SITE CLEARING
DESCRIPTION
The work in this Section shall consist of clearing, grubbing, removing of top soll, and
removing and disposing of all vegetation and debris within the limits except such objects
which are designated to remain in place or are to be removed in accordance with other
Clauses of these Specification.
This work shall also include the preservation from injury, damage or defacement of all
vegetation and objects designated to remain or areas to be protected,
CONSTRUCTION REQUIREMENTS
General
The Engineer will establish the limits of site clearing work and designate all trees, shrubs,
plants and other things to remain and areas to be protected,
Clearing and Grubbing and Tree Removal
All surface objects and all trees, down timber, rotten wood, stumps, roots, snags, bush,
other vegetation, rubbish, and other protruding obstructions, not designated to remain,
shall be cleared and/or grubbed, including disposal as required. Only felling of trees of
girth greater than 300mm measured at 1.0m height above ground level will be paid for
separately, trees and bushes smaller than this size will be dealt with and covered under
Clearing and Grubbing.
In areas under roadway embankments, from which top soll or unsuitable materials are to
be removed or which are specified to be compacted, all stumps and roots shall be
removed to a depth of at least 40 cm below the original ground surface and at least 50
‘em below the battom of the lowest pavement layer.
In roadway cut areas, all stumps and roots shall be removed to a depth of not less than
'50 cm below the bottom of the Sub-grade.
Clearing and grubbing of pits, channels, and ditches will be required only to the depth
necessitated by the excavation within those areas.
Holes left after removal of roots shall be filled with suitable material compacted in layers
and to the density of the surrounding material
Topsoll Stripping
In areas under roadway embankments or where designated by the Engineer, the
Contractor shall remove the topsoil and stockpile for reuse or dispose of it as directed by
the Engineer.
In general the removal of topsoil shall include only the removal of soil layer which is
sufficiently fertile to encourage or sustain a growth of vegetation,
Removal of topsoil over any designated area shall be executed to the depth of 40 em
below the original ground surface and at least 30 cm below the bottom of the lowest
pavement layer, and the topsoil shall be kept separate from other excavated materials.
When the topsoil will be reused for other areas as directed by the Engineer or as
indicated on the Drawings, the work of topsoil stripping will be deemed to include
stockpiling the topsoil when necessary and removing from the stockpile and the placing
and spreading of the topsoil in areas designated by the Engineer. After the placing
spreading at required thickness in the designated areas, the topsoil shall be raked to formBidding Document Section VI- Works Requiement
GENERAL SPECIFICATIONS
$2.01 (3)
$2.01 (4)
$2.01 (5)
(a
a smooth surface free from weeds, roots, sods and large stones of sizes greater than
50mm.
Protection of Areas Designated to Remain
In areas of protection designated to remain by the Engineer, the Contractor will be
responsible for the protection and routine maintenance of existing shrubs, trees and
grassed areas. On completion of the Works these areas will be returned to the Employer
in the same condition as before and any damage due directly or indirectly to the
Contractor's operations shall be made good at his own expense.
DISPOSAL OF CLEARED MATERIAL
In the first instance all cleared material is the property of the Employer and shall be used
(oF disposed of in the manner as the Employer sees fit.
The Contractor may however, have the right to use unsaleable timber (or saleable timber
when permission is granted in writing by the appropriate Government agency or
authority) for his own purposes in connection with the Contract always provided that he
has ascertained and complied with the requirements of the appropriate Government
agency or authority.
Saleable timber shall be neatly stored in an approved accessible place within or near the
right-of-way as directed and shall be trimmed and stacked in accordance with the
requirements of the appropriate Government agency. The Contractor shall refer to the
appropriate Government agency for definition or classification of saleable and unsaleable
timbers.
All other timber, except timber to be used, and all brush, stumps, roots, logs, and other
refuse from the clearing and grubbing operation shall be disposed of at locations
provided by the Contractor.
The roadway and adjacent areas shall be left with a neat and finished appearance. No
‘accumulation of debris shall remain on or adjacent to the right-of way.
METHOD OF MEASUREMENT
Clearing and grubbing, topsoil stripping, protection of designated areas and protection of
existing plantations and trees designated to remain in place, will together be considered
‘as Clearing and Grubbing, and will be paid for by measuring the total plan areas in square
meter within the limits of site clearing works established by the Engincer.
Tree removal will only be considered as Removal of Existing Trees and will be paid for by
number of trees removed of minimum girth exceeding 300mm.
The work of Clearing and Grubbing, Removal of Existing Tree for disposal sites, material
storage sites, imported borrow pit sites, haul roads and all temporary work areas for
construction or facilites of the Contractor shall not be measured or paid for
When such sites are outside the areas designated for clearing and grubbing, the
Contractor is deemed to have exercised his own option as to whether he elects to use
such temporary work areas, disposal sites or borrow pit sites on the basis of the
foregoing provisions that no payment will be made for the works of any site clearance,
rubbing, topsoll stripping and trees removal in such areas.
BASIS OF PAYMENT
The work measured as provided above shall be paid for as below mentioned. The
payment shall be full compensation for furnishing all labor, materials, tools, equipment
and incidentals necessary to do the work and for doing the Clearing and Gruobing,Bidding Document Section VI- Works Requirement
GENERAL SPECIFICATIONS
Topsoil Stripping, removal, temporary stockpiling and subsequent placing and spreading
in designated areas, protection of existing plantation and trees designated to remain, and
Removal of Existing Tree and disposal as specified in these Specifications and as directed
by the Engineer including if necessary, removal, stockpiling for reuse, placing and
spreading at final locations and disposal of the resulting material
Pay item Pay Unit
2.01.1 Clearing and Grubbing. Square Metre
2.01.2 _ Removal and Disposal of Existing Trees and Roots Number
(Girth between 300mm to 800mm)
2.01.3 Removal and Disposal of Existing Trees and Roots Number
(Girth between 801mm to 150mm)
2.01.4 Removal and Disposal of Existing Trees and Roots Number
(Girth exceeding 1500mm)
2.01.5. Cutting/Removal and Disposal of Mangroves Square MetreBidding Document Section V1- Works Requirement
GENERAL SPECIFICATIONS
SECTION 3 DEMOLITION
Page
53.01 DEMOLITION. 2