You are on page 1of 23

IMS Work Instruction

IMSWI-DWM-07
Revision no. 02
March 13, 2023

Prepared by Reviewed by Approved by


DWM Team Juniansyah-Project Manager, Boy Imlex-DWM Manager,
Syaifulloh Amro-QHSE Manager

Rig Survey

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

1.0 SCOPE AND PURPOSE

This guide and template is to be used in conjunction with the requirements of Site Survey,
Installation and Commissioning.

The worksite survey is a valuable document. It projects the Company to the customer and is
a reflection of our professionalism.

Consistency of quality is important and this document has been made to guide and assist the
survey engineer in the methodical collection and presentation of the data.

By taking time to complete all sections, much of the final report will be completed. This
workbook will then be retained as a permanent record of the survey procedure.

2.0 SURVEY ENGINEER PREPERATION. (EQUIPMENT REQUIRED).

DESCRIPTION

2.1 Personal Protective Equipment Yes / No

2.2 Drawings, etc. Yes / No

2.3 Survey Procedure Yes / No

2.4 Previous Survey Info, (if available) Yes / No

2.5 Laptop, (if available) Yes / No

2.6 Camera, (if available) Yes / No

2.7 Film Yes / No

2.8 Spare Batteries Yes / No

2.9 Measuring Tape Yes / No

2.10 Paper Yes / No

2.11 Pencil / Pens Yes / No

2.12 Ruler Yes / No

2.13 Torch Yes / No

SPECIALISED EQUIPMENT

2.14 Noise Meter (if applicable) Yes / No

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
1
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

3.0 SAFETY STATEMENT

Safety is paramount. All applicable legal and Company Safety Standards must be
adhered to at all times. Where any procedure gives cause for uncertainty or concern,
clarification must be sought from responsible Company representatives before
proceeding.

Refer to SCOMI Health, Safety and Environmental Manual and its supporting
procedures.

Scomi Oiltools personnel must comply with the client or site/location operators HSE
requirements and practices when conducting a survey.

PPE POLICY

Due to the nature of the process carried out aboard an offshore facility, personal protective
equipment (PPE), is an extremely important feature of working in the area.

Standard Scomi Oiltools Issue: Hardhat, ear protection, coveralls, safety boots, glasses
and gloves must be worn at all time onboard the facility.

Be aware of site specific hazards, such as fumes or dust, and wear the appropriate special
PPE.

SAFETY INDUCTION

All Scomi personnel that are to carry out the Survey Procedure at the onshore/offshore facility
must firstly have attended the relevant location safety induction courses.

PERMITS REQUIRED

Clarification must be sought from responsible company representative e.g. OIM regarding any
work permits you may require (Hot work for taking photographs).

SITE SPECIFIC HAZARD

Clarification must be sought from responsible company representative e.g. OIM regarding
specific hazards before commending with the survey.

4.0 GENERIC INFORMATION

4.1 Rig / Installation Name:

4.2 Type of rig: (Rig Darat / Barge/Kapal Tongkang / Jack up Rig / Fixed Platform (steel
jacket) / Rig Semi-submersible / Drillships)

4.3 Location:

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
2
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

4.4 Date of survey:

4.5 Survey Engineer:

4.6 Worksite Contact Persons:

4.7 Onshore/Offshore Contact Personnel:

______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
4.8 Onshore/Offshore Contact Personnel – Client:

______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

4.9 Company / Client:

4.10 Drilling Company (If different)

5.0 SURVEY PROCEDURE

(i) Safety – Ensure all permits/procedures are adhered to.

(ii) Meet all relevant personnel prior to entering the worksite


- Meet OIM / Toolpusher / Company Man

Discuss
- Duration
- Objectives
- Relevant historical / recommendations from the personnel regards equipment location
specification etc.
- Arrange meeting with chief electrician,
- Arrange meeting with chief engineer.

Should the Company Representative request a copy of your report, inform him that you only
have “field notes” at this point, and will send him a copy of your final report, as soon as
possible.

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
3
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

Comment By
Summarise Feedback

01

02

03

04

05

06

07

08

09

10

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
4
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

6.0 RIG FAMILIARISATION

It is recommended that prior to the survey being carried out, the engineer familiarises himself
with the workplace.

- Prior to conducting survey: Walk the system.


- Where possible, get escorted tour by Toolpusher.

- Examine proposed worksite


Discuss job with Chief Engineer and point out where you intend to burn or weld. Ensure
you know what is on the other side of any bulkhead, roof or floor you intend to weld or
burn. Look for fuel tanks, electric cables, and possible gas filled voids. Ensure the steel
work that is to support all new equipment is suitable. Consider alternative worksite.
REQUEST RIG SPECIFIC DRAWINGS, GA- of WORK SITE, AUTO-CAD if POSSIBLE

- Examine adjacent facilities (Water, Base Oil, Air Line, Electrical Supply, etc).

- Establish Certifying Authority (if possible) – (OIM can assist) ABS, DNV, NORSOK etc.
Standards required:

_________________________________________________________________________
_________________________________________________________________________
________________
Discuss the job in hand with Chief Electrician and obtain rig power supply details. Volts,
frequency? Inform the electrician of your power requirements and ascertain what will be
necessary to provide power for the new equipment. Clarify zone areas, should replacement
switch gear be in a safe area (SCR?)

- Establish rig specific worksite electrical facilities:

Hz: Volts: Ph:

- Breaker available Amperage:

- Electrical Standards required:

_________________________________________________________________________
_________________________________________________________________________
________________

Once the Scomi Survey Engineer is confident regarding the system, the work scope and has
discussed this with the relevant personnel, continue with the written survey.

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
5
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.0 SURVEY DETAILS (Use continuation sheets where required)

7.1 Record Existing Rig/Third party Equipment. Discuss what is or has been installed in
the work area. Detail all Solids Control, Containment and Handling, Treatment and
Disposal equipment, Mud Cooling Equipment. State condition and utilisation. What
possibilities exist for replacement?

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
6
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.2.1 Site preparation. What access is required to the area? (Existing access hatch,
Bulkhead/roof to be cut out)? What lifting facilities are required? Cranes, Chain
hoists, Scaffold etc. Check availability.

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
7
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.2.2 What structural modifications may be required? (to remove redundant equipment &
installation of new). (Discuss with chief engineer)

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
8
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.2.3 What pipework modifications are required? (to remove redundant equipment &
installation of new equipment). (Discuss with chief engineer).

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
9
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.2.4 Explain in detail how you see the redundant equipment being manoeuvred out of
location. Disassembly of redundant equipment? Lifting Operations and Lifting
Equipment Regulations (LOLER) What is removed? What is retained?

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
10
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

INSTALLATION

7.3.1 What preparation work is required of the worksite prior to receiving new equipment?
(additional support steel work, pipework, mud returns ditch)?

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
11
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.3.2 Explain in detail how you see the new equipment being manoeuvred into the
proposed location. Lifting facilities if different to above, Lifting Plan (LOLER).

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
12
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.3.3 What securing of the new equipment is required?

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
13
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.3.4 Explain in detail the interface between rig facilities and new equipment. (Flow-line,
interconnecting pipework, waste disposal, power supply).

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
14
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.3.5 Explain in detail the electrical installation requirements and include details of existing
electrical rig supply along with locality to installed equipment.

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
15
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.3.6 Detail all tools / resources required for site preparation. Eg. Cutting, plating, grinding,
welding, scaffolding, painting/coating etc.

_________________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
_______________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
16
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.3.7 Hook up materials Refer to Standard Equipment Hook-up Sheets for Material
Requirements e.g. Mechanical / Electrical

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
17
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.4 Schedule for installation. (Team required, Engineers/Electrician/ Welders & Platers)
Estimate time to perform tasks detailed in the survey report.

____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
18
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

7.5 Photographic requirement


(Work Permit may be required)

7.5.1 Suggested Pictures. These will be used in the final report.


Attempt where possible to collect high quality and clear pictures.

* Rig Picture
* General Area of Worksite
* Specific Areas of Interest
* Service Locations
* Access Requirements

7.6 Rig Drawings


Obtain GA drawing, Piping and Instrument Diagram (P&ID) of system whenever
possible.

To best understand the nature – Scope of the Survey, sketch the worksite using the
following templates.

Drawing should include but not be restricted to:

- Space available with lines

- Equipment inserted

- Access required, Installation path, Hoist points

- Obstructions, height, width, pipework, service location, water, air, electrical

- Working clearance, (Operating/Maintenance).

- Support structure

- Modifications to rig facilities required.

- All dimensions must be clear, Centre line of pipes/beams/structure? Alternately


overall dim’s. RECORD ALL RELEVANT DIMENSIONS, (There are never too
many dim’s).

Notes on drawing:-

Attempt to address safety as a priority. Where possible, carry out a Risk Assessment
to identify potential Hazards of the installation or subsequent operation/maintenance of
the equipment.

Drawings can be duplicated with different information shown. Do not clutter a single
drawing.

Make field sketches of the installation. Take lengths, widths and heights. Draw a plan,
end and side view of proposed installation. Draw single lines for interconnecting
pipework with arrows to show flow direction. Identify suction and discharges, pump
location, etc. A proper drawing can be produced in town. Also detail any
modifications to existing pipework or steelwork.

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
19
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

Is there anything you have missed?

Book your chopper home!

8.0 APPENDIX

 Grid Paper (A3 and A4)

 Material Lists

 Equipment Dimensions

LOLER (Lifting Operations and Lifting Equipment Regulations) Checklist

QUESTION YES NO COMMENTS


Is the equipment of a suitable design and intended for the
task and location for which it is to be used?

Is every part of a load or anything attached to it and used in


lifting it, strong enough and identifiable?

Are safe working loads marked on all lifting equipment,


including accessories?

Is equipment installed and positioned to prevent persons


being struck by equipment or load?
Can a load be prevented from drifting, falling or being
released unintentionally?
Has equipment been thoroughly examined for defects by a
competent person immediately following installation?
Is each lifting operation planned, conducted and supervised
by competent persons?

Is lifting equipment not designated for lifting persons clearly


marked as being not suitable for persons?

Has equipment (accessories) been thoroughly examined


within the last 6 months, and fixed lifting equipment within
the last 12 months?

Can you confirm that no exceptional circumstances have


occured since the last thorough examination, which might
jeopardise the safety of the equipment?
Is equipment stable and properly anchored in place?

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
20
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

Additional requirements for equipment designed for lifting persons.

YES NO COMMENTS
QUESTION

Has equipment been thoroughly examined within the last 6


months?
Is a device fitted to prevent personnel falling from carrier?
Is equipment clearly marked as being suitable for lifting
persons?
Either:- Is a device fitted to prevent carrier falling, in case
main support fails?
Or:- Does carrier have a suspension rope, wire or chain at
least twice as strong as the marked SWL, which is
inspected every day?

PUWER (Provision and Use of Work Equipment Regulations) Checklist

QUESTION YES NO COMMENTS


Is the equipment of a suitable design and intended for
the task and location for which it is to be used?
Is there documentary proof of regular maintenance?
Can all required maintenance be carried out?
Is use and maintenance of the equipment restricted
only to authorised, trained personnel?
Are persons who will use the equipment, including
standby/watchkeeping personnel, adequately trained?
Has equipment been inspected before first use?
Has sufficient, easy to understand information been
provided to enable safe use of the equipment?
Have risks of using this equipment been fully identified,
assessed, documented and controlled?
Is protection provided to protect persons from danger
caused by moving, rotating, hot or cold parts?
Are controls provided to start, stop and isolate the
equipment from power sources, in both normal and
emergency situations?
If first supplied after 1/1/95, does item have a CE
mark?
Are systems in place to ensure no persons are
exposed to risk as a result of equipment starting or
operating?
Where appropriate, have visible or audible warning
devices and barriers been put in place?
Is there sufficient lighting?
Is equipment stable and properly anchored in place?

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
21
IMS Work Instruction
IMSWI-DWM-07
Revision no. 02
Rig Survey March 13, 2023

Additional requirements for self-propelled, mobile equipment.

Are passengers prohibited from riding on equipment?


Is equipment provided with a means to stop un-
authorised use?
Are controls fitted for braking and stopping?
Are there emergency controls to brake and stop if main
controls fail?
Does the equipment operator have an unrestricted view
of the work environment?

Printed copies of this document are for reference only. Latest approved version resides in the Server
Next review of this document will be on March 13, 2026
22