This guide and template is to be used in conjunction with the requirements of Site Survey,
Installation and Commissioning.
The worksite survey is a valuable document. It projects the Company to the customer and is
a reflection of our professionalism.
Consistency of quality is important and this document has been made to guide and assist the
survey engineer in the methodical collection and presentation of the data.
By taking time to complete all sections, much of the final report will be completed. This
workbook will then be retained as a permanent record of the survey procedure.
DESCRIPTION
SPECIALISED EQUIPMENT
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
1
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
Safety is paramount. All applicable legal and Company Safety Standards must be
adhered to at all times. Where any procedure gives cause for uncertainty or concern,
clarification must be sought from responsible Company representatives before
proceeding.
Refer to SCOMI Health, Safety and Environmental Manual and its supporting
procedures.
Scomi Oiltools personnel must comply with the client or site/location operators HSE
requirements and practices when conducting a survey.
PPE POLICY
Due to the nature of the process carried out aboard an offshore facility, personal protective
equipment (PPE), is an extremely important feature of working in the area.
Standard Scomi Oiltools Issue: Hardhat, ear protection, coveralls, safety boots, glasses
and gloves must be worn at all time onboard the facility.
Be aware of site specific hazards, such as fumes or dust, and wear the appropriate special
PPE.
SAFETY INDUCTION
All Scomi personnel that are to carry out the Survey Procedure at the onshore/offshore facility
must firstly have attended the relevant location safety induction courses.
PERMITS REQUIRED
Clarification must be sought from responsible company representative e.g. OIM regarding any
work permits you may require (Hot work for taking photographs).
Clarification must be sought from responsible company representative e.g. OIM regarding
specific hazards before commending with the survey.
4.2 Type of rig: (Rig Darat / Barge/Kapal Tongkang / Jack up Rig / Fixed Platform (steel
jacket) / Rig Semi-submersible / Drillships)
4.3 Location:
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
2
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
4.8 Onshore/Offshore Contact Personnel – Client:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Discuss
- Duration
- Objectives
- Relevant historical / recommendations from the personnel regards equipment location
specification etc.
- Arrange meeting with chief electrician,
- Arrange meeting with chief engineer.
Should the Company Representative request a copy of your report, inform him that you only
have “field notes” at this point, and will send him a copy of your final report, as soon as
possible.
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
3
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
Comment By
Summarise Feedback
01
02
03
04
05
06
07
08
09
10
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
4
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
It is recommended that prior to the survey being carried out, the engineer familiarises himself
with the workplace.
- Examine adjacent facilities (Water, Base Oil, Air Line, Electrical Supply, etc).
- Establish Certifying Authority (if possible) – (OIM can assist) ABS, DNV, NORSOK etc.
Standards required:
_________________________________________________________________________
_________________________________________________________________________
________________
Discuss the job in hand with Chief Electrician and obtain rig power supply details. Volts,
frequency? Inform the electrician of your power requirements and ascertain what will be
necessary to provide power for the new equipment. Clarify zone areas, should replacement
switch gear be in a safe area (SCR?)
_________________________________________________________________________
_________________________________________________________________________
________________
Once the Scomi Survey Engineer is confident regarding the system, the work scope and has
discussed this with the relevant personnel, continue with the written survey.
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
5
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
7.1 Record Existing Rig/Third party Equipment. Discuss what is or has been installed in
the work area. Detail all Solids Control, Containment and Handling, Treatment and
Disposal equipment, Mud Cooling Equipment. State condition and utilisation. What
possibilities exist for replacement?
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
6
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
7.2.1 Site preparation. What access is required to the area? (Existing access hatch,
Bulkhead/roof to be cut out)? What lifting facilities are required? Cranes, Chain
hoists, Scaffold etc. Check availability.
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
7
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
7.2.2 What structural modifications may be required? (to remove redundant equipment &
installation of new). (Discuss with chief engineer)
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
8
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
7.2.3 What pipework modifications are required? (to remove redundant equipment &
installation of new equipment). (Discuss with chief engineer).
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
9
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
7.2.4 Explain in detail how you see the redundant equipment being manoeuvred out of
location. Disassembly of redundant equipment? Lifting Operations and Lifting
Equipment Regulations (LOLER) What is removed? What is retained?
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
10
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
INSTALLATION
7.3.1 What preparation work is required of the worksite prior to receiving new equipment?
(additional support steel work, pipework, mud returns ditch)?
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
11
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
7.3.2 Explain in detail how you see the new equipment being manoeuvred into the
proposed location. Lifting facilities if different to above, Lifting Plan (LOLER).
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
12
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
13
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
7.3.4 Explain in detail the interface between rig facilities and new equipment. (Flow-line,
interconnecting pipework, waste disposal, power supply).
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
14
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
7.3.5 Explain in detail the electrical installation requirements and include details of existing
electrical rig supply along with locality to installed equipment.
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
15
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
7.3.6 Detail all tools / resources required for site preparation. Eg. Cutting, plating, grinding,
welding, scaffolding, painting/coating etc.
_________________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
_______________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
16
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
7.3.7 Hook up materials Refer to Standard Equipment Hook-up Sheets for Material
Requirements e.g. Mechanical / Electrical
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
17
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
7.4 Schedule for installation. (Team required, Engineers/Electrician/ Welders & Platers)
Estimate time to perform tasks detailed in the survey report.
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
18
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
* Rig Picture
* General Area of Worksite
* Specific Areas of Interest
* Service Locations
* Access Requirements
To best understand the nature – Scope of the Survey, sketch the worksite using the
following templates.
- Equipment inserted
- Support structure
Notes on drawing:-
Attempt to address safety as a priority. Where possible, carry out a Risk Assessment
to identify potential Hazards of the installation or subsequent operation/maintenance of
the equipment.
Drawings can be duplicated with different information shown. Do not clutter a single
drawing.
Make field sketches of the installation. Take lengths, widths and heights. Draw a plan,
end and side view of proposed installation. Draw single lines for interconnecting
pipework with arrows to show flow direction. Identify suction and discharges, pump
location, etc. A proper drawing can be produced in town. Also detail any
modifications to existing pipework or steelwork.
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
19
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
8.0 APPENDIX
Material Lists
Equipment Dimensions
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
20
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
YES NO COMMENTS
QUESTION
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
21
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023
Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
22