You are on page 1of 1

Ref.

CP3A/HSE/CSIC/12-012A
Project Health, Safety and Rev. 0
Environment Plan Lusail CP3A Page 1 of 1
Control Project HSE Manager

MONTHLY CHAIN SLING INSPECTION CHECKLIST

Company: ________________________________________________________

Date /Time of Inspection: ____________________________________________

Inspected By: Signature: __________________

No Identification No. SWL No. Identification No. SWL


.
1. 6.
2. 7.
3. 8.
4. 9.
5. 10.

Items Checked Remarks


1. Has Chain sling been certified with 3rd
party?
2. Damages or cracked in welded joint.

3. Cut or fatigue?

4. Kinked or Twisted?

5. Wire sling lubricated?

6. Wire sling corroded?

COLOUR CODE OF INSPECTED SLINGS

JANUARY APRIL JULY OCTOBER


WHITE GREEN BLUE YELLOW
FEBRUARY MAY AUGUST NOVEMBER
WHITE GREEN BLUE YELLOW
MARCH JUNE SEPTEMBER DECEMBER
WHITE GREEN BLUE YELLOW
Inspected slings shall be marked with paints or adhesive vinyl tape, of which color shall be changed in
accordance with the above table.

You might also like