NO AGENDA PEKERJAAN CHECKLIST

A Pekerjaan Persiapan
B Pekerjaan Pengeboran
1 Pemasangan Pipa Cassing & Screen 5”
2 Penyetoran Gravel Pack & Semen Grouting
3 Pemasangan Pompa Submersible & Pipa Suction
4 Pemasangan Panel Kontrol 1 Phase & Kabel Power
5 Pumping Test (Tes Debit Air)
6 Pengambilan Sampel Laboratory
C Pengadaan Material
1 Pipa Casing, PVC Class AW 5”, P = 4m/btg (Rucika 32 batang)
2 Gravel Pack & Semen Grouting (1 lot)
3 Pipa Hisap PVC Class AW 1,5” UPVC C.R.I (41 batang)
4 Top Connector Pipa UPVC (1 pcs)
5 Bottom Connector Pipa UPVC (1 pcs)
6 Kabel Pompa NYYHY 3 x 2.5mm (Eterna 150 meter)
7 Kabel Elektroda NYYHY 3 x 1.5mm (Eterna 150 meter)
8 Tali Tambang (Pengamaan Pompa) 8mm (100 meter)
9 Elektroda Otomotis (Rangkaian 3 pcs)
10 Tali tampar 10mm (130 meter)
11 Tali tampar 14mm (130 meter)
12 Selotip (10 pcs)
13 Flange 5" Galvanis (1 pcs)
14 Pipa Instalasi ke GWT & Radar Otomatis (1 lot)
15 Panel Kontrol Type DOL 1 Phase ( Rangkaian 1 unit)
16 Dop PVC 5" AW (1 unit)
17 Water Meter 1 1/2" (1 pcs)
18 Resin 3m (1 box)
19 "Pompa Submersible : Submersible Grundfos 3 HP, Power : 2.2 KW 1 Phase/ 3
HP 1 Phase, Kapasitas : 3-5 m3/jam (1 unit)