
3.873
3.881
3.957
3.842
3.952
3.841
3.944
3.937
3.837
3.989
3.877
3.950
3.957
3.792 13:19:49
--------------------------------------------
3.892
3.872 SHX Text
-------------------------------------------
MH 13:19:49
--------------------------------------------
3.825
3.981 13:19:48
13:19:51
13:19:53
---------------------------------------------
3.881
3.789 13:19:48
13:19:49
N:2669634.014
EXISTING HIGH E:748779.700
2023-03-30
AutoCAD
2023-03-30 MH
4.769
3.836 SHX
13:19:50
Text
--------------------------------------------
3.946
3.936
3.949
3.945
3.904 13:19:50
---------------------------------------------
-AutoCAD 3.777
3.952
3.794
3.905
3.804
3.926
3.796
3.848
3.859
4.048
MHS SHX Text
SKY TOWER UNIT 36-01,36th FLOOR AL REEM

MH
4.038
P.O. Box 73250 Abu Dhabi United Arab Emirates
2023-03-30 13:19:49
13:19:50
E:748741.238 N:2669632.760

4.064
3.936
E:748738.532 VOLTAGE

-AutoCAD MH
SEW.MH
--------------------------------------------
3.957
3.830
N:2669616.410

4.034
3.904
3.909 SHX Text
-------------------------------------------
N:2669615.239

13:19:50
SUBSTATION

2023-03-30
AutoCAD 3.806
3.902
MH
3.977 SHX
13:19:51
Text
--------------------------------------------
3.999
4.010
3.874
E:748780.900

4.027
--------------------------------------------
3.872
0.000
MH
3.822
N:2669629.786 E:748797.409
N:2669639.859
AutoCAD
2023-03-30 3.980
3.855 SHX Text
13:19:51
--------------------------------------------
OWNER:
E:748744.218
E:748747.291
N:2669609.361 E:748798.062 AutoCAD
2023-03-30
2023-03-30
AutoCAD 3.959
3.956
3.981
3.941
3.790
MH
3.964
3.788
3.816
SHX
SHX Text
13:19:51
13:19:49
13:19:50
13:19:53
13:19:51
Text
---------------------------------------------
13:19:49 ENGIE SOLUTIONS
2023-03-30 MH
3.762 13:19:50
E:748777.483

3.939
E:748781.606 N:2669636.678

4.024 13:19:49
N:2669609.332
N:2669621.634 N:2669628.006
E:748799.453
2023-03-30
AutoCAD
2023-03-30 MH
3.982 SHX
13:19:51
Text
--------------------------------------------
13:19:49
13:19:51
13:19:48
13:19:50 MIDDLE EAST
--------------------------------------------
3.950
3.994
E:748741.303

AutoCAD SHX Text


-------------------------------------------
N:2669608.191 N:2669635.079
E:748742.055
2023-03-30 4.063 13:19:49
13:19:51
--------------------------------------------
AutoCAD SHX
13:19:50
Text
--------------------------------------------
AutoCAD 3.967 SHX Text
N:2669604.542

2023-03-30 13:19:51
--------------------------------------------
E:748739.695

AutoCAD SHX
13:19:50
Text
E:748778.684

--------------------------------------------
AutoCAD 3.980
3.941
3.975 SHX Text
N:2669603.589 E:748780.326

2023-03-30 13:19:51
13:19:53
N:2669618.768

AutoCAD 3.969
3.937 SHX
13:19:48
13:19:49
Text
N:2669619.446

---------------------------------------------
3.776
3.827
3.795
3.963
3.938
MH
EXISTING

AutoCAD
2023-03-30
2023-03-30
AutoCAD 3.982
3.951 SHX
13:19:51
Text
13:19:48
13:19:49
SHX Text
EPC CONTRACTOR:
3.970
TRANSFORMER AREA

--------------------------------------------
2023-03-30
AutoCAD
2023-03-30
AutoCAD MH
3.977
3.972
3.945
3.966
4.009 SHX
13:19:49
13:19:50
13:19:51
Text
13:19:50
SHX
13:19:49
Text
--------------------------------------------
-------------------------------------------
5.003
4.970 AL-NASR
E:748657.424 E:748745.018 E:748747.591 E:748784.579 AutoCAD
2023-03-30
2023-03-30
AutoCAD
2023-03-30 4.113
MH
3.978
3.978
4.967
3.918
3.911
4.051
3.950
MH SHX Text
13:19:50
--------------------------------------------
13:19:51
--------------------------------------------
SHX
13:19:50
Text
13:19:49
13:19:51
--------------------------------------------
3.880
3.950
N:2669551.429

AutoCAD
2023-03-30
2023-03-30
AutoCAD 3.998
3.997 SHX
13:19:53
Text
-------------------------------------------
13:19:51
--------------------------------------------
SHX
13:19:48
13:19:50
Text SIDEM
-AutoCAD 3.753
3.802
3.894
--------------------------------------------
LP
0.000
3.932 SHX Text
13:19:48
13:19:50
--------------------------------------------
2023-03-30
AutoCAD 3.909
4.008
3.982
MH
3.934
3.903 13:19:49
13:19:51
SHX Text
--------------------------------------------
2023-03-30
-3.962
2023-03-30 4.044
3.851
FH 13:19:48
13:19:50
-------------------------------------------
2023-03-30
AutoCAD 3.953
MH
3.929 SHX
13:19:49
Text
--------------------------------------------
3.968 13:19:50
13:19:48
13:19:49
13:19:51 CONSULTANT:
--------------------------------------------
3.772 13:19:50
E:748797.375 N:2669610.776

2023-03-30 13:19:49
13:19:51
E:748796.720

E:748785.961
E:748790.527 N:2669594.287
2023-03-30
AutoCAD
AutoCAD
2023-03-30 3.806
3.818
3.877
3.927
3.885 SHX
13:19:49
13:19:51
Text
--------------------------------------------
2023-03-30 MH
3.988 13:19:48
13:19:49
13:19:50
13:19:51
13:19:52
--------------------------------------------
3.822 SHX
SHX Text
13:19:53
--------------------------------------------
AMGD
3.957
E:748794.625

AutoCAD Text
---------------------------------------------
3.781
N:2669605.266
E:748779.458 N:2669589.846

AutoCAD
AutoCAD
2023-03-30 3.796
3.844
3.956
MH SHX
SHX Text
--------------------------------------------
3.993 13:19:52
Text
--------------------------------------------
MH
3.822
E:748660.798 E:748770.306 N:2669586.113 N:2669596.238

AutoCAD SHX Text


--------------------------------------------
-------------------------------------------
3.964
3.978
3.982
E:748788.934 N:2669593.577

2023-03-30
AutoCAD 13:19:49
SHX Text
E:748769.359 N:2669585.761

-------------------------------------------
MH
N:2669543.130
2023-03-30
2023-03-30 3.999
3.888
3.954 13:19:49
13:19:50
13:19:48
13:19:50
13:19:52
AutoCAD
2023-03-30
AutoCAD
2023-03-30 3.965
3.910
3.868
3.905
3.886
3.960
3.974
3.812
MH
3.980
4.002
3.883
3.821
3.859
3.975
3.916
3.841
3.959
3.875
3.899
3.895
3.922 SHX
13:19:49
13:19:51
SHX Text
13:19:52
13:19:48
13:19:49
13:19:50
13:19:51
Text
-------------------------------------------
3.827 13:19:49
13:19:50
13:19:51
2023-03-30 3.790
0.000
3.892 13:19:52
E:748795.660

--------------------------------------------
3.786
3.812
3.792
E:748778.614 E:748789.870

AutoCAD SHX
13:19:49
13:19:51
Text
E:748749.897

----------------------------------------------
3.795
3.803
3.807
3.810
3.799
3.796
3.820
3.837
3.890
3.884
3.809
3.793
3.801
3.805
3.806
3.831
3.816
3.814
3.813
3.818
3.819
3.919
3.820
3.823
3.831
3.829
3.828
3.815
E:748752.252

2023-03-30 3.786 13:19:52


N:2669589.244 N:2669591.738 N:2669596.101

3.884
3.866
N:2669577.669

13:19:49
N:2669578.768
E:748771.736 N:2669580.019 E:748788.847
N:2669585.614
E:748791.356
-------------------------------------------
AutoCAD
2023-03-30
2023-03-30
AutoCAD 3.830
3.826
3.835
3.838
3.836
3.844
3.814
3.855
3.880
3.865
3.891
3.845
3.833
3.828
3.841
3.852
3.840
3.846
3.849
3.842
3.832
3.860
SHX
13:19:51
Text
--------------------------------------------
13:19:48
-------------------------------------------
13:19:51
--------------------------------------------
SHX Text
---------------------------------------------
DESIGNER:
--------------------------------------------
N:2669591.838

E:748793.983
-------------------------------------------
2023-03-30
AutoCAD
AutoCAD 3.788
3.800
3.912
2023-03-30
AutoCAD SHX
13:19:50
13:19:51
SHX
SHX Text
13:19:49
-------------------------------------------
Text
13:19:49
13:19:48
13:19:50
13:19:51
Text
ARTELIA
--------------------------------------------
LP
----------------------------------------------
3.819
3.912
N:2669588.554

AutoCAD
AutoCAD FH
3.782
3.790
3.787
3.796
3.811
3.798
3.784
3.838
3.872
3.871
3.840
3.797
3.807
3.808
3.810
3.809
3.806
3.823
3.817
3.801
3.821
3.805
3.945
3.816
2023-03-303.812
3.825
3.960
3.947
FHB
3.822 SHX Text
13:19:49
SHX Text
Tel. No: +971 04 886 5690
3.826
3.854
3.871
3.898
3.784
3.793
3.833
3.886
3.847
3.858
3.955
3.815
3.877
3.807
3.809
2023-03-30
3.918
3.900
3.891
3.894 13:19:52
E:748793.181
N:2669588.305
AutoCAD3.954
3.792
LP
3.952
3.948
3.942
-2023-03-30
3.790
3.977
3.957
3.830 SHX Text
--------------------------------------------
13:19:50
Fax No: +971 04 886 5691
3.830
3.976
3.849
3.793
E:748772.830 N:2669580.137
E:748790.240 N:2669585.797

3.813
3.854
3.807 13:19:51
---------------------------------------------
-------------------------------------------
--------------------------------------------
3.956
3.807
P.O. Box No:18271 Dubai,
AutoCAD
2023-03-30
3.842
3.825
3.816
AutoCAD
2023-03-30 SHX
13:19:50
Text
13:19:49
SHX
13:19:53
Text
E:748761.458
3.817
-------------------------------------------
3.970
2023-03-30
AutoCAD
3.984
3.987
4.001 SHX
13:19:49
13:19:51
Text
13:19:50
--------------------------------------------
U.A.E.
N:2669560.421 E:748762.491
N:2669560.327
3.661
3.977
3.726
3.764
3.969
AutoCAD
3.826
2023-03-30
-2023-03-30
FH SHX Text
13:19:49
--------------------------------------------
3.821
3.981
AutoCAD SHX Text
13:19:49
-------------------------------------------
AutoCAD SHX
13:19:51
13:19:52
Text
PROJECT NAME :
E:748764.217
3.645
--------------------------------------------
-AutoCAD
3.803
-------------------------------------------
AutoCAD
3.801
3.845
2023-03-30 SHX
SHX Text
13:19:48
13:19:50
Text
3.990
N:2669553.431

3.801
E:748802.123
E:748690.022
AutoCAD SHX Text
E:748671.586

--------------------------------------------
3.829
E:748789.098

2023-03-30 13:19:50
N:2669568.828

3.916
N:2669563.562

2023-03-30 13:19:50
--------------------------------------------
--------------------------------------------
N:2669516.549 E:748765.153

3.988
MHS
N:2669523.276

4.006 13:19:48
13:19:50
13:19:51
N:2669553.802

2023-03-30
3.844
3.973
3.865
-2023-03-30 13:19:52
13:19:48
SEW.MH13:19:51
2023-03-30 13:19:49
13:19:50
--------------------------------------------
13:19:48 MIRFA 2 - 120 MIGD
E:748760.439

-------------------------------------------- 13:19:49
3.979
--------------------------------------------
N:2669551.937

3.822
E:748801.162
N:2669568.440

--------------------------------------------
3.800
--------------------------------------------
3.856
3.814
3.838
3.941
-------------------------------------------- RO IWP AL MARFA
--------------------------------------------
MH
E:748798.020

3.939
E:748789.726

-3.963
0.000
MH
N:2669567.169

E:748762.840 E:748796.416
3.987
MH
3.788
3.828
3.894
3.956
3.793
3.749
3.881
4.202
4.059
3.949
3.947
3.794
3.818
3.969
3.898
3.914
3.952
3.878
3.789
3.890
3.899
3.813
4.186
N:2669552.873

3.429
EXISTING SUBSTATION
ZONE :

SECTOR NO : PLOT NO :

AL MANTEQA AL HAMRA P68

PROJECT DESCRIPTION :
AutoCAD
AutoCAD SHX
SHX Text
Text
2023-03-30
2023-03-30 13:19:53
13:19:50
-------------------------------------------
------------------------------------------- MIRFA 2 REVERSE OSMOSIS (RO) PLANT -
INDEPENDENT WATER PROJECT
-- MHS
SEW.MH

DRAWING TITLE :

CIVIL
EXISTING SITE SURVEY RO PLANT AREA
(EXISTING UTILITIES TO BE REMOVE)
SHEET 2 OF 2

E:749038.940 DRAWING NO : REVISION NO:


N:2669544.450

E:748716.720
N:2669410.170 224020-C2-W0-ANC-6000-CG-WWZ-SK-005 A
LEGEND FOR EXISTING UTILITY SUBMISSION DATE : SCALE :

AutoCAD SHX Text 14.03-2023 1:100


AutoCAD
AutoCAD SHX
2023-03-30 Text
13:19:53
AutoCAD SHX
SHX Text
Text
2023-03-30
AutoCAD 13:19:53
SHX Text PROJECT ID : DRAWING SIZE :
-------------------------------------------
2023-03-30
2023-03-30SHX
AutoCAD
13:19:50
13:19:53
13:19:50
Text
--------------------------------------------
2023-03-30 13:19:53
--------------------------------------------
BOLLARDS 224020 A1
--------------------------------------------
-------------------------------------------
AutoCAD
2023-03-30 SHX Text
13:19:53
CONTROL
-2023-03-30
MHS SHX CABIN
--------------------------------------------
AutoCAD Text
13:19:53
ET
---------------------------------------------
MANHOLE
SEW.MH.28
AutoCAD
2023-03-30 SHX ETISALAT
Text
-------------------------------------------
13:19:53
OFFICIAL USE ONLY :
ELECTRICITY
MH
MANHOLE
AutoCAD SHX UNKNOWN
Text
-------------------------------------------
2023-03-30 13:19:53
MH
-AutoCAD
MANHOLE UNKNOWN
--------------------------------------------
SHX Text
-------------------------------------------
SQUARE
2023-03-30
AutoCAD
-ROUND 13:19:53
SHX
SIGN BOARD Text
-------------------------------------------
2023-03-30
MHW
-2023-03-30
MANHOLE 13:19:53
WATER
-------------------------------------------
13:19:53
--------------------------------------------
FIRE HYDRANT
FH
OFFICIAL USE ONLY :

--------------------------------------------
-------------------------------------------
- FHB
FIRE HYDRANT BOX
--LIGHT
TREE
Conc.Support

CONCRETE
MHSCABLE
STREET
TILE
CONCRETE
EXISTING
SEWER
HV
LP
CCTV
MANHOLE
LPF
ASPHALT
FOOT
POLE
CAMERA
PIPELINE
LIGHT
ROAD
FENCE
GATE
SUPPORT
SEWER
PATH
ROAD
CABLE
FOUNDATIONTRENCH
(1.2x0.20x1m)
ONLY 0 0.25 0.5 0.75 1 1.25m

SCALE 1:25

0 1 2 3 4 5m

SCALE 1:100
Mirfa 2 RO Plant Document number :
PROJECT N°: 224020 224020-C2-W0-ANC-6000-GB-WZZ-007

Rev: F Date :30//2023


METHOD STATEMENT & RISK ASSESSMENT (MSRA)
FOR DEMOLITION WORKS Status : GFE

Order Numbers : N/A Page 18 of 18

CONDITION ASSESSMENT FOR


EXISTING BUILDINGS
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 3 of 42
– UAE 4912660/003/ZS

1. INTRODUCTION
Bureau Veritas (BV) has been appointed by AL Nasr Contracting Co. LLC. for
carrying out the third party services for Condition Assessment for the five (5)
buildings located at Mirfa 2 RO Plant Project, Al Mirfa, Abu Dhabi, UAE as
mentioned below:

• Workshop building
• 33kv switchgear building
• 220kv switchgear building
• Chemical Store (Building D)
• Low Voltage & Control Room Building

Based on AL Nasr Contracting Co. LLC. Letter of Intent (LOI) reference


ALN/PD/10202/22 dated 22.12.2022, for providing the above services; Bureau Veritas
has carried out visual inspection, testing and sampling at the concerned
structure on 29th, 30th December 2022 and 2nd January 2023.

This report presents the outcome of the visual survey (i.e., investigation, testing,
analysis & reporting) conducted by Bureau Veritas Engineers, to the condition of the
five (5) buildings related to MIRFA RO Plant Project Al Mirfa, Abu Dhabi – UAE.

< o0o >


Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

2. SCOPE OF BUREAU VERITAS MISSION


The purpose of Bureau Veritas mission is to assess the condition of the 5 buildings for
Mirfa RO plant project.

In order to be able to fulfil the purpose of the mission, Bureau Veritas proposed
scope of work will be as follows:

2.1. Detailed Visual Inspection


The visual inspection will be carried out on a random basis on the accessible
areas of the above-mentioned structure in order to assess its condition and
soundness. The survey will ensure that a sufficiently representative part of the
structure has been visually inspected.

2.2. Mapping of the Defects


During the survey, Bureau Veritas will map out all major defects observed in the
inspected parts of the concerned structure. Such maps will be part of our final
report.
The mapping will cover the visually detected defects in the structural elements,
such as:
 Leaking areas,
 Concrete Delamination
 Cracks,
 Concrete spalling
 Steel Corrosion

2.3. Sampling and Testing

Based on the findings of the visual inspection, Bureau Veritas will develop a
sampling and testing program to be carried out on the existing structure.

The testing program for concrete shall include:


 MPI (Magnetic Particle Inspection) for the Steel Structures, ( 20 Nos)
 UT (Ultrasonic Testing) for the Steel Structures, (20 Nos)
 Half Cell potential measurement (12No.)
 Core tests for strength and visual assessment (33 No.)
 Dust sample for Chloride and Sulfate Content (33 No.)
 Depth of Carbonation (33 No.)

The aim of the testing program is to define:


Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

 The causes of disorders.


 The actual quality of the concrete and steel
 The aggressiveness of the environment.
 The suitable repair methods and materials.

2.4. Recommnedations on the Structure Conditon

After analyzing the results of the visual survey, the documents review and the
results of tests, Bureau Veritas, will recommend general guidelines and
methodologies to be implemented for the repair of the structure.

For each defect type or group of defects encountered, a separate guideline


would be recommended.

2.5. Reporting

Upon completion of all inspections and tests, Bureau Veritas will submit a
comprehensive report detailing the condition of the slab structures and facilities
and other findings. This report will include:

1. The findings of the visual inspections


2. Mapping of the defects
3. Document review
4. Conclusion & recommendations

< o0o >


Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

3. BRIEF DESCRIPTION OF THE STRUCTURE

In accordance with the scope of work highlighted above, the investigation only
concentrates on the Workshop building, 33kV Switchgear Substation Building,
220kV Switchgear Substation Building, Chemical Store Building (Building D) and
Low Voltage & Control Room Building, at Al Mirfa, Abu Dhabi, UAE.

WORKSHOP STORE BUILDING

WORKSHOP STORE BUILDING Comprises of the main workshop area with an


overhead gantry crane of 20T capacity, smaller workshops, storerooms, offices and
toilets. The workshop area is of typical reinforced concrete foundation up to
concrete pedestal elevated around 200mm from the finished slab-on-grade. The
superstructure comprises of steel columns to steel rafters and with roof framings
and sheeting. The external walls are composite with the lower portion
constructed of block wall while the upper portions up to roof is constructed of
side claddings with sandwich panels. The slab-on-grade is noted to be coated
with epoxy coating but is condition is worn out. The offices, storerooms and
smaller workshop areas have a separate column and beam frames with block wall
partitions.

CHEMICAL STORE BUILDING (BUILDING D)

CHEMICAL STORE BUILDING (BUILDING D) is a single-story building divided into


two areas, one with an open shaded area and second with enclosed area for
chemical store. The building is constructed of typical reinforced concrete
foundation, columns, slab-on-grade, roof beams and roof slab. The concrete
wall for the open area is painted while the chemical store is with floor tiles and wall
tiles up to mid height after which paint is applied all to the soffit ceiling. The op roof
slab is covered with cement tiles.

33 kV SWITCHGEAR SUBSTATION BUILDING

33 kV SWITCHGEAR SUBSTATION BUILDING Comprises of a ground floor, a roof slab


and a low height basement floor. The basement is typical reinforced concrete
slab with epoxy coating, with concrete columns and perimeter retaining walls
with emulsion coatings. Ground floor is of reinforced concrete slab and beams
with emulsion coatings for walls, while floor finishes are removed.

AIR COMPRESSOR BUILDING

The AIR COMPRESSOR BUILDING Comprises of the ground floor Air compressor
room, LV switchboard, I & C equipment room and automation panel room. The first
floor comprises of the D.C. distribution room and battery room. The air compressor
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

room is of typical reinforced concrete foundation up to concrete pedestal on the


same level to slab-on-grade. The superstructure comprises of steel columns to steel
rafters and with roof framings and sheeting. The external walls are composite
with the lower portion constructed of block wall while the upper portions up to
roof is constructed of side claddings with sandwich panels. The first-floor battery
and DC distribution room is constructed of steel framing with metal decking
concrete floor. The floor is covered with ceramics tiles while the walls have part
tiles, and the rest is continuous to the side claddings with sandwich panels.

<0o0>
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

4. SUMMARY OF INVESTIGATION AND OBSERVATION


4.1 WORKSHOP STORE BUILDING

The visual inspection has covered all concrete foundation pedestal located as
per drawing 3740-C-0-UST-C-100 Rev 07 and 3740-C-0-UST-C-101 Rev 11. Visual
survey conducted for the external pedestals from grid 1–6 / grid A-D with
protruding top portions only as other concrete pedestal is same level to slab on
grade. The overall visual inspection on the column pedestal foundations at these
areas indicated that generally they are in good condition. The concrete columns,
beams and walls from grid 6-15 / grid A-D which encloses the storerooms,
workshop areas, computer rooms and offices are generally in good conditions
except on localized delaminated column areas, localized delaminated walls and
localized wall cracks. Cracks were noticed on the floor slab.

AT one corner the external cladding (sandwich panels) are damaged.

The steel structure of the workshop is in good condition (no corrosion were noticed)
except at some locations mainly at the connections rust was noticed. The
coating for the steel structure is fading.

4.2 CHEMICAL STORE BUILDING

The visual inspection has covered all concrete columns and beams located as
per drawing 3740-C-0-USU-C-102 Rev.09 and 3740-C-0-USU-C-108 Rev.3. Visual
survey conducted for all columns and beams indicated that generally they are in
good condition except on localized areas where concrete spall was noticed
mainly in the floor slab. The walls both internal and external sides and the slab
soffit are visually in good condition except two localized areas on the soffit
slab , also localized cracks and paint peeling off.
Water proofing tiles delaminated with exposed steel reinforcement at different
locations.

Delamination on the soffit slab similar to the site


Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

4.3 33 KV SWITCHGEAR SUBSTATION BUILDING

The visual inspection has covered all concrete columns and beams located as
per drawing 3740-C-0-UAA-C-207 Rev.06 and 3740-C-0-UAA-C-201 Rev.3, 3740-C-0-
UAA- C-210 Rev.07.

Visual survey conducted for all Ground floor columns and slab indicated that
generally they are in good condition except on localized areas where concrete
delamination or spall was noticed. The walls both internal and external sides
and the slab soffit are visually in good condition apart from localized cracks and
generally paint peeling offs.

Visual survey conducted for all Roof beams and slab soffit indicated that
generally they are in good condition. The top slab is visually in good condition.

We noticed that all the columns of the basement are delaminated /spalled the
height of the damaged is varying from 05m to1.9 M from the floor slab. The size of
the columns is 400mm x 400 mm.
Also, Delamination and spalling of concrete with exposed rusted steel were
noticed on the perimeter retaining wall with average height of 1m above floor slab.

Concrete delamination on columns similar to the Concrete delamination on walls similar to the
basement columns basement wall

Concrete delamination on columns similar to the Concrete delamination on walls similar to the
basement columns basement wall
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

4.4 AIR COMPRESSOR BUILDING

The visual inspection has covered all concrete foundation pedestal located as
per drawing 3740-A-X-UTF-C-100 Rev.6, 3740-A-X-UTF-C-021 Rev.6 and 3740-A-X-
UTF-C-
020 Rev.7. The overall visual inspection on the perimeter concrete columns and
beams at these areas indicated that generally they are in good condition except
on some localized cracks and delamination with hollow sound. The slab-on-grade is
visually in good condition except on some locations where cracks and
delamination with hollow sound is noted. The steel columns, beams and roof frames
are generally in good condition.

< o0o >


Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

5. SAMPLING AND TESTING


Based on the visual inspection of the structure, Bureau Veritas engineer
indicated further testing for a better understanding the condition and soundness
of the existing structures.

Listed under Annex C, hereafter, are the tests carried out by the Arab Center for
Engineering Studies (ACES), as per Bureau Veritas recommendations. ACES report
ref. AD. SPR23000021_Rev.0 dated 10th January 2023, is attached under Annex C.
The results of these tests can be summarized as follows.

5.1. Test Results on Core Samples

Twenty-four (24) core samples of 75 mm diameter were obtained from four


buildings in different locations, the results of these tests are as follows.

CHEMICAL STORAGEBUILDING
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

 The visual examination of tested core samples revealed.


- All Core samples appeared to be in rather good condition (No
honeycombing or cracks was noted).
- Distribution of aggregate is uniform / well graded for all the cores.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

- Few voids of small and medium size noted at all the core samples.

 The determined bulk density of the core samples is 2340 kg/m³, 2380 kg/m³,
2370 kg/m³, 2360 kg/m³, 2370 kg/m³, 2340 kg/m³, 2380 kg/m³, 2330 kg/m³
and 2340 kg/m³. The average is 2356 kg/m3. The commonly accepted
averages are around 2320 kg/m3 as per ACI 318M14 section 2.3.

 The estimated cube compressive strength for the cores obtained in column
and slab are 32.7 N/mm², 34.6 N/mm², 36.5 N/mm², 37.8 N/mm², 33.4 N/mm²,
26.6 N/mm², 37.9 N/mm², 33.2 N/mm², and 29.7 N/mm². The average is about.
33.6 N/mm².
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

WORKSHOP BUILDING

 The visual examination of tested core samples revealed.


- All Core samples appeared to be in rather good condition (No
honeycombing or cracks was noted).
- Distribution of aggregate is uniform / well graded for all the cores.
- Few voids of small and medium size noted at all the core samples.

 The determined bulk density of the core samples is 2370 kg/m³, 2380 kg/m³
and 2320 kg/m³. The average is 2356 kg/m 3. The commonly accepted
averages are around 2320 kg/m3 as per ACI 318M14 section 2.3.

 The estimated cube compressive strength for the cores obtained in column
and slab are 29.7 N/mm², 38.2 N/mm² and 28.1 N/mm².The average is about
32 N/mm².
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

33KV SUBSTATION BUILDING

 The visual examination of tested core samples revealed.


- All Core samples appeared to be in rather good condition (No
honeycombing or cracks was noted).
- Distribution of aggregate is uniform / well graded for all the cores.
- Few voids of small and medium size noted at all of the core samples.

 The determined bulk density of the core samples is 2400 kg/m³, 2430 kg/m³,
2410 kg/m³, 2420 kg/m³, 2480 kg/m³, 2400 kg/m³, 2450 kg/m³, 2430 kg/m³,
and 2430 kg/m³. The average is 2416 kg/m 3. The commonly accepted
averages are around 2320 kg/m3 as per ACI 318M14 section 2.3.

 The estimated cube compressive strength for the cores obtained in


column, beam and wall are 35.5 N/mm², 29.9 N/mm², 32.5 N/mm, 33.9
N/mm, 30.6 N/mm, 35.4 N/mm, 33.2 N/mm, 35.4 N/mm and 35.5 N/mm².
The average is about 33.54 N/mm².
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

AIR COMPRESSOR BUILDING

 The visual examination of tested core samples revealed.


- All Core samples appeared to be in rather good condition (No
honeycombing or cracks was noted).
- Distribution of aggregate is uniform / well graded for all the cores.
- Few voids of small and medium size noted at all the core samples.

 The determined bulk density of the core samples is 2370 kg/m³, 2350
kg/m³and 2400 kg/m³. The average is 2373 kg/m3. The commonly
accepted averages are around 2320 kg/m3 as per ACI 318M14 section 2.3.

 The estimated cube compressive strength for the cores obtained in


column, beam and wall are 34.4 N/mm², 31.7 N/mm² and 43.0 N/mm². The
average is about 36.37 N/mm².
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

5.2. Depth of Carbonation


Twenty-four different locations were measured for the depth of carbonation
and the results of these tests are as follows:

CHEMICAL STORAGE BUILDING

 Depth of carbonation measured shows that all the results are Nil except
one location 5mm.

WORKSHOP BUILDING

 Depth of carbonation measured shows Nil for all the tested locations.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

33KV SUBSTATION BUILDING

 Depth of carbonation measured shows Nil for all the tested locations.

AIR COMPRESSOR BUILDING

 Depth of carbonation measured shows Nil for all the tested locations.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

5.3. Dust Sample


Dust samples were taken at twenty-four (24) different locations to compute
Chloride and Sulphate content. Below outcome of these test are as follows.

CHEMICAL STORAGE BUILDING


Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

5.3.1. Chloride Content

It is to be noted that, since in the structural drawings or any other documents


indicating the original design hypothesis (i.e., design strength, mix design)
hence the calculation of the chloride and sulphate content by weight of
cement was based on an assumed cement content of 350 kg/m3 and the
calculated in-situ average unit weight of concrete (2381 kg/m³).

The Chloride content is determined for three increments (0- 25 mm, 25 – 50 mm


& 50 – 75 mm). The results are provided as a percentage by weight of
concrete and as a percentage by weight of cement. The results obtained are as
follows.

 Chloride content varies between 0.02% (0.14%), 0.01% (0.07%), 0.02%


(0.14%),
0.01% (0.07%), 0.01% (0.07%), 0.01% (0.07%), 0.06% (0.41%), 0.01% (0.07%), and
0.01% (0.07%) by weight of concrete (by weight of cement) on first
increment of depth 0-25 mm. An average of 0.02% (0.12%) is computed.
 Chloride content varies between 0.02% (0.14%), 0.01% (0.07%), 0.01%
(0.07%),
0.01% (0.07%), 0.01% (0.07%), 0.01% (0.07%), 0.04% (0.27%), 0.01% (0.07%), and
0.01% (0.07%) by weight of concrete (by weight of cement) on second
increment of depth 25-50 mm. An average of 0.01% (0.10%) is computed.
 Chloride content varies between 0.01% (0.07%), 0.01% (0.07%), 0.01%
(0.07%),
0.01% (0.07%), 0.01% (0.07%), 0.01% (0.07%), 0.02% (0.14%), 0.01% (0.07%), and
0.01 % (0.07%) by weight of concrete (by weight of cement)
on third increment of depth 50-75 mm. An average of 0.01% (0.08%) is
computed.

5.3.2. Sulphate Content

Similarly, the Sulphate content is determined for three depth increments (0- 25
mm, 25 – 50 mm & 50 – 75 mm). The results are provided as a percentage by
weight of concrete and as a percentage by weight of cement. The results
obtained are as follows.

 Sulphate content varies between 0.49% (3.35%), 0.47% (3.21%), 0.49%


(3.35%), 0.42% (2.87%), 0.52% (3.56%), 0.39% (2.67%), 0.61% (4.17%), 0.40%
(2.74%), and 0.45% (3.08%) by weight of concrete (by weight of
cement) on first increment of depth 0-25 mm. An average of 0.47%
(3.22%) is computed.
 Sulphate content varies between 0.54% (3.69%), 0.48% (3.28%), 0.41%
(2.80%), 0.46% (3.15%), 0.46% (3.15%), 0.45% (3.08%), 0.47% (3.21%), 0.10%
(2.80%), and 0.52% (3.56%) by weight of concrete (by weight of
cement) on second increment of depth 25-50 mm. An average of
0.47% (3.19%) is computed.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

 Sulphate content varies between 0.46% (3.15%), 0.52% (3.56%), 0.39%


(2.67%), 0.42% (2.87%), 0.57% (3.90%), 0.39% (2.67%), 0.44% (3.01%), 0.44%
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

(3.01%), and 0.49% (3.35%) by weight of concrete (by weight of


cement) on third increment of depth 50-75 mm. An average of
0.46% (3.13%) is computed.

WORKSHOP BUILDING

5.3.3. Chloride Content

It is to be noted that, since in the structural drawings or any other documents


indicating the original design hypothesis (i.e., design strength, mix design)
hence the calculation of the chloride and sulphate content by weight of
cement was based on an assumed cement content of 350 kg/m3 and the
calculated in-situ average unit weight of concrete (2381 kg/m³).

The Chloride content is determined for three increments (0- 25 mm, 25 – 50 mm


& 50 – 75 mm). The results are provided as a percentage by weight of
concrete and as a percentage by weight of cement. The results obtained are as
follows;

 Chloride content varies between 0.04% (0.27%), 0.03% (0.21%) and 0.01%
(0.07%) by weight of concrete (by weight of cement) on first increment of
depth 0-25 mm. An average of 0.03% (0.18%) is computed.
 Chloride content varies between 0.02% (0.14%), 0.03% (0.21%) and 0.01%
(0.07%) by weight of concrete (by weight of cement) on second increment of
depth 25-50 mm. An average of 0.02% (0.14%) is computed.
 Chloride content varies between 0.02% (0.14%), 0.02% (0.14%) and 0.01%
(0.07%) by weight of concrete (by weight of cement) on third increment
of depth 50-75 mm. An average of 0.02% (0.12%) is computed.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

5.3.4. Sulphate Content

Similarly, the Sulphate content is determined for three depth increments (0- 25
mm, 25 – 50 mm & 50 – 75 mm). The results are provided as a percentage by
weight of concrete and as a percentage by weight of cement. The results
obtained are as follows.

 Sulphate content varies between 0.52% (3.56%), 0.37% (2.53%) and


0.59% (4.04%) by weight of concrete (by weight of cement) on first
increment of depth 0-25 mm. An average of 0.49% (3.38%) is
computed.
 Sulphate content varies between 0.47% (3.21%), 0.41% (2.80%) and
0.56% (3.83%) by weight of concrete (by weight of cement) on second
increment of depth 25-50 mm. An average of 0.48% (3.28%) is
computed.
 Sulphate content varies between 0.48% (3.28%), 0.41% (2.80%) and
0.55% (3.76%) by weight of concrete (by weight of cement) on
third increment of depth 50-75 mm. An average of 0.48% (3.28%)
is computed.

33KV SUBSTATION BUILDING


Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

5.3.5. Chloride Content

It is to be noted that, since in the structural drawings or any other documents


indicating the original design hypothesis (i.e., design strength, mix design)
hence the calculation of the chloride and sulphate content by weight of
cement was based on an assumed cement content of 350 kg/m3 and the
calculated in-situ average unit weight of concrete (2381 kg/m³).

The Chloride content is determined for three increments (0- 25 mm, 25 – 50 mm


& 50 – 75 mm). The results are provided as a percentage by weight of
concrete and as a percentage by weight of cement. The results obtained are as
follows.

 Chloride content varies between 0.01% (0.07%), 0.02% (0.14%), 0.01%


(0.07%),
0.01% (0.07%), 0.02% (0.14%), 0.01% (0.07%), 0.02% (0.14%), 0.01% (0.07%), and
0.01% (0.07%) by weight of concrete (by weight of cement) on first
increment of depth 0-25 mm. An average of 0.01% (0.09%) is computed.
 Chloride content varies between 0.01% (0.07%), 0.01% (0.07%), 0.01%
(0.07%),
0.01% (0.07%), 0.01% (0.14%), 0.02% (0.07%), 0.01% (0.14%), 0.01% (0.07%), and
0.01% (0.07%) by weight of concrete (by weight of cement) on second
increment of depth 25-50 mm. An average of 0.01% (0.09%) is computed.
 Chloride content varies between 0.01% (0.07%), 0.01% (0.07%), 0.01%
(0.07%),
0.01% (0.07%), 0.01% (0.07%), 0.01% (0.07%), 0.01% (0.14%), 0.01% (0.07%), and
0.01 % (0.07%) by weight of concrete (by weight of cement)
on third increment of depth 50-75 mm. An average of 0.01% (0.07%) is
computed.

5.3.6. Sulphate Content

Similarly, the Sulphate content is determined for three depth increments (0- 25
mm, 25 – 50 mm & 50 – 75 mm). The results are provided as a percentage by
weight of concrete and as a percentage by weight of cement. The results
obtained are as follows.

 Sulphate content varies between 0.49% (3.35%), 0.41% (2.80%), 0.49%


(3.35%), 0.52% (3.56%), 0.44% (3.01%), 0.43% (2.94%), 0.39% (2.67%), 0.39%
(2.67%), and 0.46% (3.15%) by weight of concrete (by weight of
cement) on first increment of depth 0-25 mm. An average of 0.45%
(3.06%) is computed.
 Sulphate content varies between 0.50% (3.42%), 0.39% (2.67%), 0.47%
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

(3.21%), 0.47% (3.21%), 0.43% (2.94%), 0.34% (2.33%), 0.41% (2.80%), 0.36%
(2.46%), and 0.46% (3.15%) by weight of concrete (by weight of
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

cement) on second increment of depth 25-50 mm. An average of


0.43% (2.91%) is computed.
 Sulphate content varies between 0.46% (3.15%), 0.33% (2.26%), 0.46%
(3.15%), 0.44% (3.01%), 0.36% (2.46%), 0.41% (2.80%), 0.38% (2.60%), 0.36%
(2.46%), and 0.42% (2.87%) by weight of concrete (by weight of
cement) on third increment of depth 0-25 mm. An average of
0.40% (2.75%) is computed.

AIR COMPRESSOR BUILDING

5.3.7. Chloride Content

It is to be noted that, since in the structural drawings or any other documents


indicating the original design hypothesis (i.e., design strength, mix design)
hence the calculation of the chloride and sulphate content by weight of
cement was based on an assumed cement content of 350 kg/m3 and the
calculated in-situ average unit weight of concrete (2381 kg/m³).

The Chloride content is determined for three increments (0- 25 mm, 25 – 50 mm


& 50 – 75 mm). The results are provided as a percentage by weight of
concrete and as a percentage by weight of cement. The results obtained are as
follows.

 Chloride content varies between 0.01% (0.07%), 0.01% (0.07%) and 0.07%
(0.48%) by weight of concrete (by weight of cement) on first increment of
depth 0-25 mm. An average of 0.03% (0.21%) is computed.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

 Chloride content varies between 0.01% (0.07%), 0.01% (0.07%) and 0.07%
(0.48%) by weight of concrete (by weight of cement) on second increment of
depth 25-50 mm. An average of 0.03% (0.21%) is computed.
 Chloride content varies between 0.01% (0.07%), 0.01% (0.07%) and 0.04%
(0.48%) by weight of concrete (by weight of cement) on third increment
of depth 50-75 mm. An average of 0.02% (0.14%) is computed.

5.3.8. Sulphate Content

Similarly, the Sulphate content is determined for three depth increments (0- 25
mm, 25 – 50 mm & 50 – 75 mm). The results are provided as a percentage by
weight of concrete and as a percentage by weight of cement. The results
obtained are as follows.

 Sulphate content varies between 0.55% (3.77%), 0.43% (2.94%) and


0.47% (3.21%) by weight of concrete (by weight of cement) on first
increment of depth 0-25 mm. An average of 0.48% (3.31%) is
computed.
 Sulphate content varies between 0.38% (2.6%), 0.39(2.67%) and 0.47%
(3.21%) by weight of concrete (by weight of cement) on second
increment of depth 0-25 mm. An average of 0.41% (2.38%) is
computed.
 Sulphate content varies between 0.41% (2.80%), 0.36% (2.46%) and
0.36% (2.46%) by weight of concrete (by weight of cement) on
third increment of depth 50-75 mm. An average of 0.38% (2.57%)
is computed.

5.4. Half-Cell Potential Survey

To evaluate the conditions of the reinforcing steel in the structure, Nine (9)
half- cell potential tests were carried out at Nine (9) different locations, at the 4
buildings Below outcome of these test are as follows.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

CHEMICAL STORAGE BUILDING

 No corrosion is established for all tested location as per ACES test results.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

WORKSHOP BUILDING

 No corrosion is established for all tested location as per ACES test results.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

33KV BUILDING

 No corrosion is established for all tested location as per ACES test results.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

AIR COMPRESSOR BUILDING

 No corrosion is established for all tested location as per ACES test result
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

5.5. Ultrasonic for Steel Thickness Measurement

To evaluate the conditions of the structural steel members, twenty (20) ultrasonic
tests were carried out for 2 buildings at twenty (20) different locations, below
outcome of these test are as follows.

WORKSHOP BUILDING

 Structural steel members at column are still in good condition for all
tested location as per ACES test results.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

AIR COMPRESSOR BUILDING

 Structural steel members at column is still in good condition for all tested
location as per ACES test results.

5.6. Magnetic Particle Inspection

To evaluate the conditions of the structural steel members welding joints, twenty
(20) magnetic particle inspection tests were carried out for 2 buildings at twenty
(20) different locations, below outcome of these test are as follows.

 Welded structural steel members at column and beam has no cracks,


pinholes and other discontinuities observe for all tested location as per ACES
test results.

< o0o >


Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

6. ANALYSIS AND DIAGNOSIS


In this section, the results obtained from the performed tests are reconsidered
in conjunction with the observations noted during the visual survey; the
following comments are made.

6.1. Test Results on Core Samples

All cores appear to be in good condition with no visible defects.

The aggregate distribution in core samples tested appears to be graded


and with few voids of different sizes all tested cores.

The average density of the tested concrete samples is more than the
commonly accepted averages.

The estimated cube compressive strengths obtained by testing of the four


building is within the rage of the required design compressive strength as
indicated on drawing # 3740-C-O-UAA-201- Rev.03.

6.2. Depth of Carbonation


The measured depth of carbonation is up to 5mm at one tested location.

The above means that steel reinforcement in four building is still chemically
protected from corrosion by the alkaline nature of the concrete as well as
by its relatively high electrical resistance.

6.3. Dust Sample

6.3.1. Chloride Content

The results of chloride content in all four building test locations are lower than
the allowable limits of 0.3% by weight of cement at first, second and third
increment.

6.3.2. Sulphate Content

The results for sulphate content are in generally within the allowable limit
of 4.0% by weight of cement in all tested locations.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

6.4. Half Cell Potential

The results obtained by the tests shows probability of no corrosion was


established for all four building test location locations.

5.6. Ultrasonic for Steel Thickness Measurement

The results obtained by the tests shows Structural steel members at column
and beam is still in good condition for all tested location.

5.7. Magnetic Particle Inspection

The results obtained by the tests shows Welded structural steel members
at column and beam has no cracks, pinholes and other discontinuities
observe for all tested location.

< o0o >


Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

7. CONCLUSION AND RECOMMENDATIONS FOR REPAIR


The condition assessment survey carried out on the four-building structure.
• Workshop building
• 33kv switchgear building
• Chemical Store (Building D)
• Low Voltage & Control Room Building

At the MIRFA RO Plant, Al Mirfa, Abu Dhabi, UAE may be concluded by the
following observations.

 Based on visual survey and testing, it may be stated that, in general, the
structural condition of the buildings is in good condition, with some
exceptions

 Concrete is in good condition. The average measured Core compressive


strength are within acceptable values.

 Depth of carbonation is within the concrete cover of reinforcing steel and


does not reach the vicinity of the surface of the reinforcing steel.

 Steel reinforcement bars are in acceptable condition.

 Concentration of chlorides below the allowable limits for all tested locations.

 Concentration of sulfate in general below the allowable limits.

 The defects encountered are

repairable The exceptions are:

 Delaminated concrete and exposed reinforcement at all columns of the


basement level and perimeter retaining wall at the 33kV Switchgear building.

 Delaminated concrete foundation for the transformer equipment’s.


 Damaged cladding at the workshop
 Coating for the steel structure is fated.
Revision Page
No.
Date Issued Third Party Inspection Services Ref. No.
No.

Condition Assessment of Mirfa 2 RO Plant Project – Abu Dhabi ADH-8122-A1-


00 19/01/2023 4 of 42
– UAE 4912660/003/ZS

It is recommended that:

 The repair shall be carried out by specialized concrete repair company.


 Temporary support shall be provided for the columns of the basement prior to
start the repair.
 All the steel structures shall be cleaned and coated.