WORK: Renovation and carpentary work DATE: 17/01/2023
LOCATION: sharma nagar QUOTATION NO: 27
SL NO SCOPE OF WORK SQFT AMOUNT
BATH AREA:
• Demolishing the floor tiles and laying of new anti skid floor
1 tiles 54 25,000.00
• Removing of existed IWC and replaced with new EWC
closet with their fittings

POOJA UNIT : doors will be placed in already existed


2 concrete shelves with design CNC cutting 21 18,500.00
,and storage below the pooja unit
TOTAL 43,500.00
NOTE ABOVE ALL INCLUDED MATERIALS, LABOURS, MACHINERIES AND
TRANSPORTATIONS.
Quotation validity – 2 WEEKS
WORK WILL BE COMPLETED IN 1 WEEK.
TERMS AND CONDITONS:
1. PAYMENT ADVANCE 80% BALANCE 20% AT TIME OF WORK PROGRESS
2. Above mentioned carpentry work FOR pooja unit is done with CNC for design
3. Internal plumbing line and masonry work for tile and pipe laying will be done properly.
4. Any issues in our workmanship we will take care.
5. EWC closet will followed with PARRYWARE BRAND. IF any changes in brand do let us know the quotation will
be revised as per the prices.