Summary Report For 10-V-127 Project Information
Summary Report For 10-V-127 Project Information
PROJECT INFORMATION
P1
E-W Dim (mm) 2500.00
N-S Dim (mm) 2500.00
Height above grade (mm) 200.00
E-W Offset (mm) 0.00
N-S Offset (mm) 0.00
Requested Reinft. Ratio 0.0015
Provided Reinft. Ratio 0.0016
Long Bar Size (mm) 16
Bars each face 6
Top Steel
Bottom Steel
1.5selfwt + 1.5EO + 0.75LL + -0.45Sx OPE (DBE) 20 16 150 13.4 7.4 10 E-W
1.5selfwt + 1.5EO + 0.75LL + -0.45Sx OPE (DBE) 20 16 150 13.4 7.57 10 N-S
Page 3 of 19
PROJECT INFORMATION
Name 10-V-127
Diameter (mm) 1820.00
Height (mm) 4960.00
POS/TOC El (mm) 200.00
Bolt Circle Dia. (mm) 2120.00
Shipping/Erection Wt (kN) 86.67
Operating Wt (kN) 92.31
Test Wt (kN) 120.07
Wind Shear (kN) 11.67
Wind Moment (kN m) 28.84
EQ Shear (kN) 13.49
EQ Moment (kN m) 33.31
APPLIED LOADS
P1
Load Axial Shear E-W Mom N-S Shear N-S Mom E-W
Case (kN) (kN) (kN m) (kN) (kN m)
P1
Load Axial Shear E-W Mom N-S Shear N-S Mom E-W
Comb (kN) (kN) (kN m) (kN) (kN m)
P1
Load Axial Shear E-W Mom N-S Shear N-S Mom E-W
Comb (kN) (kN) (kN m) (kN) (kN m)
Top Steel
Bottom Steel
1.5selfwt + 1.5EO + 0.75LL + -0.45Sx OPE (DBE) 20 16 150 13.4 7.4 10 E-W
1.5selfwt + 1.5EO + 0.75LL + -0.45Sx OPE (DBE) 20 16 150 13.4 7.57 10 N-S
PUNCHING SHEAR
P1
P1
E-W Dim (mm) 2500.00
N-S Dim (mm) 2500.00
Height above grade (mm) 200.00
E-W Offset (mm) 0.00
N-S Offset (mm) 0.00
Requested Reinft. Ratio 0.0015
Provided Reinft. Ratio 0.0016
Long Bar Size (mm) 16
Bars each face 6
P1