You are on page 1of 7

ECO Number 158676

ENGINEERING CHANGE ORDER Supplement No.


Page 1 of 7

ECO TYPE ECO CLASSIFICATION MODELS IMPLEMENTATION METHOD


A. EMERGENCY - SHIP NO ENGINES W/O THIS CHANGE NEW RELEASE VGF ALL DATE:
B. PRIORITY REVISIONS P48 IDENTIFIED PARTS SEE INTENT SECTION
C. MUST BE AVAILABLE FOR CHANGES CONFIGURATION RULES NOTIFY CSA
D. ROUTINE CHANGES ENGINE OUTLINE OR CONNECTIONS AFFECTS TORSIONAL ANALYSIS
E. DOCUMENT ONLY TECH DATA RELEASE SERVICE BULLETIN REQUIRED?
F. RESTRICTED RELEASE - PROTOTYPE CE MARK COST REDUCTION: $
INTENT:
THIS ECO RELEASES CREO RE-DRAWS OF INSTALLATION DRAWINGS L-08075-8 AND L-08075-9 FOR VGF P48 ENGINES.

NOTE:

HS/ECCN CODES: (PRC) PART RELATIONSHIP CODES:


"A"=ASSIGNED, "V"=VERIFIED, "R"=REVISED, "N"=N/A (DWI-02-1041) "1"=YES, "2"=NO, "3"=YES IF, N=ENG. OBS. (DWI-02-1032)
STOCK DISPOSITION
E
N R P PRODUCTION SERVICE P
PART NUMBER H C SUPERSEDED PART
ITEM E E DESCRIPTION R C
NEW & REVISED PART(S) S C NUMBER(S)
W V C C
N USE REWORK SCRAP USE REWORK SCRAP

1 L-08075-8 X V V ------ -- --
INSTALLATION DRAWING P48GL/GSI
a. REDRAWN IN CREO.
b. "DIMENSIONS ARE IN MM [INCHES]" WAS
"DIMENSIONS ARE IN INCHES [MILLIMETERS]"
SHEET 1 (WAS SHEET 2):
a. CONN. 1 DIM. 103[4.1] (C-2) WAS 3.82[97].
b. CONN. 15 WAS 16.
c. CONN. 15 DIM. 9 [.4] (B-7) WAS .91 [23.1].
d. CONN. 15 DIM. 611 [24.1] (E-10) WAS 23.27 [591]
e. CONN. 3 & 4 DIM. 2X 2279 [89.7] (M-10) WAS 88.78 [2255]
f. ADDED CONN. 26 WITH ITS RESPECT. DIMS. (E-10)

WORK REQUEST: ER65971 APPROVED BY: M. OTTENS APPROVED BY: R. OLSEN


REQUESTED BY: M. OTTENS, 01/09/16 APPROVED BY: M. ROLL APPROVED BY: R. NICOSON
PREPARED BY: Z. M-KOLP, 02/25/16 APPROVED BY: S. JOHNSON APPROVED BY:
CHECKED BY: J. LAVALLE, 03/04/16 APPROVED BY: A. MENTE ISSUED BY:

Form 0135-A 12-2-2009


ECO Number 158676
ENGINEERING CHANGE ORDER Supplement No.
Page 2 of 7
HS/ECCN CODES: (PRC) PART RELATIONSHIP CODES:
"A"=ASSIGNED, "V"=VERIFIED, "R"=REVISED, "N"=N/A (DWI-02-1041) "1"=YES, "2"=NO, "3"=YES IF, N=ENG. OBS. (DWI-02-1032) STOCK DISPOSITION
E
N R P PRODUCTION SERVICE P
PART NUMBER H C SUPERSEDED PART
ITEM E E DESCRIPTION R C
NEW & REVISED PART(S) S C NUMBER(S)
W V C C
N USE REWORK SCRAP USE REWORK SCRAP

g. OVERALL LENGTH OF ENGINE: 2661 [104.8] WAS


OVERALL LENGTH = 104.51 [2654.6]
h. OVERALL HEIGHT OF ENGINE: 1917 [75.5] WAS
OVERALL HEIGHT = 75.23 [1910.9]
j. OVERALL WIDTH OF ENGINE: 1512 [59.5] WAS
OVERALL WIDTH = 61.98 [1574.3]
k. ADDED NOTE "2. DIMENSIONS TAKEN FROM THE
CUSTOMER CONNECTION BOLT SURFACE OF THE
FLYWHEEL".
SHEET 2 (WAS SHEET 1):
a. CONN. 6 DIM. 2405 [94.7] (C-3) WAS 94.64 [2403.9]
b. CONN. 13 DIM. 73 [2.9] (P-2) WAS 2.13 [54.1]
c. CONN. 8 DIM. 105 [4.1] (M-10) WAS 3.94 [100]
d. ADDED CONN. 26 WITH ITS RESPECT. DIMS. (G-10)
e. JACKET WATER INLET FLANGE VIEW (S-3) WAS
SHOWN ON SHEET 5.
f. ADDED TIMING HOLE DETAIL VIEW (S-6).
g. PRELUBE PUMP FLANGE VIEW (S-9) WAS SHOWN
ON SHEET 5.
SHEET 3 (WAS SHEET 3 & 4):
a. CONN. 11 DIM. 460 [18.1] (A-5) WAS 17.95 [455.9]
b. CONN. 14 DIM. 411 [16.2] (G-10) WAS 16.30 [414.1]
SHEET 4:
a. ADDED TOP VIEW.
b. CONN. 6 DIM. 2405 [94.7] (M-3) WAS 94.64 [2403.9]
c. FLYWHEEL DETAIL VIEW (R-2) WAS SHOWN
ON SHEET 5.
d. EXHAUST OUTLET FLANGE VIEW (R-6) WAS
SHOWN ON SHEET 5.
e. JACKET WATER OUTLET FLANGE VIEW (R-8) WAS
SHOWN ON SHEET 5.
SHEET 5: continue on next page

Form 0135-B 12-2-2009


ECO Number 158676
ENGINEERING CHANGE ORDER Supplement No.
Page 3 of 7
HS/ECCN CODES: (PRC) PART RELATIONSHIP CODES:
"A"=ASSIGNED, "V"=VERIFIED, "R"=REVISED, "N"=N/A (DWI-02-1041) "1"=YES, "2"=NO, "3"=YES IF, N=ENG. OBS. (DWI-02-1032) STOCK DISPOSITION
E
N R P PRODUCTION SERVICE P
PART NUMBER H C SUPERSEDED PART
ITEM E E DESCRIPTION R C
NEW & REVISED PART(S) S C NUMBER(S)
W V C C
N USE REWORK SCRAP USE REWORK SCRAP

a. ADDED BOTTOM VIEW.


b. ENG. CONN. 14. "JACKET WATER BALANCE LINE
CONNECTION - 1.00"-11.5 NPTF" WAS CONN.15
"JACKET WATER BALANCE LINE CONNECTION -
1.00-14 NPTF"
c. CONN. 15 WAS CONN. 16.
d. CONN. 16 WAS CONN. 17.
e. CONN. 17 WAS CONN. 18.
f. CONN. 25 ."PRELUBE PUMP MOUNTING FLANGE -
(4) 11.9 [.47] DIAMETER HOLES. (SEE SHEET 2)
NOTE: MUST CONFORM TO MOTOR FRAME SIZE
56C AND "M" DRIVE CONF." WAS "PRELUBE PUMP -
.38-16UNC (4) HOLES.
g. ADDED CONN. 26. ENGINE GROUND - (2) M12 X
1.75 TAP 24 DEEP (ON RIGHT AND LEFT SIDE OF
ENGINE)
h. ADDED NOTE 3 "FLEXIBLE CONNECTION
REQUIRED AT THE FUEL INLET…"
j. ADDED NOTE 4 "FOR STANDARD PRESSURE…"
k. ADDED NOTE 5 " UNLESS OTHERWISE SPECIFIED,
ALL "NPT" PIPE THREADED ENGINE CONN…"
m. ADDED EQUIPMENT "V. AUXILIARY WATER PUMP"
n. ADDED EQUIPMENT "W. JACKET WATER PUMP"
p. ADDED EQUIPMENT "Y. CEC JUNCTION BOX…"
q. ADDED EQUIPMENT "A.A AIR CLEANER …"
REVISION HISTORY:
156504 10-13 SHEET 1: UPDATED PRICE CODE TO
P2580J11 & PRELUBE PUMP
CONNECTION POINT (25)
SHEET 2 & 4: PICTORIALLY UPDATED
PRELUBE & BREATHER SYSTEM (M & U)
SHEET 3: REMOVED 31.11 [790.2] &

Form 0135-B 12-2-2009


ECO Number 158676
ENGINEERING CHANGE ORDER Supplement No.
Page 4 of 7
HS/ECCN CODES: (PRC) PART RELATIONSHIP CODES:
"A"=ASSIGNED, "V"=VERIFIED, "R"=REVISED, "N"=N/A (DWI-02-1041) "1"=YES, "2"=NO, "3"=YES IF, N=ENG. OBS. (DWI-02-1032) STOCK DISPOSITION
E
N R P PRODUCTION SERVICE P
PART NUMBER H C SUPERSEDED PART
ITEM E E DESCRIPTION R C
NEW & REVISED PART(S) S C NUMBER(S)
W V C C
N USE REWORK SCRAP USE REWORK SCRAP

ADDED 32.42 [823.4], (m-1).


SHEET 5: ENGINE WATER DRAIN - 1" NPT
WAS M18 X 1.5 (H-2)
153665 04-11 SHEET 5: EQUIPMENT INDEX, NOTE N,
DELETED "(4) .75-10 UNC-2B"
153457 02-11 SHEET 1: REVISED VIEW FOR JBOX &
IGN. MODULE (K-8) & ADDED PRICE
CODE P2580S10 (S-8)
152018 02-10 SHEET 5: CONNS. 3 & 4: 2.0 NPTF WAS
1.5 NPTF.
141931 05-07 SEE ENGINEERING NOTICE
140813 08-06 RELEASED, SUPERSEDES L-08075

1 L-08075-9 X V V ------ -- --
INSTALLATION DRAWING P48GLD/GSID
a. REDRAWN IN CREO.
b. "DIMENSIONS ARE IN MM [INCHES]" WAS
"DIMENSIONS ARE IN INCHES [MILLIMETERS]"
SHEET 1 (WAS SHEET 2):
a. CONNECTION 16 DIM.1363 [53.7] (J-2) WAS
53.74 [1365] AND DIM. 1267 [49.9] (A-2) WAS
49.72 [1263]
b. CONN. 17 DIM. 2290 [90.2] (N-1) WAS 90.24 [2292]
c. CONN. 3 & 4 DIM.2279 [89.7] (N-10) WAS 88.78 (2255)
d. ADDED "S" WITH ITS CORRESPONDING DIMS.
e. CONN. 15 DIM. 611 [24.1](E-10) WAS 23.27 [591.1}
AND DIM. 9 [.4] (A-7) WAS .91 [23.1]
f. ADDED CONN. 26 WITH ITS RESPECT. DIMS. (E-10)
g. OVERALL LENGTH OF ENGINE: 2938 [115.7] WAS
OVERALL LENGTH = 115.12 [2924]
h. OVERALL HEIGHT OF ENGINE: 1947 [76.7] WAS

Form 0135-B 12-2-2009


ECO Number 158676
ENGINEERING CHANGE ORDER Supplement No.
Page 5 of 7
HS/ECCN CODES: (PRC) PART RELATIONSHIP CODES:
"A"=ASSIGNED, "V"=VERIFIED, "R"=REVISED, "N"=N/A (DWI-02-1041) "1"=YES, "2"=NO, "3"=YES IF, N=ENG. OBS. (DWI-02-1032) STOCK DISPOSITION
E
N R P PRODUCTION SERVICE P
PART NUMBER H C SUPERSEDED PART
ITEM E E DESCRIPTION R C
NEW & REVISED PART(S) S C NUMBER(S)
W V C C
N USE REWORK SCRAP USE REWORK SCRAP

OVERALL HEIGHT = 79.72 [2024.9]


j. OVERALL WIDTH OF ENGINE: 1557 [61.3] WAS
OVERALL WIDTH = 61.38 [1559.0]
k. ADDED NOTE "2. DIMENSIONS TAKEN FROM THE
FLYWHEEL".
SHEET 2 (WAS SHEET 1):
a. CONN. 6 DIM. 2405 [94.7] (C-2) WAS 94.64 [2403.9]
b. ADDED CONN. 16 (H-2)
c. ADDED "AA" (P-2)
d. CONN. 13 DIM. 73 [2.9] (N-2) WAS 2.13 [54.1]
e. CONN. 8 DIM. 105 [4.1] (M-10) WAS 3.94 [100]
f. JACKET WATER INLET FLANGE VIEW (S-2) WAS
SHOWN ON SHEET 5.
g. ADDED TIMING HOLE DETAIL VIEW (S-6).
h. PRELUBE PUMP FLANGE VIEW (S-8) WAS SHOWN
ON SHEET 5.
SHEET 3 (WAS SHEET 3 & 4):
a. CONN. 11 DIM. 460 [18.1] (A-6) WAS 17.95 [455.9]
b. CONN. 14 DIM. 411 [16.2] (G-10) WAS 16.30 [414.1]
SHEET 4:
a. ADDED TOP VIEW.
b. CONN. 6 DIM. 2405 [94.7] (P-4) WAS 94.64 [2403.9]
WAS SHOWN ON SHEET 1.
c. FLYWHEEL DETAIL VIEW (F-2) WAS SHOWN
ON SHEET 5.
d. EXHAUST OUTLET FLANGE VIEW (M-2) WAS
SHOWN ON SHEET 5.
e. JACKET WATER OUTLET FLANGE VIEW (R-2) WAS
SHOWN ON SHEET 5.
SHEET 5:
a. ADDED BOTTOM VIEW.
b. CONN. 1"…MATES WITH 2.00" ANSI 150#..." WAS

Form 0135-B 12-2-2009


ECO Number 158676
ENGINEERING CHANGE ORDER Supplement No.
Page 6 of 7
HS/ECCN CODES: (PRC) PART RELATIONSHIP CODES:
"A"=ASSIGNED, "V"=VERIFIED, "R"=REVISED, "N"=N/A (DWI-02-1041) "1"=YES, "2"=NO, "3"=YES IF, N=ENG. OBS. (DWI-02-1032) STOCK DISPOSITION
E
N R P PRODUCTION SERVICE P
PART NUMBER H C SUPERSEDED PART
ITEM E E DESCRIPTION R C
NEW & REVISED PART(S) S C NUMBER(S)
W V C C
N USE REWORK SCRAP USE REWORK SCRAP

"…MATES WITH 2.00" ANSI 125#..."


c. ENG. CONN. 14. "JACKET WATER BALANCE LINE
CONNECTION - 1.00"-11.5 NPTF" WAS CONN.15
"1.00-14 NPTF"
d. CONN. 19 IS NOW EQUIP. "Y"
e. CONN. 22 OIL FILTER DRAIN - "1.00"-11.5 NPT" WAS
"M36 X 1.5"
f. CONN. 25 ."PRELUBE PUMP MOUNTING FLANGE -
(4) 11.9 [.47] DIAMETER HOLES. (SEE SHEET 2)
NOTE: MUST CONFORM TO MOTOR FRAME SIZE
56C AND "M" DRIVE CONF." WAS "PRELUBE
PUMP- .38-16UNC (4) HOLES.
g. ADDED CONN. 26. ENGINE GROUND - (2) M12 X
1.75 TAP 24 DEEP (ON RIGHT AND LEFT SIDE OF
ENGINE)
h. ADDED NOTE 3 "FLEXIBLE CONNECTION
REQUIRED AT THE FUEL INLET…"
j. ADDED NOTE 4 "FOR STANDARD PRESSURE…"
k. ADDED NOTE 5 " UNLESS OTHERWISE SPECIFIED,
ALL "NPT" PIPE THREADED ENGINE CONN…"
m. ADDED EQUIPMENT "V. AUXILIARY WATER PUMP"
n. ADDED EQUIPMENT "W. JACKET WATER PUMP"
p. EQUIPM. "Y. CEC JUNCTION BOX - 24 VOLT D.C.
POWER SUPPLY" WAS "JUNCTION BOX - POSITIVE
FUEL SHUT-OFF".
q. ADDED EQUIPMENT "A.A AIR CLEANER …"
REVISION HISTORY:
156627 11-13 SHEET 1: PICTORIALLY UPDATED
ENGINE WATER DRAIN "C" (L-7)
SHEET 2: PICTORIALLY UPDATED
ENGINE WATER DRAIN "C" (E-7)
SHEET 5: ENGINE WATER DRAIN 1" NPT

Form 0135-B 12-2-2009


ECO Number 158676
ENGINEERING CHANGE ORDER Supplement No.
Page 7 of 7
HS/ECCN CODES: (PRC) PART RELATIONSHIP CODES:
"A"=ASSIGNED, "V"=VERIFIED, "R"=REVISED, "N"=N/A (DWI-02-1041) "1"=YES, "2"=NO, "3"=YES IF, N=ENG. OBS. (DWI-02-1032) STOCK DISPOSITION
E
N R P PRODUCTION SERVICE P
PART NUMBER H C SUPERSEDED PART
ITEM E E DESCRIPTION R C
NEW & REVISED PART(S) S C NUMBER(S)
W V C C
N USE REWORK SCRAP USE REWORK SCRAP

WAS M18 X 1.5 (C)


155428 11-12 SHEET 1: ADDED ITEM "Y", REVISED
PICTORIALLY IGN./FUEL SHUTOFF JCT.
BOX.
SHEET 2: MOVED BALLOON "Y" TO
SHEET 1. REMOVED PICTORIALLY
FUEL/SHUTOFF JCT BOX.
SHEET 3: REMOVED BALLOON "Y" (L-8)
SHEET 4: REMOVED BALLOON "Y"
153665 04-11 SHEET 5: EQUIPMENT INDEX, NOTE N,
DELETED "(4) .75-10 UNC-2B"
1.5 NPTF
151462 10-09 SHEET 2: UPDATED BREATHER
LOCATION AND STD PRELUBE PUMP
SHEET 4: UPDATED BREATHER
LOCATION AND STD PRELUBE PUMP
141931 05-07 SEE ENGINEERING NOTICE
141931 05-07 SEE ENGINEERING NOTICE

Form 0135-B 12-2-2009

You might also like