The formwork removal for different types of concrete elements is specified on IS code 456.
Deshuttering time
https://civilplanets.com/deshuttering-time/ 3/11
12/23/2020 Deshuttering Time For Slabs, Beams And Columns As Per IS Code
SPONSORED SEARCHES
slab steel calculator formwork for beams columns and slabs
The formwork can be removed once the concrete attains at least twice the stress it may
be subjected to at the time of removal.
https://civilplanets.com/deshuttering-time/ 4/11
12/23/2020 Deshuttering Time For Slabs, Beams And Columns As Per IS Code
In simple terms, the removal of the form is based on the maturity of concrete. The forms
can be removed when the concrete gains its design strength by hardening and can resist
the load occurrence on its own.
The concrete attains its compressive strength gradually, as mentioned in the table below.
Day 1 16%
Day 3 40%
Day 7 65%
Day 14 90%
Day 28 100%
The deshuttering period will be different when some special concrete and admixture is
used.
SPONSORED SEARCHES
slab steel calculator formwork for beams columns and slabs
Grade of cement – The compressive strength value will vary between OPC 43 and
OPC 53 and impact the percentage of strength gain. So the formwork removal
period also differs.
https://civilplanets.com/deshuttering-time/ 5/11
12/23/2020 Deshuttering Time For Slabs, Beams And Columns As Per IS Code
Temperature – In higher temperatures, the cement hydrates faster, and the concrete
gets the strength quickly. But at the same moment, shrinkage cracks happen due to
Types of cement – Quick Setting cement and rapid hardening cement will attain
greater strength in a short period than other cement types.
Ensure to mention the date of concrete on the formwork (using wet chalk piece) so
that we can instantly identify the time of removal.
Proper curing of concrete makes it durable and helps to achieve greater strength.
Ensure the concrete curing is appropriately done.
While removing shuttering boards of a long-span slab, the prop should be provided
for slabs, beams at the centre portion.
corrosion in concrete.
https://civilplanets.com/deshuttering-time/ 6/11
12/23/2020 Deshuttering Time For Slabs, Beams And Columns As Per IS Code
Proper supervision is required while removing the forms to ensure the quality of
concrete.
Happy Learning
BASICS FORMWORK
3
AUTHOR
Satheesh
Satheesh is a Civil Engineer who has more than 9+ Years of experience in residential
construction. He is the author, editor of Civil Planets
RELATED POSTS
https://civilplanets.com/deshuttering-time/ 7/11