SHELL MARINA LOBP-GMP PROJECT

Pile Load Calculation - Main Substation

Project SHELL MARINA LOBP – GMP

Originating Company Punj Lloyd Pte Ltd

Document Title Pile Load Calculation - Main Substation

Document Number 40-007-CS-8180-03043

Document Revision 02C

Document Status Approved for Construction

Document type Design Calculation

Originator / Author AKV

Security Classification Unestricted

Issue Date 17-Oct-2013

Rev # Date of Issue Description Originator Reviewer Approver


01E 14-Oct-13 Issued for Review AKV RGX DS
02C 17-Oct-13 Approved for Construction AKV RGX DS

PL Doc No. PD4015-CS-CA-A4-3043 Page 1 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

40-007-CS-8180-03043 Revision 02C Page 2 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

TABLE OF CONTENTS
1.0 INTRODUCTION....................................................................................................3
2.0 REFERENCES.......................................................................................................4
2.1 Codes.................................................................................................................4
2.2 Shell DEPs.........................................................................................................4
2.3 Geotechnical Report.........................................................................................4
2.4 Project Documents...........................................................................................4
3.0 DESIGN PHILOSOPHY.........................................................................................4
4.0 MATERIALS...........................................................................................................5
5.0 GENERAL DATA...................................................................................................5
5.1 Unit Weight........................................................................................................5
5.2 Bearing Capacity...............................................................................................6
6.0 LOADS AND LOAD COMBINATIONS..................................................................7
6.1 Dead Load..........................................................................................................7
6.2 Live Load............................................................................................................8
6.3 Wind Load..........................................................................................................8
6.4 Load Combinations.........................................................................................16
7.0 UNITS OF MEASUREMENT................................................................................18
8.0 GEOMETRY OF STRUCTURE............................................................................19
9.0 STAAD INPUT & OUTPUT..................................................................................38
ANNEXURE I DESIGN OF DRIVEN RC SQUARE PILE……..………………….. 1PAGE
ANNEXURE II PILE CALCULATIONS FOR ONE PILE...………...……….... 17 PAGES
ANNEXURE III PILE CALCULATIONS FOR TWO PILE...………………....… 6 PAGES

40-007-CS-8180-03043 Revision 02C Page 3 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1.0 INTRODUCTION

This document furnishes Pile Load Calculation for Main Substation Building for Shell
Marina LOBP-GMP Project located at Tuas Lube Park, Jurang Island, Singapore.

KEY PLAN
The Main Substation Building is a two storey Reinforced Concrete Framed structure.
The overall dimensions of the building are 31.45m (Centers of Extreme Grids) x
26.050m (Centers of Extreme Grids) x 9.0m height from finished ground and parapet
ht. of 0.6m. The structure is designed for static loads. The beam column frame
arrangement is provided with Pile Foundation with Tie Beams at Pile Cap level. For
Steel Column, Pedestal is designed as Isolated Footing at Transformer area.

40-007-CS-8180-03043 Revision 02C Page 4 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2.0 REFERENCES

2.1 Codes

a) SS CP65-Part 1: 1999: Structural use of concrete, Design and Construction

b) BS 5950: Structural use of steel work in building

c) BS 6399-Part 1:1996: Code of Practice for Dead and Imposed loads

d) BS 6399-Part 2:1997: Code of practice for wind load

e) SS CP4:2003 : Code of practice for Foundations

2.2 Shell DEPs

a) DEP 34.00.01.30-Gen, Sept 2011: Structural Design and Engineering of Onshore


Structures

b) DEP 34.19.20.31-Gen, Sept 2011: Reinforced Concrete Structures

c) DEP 34.28.00.31-Gen, Sept 2011: Onshore Steel Structures

2.3 Geotechnical Report

a) S24-02R2: KISO JIBAN Geotechnical Engineering Report Jan 6, No1 to 4

2.4 Project Documents

a) 20-T-1-600-001: Design Specification for Loads, Concrete, Steel and General


Civil

b) 20-T-1-608-001: Foundation Design Basis

c) 40-007-CB-4180-03003: Architectural Layout and Details-Main Substation

3.0 DESIGN PHILOSOPHY

Main Substation Building has been analyzed for conventional loads. Structural members
have been designed for dead, live, wind loads. Beam, columns frame arrangement and
design is done using Bentley STAAD-Pro software.

Design of concrete structures has been carried out in accordance with limit state
principles as embodied in the SS CP 65, Part 1. Each reinforced section is designed to
meet the most critical limit state.

40-007-CS-8180-03043 Revision 02C Page 5 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

Steel structures are designed in accordance with BS5950. Structural elements like
foundations, base plate and slabs have been designed manually while beams and
column design has been adopted using STAAD-Pro software.

Load combinations are considered as per clause 4 of Design Specification for Loads,
Concrete, Steel and General Civil and SS CP 65.

Pile foundation is provided for all columns with Pile Caps connected with tie- beams at
pile cap level. Isolated footing is provided wherever the governing loads are on lower
side for bearing capcity consideration.

Serviceability and strength checks of members and foundations have been carried out
as per SS CP 65, Part 1and Design Specification.

4.0 MATERIALS

a) Reinforcement: High yield deformed bars complying with BS 4449 with


characteristic strength of 460N/mm2

b) Blinding Concrete: Concrete grade C16

c) Substructure concrete:

I. Foundation Concrete grade C35


II. RCC Square Pile Concrete : C45

d) Superstructure concrete
Columns Concrete grade C35
Beams and Slabs Concrete grade C35

e) Structural steel: Rolled Steel sections complying with the requirements of BS EN


10025 grade S275JR

f) Anchor bolts: Bolt material to be BS EN 10025 grade S275

g) Steel Inserts & Plates: Complying with the requirements of BS EN 10025 grade
S275JR

5.0 GENERAL DATA

5.1 Unit Weight

For design purpose, following unit weight of construction materials are used.
a) Steel 78.5kN/m3
b) Reinforced concrete 25.0kN/m3
c) Plain concrete/Fireproofing concrete 23.0kN/m3

40-007-CS-8180-03043 Revision 02C Page 6 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

d) Wall blocks 20.0kN/m3


e) Soil 18.0kN/m3

5.2 Bearing Capacity

For design purpose the following pile capacities are considered as per BH – 2 based on
KISO JIBAN Geotechnical Report and Foundation Design Basis.

A net safe bearing capacity of 200kN/m 2 is considered at a depth of 2.5m from FGL for
shallow foundations (Refer Table 2 of Geotechnical Report).

5.2.1 Capacity of Pile

Structural Capacity of Pile in Axial Compression =1800 kN

Geotechnical Capacity of Pile in Compression = 1630kN

(Refer Annexure I for Calculations).

Bearing pressure for design of isolated foundation has been considered as 200kN/M 2
to be on conservative side below 2.0m ground level.
Refer KISO JIBAN Geotechnical Report page 92 & 93 attached below.

Df = 2.0m
40-007-CS-8180-03043 Revision 02C Page 7 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

6.0 LOADS AND LOAD COMBINATIONS

6.1 Dead Load

6.1.1 Dead Load Due to Self Weight of Slab

Thickness of floor slab considered = 200mm


Floor Slab Dead load = Dead weight of slab
= 0.20 x 25
= 5 KN/m2

Thickness of roof slab considered = 150mm


Roof Slab Dead load = Dead weight of slab
= 0.150 x 25
= 3.75 KN/m2
6.1.2 Dead Load Due to Self Weight of Finishes

Floor Screed (50mm) = 0.050*24 =1.2kN/m2


Floor Finishes (25mm) = 0.025*24 = 0.60kN/m2
Roof Water proofing (incl. of Screed) = 0.150*20 = 3.0kN/m2
6.1.3 Dead Load Due to Services supported

Services Supported from Slab = 1 KN/m2

6.1.4 Total Dead Load on floor/roof

Total Floor Slab Dead Load = 5 + 1.2 + 0.60 +1.0


=7.8 KN/m2

Total Roof Slab Dead Load = 3.75 + 3.0 +1.0


= 7.75 KN/m2

6.1.5 Block Wall load on beams:

Wall Load on plinth beams (2.6m height)= (2.6-0.6) x 0.35 x 20 = 14 kN/m


40-007-CS-8180-03043 Revision 02C Page 8 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

Wall Load on floor beams (6.0m height) = (6.0-0.6) x 0.35 x 20 = 37.8kN/m


Wall Load on floor beams (3.8m height) = (3.8-0.6) x 0.35 x 20 = 22.4kN/m
Wall Load on floor beams (3.7m height) = (3.7-0.6) x 0.35 x 20 = 21.7kN/m
Load from Parapet Wall = 1 x 0.15 x 25 = 3.75 kN/m

6.2 Live Load

HT rooms = 16 kN/m2
LT rooms and other rooms = 10 kN/m2
Corridors and Stair Cases = 4.0 kN/m2
Roof Live Load = 2.0 kN/m2
Ref cl 2.5 DEP 34.00.01.30-Gen.

6.3 Wind Load

6.3.1 Check for applicability of BS 6399-2

Applicability of this code is checked as per cl. 1.6.2 of BS 6399-2

Building type factor, kb =1


(Refer table 1, BS 6399-2)

Dynamic augmentation factor, Cr =0.05


(Refer fig 3, BS 6399-2)

The dynamic augmentation factor=0.05, falls inside the limits of applicability as per fig 3,
BS 6399-2, hence, BS 6399-2 is applicable as per cl. 1.6.2 of BS 6399-2

6.3.2 Calculation of site wind speed

Site wind speed is the basic wind speed modified to account for the altitude of the site,
direction of wind, season of exposure & probabilistic model

Site wind speed, Vs = V b x Sa x Sd x Ss x S p


(Equation 8, BS 6399, Part-2)

Where,
Vb = Basic wind speed = 22.0 m/sec

Sa = altitude factor = 1.0

Sd = direction factor = 1.0

Ss = seasonal factor = 1.0

40-007-CS-8180-03043 Revision 02C Page 9 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

Sp = probable factor = 1.0

Vs = 22.0x1.0x1.0x1.0x1.0 = 22.0m/s

6.3.3 Calculation of effective wind speed

Effective wind speed, Ve = V s x Sb


(Refer equation 12, BS 6399-2)

Where, Sb =Terrain & Building factor


(Refer BS 6399-2, cl. 2.2.3.3 & Refer table 4)
Refer cl. 3.2.1, Doc no. 20-T-1-600-001, Design Specification.

Location of site = Country terrain

Closest distance to sea upwind = 2.0km

Height Vs in Ve in
Sb
H in m m/s m/s
≥2 22.0 1.40 30.8
5 22.0 1.62 35.6
10 22.0 1.78 39.2
15 22.0 1.85 40.7

6.3.4 Calculation of dynamic pressure

Dynamic pressure, qs = 0.613Ve2


(Refer equation 1, BS 6399-2)

Where,
qs = dynamic pressure in N/m2
Ve = Effective wind speed in m/s

Height qs qs
H in m in N/m2 in kN/m2
≥2 581.5 0.59
5 778.6 0.79
10 940.0 0.96
15 1015.4 1.04

6.3.5 Pressure coefficients

Length of Building = 31.45m

40-007-CS-8180-03043 Revision 02C Page 10 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

Width of Building = 26.05m

Height of Building = 9.0m

D/H in Length Direction = 31.45/9.00 = 3.50

D/H in Width Direction = 26.05/9.00 = 2.89

Since D/H is >1 and <4 the External Pressure Coefficients considered as below

External Wall Pressure Coefficients, Cpe (from Table 5 of BS 6399-2)

Vertical Wall Face Cpe


Wind ward Face (Front) +0.85
Leeward Face (Rear) -0.50
Sides -1.3

Internal Pressure Coefficients, Cpi

Cpi = -0.3 and +0.2


Ref clause 2.6.1.2 BS 6399-2:1997

When wind is acting at 0˚ (Along X-direction):

Resultant Wind Pressure Coefficients, Cp = Cpe - Cpi


Cpi = -0.3
40-007-CS-8180-03043 Revision 02C Page 11 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1.0

1.3
θ = 00

1.15 0.85 0.3 0.5 0.2

1.3

1.0

When wind is acting at 90˚ (Along Z-direction):

Resultant Wind Pressure Coefficients, Cp = Cpe - Cpi


Cpi = -0.3
1.15
θ = 900
0.85

1.00 1.30 0.30 1.30 1.00

0.50

0.20

When wind is acting at 0˚ (Along X-direction):

Resultant Wind Pressure Coefficients, Cp = Cpe - Cpi


Cpi = 0.2
40-007-CS-8180-03043 Revision 02C Page 12 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1.5

1.3
θ = 00

0.65 0.85 0.2 0.5 0.7

1.3

1.5

When wind is acting at 90˚ (Along Z-direction):

Resultant Wind Pressure Coefficients, Cp = Cpe - Cpi


Cpi = 0.2
0.65
θ = 900
0.85

1.50 1.30 0.20 1.30 1.50

0.50

0.70

40-007-CS-8180-03043 Revision 02C Page 13 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

Wind Loads For Roof (As per BS 6399 Part 2)


(Negative Sign indicates the pressure acting away from Elements)
External Pressure Coefficients as per Table 8 (Roof slope <5˚)

A = -2.0

C = -0.7 D = +0.2
B = -1.4

A = -2.0

Internal Pressure Coeffients


Cpi = +0.2 and -0.3

40-007-CS-8180-03043 Revision 02C Page 14 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

Resultant Wind Pressure Coefficients, Cp = Cpe - Cpi (Cpi = -0.3)


When wind is acting at 0˚ (Along X-direction):

-1.7

-1.1 -0.4 0.1

-1.7

Resultant Wind Pressure Coefficients, Cp = Cpe - Cpi (Cpi = -0.3)


When wind is acting at 90˚ (Along Z-direction):

-1.7 -1.1 -1.7

-0.4

0.1

40-007-CS-8180-03043 Revision 02C Page 15 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

Resultant Wind Pressure Coefficients, Cp = Cpe - Cpi (Cpi = 0.2)


When wind is acting at 0˚ (Along X-direction):

-2.2

-1.6 -0.9 -0.4

-2.2

Resultant Wind Pressure Coefficients, Cp = Cpe - Cpi (Cpi = 0.2)


When wind is acting at 90˚ (Along Z-direction):

-2.2 -1.6 -2.2

-0.9

-0.4

40-007-CS-8180-03043 Revision 02C Page 16 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

6.4 Load Combinations

Load Combinations are considered as per Clause 4 of Design Specification for Loads,
Concrete, Steel and General Civil 20-T-600-001and SS CP65.
The fllowing Load Combinations considered.
********************************************************************************
*LOAD for Stability Check only
********************************************************************************
LOAD COMB 101 1.0DL + 1.0LL
1 1.0 2 1.0
LOAD COMB 102 1.0DL + 1.0WL+X(CPE+CPI)
1 1.0 3 1.0
LOAD COMB 103 1.0DL + 1.0WL+X(CPE-CPI)
1 1.0 4 1.0
LOAD COMB 104 1.0DL + 1.0WL-X(CPE+CPI)
1 1.0 5 1.0
LOAD COMB 105 1.0DL + 1.0WL-X(CPE-CPI)
1 1.0 6 1.0
LOAD COMB 106 1.0DL + 1.0WL+Z(CPE+CPI)
1 1.0 7 1.0
LOAD COMB 107 1.0DL + 1.0WL+Z(CPE-CPI)
1 1.0 8 1.0
LOAD COMB 108 1.0DL + 1.0WL-Z(CPE+CPI)
1 1.0 9 1.0
LOAD COMB 109 1.0DL + 1.0WL-Z(CPE-CPI)
1 1.0 10 1.0
LOAD COMB 110 1.0DL + 1.0LL + 1.0WL+X(CPE+CPI)
1 1.0 2 1.0 3 1.0
LOAD COMB 111 1.0DL + 1.0LL + 1.0WL+X(CPE-CPI)
1 1.0 2 1.0 4 1.0
LOAD COMB 112 1.0DL + 1.0LL + 1.0WL-X(CPE+CPI)
1 1.0 2 1.0 5 1.0
LOAD COMB 113 1.0DL + 1.0LL + 1.0WL-X(CPE-CPI)
1 1.0 2 1.0 6 1.0
LOAD COMB 114 1.0DL + 1.0LL + 1.0WL+Z(CPE+CPI)
1 1.0 2 1.0 7 1.0
LOAD COMB 115 1.0DL + 1.0LL + 1.0WL+Z(CPE-CPI)
1 1.0 2 1.0 8 1.0
LOAD COMB 116 1.0DL + 1.0LL + 1.0WL-Z(CPE+CPI)
1 1.0 2 1.0 9 1.0
LOAD COMB 117 1.0DL + 1.0LL + 1.0WL-Z(CPE-CPI)
1 1.0 2 1.0 10 1.0
********************************************************************************
** LOAD COMBINATIONS FOR COLUMN AND FOUNDATION DESIGN *
********************************************************************************
LOAD COMB 201 1.4DL + 1.6LL

40-007-CS-8180-03043 Revision 02C Page 17 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1 1.4 2 1.6
********************************************************************************
*** LOAD COMBINATIONS FOR WIND LOADS ARE TAKEN AS PER PS
********************************************************************************
*******************Beneficial**********
LOAD COMB 202 1DL + 1.4WL+X(CPE+CPI)
1 1.0 3 1.4
LOAD COMB 203 1DL + 1.4WL+X(CPE-CPI)
1 1.0 4 1.4
LOAD COMB 204 1DL + 1.4WL-X(CPE+CPI)
1 1.0 5 1.4
LOAD COMB 205 1DL + 1.4WL-X(CPE-CPI)
1 1.0 6 1.4
LOAD COMB 206 1DL + 1.4WL+Z(CPE+CPI)
1 1.0 7 1.4
LOAD COMB 207 1DL + 1.4WL+Z(CPE-CPI)
1 1.0 8 1.4
LOAD COMB 208 1DL + 1.4WL-Z(CPE+CPI)
1 1.0 9 1.4
LOAD COMB 209 1DL + 1.4WL-Z(CPE-CPI)
1 1.0 10 1.4
********************Adverse********************
LOAD COMB 210 1.4DL + 1.4WL+X(CPE+CPI)
1 1.4 3 1.4
LOAD COMB 211 1.4DL + 1.4WL+X(CPE-CPI)
1 1.4 4 1.4
LOAD COMB 212 1.4DL + 1.4WL-X(CPE+CPI)
1 1.4 5 1.4
LOAD COMB 213 1.4DL + 1.4WL-X(CPE-CPI)
1 1.4 6 1.4
LOAD COMB 214 1.4DL + 1.4WL+Z(CPE+CPI)
1 1.4 7 1.4
LOAD COMB 215 1.4DL + 1.4WL+Z(CPE-CPI)
1 1.4 8 1.4
LOAD COMB 216 1.4DL + 1.4WL-Z(CPE+CPI)
1 1.4 9 1.4
LOAD COMB 217 1.4DL + 1.4WL-Z(CPE-CPI)
1 1.4 10 1.4
************************************************
LOAD COMB 218 1.2DL + 1.2LL + 1.2WL+X(CPE+CPI)
1 1.2 2 1.2 3 1.2
LOAD COMB 219 1.2DL + 1.2LL + 1.2WL+X(CPE-CPI)
1 1.2 2 1.2 4 1.2
LOAD COMB 220 1.2DL + 1.2LL + 1.2WL-X(CPE+CPI)
1 1.2 2 1.2 5 1.2
LOAD COMB 221 1.2DL + 1.2LL + 1.2WL-X(CPE-CPI)

40-007-CS-8180-03043 Revision 02C Page 18 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1 1.2 2 1.2 6 1.2


LOAD COMB 222 1.2DL + 1.2LL + 1.2WL+Z(CPE+CPI)
1 1.2 2 1.2 7 1.2
LOAD COMB 223 1.2DL + 1.2LL + 1.2WL+Z(CPE-CPI)
1 1.2 2 1.2 8 1.2
LOAD COMB 224 1.2DL + 1.2LL + 1.2WL-Z(CPE+CPI)
1 1.2 2 1.2 9 1.2
LOAD COMB 225 1.2DL + 1.2LL + 1.2WL-Z(CPE-CPI)
1 1.2 2 1.2 10 1.2

7.0 UNITS OF MEASUREMENT

Elevations meter (m)

Dimensions millimeter (mm)

Force Kilo newton (kN)

Moment Kilo newton meter (kNm)

Loading Kilo newton per square metre (kN/m2)

Temperature °C

40-007-CS-8180-03043 Revision 02C Page 19 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

8.0 GEOMETRY OF STRUCTURE

3D MODEL

40-007-CS-8180-03043 Revision 02C Page 20 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

23 24 25

26 30 20 21 22

17 18 19

15 16

10 11 12 13 14

1 2 3 4 5 6

29 7 8 9

Y X
Load 101
Z 28 27

NODE NUMBERS AT PILE CAP AND FOUNDATION BOTTOM LEVEL

40-007-CS-8180-03043 Revision 02C Page 21 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

TIEBEAM LAYOUT PLAN AT PILE CAP LEVEL

40-007-CS-8180-03043 Revision 02C Page 22 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

COLUMN LAYOUT PLAN

40-007-CS-8180-03043 Revision 02C Page 23 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

PLINTH BEAM LAYOUT PLAN

40-007-CS-8180-03043 Revision 02C Page 24 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

FLOOR BEAM LAYOUT PLAN at 2nd STOREY

40-007-CS-8180-03043 Revision 02C Page 25 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

ROOF BEAM LAYOUT PLAN

40-007-CS-8180-03043 Revision 02C Page 26 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

DEAD LOAD ON FLOOR SLAB AT 2nd STOREY

40-007-CS-8180-03043 Revision 02C Page 27 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

DEAD LOAD ON ROOF SLAB

40-007-CS-8180-03043 Revision 02C Page 28 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

LIVE LOAD ON FLOOR LAB AT 2nd STOREY

40-007-CS-8180-03043 Revision 02C Page 29 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

LIVE LOAD ON ROOF SLAB

40-007-CS-8180-03043 Revision 02C Page 30 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

-0.44 kN/m
-2.51 kN/m
-0.36 kN/m-0.96 kN/m
-5.02 kN/m -2.06 kN/m
-2.51 kN/m -0.77 kN/m
2.51 kN/m -0.79 kN/m -2.40 kN/m
-4.13 kN/m -0.36 kN/m
-2.06 kN/m -0.82 kN/m
2.07 kN/m
-2.06 kN/m -0.63 kN/m
5.55 kN/m -4.80 kN/m -1.98 kN/m
4.57 kN/m -0.79 kN/m-0.67 kN/m
-4.13 kN/m
2.07 4.57
kN/m kN/m -2.40 kN/m 2.40-0.77
kN/mkN/m
-2.06 kN/m -3.95 kN/m -0.63 kN/m
4.65 kN/m 4.80 kN/m
-1.98 kN/m
4.65 kN/m 2.48 kN/m 1.98 kN/m
5.52 kN/m -0.67 kN/m
-1.98 kN/m -0.63 kN/m
4.65 kN/m 3.95 kN/m
4.57 kN/m 4.65
4.54 kN/m
kN/m 2.48 kN/m 2.40-0.48
kN/mkN/m
2.76 kN/m 4.65 kN/m -3.95 kN/m
2.76 kN/m 4.65 kN/m
2.76 kN/m7.00 kN/m 4.65 kN/m 1.98 kN/m 1.98 kN/m
4.65 -0.63 kN/m
2.76 kN/m7.00 kN/m
2.76 kN/m7.00 kN/m3.59 kN/m -2.51 kN/m 2.04 kN/m
kN/m -1.98 kN/m -0.405.02
kN/mkN/m3.95kN/m
kN/m
-0.48
2.76 kN/m7.00 kN/m 4.54 kN/m
2.76 kN/m7.00 kN/m 2.51 kN/m 5.02 kN/m 4.13 kN/m
2.76 kN/m7.00
2.95kN/m 5.82 kN/m
7.00kN/m
-2.06 kN/m
kN/m 1.98 kN/m -0.40 kN/m
7.00 kN/m 2.04 kN/m 4.13 kN/m -0.40 kN/m
2.06 kN/m 4.13 kN/m
6.35
-2.06kN/m
2.95 kN/m kN/m 3.31 kN/m 2.06 kN/m -0.40 kN/m
5.22 kN/m -0.38 kN/m 4.13 kN/m
0.95 kN/m
2.76 kN/m
0.95 kN/m
2.06 kN/m
5.22 kN/m 4.45 kN/m -0.38 kN/m

0.95 kN/m
4.45 kN/m -0.38 kN/m
1.78 kN/m
2.18 kN/m

Y
X
Z Load 3

WIND LOAD IN X DIRECTION (+CPI)

40-007-CS-8180-03043 Revision 02C Page 31 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

-1.53 kN/m
-3.76 kN/m
-1.26 kN/m -3.38 kN/m
-7.52 kN/m -3.10 kN/m
-2.69 kN/m
1.42-3.76
kN/mkN/m -2.78 kN/m
-6.19 kN/m -1.26 kN/m -3.60 kN/m
-2.86 kN/m
1.17 kN/m -3.10 kN/m -2.21 kN/m
-3.10 kN/m
3.14 kN/m
-7.20 kN/m -2.96 kN/m
2.58 kN/m -2.78 kN/m-2.35 kN/m
2.58 kN/m -6.19 kN/m -2.69 kN/m
1.17 kN/m -3.60 kN/m 3.60 kN/m
-3.10 kN/m -5.93 kN/m -2.21 kN/m
6.00 kN/m 7.20 kN/m
3.12 kN/m 1.40 kN/m
6.00 kN/m -2.96 kN/m 2.96 kN/m
6.00 kN/m -2.35 kN/m -2.21 kN/m
-2.96 kN/m 5.93 kN/m
2.58 kN/m 6.00
2.57kN/m
kN/m
3.57 kN/m 6.00 kN/m1.40 kN/m 3.60 -1.68
kN/m kN/m
-5.93 kN/m
3.57 kN/m 6.00 kN/m
3.57 kN/m10.00 kN/m 6.00 kN/m 2.96 -2.21
kN/mkN/m
3.57 kN/m10.00 kN/m 2.03 kN/m 6.00 kN/m 2.96 kN/m
3.57 kN/m10.00 kN/m
1.16 kN/m -2.96 kN/m -1.38 kN/m
7.52 kN/m5.93 kN/m
kN/m
-3.76 kN/m2.57 kN/m -1.68
3.57 kN/m10.00 kN/m
3.57 kN/m10.00 kN/m 3.76 kN/m 7.52 kN/m 6.19 kN/m
3.57 kN/m10.001.67 kN/m
kN/m 8.73 kN/m
-3.10 kN/m
10.00 kN/m 2.96 kN/m -1.38 kN/m
1.16 kN/m -1.38 kN/m
10.00 kN/m 6.19 kN/m
3.59 kN/m 3.10 kN/m 6.19 kN/m
1.67 kN/m 4.97 kN/m
-3.10 kN/m 3.10 kN/m -1.38 kN/m
2.95 kN/m -1.33 kN/m 6.19 kN/m
1.42 kN/m
1.56 kN/m
1.42 kN/m
3.10 kN/m
2.95 kN/m2.52 kN/m -1.33 kN/m

1.42 kN/m
2.52 kN/m -1.33 kN/m
2.67 kN/m
1.23 kN/m

Y
X
Z Load 4

WIND LOAD IN X DIRECTION (-CPI)

40-007-CS-8180-03043 Revision 02C Page 32 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2.51 kN/m
-2.51 kN/m

2.07 kN/m
-2.06 kN/m
-5.02 kN/m 5.55 kN/m
-0.44
-2.51kN/m
kN/m
-4.13 kN/m 4.42 kN/m-2.40 kN/m
-0.36 kN/m -0.96 kN/m 2.07 4.57
kN/m kN/m
-2.06 kN/m
-2.06 kN/m 4.69 kN/m
-0.79 kN/m -4.80 kN/m -1.98 kN/m
3.63 kN/m
-0.79 kN/m -4.13 kN/m
-0.36 kN/m 4.57 kN/m 3.86 kN/m -2.40 kN/m 2.40 kN/m
-2.06 kN/m -3.95 kN/m 4.42 kN/m
4.65 kN/m -0.96 kN/m -0.43 kN/m 4.80 kN/m
3.63 kN/m
-1.98 kN/m 1.98 kN/m
4.65 kN/m
-0.79
4.65kN/m
kN/m-0.79 kN/m -1.98 kN/m 3.95 kN/m
4.65 kN/m -0.43 kN/m 3.86 kN/m 3.63 kN/m
2.76 kN/m 4.65 kN/m 2.40
2.76 kN/m
kN/m-3.95 kN/m
2.76 kN/m 4.65 kN/m
2.76 kN/m7.00 kN/m 4.65 kN/m 1.98 kN/m 1.98 kN/m
2.76 kN/m7.00 kN/m -0.62 kN/m 4.65-0.36
kN/mkN/m -1.98 kN/m 5.02 kN/m
2.76 kN/m7.00 kN/m -2.51 kN/m -0.79 kN/m 2.27 kN/m 3.95 kN/m 3.63 kN/m
2.76 kN/m7.00 kN/m 2.76 kN/m
2.76 kN/m7.00 kN/m-0.51 kN/m 2.51 kN/m 5.02 kN/m 4.13 kN/m
2.76 kN/m7.00 kN/m 5.82 kN/m 1.98 kN/m
7.00 kN/m-2.06 kN/m -0.36 kN/m
7.00 kN/m 2.27 kN/m2.27 kN/m
4.13 kN/m
-1.10 kN/m
2.06 kN/m 4.13 kN/m
-0.51 kN/m 3.31 kN/m
-2.06 kN/m -0.91 kN/m 2.06 kN/m
2.18 kN/m 4.13 kN/m 2.27 kN/m
0.95 kN/m
-0.48 kN/m
0.95
-0.91 kN/m kN/m
-0.77 kN/m 2.06 kN/m
2.18 kN/m

0.95 kN/m
-0.77 kN/m
2.18 kN/m
1.78 kN/m
-0.38 kN/m

Y
X
Z Load 5

WIND LOAD IN -X DIRECTION (+CPI)

40-007-CS-8180-03043 Revision 02C Page 33 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1.42 kN/m
-3.76 kN/m

1.17 kN/m
-7.52 kN/m -3.10 kN/m
3.14 kN/m
-1.53
-3.76kN/m
kN/m 2.50 kN/m
-6.19 kN/m 1.17 kN/m 2.58 kN/m -3.60 kN/m
-1.26 kN/m -3.38 kN/m
-3.10 kN/m -3.10 kN/m 2.65 kN/m
-2.78 kN/m 2.05 kN/m
-7.20 kN/m -2.96 kN/m
-2.78 kN/m -6.19 kN/m 2.58 kN/m 2.18 kN/m
-1.26 kN/m -3.60 kN/m 3.60kN/m
2.50 kN/m
-3.10 kN/m -3.36 kN/m -5.93 kN/m
6.00 kN/m -1.51 kN/m 7.202.05
kN/mkN/mkN/m
6.00 kN/m -2.96 2.96 kN/m
6.00 kN/m
-2.78 kN/m-2.77 kN/m 2.18 kN/m -2.96 kN/m 2.05 kN/m
6.00 kN/m -1.51 kN/m 5.93 kN/m
3.57 kN/m 6.00 kN/m 3.60
1.56kN/m
kN/m
-5.93 kN/m
3.57 kN/m 6.00 kN/m
3.57 kN/m10.00 kN/m 6.00 kN/m 2.96 kN/m
3.57 kN/m10.00 kN/m -2.18 kN/m 6.00 kN/m
-1.24 kN/m 2.96 kN/m
-2.77 kN/m -2.96 kN/m 7.52 kN/m
1.28 kN/m 5.93 kN/m 2.05 kN/m
3.57 kN/m10.00 kN/m -3.76 kN/m
3.57 kN/m10.00 kN/m 1.56 kN/m
3.57 kN/m10.00 kN/m-1.80 kN/m 3.76 kN/m 7.52 kN/m 6.19 kN/m
3.57 kN/m10.00 kN/m 8.73 kN/m
-3.10 kN/m
10.00 kN/m -1.24 kN/m 2.96 kN/m
10.00 kN/m 6.19 kN/m 1.28 kN/m1.28 kN/m
-3.86 kN/m
3.10 kN/m 6.19 kN/m
-1.80 kN/m
4.97 kN/m
-3.10 kN/m -3.18 kN/m 3.10 kN/m
1.28 kN/m
1.23 kN/m 6.19 kN/m
1.42 kN/m
-1.68 kN/m
-3.181.42
kN/m-2.71
kN/mkN/m
3.10 kN/m
1.23 kN/m

1.42-2.71
kN/mkN/m
1.23 kN/m
2.67-1.33
kN/mkN/m

Y
X
Z Load 6

WIND LOAD IN -X DIRECTION (-CPI)

40-007-CS-8180-03043 Revision 02C Page 34 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2.88 kN/m
5.77 kN/m 2.18 kN/m
2.37 kN/m
2.88 kN/m 4.75 kN/m 1.80 kN/m
4.82 kN/m 2.76 kN/m
-2.18 kN/m 5.52 kN/m
2.37 kN/m 2.37 kN/m 3.84 kN/m
-1.80 kN/m -4.82 kN/m 3.97 kN/m
4.75 kN/m 1.80 kN/m 2.27 kN/m
-3.97 kN/m 4.08 kN/m 4.54 kN/m 3.16 kN/m
-3.97 kN/m 2.76 kN/m
2.37 kN/m
-1.80 kN/m 3.97 kN/m 3.36 kN/m 2.27 kN/m
-4.80 kN/m 3.84 kN/m
0.48 kN/m
-2.16 kN/m 2.27 kN/m 4.54 kN/m 3.16 kN/m
4.65 kN/m
4.65 kN/m
-3.97 kN/m-3.95 kN/m 0.96 kN/m 0.40 kN/m
4.65 kN/m -2.16 kN/m 3.36 kN/m 3.16 kN/m
4.65 kN/m
2.76 kN/m 4.65 kN/m 2.400.48
kN/mkN/m 0.79 kN/m
2.76 kN/m 2.88 kN/m 4.65 kN/m 2.27 kN/m
2.76 kN/m7.00 kN/m -3.12 kN/m 4.65-3.95
kN/m -1.78
2.76 kN/m7.00 kN/m 4.65 kN/mkN/mkN/m 0.40 kN/m 0.40 kN/m
2.76 kN/m7.00 kN/m 1.98 kN/m 3.16 kN/m
2.76 kN/m7.00 kN/m2.37 kN/m 2.40 kN/m
1.00 kN/m
0.79 kN/m
2.76 kN/m7.00 kN/m -2.57 kN/m
2.76 kN/m7.00 kN/m -1.78 kN/m 0.50 kN/m
7.00 kN/m 1.00 kN/m0.40 kN/m 0.83 kN/m
7.00 kN/m -5.52 kN/m 1.16 kN/m 1.98 kN/m1.98 kN/m
2.37 kN/m
-2.57 kN/m 0.83 kN/m
-4.54 kN/m 0.41 kN/m
0.83 kN/m
0.66 kN/m 0.41 kN/m 1.98 kN/m
1.90 kN/m
0.19-2.40
kN/mkN/m 0.83 kN/m
-4.54 kN/m-3.87 kN/m
0.19 kN/m
0.41 kN/m
1.90 kN/m
-3.87 kN/m
0.19 kN/m
1.90 kN/m
0.36-1.90
kN/m kN/m

Y
X
Z Load 7

WIND LOAD IN Z DIRECTION (+CPI)

40-007-CS-8180-03043 Revision 02C Page 35 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1.63 kN/m
3.28 kN/m
3.26 kN/m
1.34 kN/m
2.70 kN/m
1.63 kN/m 7.24 kN/m
-3.28 kN/m 2.68 kN/m 1.56 kN/m

1.34-2.70
kN/mkN/m -7.24 kN/m 1.34 kN/m 3.12 kN/m 5.76 kN/m
5.95 kN/m
2.70 kN/m
-5.95kN/m
2.68 kN/m 6.12 kN/m 1.28 kN/m
4.74 kN/m
-5.95 kN/m 2.57 kN/m
1.56 kN/m
1.34-2.70
kN/mkN/m 5.95 kN/m 5.04 kN/m
-7.20 kN/m 1.68 kN/m
1.28 kN/m5.76 kN/m
6.00 kN/m -3.24 kN/m
6.00 kN/m 1.28 kN/m 4.74 kN/m
2.57 kN/m 3.36 kN/m
6.00-5.95
kN/m kN/m-5.93 kN/m
-3.24 kN/m
1.38 kN/m
6.00 kN/m 5.04 kN/m 4.74 kN/m
3.57 kN/m 6.00 kN/m 3.601.68
kN/m
kN/m 2.77 kN/m
3.57 kN/m 6.00 kN/m
3.57 kN/m10.00 kN/m -4.68 kN/m 6.00 -5.93
1.63 kN/m kN/m
-2.67
kN/mkN/m
1.28 kN/m 1.38 kN/m
3.57 kN/m10.00 kN/m 6.00 kN/m 1.38 kN/m
3.57 kN/m10.00 kN/m 2.96 kN/m 3.51 kN/m 4.74 kN/m
3.57 kN/m10.00 kN/m 3.60 kN/m2.77 kN/m
3.57 kN/m10.00 kN/m -3.85 kN/m
3.57 kN/m10.00 1.34
kN/m
kN/m 1.76 kN/m
3.51 kN/m 2.89 kN/m
10.00 kN/m -2.67 kN/m 1.38 kN/m
10.00 kN/m -8.28 kN/m 4.07 kN/m 2.96 kN/m2.96 kN/m
2.89 kN/m
-3.85 kN/m
1.34 kN/m -6.81 kN/m 1.44 kN/m
2.89 kN/m
2.32 kN/m 1.44 kN/m
2.84 kN/m 2.96 kN/m
0.66 -3.60
kN/mkN/m 2.89 kN/m
-5.81 kN/m
-6.81 kN/m
0.66 kN/m
1.44 kN/m
2.84 kN/m
-5.81 kN/m
0.66 kN/m
2.84 kN/m
1.24-2.84
kN/mkN/m

Y
X
Z Load 8

WIND LOAD IN Z DIRECTION (-CPI)

40-007-CS-8180-03043 Revision 02C Page 36 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2.18-0.50
kN/mkN/m

-1.00 kN/m
1.80-0.41
kN/mkN/m
-0.50 kN/m 4.82 kN/m
-2.18 kN/m -0.83 kN/m -0.48 kN/m
3.84 kN/m
-1.80 kN/m -4.82 kN/m
-0.41 kN/m 1.80-0.41
3.97kN/m
kN/m kN/m
4.08 kN/m -0.96 kN/m
-3.97 kN/m -0.40 kN/m
-0.83 kN/m 3.16 kN/m
-3.97 kN/m
-1.80 kN/m 3.97 kN/m 3.36 kN/m -0.48 kN/m -0.79 kN/m
-0.41 kN/m -4.80 kN/m
-2.16 kN/m 3.84 kN/m
-0.40 kN/m
4.65 kN/m 3.16 kN/m -2.76 kN/m
4.65 kN/m
-3.97 kN/m-3.95 kN/m -0.40 kN/m
4.65 kN/m -2.16 kN/m 3.36 kN/m -0.79 kN/m 3.16 kN/m
-2.27 kN/m
4.65 kN/m
2.76 kN/m 4.65 kN/m 2.40 kN/m -5.52 kN/m
2.76 kN/m 4.65 kN/m
2.76 kN/m7.00 kN/m -3.12 kN/m 4.65-3.95
kN/m -1.78 -2.76 kN/m
2.76 kN/m7.00 kN/m -0.50 kN/m 4.65 kN/mkN/mkN/m -0.40 kN/m -4.54 kN/m
2.76 kN/m7.00 kN/m 1.98 kN/m
-2.27 kN/m 3.16 kN/m
-2.27 kN/m
2.76 kN/m7.00 kN/m 2.40 kN/m
2.76 kN/m7.00 kN/m -2.57 kN/m
-0.41 kN/m
2.76 kN/m7.00 kN/m -1.78 kN/m
7.00 kN/m -2.88 kN/m -4.54 kN/m
-5.77 kN/m
7.00 kN/m -5.52 kN/m 1.98 kN/m 1.98 kN/m
-2.27 kN/m
-4.75 kN/m
-2.57 kN/m -4.54 kN/m -5.77 kN/m
-0.41 kN/m
-2.37-6.69
kN/m kN/m -4.75 kN/m
1.90 kN/m 1.98 kN/m
-2.40 kN/m -2.37 kN/m
-3.81
-1.09 kN/m
kN/m -4.75 kN/m
-3.87
-4.54 kN/m kN/m
-1.09 kN/m -4.75 kN/m
1.90 kN/m
-2.37 kN/m
-3.87 kN/m
-1.09 kN/m
1.90 kN/m
-1.90 kN/m
-2.04 kN/m

Y
X
Z Load 9

WIND LOAD IN -Z DIRECTION (+CPI)

40-007-CS-8180-03043 Revision 02C Page 37 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

-1.76 kN/m
3.28 kN/m

-3.51 kN/m 2.70-1.44


kN/mkN/m
-1.76 kN/m 7.24 kN/m
-3.28 kN/m
-2.89 kN/m 5.76 kN/m-1.68 kN/m
-2.70 kN/m -7.24 kN/m 2.70-1.44 5.95 kN/m
kN/m
-1.44 kN/m
-5.95 kN/m 6.12 kN/m -3.36 kN/m -1.38 kN/m
4.74 kN/m
-5.95 kN/m
-2.89 kN/m
-2.70 kN/m 5.95 kN/m 5.04 kN/m -1.68 kN/m -2.77 kN/m
-1.44 kN/m -7.20 kN/m 5.76 kN/m
6.00 kN/m -3.24 kN/m -1.38 kN/m -1.56 kN/m
6.00 kN/m 4.74 kN/m
-5.95
6.00 kN/m kN/m -5.93 kN/m -1.38 kN/m
6.00 kN/m -3.24 kN/m 5.04 kN/m -2.77 kN/m 4.74 kN/m kN/m
-3.12 kN/m
-1.28
3.57 kN/m 6.00 kN/m 3.60 kN/m
3.57 kN/m 6.00 kN/m -1.56 kN/m
3.57 kN/m10.00 kN/m -4.68 kN/m 6.00 -5.93
kN/m -2.57 kN/m
3.57 kN/m10.00 kN/m -2.67
6.00 kN/mkN/mkN/m -1.38 kN/m
3.57 kN/m10.00 kN/m -1.76 kN/m 2.96 -1.28
kN/mkN/m -1.28 kN/m
4.74 kN/m
3.57 kN/m10.00 kN/m 3.60 kN/m
3.57 kN/m10.00 kN/m -3.85 kN/m
3.57 kN/m10.00 kN/m
-1.44 kN/m -2.57 kN/m
-3.26 kN/m
10.00 kN/m -2.67 kN/m -1.63 kN/m
10.00 kN/m -8.28 kN/m -1.28 2.96 kN/m
kN/mkN/m-2.68 kN/m
2.96kN/m
-3.26
-3.85 kN/m -6.81 kN/m -3.78 kN/m
-1.44 kN/m -1.34 kN/m -2.68 kN/m
2.84-1.34
kN/mkN/m 2.96 kN/m
-2.68 kN/m
-2.15 kN/m
-3.60 kN/m
-0.62 kN/m
-5.81 kN/m
-6.81 kN/m -2.68 kN/m
-0.62 kN/m
2.84-1.34
kN/mkN/m
-5.81 kN/m
-0.62 kN/m
2.84 kN/m
-2.84 kN/m
-1.16 kN/m

Y
X
Z Load 10

WIND LOAD IN -Z DIRECTION (-CPI)

40-007-CS-8180-03043 Revision 02C Page 38 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

9.0 STAAD INPUT & OUTPUT

************************************************
****
* *
* STAAD.Pro V8i SELECTseries2 *
* Version 20.07.07.32 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= OCT 14, 2013 *
* Time= 10:54:46 *
* *
* USER ID: ple *
****************************************************

1. STAAD SPACE
INPUT FILE: Main Substation_Pile Calc.STD
2. START JOB INFORMATION
3. ENGINEER DATE 31-JUL-13
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. PAGE LENGTH 10000
7. UNIT METER KN
8. JOINT COORDINATES
9. 1 4.1 -2 0; 2 11 -2 0; 3 16.225 -2 0; 4 21.45 -2 0; 5 26.45 -2 0;
6 31.45 -2 0
10. 7 11 -2 5; 8 16.225 -2 5; 9 21.45 -2 5; 10 0 -2 -6.5; 11 4.1 -2 -
6.5
11. 12 11 -2 -6.5; 13 16.225 -2 -6.5; 14 21.45 -2 -6.5; 15 26.45 -2 -8
12. 16 31.45 -2 -8; 17 11 -2 -11; 18 16.225 -2 -11; 19 21.45 -2 -11
13. 20 11 -2 -16.5; 21 16.225 -2 -16.5; 22 21.45 -2 -16.5; 23 11 -2 -
21.05
14. 24 16.225 -2 -21.05; 25 21.45 -2 -21.05; 26 0 -2 -16.5; 27 11 -2
9.8
15. 28 6.5 -2 9.8; 29 4.1 -2 5; 30 4.1 -2 -16.5; 31 21.45 -1.5 -8
16. 32 26.45 -1.5 -8; 33 11 -1.5 5; 34 31.45 -1.5 -8; 35 16.225 -1.5 -
21.05
17. 36 16.225 -1.5 -11; 37 11 -1.5 -21.05; 38 11 -1.5 -6.5; 39 21.45 -
1.5 -21.05
18. 40 21.45 -1.5 -16.5; 41 11 -1.5 -11; 42 26.45 -1.5 0; 43 11 -1.5 0
19. 44 16.225 -1.5 -16.5; 45 4.1 -1.5 0; 46 31.45 -1.5 0; 47 21.45 -
1.5 0
20. 48 16.225 -1.5 5; 50 16.225 -1.5 0; 51 16.225 -1.5 -6.5; 52 21.45
-1.5 -6.5
21. 53 21.45 -1.5 -11; 54 21.45 -1.5 5; 55 4.1 -1.5 -6.5; 56 11 -1.5 -
16.5
22. 60 4.1 -1.5 5; 61 0 0.3 -6.5; 62 4.1 0.3 0; 63 11 0.3 0; 64 21.45
0.3 0
23. 65 26.45 0.3 0; 66 31.45 0.3 0; 67 11 0.3 5; 68 16.225 0.3 5; 69
21.45 0.3 5

40-007-CS-8180-03043 Revision 02C Page 39 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

24. 70 4.1 0.3 -6.5; 71 11 0.3 -6.5; 72 21.45 0.3 -6.5; 73 26.45 0.3 -
8
25. 74 31.45 0.3 -8; 75 11 0.3 -11; 76 21.45 0.3 -11; 77 11 0.3 -16.5
26. 78 21.45 0.3 -16.5; 79 11 0.3 -21.05; 80 16.225 0.3 -21.05
27. 81 21.45 0.3 -21.05; 82 21.45 0.3 -8; 83 0 0.3 -16.5; 84 4.1 0.3 5
28. 85 6.5 0.3 9.8; 86 11 0.3 9.8; 87 6.5 0.3 5; 88 4.1 0.3 -16.5; 89
4.1 3 0
29. 90 11 3 0; 91 16.225 3 0; 92 21.45 3 0; 93 26.45 3 0; 94 31.45 3
0; 95 11 3 5
30. 96 16.225 3 5; 97 21.45 3 5; 98 0 3 -6.5; 99 4.1 3 -6.5; 100 11 3
-6.5
31. 101 16.225 3 -6.5; 102 21.45 3 -6.5; 103 26.45 3 -8; 104 31.45 3 -
8
32. 105 11 3 -11; 106 16.225 3 -11; 107 21.45 3 -11; 108 11 3 -16.5
33. 109 16.225 3 -16.5; 110 21.45 3 -16.5; 111 11 3 -21.05; 112 16.225
3 -21.05
34. 113 21.45 3 -21.05; 114 21.45 3 -8; 115 12.41 3 0; 116 12.41 3 5
35. 117 12.41 3 -6.5; 118 14.04 3 -11; 119 14.04 3 -16.5; 120 14.04 3
-21.05
36. 121 13.265 3 0; 122 13.265 3 5; 123 13.265 3 -6.5; 124 14.68 3 -11
37. 125 14.68 3 -16.5; 126 14.68 3 -21.05; 127 16.826 3 0; 128 16.826
3 5
38. 129 16.826 3 -6.5; 130 16.826 3 -11; 131 16.826 3 -16.5; 132
16.826 3 -21.05
39. 133 18.83 3 0; 134 18.83 3 5; 135 18.83 3 -6.5; 136 18.83 3 -11
40. 137 18.83 3 -16.5; 138 18.83 3 -21.05; 139 19.585 3 0; 140 19.585
3 5
41. 141 19.585 3 -6.5; 142 19.585 3 -11; 143 19.585 3 -16.5; 144
19.585 3 -21.05
42. 149 0 3 -16.5; 150 4.1 3 -16.5; 151 10.5 3 -16.5; 152 10.5 3 -6.5
43. 153 0 3 -11.5; 154 4.1 3 -11.5; 155 10.5 3 -11.5; 156 16.225 3 -
22.65
44. 157 14.04 3 -6.9; 158 11.94 3 -21.05; 159 11.94 3 -16.5; 160 11.94
3 -11
45. 161 11.94 3 -6.9; 162 18.835 3 -22.65; 163 4.1 3 5; 164 1.36667 3
-16.5
46. 165 2.73333 3 -16.5; 166 5.38 3 -16.5; 167 6.66 3 -16.5; 168 7.94
3 -16.5
47. 169 9.22 3 -16.5; 170 0 3 -15.25; 171 0 3 -14; 172 0 3 -12.75; 173
0 3 -10.25
48. 174 0 3 -9; 175 0 3 -7.75; 176 4.1 3 -15.25; 177 4.1 3 -14; 178
4.1 3 -12.75
49. 179 4.1 3 -10.25; 180 4.1 3 -9; 181 4.1 3 -7.75; 182 10.5 3 -15.25
50. 183 10.5 3 -14; 184 10.5 3 -12.75; 185 10.5 3 -10.25; 186 10.5 3 -
9
51. 187 10.5 3 -7.75; 188 14.68 3 -6.5; 189 14.04 3 -6.5; 190 11.94 3
-6.5
52. 191 0 4 -16.5; 192 4.1 4 -16.5; 193 10.5 4 -16.5; 194 11 4 -16.5
53. 195 1.36667 4 -16.5; 196 2.73333 4 -16.5; 197 5.38 4 -16.5; 198
6.66 4 -16.5
54. 199 7.94 4 -16.5; 200 9.22 4 -16.5; 201 11 4.1 5; 202 4.1 4.1 5
55. 203 6.5 4.1 9.8; 204 11 4.1 9.8; 205 6.5 4.1 5; 206 11 4.1 7.4
56. 207 6.5 4.1 7.4; 208 0 4.12563 -15.25; 209 4.1 4.12563 -15.25
57. 210 10.5 4.12563 -15.25; 211 0 4.25125 -14; 212 4.1 4.25125 -14
40-007-CS-8180-03043 Revision 02C Page 40 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

58. 213 10.5 4.25125 -14; 214 0 4.37687 -12.75; 215 4.1 4.37687 -12.75
59. 216 10.5 4.37687 -12.75; 217 0 4.5025 -11.5; 218 4.1 4.5025 -11.5
60. 219 10.5 4.5025 -11.5; 220 0 4.62813 -10.25; 221 4.1 4.62813 -
10.25
61. 222 10.5 4.62813 -10.25; 223 0 4.75375 -9; 224 4.1 4.75375 -9
62. 225 10.5 4.75375 -9; 226 0 4.87937 -7.75; 227 4.1 4.87937 -7.75
63. 228 10.5 4.87937 -7.75; 229 0 5.005 -6.5; 230 4.1 5.005 -6.5
64. 231 10.5 5.005 -6.5; 232 11 5.005 -6.5; 234 4.1 6.5 0; 235 11 6.5
5
65. 236 4.1 6.5 5; 237 11 6.5 0; 238 4.1 6.5 -6.5; 239 11 6.5 -6.5
66. 240 4.1 6.5 -3.25; 241 11 6.5 -3.25; 242 4.1 6.5 2.5; 243 11 6.5
2.5
67. 244 11 9 0; 245 21.45 9 0; 246 26.45 9 0; 247 31.45 9 0; 248 11 9
5
68. 249 16.225 9 5; 250 21.45 9 5; 251 11 9 -6.5; 252 21.45 9 -6.5;
253 26.45 9 -8
69. 254 31.45 9 -8; 255 11 9 -11; 256 21.45 9 -11; 257 11 9 -16.5
70. 258 21.45 9 -16.5; 259 11 9 -21.05; 260 16.225 9 -21.05; 261 21.45
9 -21.05
71. 262 21.45 9 -8; 263 11 9 -3.25; 264 16.225 9 0; 265 16.225 9 -6.5
72. 266 16.225 9 -11; 267 16.225 9 -16.5; 268 21.45 9 -3.25; 269 11 9
-18.775
73. 270 11 9 -13.75; 271 11 9 2.5; 272 21.45 9 -18.775; 273 21.45 9 -
13.75
74. 274 21.45 9 2.5; 275 16.225 9 -18.775; 276 16.225 9 2.5; 277
16.225 9 -13.75
75. 278 11 9 -8; 279 31.45 9 -5.66667; 280 31.45 9 -2.83333; 281 21.45
9 -5.66667
76. 282 21.45 9 -2.83333; 283 26.45 9 -2.83333; 284 26.45 9 -5.66667
77. 285 16.225 9 -3.25; 286 16.225 9 -8; 287 2.05 3 -11.5; 288 7.3 3 -
11.5
78. 289 2.05 4.5025 -11.5; 290 7.3 4.5025 -11.5; 295 4.1 3 2.8; 296 11
3 2.8
79. 297 7.85 3 2.8; 298 9.35 3 2.8; 300 7.85 3 -4.7; 303 16.225 3 6.6
80. 304 21.45 3 6.6; 305 2 6.5 0; 306 2 6.5 5; 307 2 6.5 -6.5; 308 2
6.5 -3.25
81. 309 2 6.5 2.5; 310 9.35 3 -4.7; 312 6.15 3 2.8; 313 6.15 3 5; 314
8.95 3 2.8
82. 315 8.95 3 5; 316 6.15 3 3.7; 317 8.95 3 3.7; 319 2.5 3 -4.7
83. 321 6.15 3 -1.19209E-007; 323 9.35 3 -6.5; 325 6.15 3 -4.7; 326
4.1 3 -4.7
84. MEMBER INCIDENCES
85. 1 1 45; 2 2 43; 3 3 50; 4 4 47; 5 5 42; 6 6 46; 7 7 33; 8 8 48; 9
9 54
86. 11 11 55; 12 12 38; 13 13 51; 14 14 52; 15 15 32; 16 16 34; 17 17
41; 18 18 36
87. 19 19 53; 20 20 56; 21 21 44; 22 22 40; 23 23 37; 24 24 35; 25 25
39; 26 27 86
88. 27 28 85; 28 29 60; 29 45 43; 30 43 50; 31 50 47; 32 47 42; 33 42
46; 34 33 48
89. 35 48 54; 37 55 38; 38 38 51; 39 51 52; 40 32 34; 41 41 36; 42 36
53; 43 56 44
90. 44 44 40; 45 37 35; 46 35 39; 47 55 45; 48 37 56; 49 56 41; 50 41
38; 51 38 43
40-007-CS-8180-03043 Revision 02C Page 41 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

91. 52 43 33; 53 35 44; 54 44 36; 55 36 51; 56 51 50; 57 50 48; 58 39


40; 59 40 53
92. 60 53 31; 61 52 47; 62 47 54; 63 32 42; 64 34 46; 65 31 52; 66 31
32; 69 33 60
93. 72 45 60; 73 26 83; 74 30 88; 75 33 67; 76 34 74; 77 35 80; 78 37
79; 79 32 73
94. 80 38 71; 81 39 81; 82 40 78; 83 41 75; 84 42 65; 85 43 63; 86 45
62; 87 46 66
95. 88 47 64; 89 48 68; 90 52 72; 91 53 76; 92 54 69; 93 55 70; 94 56
77; 95 60 84
96. 96 10 61; 99 64 65; 100 65 66; 101 67 68; 102 68 69; 103 70 71;
104 73 74
97. 105 79 80; 106 80 81; 107 79 77; 108 77 75; 109 75 71; 110 63 67;
111 81 78
98. 112 78 76; 113 76 82; 114 72 64; 115 64 69; 116 74 66; 117 82 72;
118 82 73
99. 119 62 84; 120 84 87; 121 70 62; 122 71 63; 123 67 86; 124 87 67;
125 87 85
100. 126 85 86; 127 36 106; 128 44 109; 129 50 91; 130 51 101; 131 62
89; 132 63 90
101. 133 64 92; 134 65 93; 135 66 94; 136 67 95; 137 68 96; 138 69 97;
139 61 98
102. 140 70 99; 141 71 100; 142 72 102; 143 73 103; 144 74 104; 145 75
105
103. 146 76 107; 147 77 108; 148 78 110; 149 79 111; 150 80 112; 151 81
113
104. 152 83 149; 153 84 163; 154 88 150; 155 85 203; 156 86 204; 159 92
93
105. 160 93 94; 161 95 116; 162 98 99; 163 99 323; 164 100 190; 165 103
104
106. 166 105 160; 167 108 159; 168 111 158; 169 99 326; 170 111 108;
171 108 105
107. 172 105 100; 173 100 90; 174 90 296; 175 113 110; 176 110 107; 177
107 114
108. 178 102 92; 179 92 97; 180 104 94; 181 114 102; 182 114 103; 183
115 121
109. 184 116 122; 185 117 123; 186 118 124; 187 119 125; 188 120 126;
189 120 119
110. 190 119 118; 191 118 157; 192 117 115; 193 115 116; 194 121 91;
195 122 96
111. 196 123 189; 197 124 106; 198 125 109; 199 126 112; 200 126 125;
201 125 124
112. 202 124 188; 203 123 121; 204 121 122; 205 91 127; 206 96 128; 207
101 129
113. 208 106 130; 209 109 131; 210 112 132; 211 112 109; 212 109 106;
213 106 101
114. 214 101 91; 215 91 96; 216 127 133; 217 128 134; 218 129 135; 219
130 136
115. 220 131 137; 221 132 138; 222 132 131; 223 131 130; 224 130 129;
225 129 127
116. 226 127 128; 227 133 139; 228 134 140; 229 135 141; 230 136 142;
231 137 143
117. 232 138 137; 233 137 136; 234 136 135; 235 135 133; 236 133 134;
237 139 92
40-007-CS-8180-03043 Revision 02C Page 42 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

118. 238 140 97; 239 141 102; 240 142 107; 241 143 110; 242 144 113;
243 144 143
119. 244 143 142; 245 142 141; 246 141 139; 247 139 140; 254 149 164;
255 150 166
120. 256 149 170; 257 150 176; 258 151 108; 259 151 182; 260 152 100;
261 156 112
121. 262 158 120; 263 159 119; 264 158 159; 265 160 118; 266 159 160;
267 161 157
122. 268 160 161; 269 153 287; 270 154 288; 271 149 287; 272 150 287;
273 150 288
123. 274 151 288; 275 162 138; 276 138 144; 277 163 313; 278 89 295;
279 164 165
124. 280 165 150; 281 166 167; 282 167 168; 283 168 169; 284 169 151;
285 170 171
125. 286 171 172; 287 172 153; 288 153 173; 289 173 174; 290 174 175;
291 175 98
126. 292 176 177; 293 177 178; 294 178 154; 295 179 180; 296 180 181;
297 181 99
127. 298 182 183; 299 183 184; 300 184 155; 301 185 186; 302 186 187;
303 187 152
128. 304 188 101; 305 189 188; 306 157 189; 307 190 117; 308 161 190;
309 154 179
129. 310 155 185; 311 108 194; 312 149 191; 313 150 192; 314 149 195;
315 150 196
130. 316 165 195; 317 164 196; 318 164 195; 319 165 196; 320 150 197;
321 200 151
131. 322 169 200; 323 168 199; 324 167 198; 325 166 197; 326 197 167;
327 198 168
132. 328 168 200; 329 151 193; 330 95 201; 331 163 202; 333 149 208;
335 176 209
133. 336 150 209; 343 177 212; 349 178 215; 354 154 218; 358 179 221;
364 180 224
134. 371 181 227; 377 191 195; 378 192 197; 379 193 194; 380 195 196;
381 196 192
135. 382 197 198; 383 198 199; 384 199 200; 385 200 193; 386 98 229;
387 99 230
136. 388 100 232; 389 152 231; 391 191 208; 392 192 209; 393 193 210;
394 202 205
137. 395 201 206; 396 205 201; 397 205 207; 398 203 204; 399 206 204;
400 207 203
138. 401 207 206; 402 208 211; 403 209 212; 404 210 213; 405 211 214;
406 212 215
139. 407 213 216; 408 214 217; 409 215 218; 410 216 219; 411 191 289;
412 192 289
140. 413 192 290; 414 193 290; 415 217 220; 416 218 221; 417 219 222;
418 220 223
141. 419 221 224; 420 222 225; 421 89 234; 422 90 237; 423 223 226; 424
224 227
142. 425 225 228; 426 226 229; 427 227 230; 428 228 231; 429 231 232;
430 229 230
143. 431 201 235; 432 202 236; 433 230 238; 434 232 239; 435 92 245;
436 93 246
144. 437 96 249; 438 97 250; 439 102 252; 440 103 253; 441 105 255; 442
107 256
40-007-CS-8180-03043 Revision 02C Page 43 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

145. 443 110 258; 444 111 259; 445 112 260; 446 113 261; 447 94 247;
448 104 254
146. 449 236 235; 450 234 242; 451 234 237; 452 238 239; 453 238 240;
454 239 241
147. 455 240 234; 456 241 237; 457 240 241; 458 237 243; 459 194 257;
460 242 236
148. 461 243 235; 462 242 243; 463 235 248; 464 237 244; 465 239 251;
466 244 264
149. 467 245 246; 468 246 247; 469 248 249; 470 249 250; 471 251 265;
472 253 254
150. 473 255 266; 474 257 267; 475 259 260; 476 260 261; 477 259 269;
478 257 270
151. 479 255 278; 480 244 271; 481 261 272; 482 258 273; 483 256 262;
484 252 281
152. 485 245 274; 486 253 284; 487 254 279; 488 262 252; 489 262 253;
490 260 275
153. 491 264 245; 492 265 252; 493 266 256; 494 267 258; 495 264 276;
496 265 285
154. 497 266 286; 498 267 277; 499 268 282; 500 263 285; 501 269 257;
502 270 255
155. 503 271 248; 504 272 258; 505 273 256; 506 274 250; 507 275 267;
508 276 249
156. 509 277 266; 510 269 275; 511 275 272; 512 270 277; 513 277 273;
514 271 276
157. 515 276 274; 516 278 251; 517 278 286; 518 279 280; 519 280 247;
520 281 268
158. 521 281 284; 522 282 245; 523 282 283; 524 283 246; 525 284 283;
526 285 264
159. 527 286 265; 528 285 268; 529 286 262; 530 284 279; 531 283 280;
532 251 263
160. 533 263 244; 534 287 154; 535 288 155; 536 287 99; 537 287 98; 538
288 152
161. 539 288 99; 548 289 230; 549 289 229; 550 217 289; 551 290 231;
552 290 230
162. 553 218 290; 554 289 218; 555 290 219; 556 61 70; 562 295 163; 563
296 95
163. 564 295 312; 565 297 314; 566 297 300; 567 298 296; 568 298 310;
574 96 303
164. 575 97 304; 576 234 305; 577 236 306; 578 238 307; 581 305 309;
582 307 308
165. 585 176 212; 586 177 215; 587 178 218; 588 227 99; 589 224 181;
590 221 180
166. 591 218 179; 592 182 210; 593 151 210; 594 183 213; 595 184 216;
596 155 219
167. 597 185 222; 598 186 225; 599 187 228; 600 182 213; 601 183 216;
602 184 219
168. 603 228 152; 604 225 187; 605 222 186; 606 219 185; 607 170 208;
608 171 211
169. 609 172 214; 610 153 217; 611 173 220; 612 174 223; 613 175 226;
614 170 211
170. 615 171 214; 616 172 217; 617 226 98; 618 223 175; 619 220 174;
620 217 173
171. 621 308 305; 622 240 308; 623 309 306; 624 242 309; 626 300 310;
629 312 297
40-007-CS-8180-03043 Revision 02C Page 44 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

172. 630 313 315; 631 312 316; 632 314 298; 633 315 95; 634 314 317;
635 316 313
173. 636 317 315; 637 316 317; 639 319 326; 641 312 321; 643 326 325;
646 323 152
174. 647 310 323; 649 90 115; 651 326 89; 652 325 300; 653 89 321; 654
321 325
175. START GROUP DEFINITION
176. FLOOR
177. _3.00MLEVELFLOOR 164 166 TO 168 170 TO 172 175 TO 177 181 185 TO
191 -
178. 196 TO 202 207 TO 213 218 TO 224 229 TO 234 239 TO 245 262 TO 268
276 304 -
179. 305 TO 308
180. _3.00MLVLHTFLOOR 161 163 164 169 173 174 178 179 183 TO 185 192 TO
196 203 -
181. 204 TO 207 214 TO 218 225 TO 229 235 TO 239 246 247 260 277 278
304 305 307 -
182. 562 TO 568 626 629 TO 637 641 643 646 647 649 651 TO 654
183. _9.00MLVLROOF 466 TO 533
184. _6.5MLVLROOF 449 TO 458 460 TO 462 576 TO 578 581 582 621 TO 624
185. _4.1MLVLROOF 395 TO 400
186. JOINT
187. END GROUP DEFINITION
188. DEFINE MATERIAL START
189. ISOTROPIC CONCRETE
190. E 2.17185E+007
191. POISSON 0.17
192. DENSITY 23.5616
193. ALPHA 1E-005
194. DAMP 0.05
195. ISOTROPIC STEEL
196. E 2.05E+008
197. POISSON 0.3
198. DENSITY 76.8195
199. ALPHA 1.2E-005
200. DAMP 0.03
201. END DEFINE MATERIAL
202. MEMBER PROPERTY BRITISH
203. 1 3 6 TO 9 11 13 16 18 21 23 TO 28 75 TO 78 81 86 87 89 92 93 95
96 -
204. 127 TO 131 135 TO 140 144 149 TO 151 153 155 156 330 331 386 387
421 431 -
205. 432 TO 433 437 438 444 TO 448 463 PRIS YD 0.4 ZD 0.6
206. MEMBER PROPERTY BRITISH
207. 73 74 PRIS YD 0.6 ZD 0.6
208. 2 4 5 12 14 15 17 19 20 22 79 80 82 TO 85 88 90 91 94 132 TO 134
141 TO 143 -
209. 145 TO 148 311 388 422 434 TO 436 439 TO 443 459 464 -
210. 465 PRIS YD 0.8 ZD 0.4
211. MEMBER PROPERTY BRITISH
212. 29 TO 35 37 TO 62 65 66 69 72 PRIS YD 0.4 ZD 0.3
213. 451 467 TO 470 472 475 476 489 576 PRIS YD 0.5 ZD 0.35
214. 162 169 TO 176 178 179 277 278 562 TO 565 567 568 575 626 629 630
632 633 -
40-007-CS-8180-03043 Revision 02C Page 45 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

215. 639 643 647 651 TO 653 PRIS YD 0.6 ZD 0.4


216. 189 TO 193 200 TO 204 222 TO 226 232 TO 236 243 TO 247 264 266 TO
268 275 -
217. 306 308 566 631 634 TO 637 641 654 PRIS YD 0.5 ZD 0.3
218. 161 168 177 181 184 188 195 199 206 210 217 221 228 238 242 262 -
219. 276 PRIS YD 0.6 ZD 0.4
220. 163 164 166 167 183 185 TO 187 194 196 TO 198 205 207 TO 209 216
218 TO 220 -
221. 227 229 TO 231 237 239 TO 241 260 263 265 304 305 307 646 -
222. 649 PRIS YD 0.6 ZD 0.4
223. 63 64 401 462 624 PRIS YD 0.5 ZD 0.3
224. 466 471 473 474 491 TO 494 PRIS YD 0.8 ZD 0.4
225. 430 457 500 510 TO 515 517 521 523 528 TO 531 622 PRIS YD 0.5 ZD
0.3
226. 99 TO 126 394 TO 400 449 450 452 TO 456 458 460 461 556 577 -
227. 578 PRIS YD 0.5 ZD 0.35
228. 159 160 165 180 182 477 TO 488 490 495 TO 499 501 TO 509 516 518
TO 520 522 -
229. 524 TO 527 532 533 PRIS YD 0.6 ZD 0.4
230. MEMBER PROPERTY BRITISH
231. 211 TO 215 261 574 PRIS YD 0.6 ZD 0.4
232. MEMBER PROPERTY BRITISH
233. 581 582 621 623 PRIS YD 0.4 ZD 0.3
234. MEMBER PROPERTY BRITISH
235. 152 154 312 313 TABLE ST UC203X203X46
236. 254 TO 259 279 TO 303 309 310 377 TO 385 391 TO 393 402 TO 410 415
TO 420 -
237. 423 TO 428 TABLE D CH152X89 SP 0.01
238. 389 TABLE ST UA90X90X8
239. 429 TABLE ST CH200X75X23
240. 314 TO 329 333 335 336 343 349 354 358 364 371 585 TO 620 TABLE ST
CH152X89
241. 269 TO 274 411 TO 414 534 TO 539 548 TO 555 TABLE ST UA100X100X10
242. CONSTANTS
243. BETA 90 MEMB 1 3 5 TO 9 11 13 15 16 18 21 23 TO 25 28 75 TO 79 81
84 86 87 -
244. 89 92 93 95 127 TO 131 134 TO 138 140 143 144 149 TO 156 312 313
330 331 -
245. 387 421 431 TO 433 436 TO 438 440 444 TO 448 463
246. MATERIAL CONCRETE MEMB 1 TO 9 11 TO 35 37 TO 66 69 72 TO 96 99 TO
151 153 -
247. 155 156 159 TO 247 260 TO 268 275 TO 278 304 TO 308 311 330 331
386 TO 388 -
248. 394 TO 401 421 422 430 TO 533 556 562 TO 568 574 TO 578 581 582
621 TO 624 -
249. 626 629 TO 637 639 641 643 646 647 649 651 TO 654
250. MATERIAL STEEL MEMB 152 154 254 TO 259 269 TO 274 279 TO 303 309
310 -
251. 312 TO 329 333 335 336 343 349 354 358 364 371 377 TO 385 389 391
TO 393 -
252. 402 TO 420 423 TO 429 534 TO 539 548 TO 555 585 TO 620
253. MEMBER RELEASE
254. 66 118 125 182 189 192 200 203 222 243 254 TO 257 259 264 267 377
378 389 -
40-007-CS-8180-03043 Revision 02C Page 46 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

255. 391 TO 393 397 401 429 500 510 512 514 517 521 523 564 566 582 634
-
256. 637 START MY MZ
257. 193 202 204 226 236 247 258 267 280 306 308 379 381 401 457 462
511 513 515 -
258. 528 530 531 566 567 576 622 TO 624 626 635 TO 637 647 653 654 END
MY MZ
259. 291 297 303 426 TO 428 END FX MY MZ
260. 568 START MY MZ
261. SUPPORTS
262. 1 TO 9 11 TO 25 29 PINNED
263. 10 26 TO 28 30 FIXED
264.
**************************************************************************
*****
265. MEMBER TRUSS
266. 271 TO 274 314 TO 329 333 335 336 343 349 354 358 364 371 411 TO
414 -
267. 536 TO 539 548 549 551 552 585 TO 620
268.
**************************************************************************
*****
269. LOAD 1 LOADTYPE DEAD TITLE DEAD LOAD
270. SELFWEIGHT Y -1
271. FLOOR LOAD
272. _3.00MLEVELFLOOR FLOAD -7.8 GY
**WARNING** about Floor/OneWay Loads/Weights.
Please note that depending on the shape of the floor you may
have to break up the FLOOR/ONEWAY LOAD into multiple commands.
For details please refer to Technical Reference Manual
Section 5.32.4 Note 6.

273. _3.00MLVLHTFLOOR FLOAD -7.8 GY


274. _9.00MLVLROOF FLOAD -7.75 GY
275. _6.5MLVLROOF FLOAD -7.75 GY
276. _4.1MLVLROOF FLOAD -7.75 GY
277. MEMBER LOAD
278. ****WALL LOAD ON PLINTH BEAMS (EXCLUDING SP POWE GRID AREA)=
(2.7-.5) X 0.35 X
279. 99 TO 122 124 556 UNI GY -14
280. ****WALL LOAD ON PLINTH BEAMSSP POWE GRID AREA= (3.8-.5) X 0.35 X
20 = 23.1 KN/
281. 123 125 126 UNI GY -21.7
282. ****WALL LOAD ON FIRST FLOOR BEAMS = (6.0-.5) X 0.35 X 20 = 38.5
KN/M
283. MEMBER LOAD
284. 159 TO 161 165 168 170 TO 182 184 188 195 199 206 210 217 221 228
238 242 -
285. 262 276 563 637 UNI GY -38.5
286. ****WALL LOAD ON FIRST FLOOR BEAMS = (2.0-.5) X 0.35 X 20 = 10.5
KN/M
287. MEMBER LOAD
288. 162 UNI GY -10.5
289. ****LOAD FROM PARAPET WALL = 1 X 0.15 X 25 = 3.75 KN/M
40-007-CS-8180-03043 Revision 02C Page 47 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

290. 395 397 TO 400 449 452 467 TO 470 472 475 TO 483 485 487 489 501
TO 506 516 -
291. 518 519 532 533 577 578 581 582 621 623 UNI GY -3.75
292. *LOAD ON TRUSS 0.5KN/SQM
293. 391 402 405 408 415 418 423 426 UNI GY -1.025
294. 392 403 406 409 416 419 424 427 UNI GY -2.75
295. 393 404 407 410 417 420 425 428 UNI GY -1.725
296.
********************************************************************
297. ***LOAD FROM STAIRS (DEAD)
298.
********************************************************************
299. *LENGTH OF SOFFIT SLAB = 6.0 M
300. **UNIT WEIGHT OF SOFFIT SLAB = 1*1*0.20X25 = 5 KN/SQ.M
301. **UNIT WEIGHT OF FLOOR FINISH = (0.50+0.025)*24 = 1.8 KN/SQ.M
302. **LOAD COMING ON TO LANDING BEAM = 6.0/2* (5+1.8) = 20.4 KN/M
303. **LOAD DUE TO LANDING SLAB (SHEAR) = 1.75* (5+1.8) = 11.9 KN
304. MEMBER LOAD
305. 275 574 575 639 UNI GY -20.4
306. 206 210 217 221 228 238 651 UNI GY -11.9
307. 261 275 UNI GY -6.53
308. 163 169 260 277 278 562 630 633 646 651 UNI GY -22.4
309.
********************************************************************
310. LOAD 2 LOADTYPE LIVE REDUCIBLE TITLE LIVE LOAD
311. FLOOR LOAD
312. _3.00MLEVELFLOOR FLOAD -10 GY
313. _3.00MLVLHTFLOOR FLOAD -16 GY
314. _9.00MLVLROOF FLOAD -2 GY
315. _6.5MLVLROOF FLOAD -2 GY
316. _4.1MLVLROOF FLOAD -2 GY
317.
********************************************************************
318. ***LOAD FROM STAIRS (LIVE)
319.
********************************************************************
320. *LENGTH OF SOFFIT SLAB = 6.0 M
321. **LIVE LOAD ON SOFFIT SLAB = 4 KN/SQ.M
322. **LOAD COMING ON TO LANDING BEAM = 6.0/2*4 = 12 KN/M
323. **LOAD DUE TO LANDING SLAB (SHEAR) = 1.75*4 =7 KN
324. MEMBER LOAD
325. 275 574 575 639 UNI GY -12
326. 206 210 217 221 228 238 651 UNI GY -7
327. 275 UNI GY -7
328. 261 UNI GY -7
329.
********************************************************************
330. *LOAD ON TRUSS 0.75KN/SQM
331. MEMBER LOAD
332. 391 402 405 408 415 418 423 426 UNI GY -1.6
333. 392 403 406 409 416 419 424 427 UNI GY -4
334. 393 404 407 410 417 420 425 428 UNI GY -2.6
335.
********************************************************************
40-007-CS-8180-03043 Revision 02C Page 48 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

336. LOAD 3 LOADTYPE WIND TITLE WIND LOAD (CPE+CPI) (+X)


337. MEMBER LOAD
338. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
339. **** INFLUENCE WIDTH 4.55 M
340. **** = (-0.85+-0.3)X0.79X2.275
341. **** = -2.0668375 KN/M
342. 149 UNI GX 2.06684
343. 444 UNI GX 2.06684 0 1.3
344. **** INFLUENCE WIDTH 4.55 M
345. **** = (-0.85+-0.3)X0.96X2.275
346. **** = -2.5116 KN/M
347. 444 UNI GX 2.5116 1.3 6
348. MEMBER LOAD
349. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
350. **** INFLUENCE WIDTH 10.05 M
351. **** = (-0.85+-0.3)X0.79X5.025
352. **** = -4.5652125 KN/M
353. 147 311 UNI GX 4.56521
354. 459 UNI GX 4.56521 0 1
355. **** INFLUENCE WIDTH 10.05 M
356. **** = (-0.85+-0.3)X0.96X5.025
357. **** = -5.5476 KN/M
358. 459 UNI GX 5.5476 1 5
359. MEMBER LOAD
360. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
361. **** INFLUENCE WIDTH 10 M
362. **** = (-0.85+-0.3)X0.79X5
363. **** = -4.5425 KN/M
364. 145 UNI GX 4.5425
365. 441 UNI GX 4.5425 0 1.3
366. **** INFLUENCE WIDTH 10 M
367. **** = (-0.85+-0.3)X0.96X5
368. **** = -5.52 KN/M
369. 441 UNI GX 5.52 1.3 6
370. MEMBER LOAD
371. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
372. **** INFLUENCE WIDTH 4.5 M
373. **** = (-0.85+-0.3)X0.79X2.25
374. **** = -2.044125 KN/M
375. 141 388 UNI GX 2.04413
376. **** INFLUENCE WIDTH 4.5 M
377. **** = (-0.85+-0.3)X0.96X2.25
378. **** = -2.484 KN/M
379. 434 465 UNI GX 2.484
380. MEMBER LOAD
381. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
382. **** INFLUENCE WIDTH 6.5 M
383. **** = (-0.85+-0.3)X0.79X3.25
384. **** = -2.952625 KN/M
385. 140 387 UNI GX 2.95263
386. **** INFLUENCE WIDTH 6.5 M
387. **** = (-0.85+-0.3)X0.96X3.25
388. **** = -3.588 KN/M
389. 433 UNI GX 3.588
40-007-CS-8180-03043 Revision 02C Page 49 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

390. MEMBER LOAD


391. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
392. **** INFLUENCE WIDTH 11.5 M
393. **** = (-0.85+-0.3)X0.79X5.75
394. **** = -5.223875 KN/M
395. 131 UNI GX 5.22388
396. 421 UNI GX 5.22388 0 1.3
397. **** INFLUENCE WIDTH 11.5 M
398. **** = (-0.85+-0.3)X0.96X5.75
399. **** = -6.348 KN/M
400. 421 UNI GX 6.348 1.3 3.5
401. MEMBER LOAD
402. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
403. **** INFLUENCE WIDTH 9.8 M
404. **** = (-0.85+-0.3)X0.79X4.9
405. **** = -4.45165 KN/M
406. 153 UNI GX 4.45165
407. 331 UNI GX 4.45165
408. **** INFLUENCE WIDTH 5 M
409. **** = (-0.85+-0.3)X0.96X2.5
410. **** = -2.76 KN/M
411. 432 UNI GX 2.76
412. MEMBER LOAD
413. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
414. **** INFLUENCE WIDTH 4.8 M
415. **** = (-0.85+-0.3)X0.79X2.4
416. **** = -2.1804 KN/M
417. 155 UNI GX 2.1804
418. **** INFLUENCE WIDTH 4.55 M
419. **** = (0.5+-0.3)X0.79X2.275
420. **** = 0.35945 KN/M
421. 151 UNI GX -0.35945
422. 446 UNI GX -0.35945 0 2
423. **** INFLUENCE WIDTH 4.55 M
424. **** = (0.5+-0.3)X0.96X2.275
425. **** = 0.4368 KN/M
426. 446 UNI GX -0.4368 2 6
427. **** INFLUENCE WIDTH 10.05 M
428. **** = (0.5+-0.3)X0.79X5.025
429. **** = 0.79395 KN/M
430. 148 UNI GX -0.79395
431. 443 UNI GX -0.79395 0 2
432. **** INFLUENCE WIDTH 10.05 M
433. **** = (0.5+-0.3)X0.96X5.025
434. **** = 0.9648 KN/M
435. 443 UNI GX -0.9648 2 6
436. **** INFLUENCE WIDTH 8.5 M
437. **** = (0.5+-0.3)X0.79X4.25
438. **** = 0.6715 KN/M
439. 146 UNI GX -0.6715
440. 442 UNI GX -0.6715 0 2
441. **** INFLUENCE WIDTH 8.5 M
442. **** = (0.5+-0.3)X0.96X4.25
443. **** = 0.816 KN/M
40-007-CS-8180-03043 Revision 02C Page 50 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

444. 442 UNI GX -0.816 2 6


445. **** INFLUENCE WIDTH 8 M
446. **** = (0.5+-0.3)X0.79X4
447. **** = 0.632 KN/M
448. 144 UNI GX -0.632
449. 448 UNI GX -0.632 0 2
450. **** INFLUENCE WIDTH 8 M
451. **** = (0.5+-0.3)X0.96X4
452. **** = 0.768 KN/M
453. 448 UNI GX -0.768 2 6
454. **** INFLUENCE WIDTH 8 M
455. **** = (0.5+-0.3)X0.79X4
456. **** = 0.632 KN/M
457. 135 UNI GX -0.632
458. 447 UNI GX -0.632 0 2
459. **** INFLUENCE WIDTH 8 M
460. **** = (0.5+-0.3)X0.96X4
461. **** = 0.768 KN/M
462. 447 UNI GX -0.768 2 6
463. **** INFLUENCE WIDTH 5 M
464. **** = (0.5+-0.3)X0.79X2.5
465. **** = 0.395 KN/M
466. 133 UNI GX -0.395
467. 435 UNI GX -0.395 0 2
468. **** INFLUENCE WIDTH 5 M
469. **** = (0.5+-0.3)X0.96X2.5
470. **** = 0.48 KN/M
471. 435 UNI GX -0.48 2 6
472. **** INFLUENCE WIDTH 5 M
473. **** = (0.5+-0.3)X0.79X2.5
474. **** = 0.395 KN/M
475. 138 UNI GX -0.395
476. 438 UNI GX -0.395 0 2
477. **** INFLUENCE WIDTH 5 M
478. **** = (0.5+-0.3)X0.96X2.5
479. **** = 0.48 KN/M
480. 438 UNI GX -0.48 2 6
481. **** INFLUENCE WIDTH 4.8 M
482. **** = (0.5+-0.3)X0.79X2.4
483. **** = 0.3792 KN/M
484. 136 UNI GX -0.3792
485. 330 UNI GX -0.3792 0 1.1
486. **** INFLUENCE WIDTH 4.8 M
487. **** = (0.5+-0.3)X0.79X2.4
488. **** = 0.3792 KN/M
489. 156 UNI GX -0.3792
490. **** INFLUENCE WIDTH 5.225 M
491. **** = (1.3+-0.3)X0.79X2.6125
492. **** = 2.063875 KN/M
493. 140 387 UNI GZ -2.06387
494. **** INFLUENCE WIDTH 5.225 M
495. **** = (1.3+-0.3)X0.96X2.6125
496. **** = 2.508 KN/M
497. 433 UNI GZ -2.508
40-007-CS-8180-03043 Revision 02C Page 51 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

498. **** INFLUENCE WIDTH 5.225 M


499. **** = (1.3+-0.3)X0.79X2.6125
500. **** = 2.063875 KN/M
501. 149 UNI GZ -2.06387
502. 444 UNI GZ -2.06387 0 2
503. **** INFLUENCE WIDTH 5.225 M
504. **** = (1.3+-0.3)X0.96X2.6125
505. **** = 2.508 KN/M
506. 444 UNI GZ -2.508 2 6
507. **** INFLUENCE WIDTH 10.45 M
508. **** = (1.3+-0.3)X0.79X5.225
509. **** = 4.12775 KN/M
510. 150 UNI GZ -4.12775
511. 445 UNI GZ -4.12775 0 2
512. **** INFLUENCE WIDTH 10.45 M
513. **** = (1.3+-0.3)X0.96X5.225
514. **** = 5.016 KN/M
515. 445 UNI GZ -5.016 2 6
516. **** INFLUENCE WIDTH 5.225 M
517. **** = (1.3+-0.3)X0.79X2.6125
518. **** = 2.063875 KN/M
519. 151 UNI GZ -2.06387
520. 446 UNI GZ -2.06387 0 2
521. **** INFLUENCE WIDTH 5.225 M
522. **** = (1.3+-0.3)X0.96X2.6125
523. **** = 2.508 KN/M
524. 446 UNI GZ -2.508 2 6
525. **** INFLUENCE WIDTH 5 M
526. **** = (1.3+-0.3)X0.79X2.5
527. **** = 1.975 KN/M
528. 142 UNI GZ -1.975
529. 439 UNI GZ -1.975 0 2
530. **** INFLUENCE WIDTH 5 M
531. **** = (1.3+-0.3)X0.96X2.5
532. **** = 2.4 KN/M
533. 439 UNI GZ -2.4 2 6
534. **** INFLUENCE WIDTH 10 M
535. **** = (1.3+-0.3)X0.79X5
536. **** = 3.95 KN/M
537. 143 UNI GZ -3.95
538. 440 UNI GZ -3.95 0 2
539. **** INFLUENCE WIDTH 10 M
540. **** = (1.3+-0.3)X0.96X5
541. **** = 4.8 KN/M
542. 440 UNI GZ -4.8 2 6
543. **** INFLUENCE WIDTH 5 M
544. **** = (1.3+-0.3)X0.79X2.5
545. **** = 1.975 KN/M
546. 144 UNI GZ -1.975
547. 448 UNI GZ -1.975 0 2
548. **** INFLUENCE WIDTH 5 M
549. **** = (1.3+-0.3)X0.96X2.5
550. **** = 2.4 KN/M
551. 448 UNI GZ -2.4 2 6
40-007-CS-8180-03043 Revision 02C Page 52 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

552. **** INFLUENCE WIDTH 2.4 M


553. **** = (1.3+-0.3)X0.79X1.2
554. **** = 0.948 KN/M
555. 153 331 UNI GZ 0.948
556. 432 UNI GZ 0.948 0 0.9
557. **** INFLUENCE WIDTH 6.9 M
558. **** = (1.3+-0.3)X0.96X3.45
559. **** = 3.312 KN/M
560. 432 UNI GZ 3.312 0.9 2.4
561. **** INFLUENCE WIDTH 4.5 M
562. **** = (1.3+-0.3)X0.79X2.25
563. **** = 1.7775 KN/M
564. 155 UNI GZ 1.7775
565. **** INFLUENCE WIDTH 4.5 M
566. **** = (1.3+-0.3)X0.79X2.25
567. **** = 1.7775 KN/M
568. 155 UNI GZ 1.7775
569. **** INFLUENCE WIDTH 5.225 M
570. **** = (1.3+-0.3)X0.79X2.6125
571. **** = 2.063875 KN/M
572. 136 330 UNI GZ 2.06387
573. 431 UNI GZ 2.06387 0 0.9
574. **** INFLUENCE WIDTH 12.1225 M
575. **** = (1.3+-0.3)X0.96X6.06125
576. **** = 5.8188 KN/M
577. 431 UNI GZ 5.8188 0.9 2.4 0
578. **** INFLUENCE WIDTH 5.225 M
579. **** = (1.3+-0.3)X0.96X2.6125
580. **** = 2.508 KN/M
581. 463 UNI GZ 2.508
582. **** INFLUENCE WIDTH 10.45 M
583. **** = (1.3+-0.3)X0.79X5.225
584. **** = 4.12775 KN/M
585. 137 UNI GZ 4.12775
586. 437 UNI GZ 4.12775 0 1.3
587. **** INFLUENCE WIDTH 10.45 M
588. **** = (1.3+-0.3)X0.96X5.225
589. **** = 5.016 KN/M
590. 437 UNI GZ 5.016 1.3 6
591. **** INFLUENCE WIDTH 10.45 M
592. **** = (1.3+-0.3)X0.79X5.225
593. **** = 4.12775 KN/M
594. 138 UNI GZ 4.12775
595. 438 UNI GZ 4.12775 0 1.3
596. **** INFLUENCE WIDTH 10.45 M
597. **** = (1.3+-0.3)X0.96X5.225
598. **** = 5.016 KN/M
599. 438 UNI GZ 5.016 1.3 6
600. **** INFLUENCE WIDTH 5 M
601. **** = (1.3+-0.3)X0.79X2.5
602. **** = 1.975 KN/M
603. 133 UNI GZ 1.975
604. 435 UNI GZ 1.975 0 1.3
605. **** INFLUENCE WIDTH 5 M
40-007-CS-8180-03043 Revision 02C Page 53 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

606. **** = (1.3+-0.3)X0.96X2.5


607. **** = 2.4 KN/M
608. 435 UNI GZ 2.4 1.3 6
609. **** INFLUENCE WIDTH 10 M
610. **** = (1.3+-0.3)X0.79X5
611. **** = 3.95 KN/M
612. 134 UNI GZ 3.95
613. 436 UNI GZ 3.95 0 1.3
614. **** INFLUENCE WIDTH 10 M
615. **** = (1.3+-0.3)X0.96X5
616. **** = 4.8 KN/M
617. 436 UNI GZ 4.8 1.3 6
618. **** INFLUENCE WIDTH 5 M
619. **** = (1.3+-0.3)X0.79X2.5
620. **** = 1.975 KN/M
621. 135 UNI GZ 1.975
622. 447 UNI GZ 1.975 0 1.3
623. **** INFLUENCE WIDTH 5 M
624. **** = (1.3+-0.3)X0.96X2.5
625. **** = 2.4 KN/M
626. 447 UNI GZ 2.4 1.3 6
627. MEMBER LOAD
628. 391 402 405 408 415 418 423 426 UNI Y 2.76
629. 392 403 406 409 416 419 424 427 UNI Y 7
630. 393 404 407 410 417 420 425 428 UNI Y 4.65
631.
**************************************************************************
*****
632. LOAD 4 LOADTYPE WIND TITLE WIND LOAD (CPE-CPI) (+X)
633. MEMBER LOAD
634. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
635. **** INFLUENCE WIDTH 4.55 M
636. **** = (-0.85+0.2)X0.79X2.275
637. **** = -1.1682125 KN/M
638. 149 UNI GX 1.16821
639. 444 UNI GX 1.16821 0 1.3
640. **** INFLUENCE WIDTH 4.55 M
641. **** = (-0.85+0.2)X0.96X2.275
642. **** = -1.4196 KN/M
643. 444 UNI GX 1.4196 1.3 6
644. MEMBER LOAD
645. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
646. **** INFLUENCE WIDTH 10.05 M
647. **** = (-0.85+0.2)X0.79X5.025
648. **** = -2.5803375 KN/M
649. 147 311 UNI GX 2.58034
650. 459 UNI GX 2.58034 0 1
651. **** INFLUENCE WIDTH 10.05 M
652. **** = (-0.85+0.2)X0.96X5.025
653. **** = -3.1356 KN/M
654. 459 UNI GX 3.1356 1 5
655. MEMBER LOAD
656. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
657. **** INFLUENCE WIDTH 10 M
40-007-CS-8180-03043 Revision 02C Page 54 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

658. **** = (-0.85+0.2)X0.79X5


659. **** = -2.5675 KN/M
660. 145 UNI GX 2.5675
661. 441 UNI GX 2.5675 0 1.3
662. **** INFLUENCE WIDTH 10 M
663. **** = (-0.85+0.2)X0.96X5
664. **** = -3.12 KN/M
665. 441 UNI GX 3.12 1.3 6
666. MEMBER LOAD
667. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
668. **** INFLUENCE WIDTH 4.5 M
669. **** = (-0.85+0.2)X0.79X2.25
670. **** = -1.155375 KN/M
671. 141 388 UNI GX 1.15538
672. **** INFLUENCE WIDTH 4.5 M
673. **** = (-0.85+0.2)X0.96X2.25
674. **** = -1.404 KN/M
675. 434 465 UNI GX 1.404
676. MEMBER LOAD
677. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
678. **** INFLUENCE WIDTH 6.5 M
679. **** = (-0.85+0.2)X0.79X3.25
680. **** = -1.668875 KN/M
681. 140 387 UNI GX 1.66887
682. **** INFLUENCE WIDTH 6.5 M
683. **** = (-0.85+0.2)X0.96X3.25
684. **** = -2.028 KN/M
685. 433 UNI GX 2.028
686. MEMBER LOAD
687. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
688. **** INFLUENCE WIDTH 11.5 M
689. **** = (-0.85+0.2)X0.79X5.75
690. **** = -2.952625 KN/M
691. 131 UNI GX 2.95263
692. 421 UNI GX 2.95263 0 1.3
693. **** INFLUENCE WIDTH 11.5 M
694. **** = (-0.85+0.2)X0.96X5.75
695. **** = -3.588 KN/M
696. 421 UNI GX 3.588 1.3 3.5
697. MEMBER LOAD
698. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
699. **** INFLUENCE WIDTH 9.8 M
700. **** = (-0.85+0.2)X0.79X4.9
701. **** = -2.51615 KN/M
702. 153 UNI GX 2.51615
703. 331 UNI GX 2.51615
704. **** INFLUENCE WIDTH 5 M
705. **** = (-0.85+0.2)X0.96X2.5
706. **** = -1.56 KN/M
707. 432 UNI GX 1.56
708. MEMBER LOAD
709. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
710. **** INFLUENCE WIDTH 4.8 M
711. **** = (-0.85+0.2)X0.79X2.4
40-007-CS-8180-03043 Revision 02C Page 55 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

712. **** = -1.2324 KN/M


713. 155 UNI GX 1.2324
714. **** INFLUENCE WIDTH 4.55 M
715. **** = (0.5+0.2)X0.79X2.275
716. **** = 1.258075 KN/M
717. 151 UNI GX -1.25807
718. 446 UNI GX -1.25807 0 2
719. **** INFLUENCE WIDTH 4.55 M
720. **** = (0.5+0.2)X0.96X2.275
721. **** = 1.5288 KN/M
722. 446 UNI GX -1.5288 2 6
723. **** INFLUENCE WIDTH 10.05 M
724. **** = (0.5+0.2)X0.79X5.025
725. **** = 2.778825 KN/M
726. 148 UNI GX -2.77883
727. 443 UNI GX -2.77883 0 2
728. **** INFLUENCE WIDTH 10.05 M
729. **** = (0.5+0.2)X0.96X5.025
730. **** = 3.3768 KN/M
731. 443 UNI GX -3.3768 2 6
732. **** INFLUENCE WIDTH 8.5 M
733. **** = (0.5+0.2)X0.79X4.25
734. **** = 2.35025 KN/M
735. 146 UNI GX -2.35025
736. 442 UNI GX -2.35025 0 2
737. **** INFLUENCE WIDTH 8.5 M
738. **** = (0.5+0.2)X0.96X4.25
739. **** = 2.856 KN/M
740. 442 UNI GX -2.856 2 6
741. **** INFLUENCE WIDTH 8 M
742. **** = (0.5+0.2)X0.79X4
743. **** = 2.212 KN/M
744. 144 UNI GX -2.212
745. 448 UNI GX -2.212 0 2
746. **** INFLUENCE WIDTH 8 M
747. **** = (0.5+0.2)X0.96X4
748. **** = 2.688 KN/M
749. 448 UNI GX -2.688 2 6
750. **** INFLUENCE WIDTH 8 M
751. **** = (0.5+0.2)X0.79X4
752. **** = 2.212 KN/M
753. 135 UNI GX -2.212
754. 447 UNI GX -2.212 0 2
755. **** INFLUENCE WIDTH 8 M
756. **** = (0.5+0.2)X0.96X4
757. **** = 2.688 KN/M
758. 447 UNI GX -2.688 2 6
759. **** INFLUENCE WIDTH 5 M
760. **** = (0.5+0.2)X0.79X2.5
761. **** = 1.3825 KN/M
762. 133 UNI GX -1.3825
763. 435 UNI GX -1.3825 0 2
764. **** INFLUENCE WIDTH 5 M
765. **** = (0.5+0.2)X0.96X2.5
40-007-CS-8180-03043 Revision 02C Page 56 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

766. **** = 1.68 KN/M


767. 435 UNI GX -1.68 2 6
768. **** INFLUENCE WIDTH 5 M
769. **** = (0.5+0.2)X0.79X2.5
770. **** = 1.3825 KN/M
771. 138 UNI GX -1.3825
772. 438 UNI GX -1.3825 0 2
773. **** INFLUENCE WIDTH 5 M
774. **** = (0.5+0.2)X0.96X2.5
775. **** = 1.68 KN/M
776. 438 UNI GX -1.68 2 6
777. **** INFLUENCE WIDTH 4.8 M
778. **** = (0.5+0.2)X0.79X2.4
779. **** = 1.3272 KN/M
780. 136 UNI GX -1.3272
781. 330 UNI GX -1.3272 0 1.1
782. **** INFLUENCE WIDTH 4.8 M
783. **** = (0.5+0.2)X0.79X2.4
784. **** = 1.3272 KN/M
785. 156 UNI GX -1.3272
786. **** INFLUENCE WIDTH 5.225 M
787. **** = (1.3+0.2)X0.79X2.6125
788. **** = 3.0958125 KN/M
789. 140 387 UNI GZ -3.09581
790. **** INFLUENCE WIDTH 5.225 M
791. **** = (1.3+0.2)X0.96X2.6125
792. **** = 3.762 KN/M
793. 433 UNI GZ -3.762
794. **** INFLUENCE WIDTH 5.225 M
795. **** = (1.3+0.2)X0.79X2.6125
796. **** = 3.0958125 KN/M
797. 149 UNI GZ -3.09581
798. 444 UNI GZ -3.09581 0 2
799. **** INFLUENCE WIDTH 5.225 M
800. **** = (1.3+0.2)X0.96X2.6125
801. **** = 3.762 KN/M
802. 444 UNI GZ -3.762 2 6
803. **** INFLUENCE WIDTH 10.45 M
804. **** = (1.3+0.2)X0.79X5.225
805. **** = 6.191625 KN/M
806. 150 UNI GZ -6.19163
807. 445 UNI GZ -6.19163 0 2
808. **** INFLUENCE WIDTH 10.45 M
809. **** = (1.3+0.2)X0.96X5.225
810. **** = 7.524 KN/M
811. 445 UNI GZ -7.524 2 6
812. **** INFLUENCE WIDTH 5.225 M
813. **** = (1.3+0.2)X0.79X2.6125
814. **** = 3.0958125 KN/M
815. 151 UNI GZ -3.09581
816. 446 UNI GZ -3.09581 0 2
817. **** INFLUENCE WIDTH 5.225 M
818. **** = (1.3+0.2)X0.96X2.6125
819. **** = 3.762 KN/M
40-007-CS-8180-03043 Revision 02C Page 57 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

820. 446 UNI GZ -3.762 2 6


821. **** INFLUENCE WIDTH 5 M
822. **** = (1.3+0.2)X0.79X2.5
823. **** = 2.9625 KN/M
824. 142 UNI GZ -2.9625
825. 439 UNI GZ -2.9625 0 2
826. **** INFLUENCE WIDTH 5 M
827. **** = (1.3+0.2)X0.96X2.5
828. **** = 3.6 KN/M
829. 439 UNI GZ -3.6 2 6
830. **** INFLUENCE WIDTH 10 M
831. **** = (1.3+0.2)X0.79X5
832. **** = 5.925 KN/M
833. 143 UNI GZ -5.925
834. 440 UNI GZ -5.925 0 2
835. **** INFLUENCE WIDTH 10 M
836. **** = (1.3+0.2)X0.96X5
837. **** = 7.2 KN/M
838. 440 UNI GZ -7.2 2 6
839. **** INFLUENCE WIDTH 5 M
840. **** = (1.3+0.2)X0.79X2.5
841. **** = 2.9625 KN/M
842. 144 UNI GZ -2.9625
843. 448 UNI GZ -2.9625 0 2
844. **** INFLUENCE WIDTH 5 M
845. **** = (1.3+0.2)X0.96X2.5
846. **** = 3.6 KN/M
847. 448 UNI GZ -3.6 2 6
848. **** INFLUENCE WIDTH 2.4 M
849. **** = (1.3+0.2)X0.79X1.2
850. **** = 1.422 KN/M
851. 153 331 UNI GZ 1.422
852. 432 UNI GZ 1.422 0 0.9
853. **** INFLUENCE WIDTH 6.9 M
854. **** = (1.3+0.2)X0.96X3.45
855. **** = 4.968 KN/M
856. 432 UNI GZ 4.968 0.9 2.4
857. **** INFLUENCE WIDTH 4.5 M
858. **** = (1.3+0.2)X0.79X2.25
859. **** = 2.66625 KN/M
860. 155 UNI GZ 2.66625
861. **** INFLUENCE WIDTH 4.5 M
862. **** = (1.3+0.2)X0.79X2.25
863. **** = 2.66625 KN/M
864. 155 UNI GZ 2.66625
865. **** INFLUENCE WIDTH 5.225 M
866. **** = (1.3+0.2)X0.79X2.6125
867. **** = 3.0958125 KN/M
868. 136 330 UNI GZ 3.09581
869. 431 UNI GZ 3.09581 0 0.9
870. **** INFLUENCE WIDTH 12.1225 M
871. **** = (1.3+0.2)X0.96X6.06125
872. **** = 8.7282 KN/M
873. 431 UNI GZ 8.7282 0.9 2.4 0
40-007-CS-8180-03043 Revision 02C Page 58 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

874. **** INFLUENCE WIDTH 5.225 M


875. **** = (1.3+0.2)X0.96X2.6125
876. **** = 3.762 KN/M
877. 463 UNI GZ 3.762
878. **** INFLUENCE WIDTH 10.45 M
879. **** = (1.3+0.2)X0.79X5.225
880. **** = 6.191625 KN/M
881. 137 UNI GZ 6.19163
882. 437 UNI GZ 6.19163 0 1.3
883. **** INFLUENCE WIDTH 10.45 M
884. **** = (1.3+0.2)X0.96X5.225
885. **** = 7.524 KN/M
886. 437 UNI GZ 7.524 1.3 6
887. **** INFLUENCE WIDTH 10.45 M
888. **** = (1.3+0.2)X0.79X5.225
889. **** = 6.191625 KN/M
890. 138 UNI GZ 6.19163
891. 438 UNI GZ 6.19163 0 1.3
892. **** INFLUENCE WIDTH 10.45 M
893. **** = (1.3+0.2)X0.96X5.225
894. **** = 7.524 KN/M
895. 438 UNI GZ 7.524 1.3 6
896. **** INFLUENCE WIDTH 5 M
897. **** = (1.3+0.2)X0.79X2.5
898. **** = 2.9625 KN/M
899. 133 UNI GZ 2.9625
900. 435 UNI GZ 2.9625 0 1.3
901. **** INFLUENCE WIDTH 5 M
902. **** = (1.3+0.2)X0.96X2.5
903. **** = 3.6 KN/M
904. 435 UNI GZ 3.6 1.3 6
905. **** INFLUENCE WIDTH 10 M
906. **** = (1.3+0.2)X0.79X5
907. **** = 5.925 KN/M
908. 134 UNI GZ 5.925
909. 436 UNI GZ 5.925 0 1.3
910. **** INFLUENCE WIDTH 10 M
911. **** = (1.3+0.2)X0.96X5
912. **** = 7.2 KN/M
913. 436 UNI GZ 7.2 1.3 6
914. **** INFLUENCE WIDTH 5 M
915. **** = (1.3+0.2)X0.79X2.5
916. **** = 2.9625 KN/M
917. 135 UNI GZ 2.9625
918. 447 UNI GZ 2.9625 0 1.3
919. **** INFLUENCE WIDTH 5 M
920. **** = (1.3+0.2)X0.96X2.5
921. **** = 3.6 KN/M
922. 447 UNI GZ 3.6 1.3 6
923. MEMBER LOAD
924. 391 402 405 408 415 418 423 426 UNI Y 3.57
925. 392 403 406 409 416 419 424 427 UNI Y 10
926. 393 404 407 410 417 420 425 428 UNI Y 6

40-007-CS-8180-03043 Revision 02C Page 59 of 105


SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

927.
**************************************************************************
*****
928. LOAD 5 LOADTYPE WIND TITLE WIND LOAD (CPE+CPI) (-X)
929. MEMBER LOAD
930. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
931. **** INFLUENCE WIDTH 4.55 M
932. **** = (0.5+-0.3)X0.79X2.275
933. **** = 0.35945 KN/M
934. 149 UNI GX -0.35945
935. 444 UNI GX -0.35945 0 1.3
936. **** INFLUENCE WIDTH 4.55 M
937. **** = (0.5+-0.3)X0.96X2.275
938. **** = 0.4368 KN/M
939. 444 UNI GX -0.4368 1.3 6
940. MEMBER LOAD
941. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
942. **** INFLUENCE WIDTH 10.05 M
943. **** = (0.5+-0.3)X0.79X5.025
944. **** = 0.79395 KN/M
945. 147 311 UNI GX -0.79395
946. 459 UNI GX -0.79395 0 1
947. **** INFLUENCE WIDTH 10.05 M
948. **** = (0.5+-0.3)X0.96X5.025
949. **** = 0.9648 KN/M
950. 459 UNI GX -0.9648 1 5
951. MEMBER LOAD
952. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
953. **** INFLUENCE WIDTH 10 M
954. **** = (0.5+-0.3)X0.79X5
955. **** = 0.79 KN/M
956. 145 UNI GX -0.79
957. 441 UNI GX -0.79 0 1.3
958. **** INFLUENCE WIDTH 10 M
959. **** = (0.5+-0.3)X0.96X5
960. **** = 0.96 KN/M
961. 441 UNI GX -0.96 1.3 6
962. MEMBER LOAD
963. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
964. **** INFLUENCE WIDTH 4.5 M
965. **** = (0.5+-0.3)X0.79X2.25
966. **** = 0.3555 KN/M
967. 141 388 UNI GX -0.3555
968. **** INFLUENCE WIDTH 4.5 M
969. **** = (0.5+-0.3)X0.96X2.25
970. **** = 0.432 KN/M
971. 434 465 UNI GX -0.432
972. MEMBER LOAD
973. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
974. **** INFLUENCE WIDTH 6.5 M
975. **** = (0.5+-0.3)X0.79X3.25
976. **** = 0.5135 KN/M
977. 140 387 UNI GX -0.5135
978. **** INFLUENCE WIDTH 6.5 M
40-007-CS-8180-03043 Revision 02C Page 60 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

979. **** = (0.5+-0.3)X0.96X3.25


980. **** = 0.624 KN/M
981. 433 UNI GX -0.624
982. MEMBER LOAD
983. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
984. **** INFLUENCE WIDTH 11.5 M
985. **** = (0.5+-0.3)X0.79X5.75
986. **** = 0.9085 KN/M
987. 131 UNI GX -0.9085
988. 421 UNI GX -0.9085 0 1.3
989. **** INFLUENCE WIDTH 11.5 M
990. **** = (0.5+-0.3)X0.96X5.75
991. **** = 1.104 KN/M
992. 421 UNI GX -1.104 1.3 3.5
993. MEMBER LOAD
994. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
995. **** INFLUENCE WIDTH 9.8 M
996. **** = (0.5+-0.3)X0.79X4.9
997. **** = 0.7742 KN/M
998. 153 UNI GX -0.7742
999. 331 UNI GX -0.7742
1000. **** INFLUENCE WIDTH 5 M
1001. **** = (0.5+-0.3)X0.96X2.5
1002. **** = 0.48 KN/M
1003. 432 UNI GX -0.48
1004. MEMBER LOAD
1005. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1006. **** INFLUENCE WIDTH 4.8 M
1007. **** = (0.5+-0.3)X0.79X2.4
1008. **** = 0.3792 KN/M
1009. 155 UNI GX -0.3792
1010. **** INFLUENCE WIDTH 4.55 M
1011. **** = (-0.85+-0.3)X0.79X2.275
1012. **** = -2.0668375 KN/M
1013. 151 UNI GX 2.06684
1014. 446 UNI GX 2.06684 0 2
1015. **** INFLUENCE WIDTH 4.55 M
1016. **** = (-0.85+-0.3)X0.96X2.275
1017. **** = -2.5116 KN/M
1018. 446 UNI GX 2.5116 2 6
1019. **** INFLUENCE WIDTH 10.05 M
1020. **** = (-0.85+-0.3)X0.79X5.025
1021. **** = -4.5652125 KN/M
1022. 148 UNI GX 4.56521
1023. 443 UNI GX 4.56521 0 2
1024. **** INFLUENCE WIDTH 10.05 M
1025. **** = (-0.85+-0.3)X0.96X5.025
1026. **** = -5.5476 KN/M
1027. 443 UNI GX 5.5476 2 6
1028. **** INFLUENCE WIDTH 8.5 M
1029. **** = (-0.85+-0.3)X0.79X4.25
1030. **** = -3.861125 KN/M
1031. 146 UNI GX 3.86112
1032. 442 UNI GX 3.86112 0 2
40-007-CS-8180-03043 Revision 02C Page 61 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1033. **** INFLUENCE WIDTH 8.5 M


1034. **** = (-0.85+-0.3)X0.96X4.25
1035. **** = -4.692 KN/M
1036. 442 UNI GX 4.692 2 6
1037. **** INFLUENCE WIDTH 8 M
1038. **** = (-0.85+-0.3)X0.79X4
1039. **** = -3.634 KN/M
1040. 144 UNI GX 3.634
1041. 448 UNI GX 3.634 0 2
1042. **** INFLUENCE WIDTH 8 M
1043. **** = (-0.85+-0.3)X0.96X4
1044. **** = -4.416 KN/M
1045. 448 UNI GX 4.416 2 6
1046. **** INFLUENCE WIDTH 8 M
1047. **** = (-0.85+-0.3)X0.79X4
1048. **** = -3.634 KN/M
1049. 135 UNI GX 3.634
1050. 447 UNI GX 3.634 0 2
1051. **** INFLUENCE WIDTH 8 M
1052. **** = (-0.85+-0.3)X0.96X4
1053. **** = -4.416 KN/M
1054. 447 UNI GX 4.416 2 6
1055. **** INFLUENCE WIDTH 5 M
1056. **** = (-0.85+-0.3)X0.79X2.5
1057. **** = -2.27125 KN/M
1058. 133 UNI GX 2.27125
1059. 435 UNI GX 2.27125 0 2
1060. **** INFLUENCE WIDTH 5 M
1061. **** = (-0.85+-0.3)X0.96X2.5
1062. **** = -2.76 KN/M
1063. 435 UNI GX 2.76 2 6
1064. **** INFLUENCE WIDTH 5 M
1065. **** = (-0.85+-0.3)X0.79X2.5
1066. **** = -2.27125 KN/M
1067. 138 UNI GX 2.27125
1068. 438 UNI GX 2.27125 0 2
1069. **** INFLUENCE WIDTH 5 M
1070. **** = (-0.85+-0.3)X0.96X2.5
1071. **** = -2.76 KN/M
1072. 438 UNI GX 2.76 2 6
1073. **** INFLUENCE WIDTH 4.8 M
1074. **** = (-0.85+-0.3)X0.79X2.4
1075. **** = -2.1804 KN/M
1076. 136 UNI GX 2.1804
1077. 330 UNI GX 2.1804 0 1.1
1078. **** INFLUENCE WIDTH 4.8 M
1079. **** = (-0.85+-0.3)X0.79X2.4
1080. **** = -2.1804 KN/M
1081. 156 UNI GX 2.1804
1082. **** INFLUENCE WIDTH 5.225 M
1083. **** = (1.3+-0.3)X0.79X2.6125
1084. **** = 2.063875 KN/M
1085. 140 387 UNI GZ -2.06387
1086. **** INFLUENCE WIDTH 5.225 M
40-007-CS-8180-03043 Revision 02C Page 62 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1087. **** = (1.3+-0.3)X0.96X2.6125


1088. **** = 2.508 KN/M
1089. 433 UNI GZ -2.508
1090. **** INFLUENCE WIDTH 5.225 M
1091. **** = (1.3+-0.3)X0.79X2.6125
1092. **** = 2.063875 KN/M
1093. 149 UNI GZ -2.06387
1094. 444 UNI GZ -2.06387 0 2
1095. **** INFLUENCE WIDTH 5.225 M
1096. **** = (1.3+-0.3)X0.96X2.6125
1097. **** = 2.508 KN/M
1098. 444 UNI GZ -2.508 2 6
1099. **** INFLUENCE WIDTH 10.45 M
1100. **** = (1.3+-0.3)X0.79X5.225
1101. **** = 4.12775 KN/M
1102. 150 UNI GZ -4.12775
1103. 445 UNI GZ -4.12775 0 2
1104. **** INFLUENCE WIDTH 10.45 M
1105. **** = (1.3+-0.3)X0.96X5.225
1106. **** = 5.016 KN/M
1107. 445 UNI GZ -5.016 2 6
1108. **** INFLUENCE WIDTH 5.225 M
1109. **** = (1.3+-0.3)X0.79X2.6125
1110. **** = 2.063875 KN/M
1111. 151 UNI GZ -2.06387
1112. 446 UNI GZ -2.06387 0 2
1113. **** INFLUENCE WIDTH 5.225 M
1114. **** = (1.3+-0.3)X0.96X2.6125
1115. **** = 2.508 KN/M
1116. 446 UNI GZ -2.508 2 6
1117. **** INFLUENCE WIDTH 5 M
1118. **** = (1.3+-0.3)X0.79X2.5
1119. **** = 1.975 KN/M
1120. 142 UNI GZ -1.975
1121. 439 UNI GZ -1.975 0 2
1122. **** INFLUENCE WIDTH 5 M
1123. **** = (1.3+-0.3)X0.96X2.5
1124. **** = 2.4 KN/M
1125. 439 UNI GZ -2.4 2 6
1126. **** INFLUENCE WIDTH 10 M
1127. **** = (1.3+-0.3)X0.79X5
1128. **** = 3.95 KN/M
1129. 143 UNI GZ -3.95
1130. 440 UNI GZ -3.95 0 2
1131. **** INFLUENCE WIDTH 10 M
1132. **** = (1.3+-0.3)X0.96X5
1133. **** = 4.8 KN/M
1134. 440 UNI GZ -4.8 2 6
1135. **** INFLUENCE WIDTH 5 M
1136. **** = (1.3+-0.3)X0.79X2.5
1137. **** = 1.975 KN/M
1138. 144 UNI GZ -1.975
1139. 448 UNI GZ -1.975 0 2
1140. **** INFLUENCE WIDTH 5 M
40-007-CS-8180-03043 Revision 02C Page 63 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1141. **** = (1.3+-0.3)X0.96X2.5


1142. **** = 2.4 KN/M
1143. 448 UNI GZ -2.4 2 6
1144. **** INFLUENCE WIDTH 2.4 M
1145. **** = (1.3+-0.3)X0.79X1.2
1146. **** = 0.948 KN/M
1147. 153 331 UNI GZ 0.948
1148. 432 UNI GZ 0.948 0 0.9
1149. **** INFLUENCE WIDTH 6.9 M
1150. **** = (1.3+-0.3)X0.96X3.45
1151. **** = 3.312 KN/M
1152. 432 UNI GZ 3.312 0.9 2.4
1153. **** INFLUENCE WIDTH 4.5 M
1154. **** = (1.3+-0.3)X0.79X2.25
1155. **** = 1.7775 KN/M
1156. 155 UNI GZ 1.7775
1157. **** INFLUENCE WIDTH 4.5 M
1158. **** = (1.3+-0.3)X0.79X2.25
1159. **** = 1.7775 KN/M
1160. 155 UNI GZ 1.7775
1161. **** INFLUENCE WIDTH 5.225 M
1162. **** = (1.3+-0.3)X0.79X2.6125
1163. **** = 2.063875 KN/M
1164. 136 330 UNI GZ 2.06387
1165. 431 UNI GZ 2.06387 0 0.9
1166. **** INFLUENCE WIDTH 12.1225 M
1167. **** = (1.3+-0.3)X0.96X6.06125
1168. **** = 5.8188 KN/M
1169. 431 UNI GZ 5.8188 0.9 2.4 0
1170. **** INFLUENCE WIDTH 5.225 M
1171. **** = (1.3+-0.3)X0.96X2.6125
1172. **** = 2.508 KN/M
1173. 463 UNI GZ 2.508
1174. **** INFLUENCE WIDTH 10.45 M
1175. **** = (1.3+-0.3)X0.79X5.225
1176. **** = 4.12775 KN/M
1177. 137 UNI GZ 4.12775
1178. 437 UNI GZ 4.12775 0 1.3
1179. **** INFLUENCE WIDTH 10.45 M
1180. **** = (1.3+-0.3)X0.96X5.225
1181. **** = 5.016 KN/M
1182. 437 UNI GZ 5.016 1.3 6
1183. **** INFLUENCE WIDTH 10.45 M
1184. **** = (1.3+-0.3)X0.79X5.225
1185. **** = 4.12775 KN/M
1186. 138 UNI GZ 4.12775
1187. 438 UNI GZ 4.12775 0 1.3
1188. **** INFLUENCE WIDTH 10.45 M
1189. **** = (1.3+-0.3)X0.96X5.225
1190. **** = 5.016 KN/M
1191. 438 UNI GZ 5.016 1.3 6
1192. **** INFLUENCE WIDTH 5 M
1193. **** = (1.3+-0.3)X0.79X2.5
1194. **** = 1.975 KN/M
40-007-CS-8180-03043 Revision 02C Page 64 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1195. 133 UNI GZ 1.975


1196. 435 UNI GZ 1.975 0 1.3
1197. **** INFLUENCE WIDTH 5 M
1198. **** = (1.3+-0.3)X0.96X2.5
1199. **** = 2.4 KN/M
1200. 435 UNI GZ 2.4 1.3 6
1201. **** INFLUENCE WIDTH 10 M
1202. **** = (1.3+-0.3)X0.79X5
1203. **** = 3.95 KN/M
1204. 134 UNI GZ 3.95
1205. 436 UNI GZ 3.95 0 1.3
1206. **** INFLUENCE WIDTH 10 M
1207. **** = (1.3+-0.3)X0.96X5
1208. **** = 4.8 KN/M
1209. 436 UNI GZ 4.8 1.3 6
1210. **** INFLUENCE WIDTH 5 M
1211. **** = (1.3+-0.3)X0.79X2.5
1212. **** = 1.975 KN/M
1213. 135 UNI GZ 1.975
1214. 447 UNI GZ 1.975 0 1.3
1215. **** INFLUENCE WIDTH 5 M
1216. **** = (1.3+-0.3)X0.96X2.5
1217. **** = 2.4 KN/M
1218. 447 UNI GZ 2.4 1.3 6
1219. MEMBER LOAD
1220. 391 402 405 408 415 418 423 426 UNI Y 2.76
1221. 392 403 406 409 416 419 424 427 UNI Y 7
1222. 393 404 407 410 417 420 425 428 UNI Y 4.65
1223.
**************************************************************************
*****
1224. LOAD 6 LOADTYPE WIND TITLE WIND LOAD (CPE-CPI) (-X)
1225. MEMBER LOAD
1226. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1227. **** INFLUENCE WIDTH 4.55 M
1228. **** = (0.5+0.2)X0.79X2.275
1229. **** = 1.258075 KN/M
1230. 149 UNI GX -1.25807
1231. 444 UNI GX -1.25807 0 1.3
1232. **** INFLUENCE WIDTH 4.55 M
1233. **** = (0.5+0.2)X0.96X2.275
1234. **** = 1.5288 KN/M
1235. 444 UNI GX -1.5288 1.3 6
1236. MEMBER LOAD
1237. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1238. **** INFLUENCE WIDTH 10.05 M
1239. **** = (0.5+0.2)X0.79X5.025
1240. **** = 2.778825 KN/M
1241. 147 311 UNI GX -2.77883
1242. 459 UNI GX -2.77883 0 1
1243. **** INFLUENCE WIDTH 10.05 M
1244. **** = (0.5+0.2)X0.96X5.025
1245. **** = 3.3768 KN/M
1246. 459 UNI GX -3.3768 1 5
40-007-CS-8180-03043 Revision 02C Page 65 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1247. MEMBER LOAD


1248. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1249. **** INFLUENCE WIDTH 10 M
1250. **** = (0.5+0.2)X0.79X5
1251. **** = 2.765 KN/M
1252. 145 UNI GX -2.765
1253. 441 UNI GX -2.765 0 1.3
1254. **** INFLUENCE WIDTH 10 M
1255. **** = (0.5+0.2)X0.96X5
1256. **** = 3.36 KN/M
1257. 441 UNI GX -3.36 1.3 6
1258. MEMBER LOAD
1259. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1260. **** INFLUENCE WIDTH 4.5 M
1261. **** = (0.5+0.2)X0.79X2.25
1262. **** = 1.24425 KN/M
1263. 141 388 UNI GX -1.24425
1264. **** INFLUENCE WIDTH 4.5 M
1265. **** = (0.5+0.2)X0.96X2.25
1266. **** = 1.512 KN/M
1267. 434 465 UNI GX -1.512
1268. MEMBER LOAD
1269. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1270. **** INFLUENCE WIDTH 6.5 M
1271. **** = (0.5+0.2)X0.79X3.25
1272. **** = 1.79725 KN/M
1273. 140 387 UNI GX -1.79725
1274. **** INFLUENCE WIDTH 6.5 M
1275. **** = (0.5+0.2)X0.96X3.25
1276. **** = 2.184 KN/M
1277. 433 UNI GX -2.184
1278. MEMBER LOAD
1279. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1280. **** INFLUENCE WIDTH 11.5 M
1281. **** = (0.5+0.2)X0.79X5.75
1282. **** = 3.17975 KN/M
1283. 131 UNI GX -3.17975
1284. 421 UNI GX -3.17975 0 1.3
1285. **** INFLUENCE WIDTH 11.5 M
1286. **** = (0.5+0.2)X0.96X5.75
1287. **** = 3.864 KN/M
1288. 421 UNI GX -3.864 1.3 3.5
1289. MEMBER LOAD
1290. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1291. **** INFLUENCE WIDTH 9.8 M
1292. **** = (0.5+0.2)X0.79X4.9
1293. **** = 2.7097 KN/M
1294. 153 UNI GX -2.7097
1295. 331 UNI GX -2.7097
1296. **** INFLUENCE WIDTH 5 M
1297. **** = (0.5+0.2)X0.96X2.5
1298. **** = 1.68 KN/M
1299. 432 UNI GX -1.68
1300. MEMBER LOAD
40-007-CS-8180-03043 Revision 02C Page 66 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1301. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.


1302. **** INFLUENCE WIDTH 4.8 M
1303. **** = (0.5+0.2)X0.79X2.4
1304. **** = 1.3272 KN/M
1305. 155 UNI GX -1.3272
1306. **** INFLUENCE WIDTH 4.55 M
1307. **** = (-0.85+0.2)X0.79X2.275
1308. **** = -1.1682125 KN/M
1309. 151 UNI GX 1.16821
1310. 446 UNI GX 1.16821 0 2
1311. **** INFLUENCE WIDTH 4.55 M
1312. **** = (-0.85+0.2)X0.96X2.275
1313. **** = -1.4196 KN/M
1314. 446 UNI GX 1.4196 2 6
1315. **** INFLUENCE WIDTH 10.05 M
1316. **** = (-0.85+0.2)X0.79X5.025
1317. **** = -2.5803375 KN/M
1318. 148 UNI GX 2.58034
1319. 443 UNI GX 2.58034 0 2
1320. **** INFLUENCE WIDTH 10.05 M
1321. **** = (-0.85+0.2)X0.96X5.025
1322. **** = -3.1356 KN/M
1323. 443 UNI GX 3.1356 2 6
1324. **** INFLUENCE WIDTH 8.5 M
1325. **** = (-0.85+0.2)X0.79X4.25
1326. **** = -2.182375 KN/M
1327. 146 UNI GX 2.18237
1328. 442 UNI GX 2.18237 0 2
1329. **** INFLUENCE WIDTH 8.5 M
1330. **** = (-0.85+0.2)X0.96X4.25
1331. **** = -2.652 KN/M
1332. 442 UNI GX 2.652 2 6
1333. **** INFLUENCE WIDTH 8 M
1334. **** = (-0.85+0.2)X0.79X4
1335. **** = -2.054 KN/M
1336. 144 UNI GX 2.054
1337. 448 UNI GX 2.054 0 2
1338. **** INFLUENCE WIDTH 8 M
1339. **** = (-0.85+0.2)X0.96X4
1340. **** = -2.496 KN/M
1341. 448 UNI GX 2.496 2 6
1342. **** INFLUENCE WIDTH 8 M
1343. **** = (-0.85+0.2)X0.79X4
1344. **** = -2.054 KN/M
1345. 135 UNI GX 2.054
1346. 447 UNI GX 2.054 0 2
1347. **** INFLUENCE WIDTH 8 M
1348. **** = (-0.85+0.2)X0.96X4
1349. **** = -2.496 KN/M
1350. 447 UNI GX 2.496 2 6
1351. **** INFLUENCE WIDTH 5 M
1352. **** = (-0.85+0.2)X0.79X2.5
1353. **** = -1.28375 KN/M
1354. 133 UNI GX 1.28375
40-007-CS-8180-03043 Revision 02C Page 67 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1355. 435 UNI GX 1.28375 0 2


1356. **** INFLUENCE WIDTH 5 M
1357. **** = (-0.85+0.2)X0.96X2.5
1358. **** = -1.56 KN/M
1359. 435 UNI GX 1.56 2 6
1360. **** INFLUENCE WIDTH 5 M
1361. **** = (-0.85+0.2)X0.79X2.5
1362. **** = -1.28375 KN/M
1363. 138 UNI GX 1.28375
1364. 438 UNI GX 1.28375 0 2
1365. **** INFLUENCE WIDTH 5 M
1366. **** = (-0.85+0.2)X0.96X2.5
1367. **** = -1.56 KN/M
1368. 438 UNI GX 1.56 2 6
1369. **** INFLUENCE WIDTH 4.8 M
1370. **** = (-0.85+0.2)X0.79X2.4
1371. **** = -1.2324 KN/M
1372. 136 UNI GX 1.2324
1373. 330 UNI GX 1.2324 0 1.1
1374. **** INFLUENCE WIDTH 4.8 M
1375. **** = (-0.85+0.2)X0.79X2.4
1376. **** = -1.2324 KN/M
1377. 156 UNI GX 1.2324
1378. **** INFLUENCE WIDTH 5.225 M
1379. **** = (1.3+0.2)X0.79X2.6125
1380. **** = 3.0958125 KN/M
1381. 140 387 UNI GZ -3.09581
1382. **** INFLUENCE WIDTH 5.225 M
1383. **** = (1.3+0.2)X0.96X2.6125
1384. **** = 3.762 KN/M
1385. 433 UNI GZ -3.762
1386. **** INFLUENCE WIDTH 5.225 M
1387. **** = (1.3+0.2)X0.79X2.6125
1388. **** = 3.0958125 KN/M
1389. 149 UNI GZ -3.09581
1390. 444 UNI GZ -3.09581 0 2
1391. **** INFLUENCE WIDTH 5.225 M
1392. **** = (1.3+0.2)X0.96X2.6125
1393. **** = 3.762 KN/M
1394. 444 UNI GZ -3.762 2 6
1395. **** INFLUENCE WIDTH 10.45 M
1396. **** = (1.3+0.2)X0.79X5.225
1397. **** = 6.191625 KN/M
1398. 150 UNI GZ -6.19163
1399. 445 UNI GZ -6.19163 0 2
1400. **** INFLUENCE WIDTH 10.45 M
1401. **** = (1.3+0.2)X0.96X5.225
1402. **** = 7.524 KN/M
1403. 445 UNI GZ -7.524 2 6
1404. **** INFLUENCE WIDTH 5.225 M
1405. **** = (1.3+0.2)X0.79X2.6125
1406. **** = 3.0958125 KN/M
1407. 151 UNI GZ -3.09581
1408. 446 UNI GZ -3.09581 0 2
40-007-CS-8180-03043 Revision 02C Page 68 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1409. **** INFLUENCE WIDTH 5.225 M


1410. **** = (1.3+0.2)X0.96X2.6125
1411. **** = 3.762 KN/M
1412. 446 UNI GZ -3.762 2 6
1413. **** INFLUENCE WIDTH 5 M
1414. **** = (1.3+0.2)X0.79X2.5
1415. **** = 2.9625 KN/M
1416. 142 UNI GZ -2.9625
1417. 439 UNI GZ -2.9625 0 2
1418. **** INFLUENCE WIDTH 5 M
1419. **** = (1.3+0.2)X0.96X2.5
1420. **** = 3.6 KN/M
1421. 439 UNI GZ -3.6 2 6
1422. **** INFLUENCE WIDTH 10 M
1423. **** = (1.3+0.2)X0.79X5
1424. **** = 5.925 KN/M
1425. 143 UNI GZ -5.925
1426. 440 UNI GZ -5.925 0 2
1427. **** INFLUENCE WIDTH 10 M
1428. **** = (1.3+0.2)X0.96X5
1429. **** = 7.2 KN/M
1430. 440 UNI GZ -7.2 2 6
1431. **** INFLUENCE WIDTH 5 M
1432. **** = (1.3+0.2)X0.79X2.5
1433. **** = 2.9625 KN/M
1434. 144 UNI GZ -2.9625
1435. 448 UNI GZ -2.9625 0 2
1436. **** INFLUENCE WIDTH 5 M
1437. **** = (1.3+0.2)X0.96X2.5
1438. **** = 3.6 KN/M
1439. 448 UNI GZ -3.6 2 6
1440. **** INFLUENCE WIDTH 2.4 M
1441. **** = (1.3+0.2)X0.79X1.2
1442. **** = 1.422 KN/M
1443. 153 331 UNI GZ 1.422
1444. 432 UNI GZ 1.422 0 0.9
1445. **** INFLUENCE WIDTH 6.9 M
1446. **** = (1.3+0.2)X0.96X3.45
1447. **** = 4.968 KN/M
1448. 432 UNI GZ 4.968 0.9 2.4
1449. **** INFLUENCE WIDTH 4.5 M
1450. **** = (1.3+0.2)X0.79X2.25
1451. **** = 2.66625 KN/M
1452. 155 UNI GZ 2.66625
1453. **** INFLUENCE WIDTH 4.5 M
1454. **** = (1.3+0.2)X0.79X2.25
1455. **** = 2.66625 KN/M
1456. 155 UNI GZ 2.66625
1457. **** INFLUENCE WIDTH 5.225 M
1458. **** = (1.3+0.2)X0.79X2.6125
1459. **** = 3.0958125 KN/M
1460. 136 330 UNI GZ 3.09581
1461. 431 UNI GZ 3.09581 0 0.9
1462. **** INFLUENCE WIDTH 12.1225 M
40-007-CS-8180-03043 Revision 02C Page 69 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1463. **** = (1.3+0.2)X0.96X6.06125


1464. **** = 8.7282 KN/M
1465. 431 UNI GZ 8.7282 0.9 2.4 0
1466. **** INFLUENCE WIDTH 5.225 M
1467. **** = (1.3+0.2)X0.96X2.6125
1468. **** = 3.762 KN/M
1469. 463 UNI GZ 3.762
1470. **** INFLUENCE WIDTH 10.45 M
1471. **** = (1.3+0.2)X0.79X5.225
1472. **** = 6.191625 KN/M
1473. 137 UNI GZ 6.19163
1474. 437 UNI GZ 6.19163 0 1.3
1475. **** INFLUENCE WIDTH 10.45 M
1476. **** = (1.3+0.2)X0.96X5.225
1477. **** = 7.524 KN/M
1478. 437 UNI GZ 7.524 1.3 6
1479. **** INFLUENCE WIDTH 10.45 M
1480. **** = (1.3+0.2)X0.79X5.225
1481. **** = 6.191625 KN/M
1482. 138 UNI GZ 6.19163
1483. 438 UNI GZ 6.19163 0 1.3
1484. **** INFLUENCE WIDTH 10.45 M
1485. **** = (1.3+0.2)X0.96X5.225
1486. **** = 7.524 KN/M
1487. 438 UNI GZ 7.524 1.3 6
1488. **** INFLUENCE WIDTH 5 M
1489. **** = (1.3+0.2)X0.79X2.5
1490. **** = 2.9625 KN/M
1491. 133 UNI GZ 2.9625
1492. 435 UNI GZ 2.9625 0 1.3
1493. **** INFLUENCE WIDTH 5 M
1494. **** = (1.3+0.2)X0.96X2.5
1495. **** = 3.6 KN/M
1496. 435 UNI GZ 3.6 1.3 6
1497. **** INFLUENCE WIDTH 10 M
1498. **** = (1.3+0.2)X0.79X5
1499. **** = 5.925 KN/M
1500. 134 UNI GZ 5.925
1501. 436 UNI GZ 5.925 0 1.3
1502. **** INFLUENCE WIDTH 10 M
1503. **** = (1.3+0.2)X0.96X5
1504. **** = 7.2 KN/M
1505. 436 UNI GZ 7.2 1.3 6
1506. **** INFLUENCE WIDTH 5 M
1507. **** = (1.3+0.2)X0.79X2.5
1508. **** = 2.9625 KN/M
1509. 135 UNI GZ 2.9625
1510. 447 UNI GZ 2.9625 0 1.3
1511. **** INFLUENCE WIDTH 5 M
1512. **** = (1.3+0.2)X0.96X2.5
1513. **** = 3.6 KN/M
1514. 447 UNI GZ 3.6 1.3 6
1515. MEMBER LOAD
1516. 391 402 405 408 415 418 423 426 UNI Y 3.57
40-007-CS-8180-03043 Revision 02C Page 70 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1517. 392 403 406 409 416 419 424 427 UNI Y 10
1518. 393 404 407 410 417 420 425 428 UNI Y 6
1519.
**************************************************************************
*****
1520. LOAD 7 LOADTYPE WIND TITLE WIND LOAD (CPE+CPI) (+Z)
1521. MEMBER LOAD
1522. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1523. **** INFLUENCE WIDTH 4.55 M
1524. **** = (1.3+-0.3)X0.79X2.275
1525. **** = 1.79725 KN/M
1526. 149 UNI GX -1.79725
1527. 444 UNI GX -1.79725 0 1.3
1528. **** INFLUENCE WIDTH 4.55 M
1529. **** = (1.3+-0.3)X0.96X2.275
1530. **** = 2.184 KN/M
1531. 444 UNI GX -2.184 1.3 6
1532. MEMBER LOAD
1533. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1534. **** INFLUENCE WIDTH 10.05 M
1535. **** = (1.3+-0.3)X0.79X5.025
1536. **** = 3.96975 KN/M
1537. 147 311 UNI GX -3.96975
1538. 459 UNI GX -3.96975 0 1
1539. **** INFLUENCE WIDTH 10.05 M
1540. **** = (1.3+-0.3)X0.96X5.025
1541. **** = 4.824 KN/M
1542. 459 UNI GX -4.824 1 5
1543. MEMBER LOAD
1544. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1545. **** INFLUENCE WIDTH 10 M
1546. **** = (1.3+-0.3)X0.79X5
1547. **** = 3.95 KN/M
1548. 145 UNI GX -3.95
1549. 441 UNI GX -3.95 0 1.3
1550. **** INFLUENCE WIDTH 10 M
1551. **** = (1.3+-0.3)X0.96X5
1552. **** = 4.8 KN/M
1553. 441 UNI GX -4.8 1.3 6
1554. MEMBER LOAD
1555. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1556. **** INFLUENCE WIDTH 4.5 M
1557. **** = (1.3+-0.3)X0.79X2.25
1558. **** = 1.7775 KN/M
1559. 141 388 UNI GX -1.7775
1560. **** INFLUENCE WIDTH 4.5 M
1561. **** = (1.3+-0.3)X0.96X2.25
1562. **** = 2.16 KN/M
1563. 434 465 UNI GX -2.16
1564. MEMBER LOAD
1565. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1566. **** INFLUENCE WIDTH 6.5 M
1567. **** = (1.3+-0.3)X0.79X3.25
1568. **** = 2.5675 KN/M
40-007-CS-8180-03043 Revision 02C Page 71 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1569. 140 387 UNI GX -2.5675


1570. **** INFLUENCE WIDTH 6.5 M
1571. **** = (1.3+-0.3)X0.96X3.25
1572. **** = 3.12 KN/M
1573. 433 UNI GX -3.12
1574. MEMBER LOAD
1575. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1576. **** INFLUENCE WIDTH 11.5 M
1577. **** = (1.3+-0.3)X0.79X5.75
1578. **** = 4.5425 KN/M
1579. 131 UNI GX -4.5425
1580. 421 UNI GX -4.5425 0 1.3
1581. **** INFLUENCE WIDTH 11.5 M
1582. **** = (1.3+-0.3)X0.96X5.75
1583. **** = 5.52 KN/M
1584. 421 UNI GX -5.52 1.3 3.5
1585. MEMBER LOAD
1586. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1587. **** INFLUENCE WIDTH 9.8 M
1588. **** = (1.3+-0.3)X0.79X4.9
1589. **** = 3.871 KN/M
1590. 153 UNI GX -3.871
1591. 331 UNI GX -3.871
1592. **** INFLUENCE WIDTH 5 M
1593. **** = (1.3+-0.3)X0.96X2.5
1594. **** = 2.4 KN/M
1595. 432 UNI GX -2.4
1596. MEMBER LOAD
1597. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1598. **** INFLUENCE WIDTH 4.8 M
1599. **** = (1.3+-0.3)X0.79X2.4
1600. **** = 1.896 KN/M
1601. 155 UNI GX -1.896
1602. **** INFLUENCE WIDTH 4.55 M
1603. **** = (1.3+-0.3)X0.79X2.275
1604. **** = 1.79725 KN/M
1605. 151 UNI GX 1.79725
1606. 446 UNI GX 1.79725 0 2
1607. **** INFLUENCE WIDTH 4.55 M
1608. **** = (1.3+-0.3)X0.96X2.275
1609. **** = 2.184 KN/M
1610. 446 UNI GX 2.184 2 6
1611. **** INFLUENCE WIDTH 10.05 M
1612. **** = (1.3+-0.3)X0.79X5.025
1613. **** = 3.96975 KN/M
1614. 148 UNI GX 3.96975
1615. 443 UNI GX 3.96975 0 2
1616. **** INFLUENCE WIDTH 10.05 M
1617. **** = (1.3+-0.3)X0.96X5.025
1618. **** = 4.824 KN/M
1619. 443 UNI GX 4.824 2 6
1620. **** INFLUENCE WIDTH 8.5 M
1621. **** = (1.3+-0.3)X0.79X4.25
1622. **** = 3.3575 KN/M
40-007-CS-8180-03043 Revision 02C Page 72 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1623. 146 UNI GX 3.3575


1624. 442 UNI GX 3.3575 0 2
1625. **** INFLUENCE WIDTH 8.5 M
1626. **** = (1.3+-0.3)X0.96X4.25
1627. **** = 4.08 KN/M
1628. 442 UNI GX 4.08 2 6
1629. **** INFLUENCE WIDTH 8 M
1630. **** = (1.3+-0.3)X0.79X4
1631. **** = 3.16 KN/M
1632. 144 UNI GX 3.16
1633. 448 UNI GX 3.16 0 2
1634. **** INFLUENCE WIDTH 8 M
1635. **** = (1.3+-0.3)X0.96X4
1636. **** = 3.84 KN/M
1637. 448 UNI GX 3.84 2 6
1638. **** INFLUENCE WIDTH 8 M
1639. **** = (1.3+-0.3)X0.79X4
1640. **** = 3.16 KN/M
1641. 135 UNI GX 3.16
1642. 447 UNI GX 3.16 0 2
1643. **** INFLUENCE WIDTH 8 M
1644. **** = (1.3+-0.3)X0.96X4
1645. **** = 3.84 KN/M
1646. 447 UNI GX 3.84 2 6
1647. **** INFLUENCE WIDTH 5 M
1648. **** = (1.3+-0.3)X0.79X2.5
1649. **** = 1.975 KN/M
1650. 133 UNI GX 1.975
1651. 435 UNI GX 1.975 0 2
1652. **** INFLUENCE WIDTH 5 M
1653. **** = (1.3+-0.3)X0.96X2.5
1654. **** = 2.4 KN/M
1655. 435 UNI GX 2.4 2 6
1656. **** INFLUENCE WIDTH 5 M
1657. **** = (1.3+-0.3)X0.79X2.5
1658. **** = 1.975 KN/M
1659. 138 UNI GX 1.975
1660. 438 UNI GX 1.975 0 2
1661. **** INFLUENCE WIDTH 5 M
1662. **** = (1.3+-0.3)X0.96X2.5
1663. **** = 2.4 KN/M
1664. 438 UNI GX 2.4 2 6
1665. **** INFLUENCE WIDTH 4.8 M
1666. **** = (1.3+-0.3)X0.79X2.4
1667. **** = 1.896 KN/M
1668. 136 UNI GX 1.896
1669. 330 UNI GX 1.896 0 1.1
1670. **** INFLUENCE WIDTH 4.8 M
1671. **** = (1.3+-0.3)X0.79X2.4
1672. **** = 1.896 KN/M
1673. 156 UNI GX 1.896
1674. **** INFLUENCE WIDTH 5.225 M
1675. **** = (-0.85+-0.3)X0.79X2.6125
1676. **** = -2.37345625 KN/M
40-007-CS-8180-03043 Revision 02C Page 73 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1677. 140 387 UNI GZ 2.37346


1678. **** INFLUENCE WIDTH 5.225 M
1679. **** = (-0.85+-0.3)X0.96X2.6125
1680. **** = -2.8842 KN/M
1681. 433 UNI GZ 2.8842
1682. **** INFLUENCE WIDTH 5.225 M
1683. **** = (-0.85+-0.3)X0.79X2.6125
1684. **** = -2.37345625 KN/M
1685. 149 UNI GZ 2.37346
1686. 444 UNI GZ 2.37346 0 2
1687. **** INFLUENCE WIDTH 5.225 M
1688. **** = (-0.85+-0.3)X0.96X2.6125
1689. **** = -2.8842 KN/M
1690. 444 UNI GZ 2.8842 2 6
1691. **** INFLUENCE WIDTH 10.45 M
1692. **** = (-0.85+-0.3)X0.79X5.225
1693. **** = -4.7469125 KN/M
1694. 150 UNI GZ 4.74691
1695. 445 UNI GZ 4.74691 0 2
1696. **** INFLUENCE WIDTH 10.45 M
1697. **** = (-0.85+-0.3)X0.96X5.225
1698. **** = -5.7684 KN/M
1699. 445 UNI GZ 5.7684 2 6
1700. **** INFLUENCE WIDTH 5.225 M
1701. **** = (-0.85+-0.3)X0.79X2.6125
1702. **** = -2.37345625 KN/M
1703. 151 UNI GZ 2.37346
1704. 446 UNI GZ 2.37346 0 2
1705. **** INFLUENCE WIDTH 5.225 M
1706. **** = (-0.85+-0.3)X0.96X2.6125
1707. **** = -2.8842 KN/M
1708. 446 UNI GZ 2.8842 2 6
1709. **** INFLUENCE WIDTH 5 M
1710. **** = (-0.85+-0.3)X0.79X2.5
1711. **** = -2.27125 KN/M
1712. 142 UNI GZ 2.27125
1713. 439 UNI GZ 2.27125 0 2
1714. **** INFLUENCE WIDTH 5 M
1715. **** = (-0.85+-0.3)X0.96X2.5
1716. **** = -2.76 KN/M
1717. 439 UNI GZ 2.76 2 6
1718. **** INFLUENCE WIDTH 10 M
1719. **** = (-0.85+-0.3)X0.79X5
1720. **** = -4.5425 KN/M
1721. 143 UNI GZ 4.5425
1722. 440 UNI GZ 4.5425 0 2
1723. **** INFLUENCE WIDTH 10 M
1724. **** = (-0.85+-0.3)X0.96X5
1725. **** = -5.52 KN/M
1726. 440 UNI GZ 5.52 2 6
1727. **** INFLUENCE WIDTH 5 M
1728. **** = (-0.85+-0.3)X0.79X2.5
1729. **** = -2.27125 KN/M
1730. 144 UNI GZ 2.27125
40-007-CS-8180-03043 Revision 02C Page 74 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1731. 448 UNI GZ 2.27125 0 2


1732. **** INFLUENCE WIDTH 5 M
1733. **** = (-0.85+-0.3)X0.96X2.5
1734. **** = -2.76 KN/M
1735. 448 UNI GZ 2.76 2 6
1736. **** INFLUENCE WIDTH 2.4 M
1737. **** = (0.5+-0.3)X0.79X1.2
1738. **** = 0.1896 KN/M
1739. 153 331 UNI GZ 0.1896
1740. 432 UNI GZ 0.1896 0 0.9
1741. **** INFLUENCE WIDTH 6.9 M
1742. **** = (0.5+-0.3)X0.96X3.45
1743. **** = 0.6624 KN/M
1744. 432 UNI GZ 0.6624 0.9 2.4
1745. **** INFLUENCE WIDTH 4.5 M
1746. **** = (0.5+-0.3)X0.79X2.25
1747. **** = 0.3555 KN/M
1748. 155 UNI GZ 0.3555
1749. **** INFLUENCE WIDTH 4.5 M
1750. **** = (0.5+-0.3)X0.79X2.25
1751. **** = 0.3555 KN/M
1752. 155 UNI GZ 0.3555
1753. **** INFLUENCE WIDTH 5.225 M
1754. **** = (0.5+-0.3)X0.79X2.6125
1755. **** = 0.412775 KN/M
1756. 136 330 UNI GZ 0.412775
1757. 431 UNI GZ 0.412775 0 0.9
1758. **** INFLUENCE WIDTH 12.1225 M
1759. **** = (0.5+-0.3)X0.96X6.06125
1760. **** = 1.16376 KN/M
1761. 431 UNI GZ 1.16376 0.9 2.4 0
1762. **** INFLUENCE WIDTH 5.225 M
1763. **** = (0.5+-0.3)X0.96X2.6125
1764. **** = 0.5016 KN/M
1765. 463 UNI GZ 0.5016
1766. **** INFLUENCE WIDTH 10.45 M
1767. **** = (0.5+-0.3)X0.79X5.225
1768. **** = 0.82555 KN/M
1769. 137 UNI GZ 0.82555
1770. 437 UNI GZ 0.82555 0 1.3
1771. **** INFLUENCE WIDTH 10.45 M
1772. **** = (0.5+-0.3)X0.96X5.225
1773. **** = 1.0032 KN/M
1774. 437 UNI GZ 1.0032 1.3 6
1775. **** INFLUENCE WIDTH 10.45 M
1776. **** = (0.5+-0.3)X0.79X5.225
1777. **** = 0.82555 KN/M
1778. 138 UNI GZ 0.82555
1779. 438 UNI GZ 0.82555 0 1.3
1780. **** INFLUENCE WIDTH 10.45 M
1781. **** = (0.5+-0.3)X0.96X5.225
1782. **** = 1.0032 KN/M
1783. 438 UNI GZ 1.0032 1.3 6
1784. **** INFLUENCE WIDTH 5 M
40-007-CS-8180-03043 Revision 02C Page 75 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1785. **** = (0.5+-0.3)X0.79X2.5


1786. **** = 0.395 KN/M
1787. 133 UNI GZ 0.395
1788. 435 UNI GZ 0.395 0 1.3
1789. **** INFLUENCE WIDTH 5 M
1790. **** = (0.5+-0.3)X0.96X2.5
1791. **** = 0.48 KN/M
1792. 435 UNI GZ 0.48 1.3 6
1793. **** INFLUENCE WIDTH 10 M
1794. **** = (0.5+-0.3)X0.79X5
1795. **** = 0.79 KN/M
1796. 134 UNI GZ 0.79
1797. 436 UNI GZ 0.79 0 1.3
1798. **** INFLUENCE WIDTH 10 M
1799. **** = (0.5+-0.3)X0.96X5
1800. **** = 0.96 KN/M
1801. 436 UNI GZ 0.96 1.3 6
1802. **** INFLUENCE WIDTH 5 M
1803. **** = (0.5+-0.3)X0.79X2.5
1804. **** = 0.395 KN/M
1805. 135 UNI GZ 0.395
1806. 447 UNI GZ 0.395 0 1.3
1807. **** INFLUENCE WIDTH 5 M
1808. **** = (0.5+-0.3)X0.96X2.5
1809. **** = 0.48 KN/M
1810. 447 UNI GZ 0.48 1.3 6
1811. MEMBER LOAD
1812. 391 402 405 408 415 418 423 426 UNI Y 2.76
1813. 392 403 406 409 416 419 424 427 UNI Y 7
1814. 393 404 407 410 417 420 425 428 UNI Y 4.65
1815.
**************************************************************************
*****
1816. LOAD 8 LOADTYPE WIND TITLE WIND LOAD (CPE-CPI) (+Z)
1817. MEMBER LOAD
1818. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1819. **** INFLUENCE WIDTH 4.55 M
1820. **** = (1.3+0.2)X0.79X2.275
1821. **** = 2.695875 KN/M
1822. 149 UNI GX -2.69587
1823. 444 UNI GX -2.69587 0 1.3
1824. **** INFLUENCE WIDTH 4.55 M
1825. **** = (1.3+0.2)X0.96X2.275
1826. **** = 3.276 KN/M
1827. 444 UNI GX -3.276 1.3 6
1828. MEMBER LOAD
1829. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1830. **** INFLUENCE WIDTH 10.05 M
1831. **** = (1.3+0.2)X0.79X5.025
1832. **** = 5.954625 KN/M
1833. 147 311 UNI GX -5.95463
1834. 459 UNI GX -5.95463 0 1
1835. **** INFLUENCE WIDTH 10.05 M
1836. **** = (1.3+0.2)X0.96X5.025
40-007-CS-8180-03043 Revision 02C Page 76 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1837. **** = 7.236 KN/M


1838. 459 UNI GX -7.236 1 5
1839. MEMBER LOAD
1840. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1841. **** INFLUENCE WIDTH 10 M
1842. **** = (1.3+0.2)X0.79X5
1843. **** = 5.925 KN/M
1844. 145 UNI GX -5.925
1845. 441 UNI GX -5.925 0 1.3
1846. **** INFLUENCE WIDTH 10 M
1847. **** = (1.3+0.2)X0.96X5
1848. **** = 7.2 KN/M
1849. 441 UNI GX -7.2 1.3 6
1850. MEMBER LOAD
1851. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1852. **** INFLUENCE WIDTH 4.5 M
1853. **** = (1.3+0.2)X0.79X2.25
1854. **** = 2.66625 KN/M
1855. 141 388 UNI GX -2.66625
1856. **** INFLUENCE WIDTH 4.5 M
1857. **** = (1.3+0.2)X0.96X2.25
1858. **** = 3.24 KN/M
1859. 434 465 UNI GX -3.24
1860. MEMBER LOAD
1861. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1862. **** INFLUENCE WIDTH 6.5 M
1863. **** = (1.3+0.2)X0.79X3.25
1864. **** = 3.85125 KN/M
1865. 140 387 UNI GX -3.85125
1866. **** INFLUENCE WIDTH 6.5 M
1867. **** = (1.3+0.2)X0.96X3.25
1868. **** = 4.68 KN/M
1869. 433 UNI GX -4.68
1870. MEMBER LOAD
1871. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1872. **** INFLUENCE WIDTH 11.5 M
1873. **** = (1.3+0.2)X0.79X5.75
1874. **** = 6.81375 KN/M
1875. 131 UNI GX -6.81375
1876. 421 UNI GX -6.81375 0 1.3
1877. **** INFLUENCE WIDTH 11.5 M
1878. **** = (1.3+0.2)X0.96X5.75
1879. **** = 8.28 KN/M
1880. 421 UNI GX -8.28 1.3 3.5
1881. MEMBER LOAD
1882. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1883. **** INFLUENCE WIDTH 9.8 M
1884. **** = (1.3+0.2)X0.79X4.9
1885. **** = 5.8065 KN/M
1886. 153 UNI GX -5.8065
1887. 331 UNI GX -5.8065
1888. **** INFLUENCE WIDTH 5 M
1889. **** = (1.3+0.2)X0.96X2.5
1890. **** = 3.6 KN/M
40-007-CS-8180-03043 Revision 02C Page 77 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1891. 432 UNI GX -3.6


1892. MEMBER LOAD
1893. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
1894. **** INFLUENCE WIDTH 4.8 M
1895. **** = (1.3+0.2)X0.79X2.4
1896. **** = 2.844 KN/M
1897. 155 UNI GX -2.844
1898. **** INFLUENCE WIDTH 4.55 M
1899. **** = (1.3+0.2)X0.79X2.275
1900. **** = 2.695875 KN/M
1901. 151 UNI GX 2.69587
1902. 446 UNI GX 2.69587 0 2
1903. **** INFLUENCE WIDTH 4.55 M
1904. **** = (1.3+0.2)X0.96X2.275
1905. **** = 3.276 KN/M
1906. 446 UNI GX 3.276 2 6
1907. **** INFLUENCE WIDTH 10.05 M
1908. **** = (1.3+0.2)X0.79X5.025
1909. **** = 5.954625 KN/M
1910. 148 UNI GX 5.95463
1911. 443 UNI GX 5.95463 0 2
1912. **** INFLUENCE WIDTH 10.05 M
1913. **** = (1.3+0.2)X0.96X5.025
1914. **** = 7.236 KN/M
1915. 443 UNI GX 7.236 2 6
1916. **** INFLUENCE WIDTH 8.5 M
1917. **** = (1.3+0.2)X0.79X4.25
1918. **** = 5.03625 KN/M
1919. 146 UNI GX 5.03625
1920. 442 UNI GX 5.03625 0 2
1921. **** INFLUENCE WIDTH 8.5 M
1922. **** = (1.3+0.2)X0.96X4.25
1923. **** = 6.12 KN/M
1924. 442 UNI GX 6.12 2 6
1925. **** INFLUENCE WIDTH 8 M
1926. **** = (1.3+0.2)X0.79X4
1927. **** = 4.74 KN/M
1928. 144 UNI GX 4.74
1929. 448 UNI GX 4.74 0 2
1930. **** INFLUENCE WIDTH 8 M
1931. **** = (1.3+0.2)X0.96X4
1932. **** = 5.76 KN/M
1933. 448 UNI GX 5.76 2 6
1934. **** INFLUENCE WIDTH 8 M
1935. **** = (1.3+0.2)X0.79X4
1936. **** = 4.74 KN/M
1937. 135 UNI GX 4.74
1938. 447 UNI GX 4.74 0 2
1939. **** INFLUENCE WIDTH 8 M
1940. **** = (1.3+0.2)X0.96X4
1941. **** = 5.76 KN/M
1942. 447 UNI GX 5.76 2 6
1943. **** INFLUENCE WIDTH 5 M
1944. **** = (1.3+0.2)X0.79X2.5
40-007-CS-8180-03043 Revision 02C Page 78 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1945. **** = 2.9625 KN/M


1946. 133 UNI GX 2.9625
1947. 435 UNI GX 2.9625 0 2
1948. **** INFLUENCE WIDTH 5 M
1949. **** = (1.3+0.2)X0.96X2.5
1950. **** = 3.6 KN/M
1951. 435 UNI GX 3.6 2 6
1952. **** INFLUENCE WIDTH 5 M
1953. **** = (1.3+0.2)X0.79X2.5
1954. **** = 2.9625 KN/M
1955. 138 UNI GX 2.9625
1956. 438 UNI GX 2.9625 0 2
1957. **** INFLUENCE WIDTH 5 M
1958. **** = (1.3+0.2)X0.96X2.5
1959. **** = 3.6 KN/M
1960. 438 UNI GX 3.6 2 6
1961. **** INFLUENCE WIDTH 4.8 M
1962. **** = (1.3+0.2)X0.79X2.4
1963. **** = 2.844 KN/M
1964. 136 UNI GX 2.844
1965. 330 UNI GX 2.844 0 1.1
1966. **** INFLUENCE WIDTH 4.8 M
1967. **** = (1.3+0.2)X0.79X2.4
1968. **** = 2.844 KN/M
1969. 156 UNI GX 2.844
1970. **** INFLUENCE WIDTH 5.225 M
1971. **** = (-0.85+0.2)X0.79X2.6125
1972. **** = -1.34151875 KN/M
1973. 140 387 UNI GZ 1.34152
1974. **** INFLUENCE WIDTH 5.225 M
1975. **** = (-0.85+0.2)X0.96X2.6125
1976. **** = -1.6302 KN/M
1977. 433 UNI GZ 1.6302
1978. **** INFLUENCE WIDTH 5.225 M
1979. **** = (-0.85+0.2)X0.79X2.6125
1980. **** = -1.34151875 KN/M
1981. 149 UNI GZ 1.34152
1982. 444 UNI GZ 1.34152 0 2
1983. **** INFLUENCE WIDTH 5.225 M
1984. **** = (-0.85+0.2)X0.96X2.6125
1985. **** = -1.6302 KN/M
1986. 444 UNI GZ 1.6302 2 6
1987. **** INFLUENCE WIDTH 10.45 M
1988. **** = (-0.85+0.2)X0.79X5.225
1989. **** = -2.6830375 KN/M
1990. 150 UNI GZ 2.68304
1991. 445 UNI GZ 2.68304 0 2
1992. **** INFLUENCE WIDTH 10.45 M
1993. **** = (-0.85+0.2)X0.96X5.225
1994. **** = -3.2604 KN/M
1995. 445 UNI GZ 3.2604 2 6
1996. **** INFLUENCE WIDTH 5.225 M
1997. **** = (-0.85+0.2)X0.79X2.6125
1998. **** = -1.34151875 KN/M
40-007-CS-8180-03043 Revision 02C Page 79 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

1999. 151 UNI GZ 1.34152


2000. 446 UNI GZ 1.34152 0 2
2001. **** INFLUENCE WIDTH 5.225 M
2002. **** = (-0.85+0.2)X0.96X2.6125
2003. **** = -1.6302 KN/M
2004. 446 UNI GZ 1.6302 2 6
2005. **** INFLUENCE WIDTH 5 M
2006. **** = (-0.85+0.2)X0.79X2.5
2007. **** = -1.28375 KN/M
2008. 142 UNI GZ 1.28375
2009. 439 UNI GZ 1.28375 0 2
2010. **** INFLUENCE WIDTH 5 M
2011. **** = (-0.85+0.2)X0.96X2.5
2012. **** = -1.56 KN/M
2013. 439 UNI GZ 1.56 2 6
2014. **** INFLUENCE WIDTH 10 M
2015. **** = (-0.85+0.2)X0.79X5
2016. **** = -2.5675 KN/M
2017. 143 UNI GZ 2.5675
2018. 440 UNI GZ 2.5675 0 2
2019. **** INFLUENCE WIDTH 10 M
2020. **** = (-0.85+0.2)X0.96X5
2021. **** = -3.12 KN/M
2022. 440 UNI GZ 3.12 2 6
2023. **** INFLUENCE WIDTH 5 M
2024. **** = (-0.85+0.2)X0.79X2.5
2025. **** = -1.28375 KN/M
2026. 144 UNI GZ 1.28375
2027. 448 UNI GZ 1.28375 0 2
2028. **** INFLUENCE WIDTH 5 M
2029. **** = (-0.85+0.2)X0.96X2.5
2030. **** = -1.56 KN/M
2031. 448 UNI GZ 1.56 2 6
2032. **** INFLUENCE WIDTH 2.4 M
2033. **** = (0.5+0.2)X0.79X1.2
2034. **** = 0.6636 KN/M
2035. 153 331 UNI GZ 0.6636
2036. 432 UNI GZ 0.6636 0 0.9
2037. **** INFLUENCE WIDTH 6.9 M
2038. **** = (0.5+0.2)X0.96X3.45
2039. **** = 2.3184 KN/M
2040. 432 UNI GZ 2.3184 0.9 2.4
2041. **** INFLUENCE WIDTH 4.5 M
2042. **** = (0.5+0.2)X0.79X2.25
2043. **** = 1.24425 KN/M
2044. 155 UNI GZ 1.24425
2045. **** INFLUENCE WIDTH 4.5 M
2046. **** = (0.5+0.2)X0.79X2.25
2047. **** = 1.24425 KN/M
2048. 155 UNI GZ 1.24425
2049. **** INFLUENCE WIDTH 5.225 M
2050. **** = (0.5+0.2)X0.79X2.6125
2051. **** = 1.4447125 KN/M
2052. 136 330 UNI GZ 1.44471
40-007-CS-8180-03043 Revision 02C Page 80 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2053. 431 UNI GZ 1.44471 0 0.9


2054. **** INFLUENCE WIDTH 12.1225 M
2055. **** = (0.5+0.2)X0.96X6.06125
2056. **** = 4.07316 KN/M
2057. 431 UNI GZ 4.07316 0.9 2.4 0
2058. **** INFLUENCE WIDTH 5.225 M
2059. **** = (0.5+0.2)X0.96X2.6125
2060. **** = 1.7556 KN/M
2061. 463 UNI GZ 1.7556
2062. **** INFLUENCE WIDTH 10.45 M
2063. **** = (0.5+0.2)X0.79X5.225
2064. **** = 2.889425 KN/M
2065. 137 UNI GZ 2.88943
2066. 437 UNI GZ 2.88943 0 1.3
2067. **** INFLUENCE WIDTH 10.45 M
2068. **** = (0.5+0.2)X0.96X5.225
2069. **** = 3.5112 KN/M
2070. 437 UNI GZ 3.5112 1.3 6
2071. **** INFLUENCE WIDTH 10.45 M
2072. **** = (0.5+0.2)X0.79X5.225
2073. **** = 2.889425 KN/M
2074. 138 UNI GZ 2.88943
2075. 438 UNI GZ 2.88943 0 1.3
2076. **** INFLUENCE WIDTH 10.45 M
2077. **** = (0.5+0.2)X0.96X5.225
2078. **** = 3.5112 KN/M
2079. 438 UNI GZ 3.5112 1.3 6
2080. **** INFLUENCE WIDTH 5 M
2081. **** = (0.5+0.2)X0.79X2.5
2082. **** = 1.3825 KN/M
2083. 133 UNI GZ 1.3825
2084. 435 UNI GZ 1.3825 0 1.3
2085. **** INFLUENCE WIDTH 5 M
2086. **** = (0.5+0.2)X0.96X2.5
2087. **** = 1.68 KN/M
2088. 435 UNI GZ 1.68 1.3 6
2089. **** INFLUENCE WIDTH 10 M
2090. **** = (0.5+0.2)X0.79X5
2091. **** = 2.765 KN/M
2092. 134 UNI GZ 2.765
2093. 436 UNI GZ 2.765 0 1.3
2094. **** INFLUENCE WIDTH 10 M
2095. **** = (0.5+0.2)X0.96X5
2096. **** = 3.36 KN/M
2097. 436 UNI GZ 3.36 1.3 6
2098. **** INFLUENCE WIDTH 5 M
2099. **** = (0.5+0.2)X0.79X2.5
2100. **** = 1.3825 KN/M
2101. 135 UNI GZ 1.3825
2102. 447 UNI GZ 1.3825 0 1.3
2103. **** INFLUENCE WIDTH 5 M
2104. **** = (0.5+0.2)X0.96X2.5
2105. **** = 1.68 KN/M
2106. 447 UNI GZ 1.68 1.3 6
40-007-CS-8180-03043 Revision 02C Page 81 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2107. MEMBER LOAD


2108. 391 402 405 408 415 418 423 426 UNI Y 3.57
2109. 392 403 406 409 416 419 424 427 UNI Y 10
2110. 393 404 407 410 417 420 425 428 UNI Y 6
2111.
**************************************************************************
*****
2112. LOAD 9 LOADTYPE WIND TITLE WIND LOAD (CPE+CPI) (-Z)
2113. MEMBER LOAD
2114. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2115. **** INFLUENCE WIDTH 4.55 M
2116. **** = (1.3+-0.3)X0.79X2.275
2117. **** = 1.79725 KN/M
2118. 149 UNI GX -1.79725
2119. 444 UNI GX -1.79725 0 1.3
2120. **** INFLUENCE WIDTH 4.55 M
2121. **** = (1.3+-0.3)X0.96X2.275
2122. **** = 2.184 KN/M
2123. 444 UNI GX -2.184 1.3 6
2124. MEMBER LOAD
2125. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2126. **** INFLUENCE WIDTH 10.05 M
2127. **** = (1.3+-0.3)X0.79X5.025
2128. **** = 3.96975 KN/M
2129. 147 311 UNI GX -3.96975
2130. 459 UNI GX -3.96975 0 1
2131. **** INFLUENCE WIDTH 10.05 M
2132. **** = (1.3+-0.3)X0.96X5.025
2133. **** = 4.824 KN/M
2134. 459 UNI GX -4.824 1 5
2135. MEMBER LOAD
2136. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2137. **** INFLUENCE WIDTH 10 M
2138. **** = (1.3+-0.3)X0.79X5
2139. **** = 3.95 KN/M
2140. 145 UNI GX -3.95
2141. 441 UNI GX -3.95 0 1.3
2142. **** INFLUENCE WIDTH 10 M
2143. **** = (1.3+-0.3)X0.96X5
2144. **** = 4.8 KN/M
2145. 441 UNI GX -4.8 1.3 6
2146. MEMBER LOAD
2147. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2148. **** INFLUENCE WIDTH 4.5 M
2149. **** = (1.3+-0.3)X0.79X2.25
2150. **** = 1.7775 KN/M
2151. 141 388 UNI GX -1.7775
2152. **** INFLUENCE WIDTH 4.5 M
2153. **** = (1.3+-0.3)X0.96X2.25
2154. **** = 2.16 KN/M
2155. 434 465 UNI GX -2.16
2156. MEMBER LOAD
2157. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2158. **** INFLUENCE WIDTH 6.5 M
40-007-CS-8180-03043 Revision 02C Page 82 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2159. **** = (1.3+-0.3)X0.79X3.25


2160. **** = 2.5675 KN/M
2161. 140 387 UNI GX -2.5675
2162. **** INFLUENCE WIDTH 6.5 M
2163. **** = (1.3+-0.3)X0.96X3.25
2164. **** = 3.12 KN/M
2165. 433 UNI GX -3.12
2166. MEMBER LOAD
2167. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2168. **** INFLUENCE WIDTH 11.5 M
2169. **** = (1.3+-0.3)X0.79X5.75
2170. **** = 4.5425 KN/M
2171. 131 UNI GX -4.5425
2172. 421 UNI GX -4.5425 0 1.3
2173. **** INFLUENCE WIDTH 11.5 M
2174. **** = (1.3+-0.3)X0.96X5.75
2175. **** = 5.52 KN/M
2176. 421 UNI GX -5.52 1.3 3.5
2177. MEMBER LOAD
2178. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2179. **** INFLUENCE WIDTH 9.8 M
2180. **** = (1.3+-0.3)X0.79X4.9
2181. **** = 3.871 KN/M
2182. 153 UNI GX -3.871
2183. 331 UNI GX -3.871
2184. **** INFLUENCE WIDTH 5 M
2185. **** = (1.3+-0.3)X0.96X2.5
2186. **** = 2.4 KN/M
2187. 432 UNI GX -2.4
2188. MEMBER LOAD
2189. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2190. **** INFLUENCE WIDTH 4.8 M
2191. **** = (1.3+-0.3)X0.79X2.4
2192. **** = 1.896 KN/M
2193. 155 UNI GX -1.896
2194. **** INFLUENCE WIDTH 4.55 M
2195. **** = (1.3+-0.3)X0.79X2.275
2196. **** = 1.79725 KN/M
2197. 151 UNI GX 1.79725
2198. 446 UNI GX 1.79725 0 2
2199. **** INFLUENCE WIDTH 4.55 M
2200. **** = (1.3+-0.3)X0.96X2.275
2201. **** = 2.184 KN/M
2202. 446 UNI GX 2.184 2 6
2203. **** INFLUENCE WIDTH 10.05 M
2204. **** = (1.3+-0.3)X0.79X5.025
2205. **** = 3.96975 KN/M
2206. 148 UNI GX 3.96975
2207. 443 UNI GX 3.96975 0 2
2208. **** INFLUENCE WIDTH 10.05 M
2209. **** = (1.3+-0.3)X0.96X5.025
2210. **** = 4.824 KN/M
2211. 443 UNI GX 4.824 2 6
2212. **** INFLUENCE WIDTH 8.5 M
40-007-CS-8180-03043 Revision 02C Page 83 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2213. **** = (1.3+-0.3)X0.79X4.25


2214. **** = 3.3575 KN/M
2215. 146 UNI GX 3.3575
2216. 442 UNI GX 3.3575 0 2
2217. **** INFLUENCE WIDTH 8.5 M
2218. **** = (1.3+-0.3)X0.96X4.25
2219. **** = 4.08 KN/M
2220. 442 UNI GX 4.08 2 6
2221. **** INFLUENCE WIDTH 8 M
2222. **** = (1.3+-0.3)X0.79X4
2223. **** = 3.16 KN/M
2224. 144 UNI GX 3.16
2225. 448 UNI GX 3.16 0 2
2226. **** INFLUENCE WIDTH 8 M
2227. **** = (1.3+-0.3)X0.96X4
2228. **** = 3.84 KN/M
2229. 448 UNI GX 3.84 2 6
2230. **** INFLUENCE WIDTH 8 M
2231. **** = (1.3+-0.3)X0.79X4
2232. **** = 3.16 KN/M
2233. 135 UNI GX 3.16
2234. 447 UNI GX 3.16 0 2
2235. **** INFLUENCE WIDTH 8 M
2236. **** = (1.3+-0.3)X0.96X4
2237. **** = 3.84 KN/M
2238. 447 UNI GX 3.84 2 6
2239. **** INFLUENCE WIDTH 5 M
2240. **** = (1.3+-0.3)X0.79X2.5
2241. **** = 1.975 KN/M
2242. 133 UNI GX 1.975
2243. 435 UNI GX 1.975 0 2
2244. **** INFLUENCE WIDTH 5 M
2245. **** = (1.3+-0.3)X0.96X2.5
2246. **** = 2.4 KN/M
2247. 435 UNI GX 2.4 2 6
2248. **** INFLUENCE WIDTH 5 M
2249. **** = (1.3+-0.3)X0.79X2.5
2250. **** = 1.975 KN/M
2251. 138 UNI GX 1.975
2252. 438 UNI GX 1.975 0 2
2253. **** INFLUENCE WIDTH 5 M
2254. **** = (1.3+-0.3)X0.96X2.5
2255. **** = 2.4 KN/M
2256. 438 UNI GX 2.4 2 6
2257. **** INFLUENCE WIDTH 4.8 M
2258. **** = (1.3+-0.3)X0.79X2.4
2259. **** = 1.896 KN/M
2260. 136 UNI GX 1.896
2261. 330 UNI GX 1.896 0 1.1
2262. **** INFLUENCE WIDTH 4.8 M
2263. **** = (1.3+-0.3)X0.79X2.4
2264. **** = 1.896 KN/M
2265. 156 UNI GX 1.896
2266. **** INFLUENCE WIDTH 5.225 M
40-007-CS-8180-03043 Revision 02C Page 84 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2267. **** = (0.5+-0.3)X0.79X2.6125


2268. **** = 0.412775 KN/M
2269. 140 387 UNI GZ -0.412775
2270. **** INFLUENCE WIDTH 5.225 M
2271. **** = (0.5+-0.3)X0.96X2.6125
2272. **** = 0.5016 KN/M
2273. 433 UNI GZ -0.5016
2274. **** INFLUENCE WIDTH 5.225 M
2275. **** = (0.5+-0.3)X0.79X2.6125
2276. **** = 0.412775 KN/M
2277. 149 UNI GZ -0.412775
2278. 444 UNI GZ -0.412775 0 2
2279. **** INFLUENCE WIDTH 5.225 M
2280. **** = (0.5+-0.3)X0.96X2.6125
2281. **** = 0.5016 KN/M
2282. 444 UNI GZ -0.5016 2 6
2283. **** INFLUENCE WIDTH 10.45 M
2284. **** = (0.5+-0.3)X0.79X5.225
2285. **** = 0.82555 KN/M
2286. 150 UNI GZ -0.82555
2287. 445 UNI GZ -0.82555 0 2
2288. **** INFLUENCE WIDTH 10.45 M
2289. **** = (0.5+-0.3)X0.96X5.225
2290. **** = 1.0032 KN/M
2291. 445 UNI GZ -1.0032 2 6
2292. **** INFLUENCE WIDTH 5.225 M
2293. **** = (0.5+-0.3)X0.79X2.6125
2294. **** = 0.412775 KN/M
2295. 151 UNI GZ -0.412775
2296. 446 UNI GZ -0.412775 0 2
2297. **** INFLUENCE WIDTH 5.225 M
2298. **** = (0.5+-0.3)X0.96X2.6125
2299. **** = 0.5016 KN/M
2300. 446 UNI GZ -0.5016 2 6
2301. **** INFLUENCE WIDTH 5 M
2302. **** = (0.5+-0.3)X0.79X2.5
2303. **** = 0.395 KN/M
2304. 142 UNI GZ -0.395
2305. 439 UNI GZ -0.395 0 2
2306. **** INFLUENCE WIDTH 5 M
2307. **** = (0.5+-0.3)X0.96X2.5
2308. **** = 0.48 KN/M
2309. 439 UNI GZ -0.48 2 6
2310. **** INFLUENCE WIDTH 10 M
2311. **** = (0.5+-0.3)X0.79X5
2312. **** = 0.79 KN/M
2313. 143 UNI GZ -0.79
2314. 440 UNI GZ -0.79 0 2
2315. **** INFLUENCE WIDTH 10 M
2316. **** = (0.5+-0.3)X0.96X5
2317. **** = 0.96 KN/M
2318. 440 UNI GZ -0.96 2 6
2319. **** INFLUENCE WIDTH 5 M
2320. **** = (0.5+-0.3)X0.79X2.5
40-007-CS-8180-03043 Revision 02C Page 85 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2321. **** = 0.395 KN/M


2322. 144 UNI GZ -0.395
2323. 448 UNI GZ -0.395 0 2
2324. **** INFLUENCE WIDTH 5 M
2325. **** = (0.5+-0.3)X0.96X2.5
2326. **** = 0.48 KN/M
2327. 448 UNI GZ -0.48 2 6
2328. **** INFLUENCE WIDTH 2.4 M
2329. **** = (-0.85+-0.3)X0.79X1.2
2330. **** = -1.0902 KN/M
2331. 153 331 UNI GZ -1.0902
2332. 432 UNI GZ -1.0902 0 0.9
2333. **** INFLUENCE WIDTH 6.9 M
2334. **** = (-0.85+-0.3)X0.96X3.45
2335. **** = -3.8088 KN/M
2336. 432 UNI GZ -3.8088 0.9 2.4
2337. **** INFLUENCE WIDTH 4.5 M
2338. **** = (-0.85+-0.3)X0.79X2.25
2339. **** = -2.044125 KN/M
2340. 155 UNI GZ -2.04413
2341. **** INFLUENCE WIDTH 4.5 M
2342. **** = (-0.85+-0.3)X0.79X2.25
2343. **** = -2.044125 KN/M
2344. 155 UNI GZ -2.04413
2345. **** INFLUENCE WIDTH 5.225 M
2346. **** = (-0.85+-0.3)X0.79X2.6125
2347. **** = -2.37345625 KN/M
2348. 136 330 UNI GZ -2.37346
2349. 431 UNI GZ -2.37346 0 0.9
2350. **** INFLUENCE WIDTH 12.1225 M
2351. **** = (-0.85+-0.3)X0.96X6.06125
2352. **** = -6.69162 KN/M
2353. 431 UNI GZ -6.69162 0.9 2.4 0
2354. **** INFLUENCE WIDTH 5.225 M
2355. **** = (-0.85+-0.3)X0.96X2.6125
2356. **** = -2.8842 KN/M
2357. 463 UNI GZ -2.8842
2358. **** INFLUENCE WIDTH 10.45 M
2359. **** = (-0.85+-0.3)X0.79X5.225
2360. **** = -4.7469125 KN/M
2361. 137 UNI GZ -4.74691
2362. 437 UNI GZ -4.74691 0 1.3
2363. **** INFLUENCE WIDTH 10.45 M
2364. **** = (-0.85+-0.3)X0.96X5.225
2365. **** = -5.7684 KN/M
2366. 437 UNI GZ -5.7684 1.3 6
2367. **** INFLUENCE WIDTH 10.45 M
2368. **** = (-0.85+-0.3)X0.79X5.225
2369. **** = -4.7469125 KN/M
2370. 138 UNI GZ -4.74691
2371. 438 UNI GZ -4.74691 0 1.3
2372. **** INFLUENCE WIDTH 10.45 M
2373. **** = (-0.85+-0.3)X0.96X5.225
2374. **** = -5.7684 KN/M
40-007-CS-8180-03043 Revision 02C Page 86 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2375. 438 UNI GZ -5.7684 1.3 6


2376. **** INFLUENCE WIDTH 5 M
2377. **** = (-0.85+-0.3)X0.79X2.5
2378. **** = -2.27125 KN/M
2379. 133 UNI GZ -2.27125
2380. 435 UNI GZ -2.27125 0 1.3
2381. **** INFLUENCE WIDTH 5 M
2382. **** = (-0.85+-0.3)X0.96X2.5
2383. **** = -2.76 KN/M
2384. 435 UNI GZ -2.76 1.3 6
2385. **** INFLUENCE WIDTH 10 M
2386. **** = (-0.85+-0.3)X0.79X5
2387. **** = -4.5425 KN/M
2388. 134 UNI GZ -4.5425
2389. 436 UNI GZ -4.5425 0 1.3
2390. **** INFLUENCE WIDTH 10 M
2391. **** = (-0.85+-0.3)X0.96X5
2392. **** = -5.52 KN/M
2393. 436 UNI GZ -5.52 1.3 6
2394. **** INFLUENCE WIDTH 5 M
2395. **** = (-0.85+-0.3)X0.79X2.5
2396. **** = -2.27125 KN/M
2397. 135 UNI GZ -2.27125
2398. 447 UNI GZ -2.27125 0 1.3
2399. **** INFLUENCE WIDTH 5 M
2400. **** = (-0.85+-0.3)X0.96X2.5
2401. **** = -2.76 KN/M
2402. 447 UNI GZ -2.76 1.3 6
2403. MEMBER LOAD
2404. 391 402 405 408 415 418 423 426 UNI Y 2.76
2405. 392 403 406 409 416 419 424 427 UNI Y 7
2406. 393 404 407 410 417 420 425 428 UNI Y 4.65
2407.
**************************************************************************
*****
2408. LOAD 10 LOADTYPE WIND TITLE WIND LOAD (CPE-CPI) (-Z)
2409. MEMBER LOAD
2410. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2411. **** INFLUENCE WIDTH 4.55 M
2412. **** = (1.3+0.2)X0.79X2.275
2413. **** = 2.695875 KN/M
2414. 149 UNI GX -2.69587
2415. 444 UNI GX -2.69587 0 1.3
2416. **** INFLUENCE WIDTH 4.55 M
2417. **** = (1.3+0.2)X0.96X2.275
2418. **** = 3.276 KN/M
2419. 444 UNI GX -3.276 1.3 6
2420. MEMBER LOAD
2421. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2422. **** INFLUENCE WIDTH 10.05 M
2423. **** = (1.3+0.2)X0.79X5.025
2424. **** = 5.954625 KN/M
2425. 147 311 UNI GX -5.95463
2426. 459 UNI GX -5.95463 0 1
40-007-CS-8180-03043 Revision 02C Page 87 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2427. **** INFLUENCE WIDTH 10.05 M


2428. **** = (1.3+0.2)X0.96X5.025
2429. **** = 7.236 KN/M
2430. 459 UNI GX -7.236 1 5
2431. MEMBER LOAD
2432. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2433. **** INFLUENCE WIDTH 10 M
2434. **** = (1.3+0.2)X0.79X5
2435. **** = 5.925 KN/M
2436. 145 UNI GX -5.925
2437. 441 UNI GX -5.925 0 1.3
2438. **** INFLUENCE WIDTH 10 M
2439. **** = (1.3+0.2)X0.96X5
2440. **** = 7.2 KN/M
2441. 441 UNI GX -7.2 1.3 6
2442. MEMBER LOAD
2443. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2444. **** INFLUENCE WIDTH 4.5 M
2445. **** = (1.3+0.2)X0.79X2.25
2446. **** = 2.66625 KN/M
2447. 141 388 UNI GX -2.66625
2448. **** INFLUENCE WIDTH 4.5 M
2449. **** = (1.3+0.2)X0.96X2.25
2450. **** = 3.24 KN/M
2451. 434 465 UNI GX -3.24
2452. MEMBER LOAD
2453. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2454. **** INFLUENCE WIDTH 6.5 M
2455. **** = (1.3+0.2)X0.79X3.25
2456. **** = 3.85125 KN/M
2457. 140 387 UNI GX -3.85125
2458. **** INFLUENCE WIDTH 6.5 M
2459. **** = (1.3+0.2)X0.96X3.25
2460. **** = 4.68 KN/M
2461. 433 UNI GX -4.68
2462. MEMBER LOAD
2463. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2464. **** INFLUENCE WIDTH 11.5 M
2465. **** = (1.3+0.2)X0.79X5.75
2466. **** = 6.81375 KN/M
2467. 131 UNI GX -6.81375
2468. 421 UNI GX -6.81375 0 1.3
2469. **** INFLUENCE WIDTH 11.5 M
2470. **** = (1.3+0.2)X0.96X5.75
2471. **** = 8.28 KN/M
2472. 421 UNI GX -8.28 1.3 3.5
2473. MEMBER LOAD
2474. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2475. **** INFLUENCE WIDTH 9.8 M
2476. **** = (1.3+0.2)X0.79X4.9
2477. **** = 5.8065 KN/M
2478. 153 UNI GX -5.8065
2479. 331 UNI GX -5.8065
2480. **** INFLUENCE WIDTH 5 M
40-007-CS-8180-03043 Revision 02C Page 88 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2481. **** = (1.3+0.2)X0.96X2.5


2482. **** = 3.6 KN/M
2483. 432 UNI GX -3.6
2484. MEMBER LOAD
2485. ****WIND LOAD ON EXTERIOR = (CPE + CPI) X PE X WIDTH.
2486. **** INFLUENCE WIDTH 4.8 M
2487. **** = (1.3+0.2)X0.79X2.4
2488. **** = 2.844 KN/M
2489. 155 UNI GX -2.844
2490. **** INFLUENCE WIDTH 4.55 M
2491. **** = (1.3+0.2)X0.79X2.275
2492. **** = 2.695875 KN/M
2493. 151 UNI GX 2.69587
2494. 446 UNI GX 2.69587 0 2
2495. **** INFLUENCE WIDTH 4.55 M
2496. **** = (1.3+0.2)X0.96X2.275
2497. **** = 3.276 KN/M
2498. 446 UNI GX 3.276 2 6
2499. **** INFLUENCE WIDTH 10.05 M
2500. **** = (1.3+0.2)X0.79X5.025
2501. **** = 5.954625 KN/M
2502. 148 UNI GX 5.95463
2503. 443 UNI GX 5.95463 0 2
2504. **** INFLUENCE WIDTH 10.05 M
2505. **** = (1.3+0.2)X0.96X5.025
2506. **** = 7.236 KN/M
2507. 443 UNI GX 7.236 2 6
2508. **** INFLUENCE WIDTH 8.5 M
2509. **** = (1.3+0.2)X0.79X4.25
2510. **** = 5.03625 KN/M
2511. 146 UNI GX 5.03625
2512. 442 UNI GX 5.03625 0 2
2513. **** INFLUENCE WIDTH 8.5 M
2514. **** = (1.3+0.2)X0.96X4.25
2515. **** = 6.12 KN/M
2516. 442 UNI GX 6.12 2 6
2517. **** INFLUENCE WIDTH 8 M
2518. **** = (1.3+0.2)X0.79X4
2519. **** = 4.74 KN/M
2520. 144 UNI GX 4.74
2521. 448 UNI GX 4.74 0 2
2522. **** INFLUENCE WIDTH 8 M
2523. **** = (1.3+0.2)X0.96X4
2524. **** = 5.76 KN/M
2525. 448 UNI GX 5.76 2 6
2526. **** INFLUENCE WIDTH 8 M
2527. **** = (1.3+0.2)X0.79X4
2528. **** = 4.74 KN/M
2529. 135 UNI GX 4.74
2530. 447 UNI GX 4.74 0 2
2531. **** INFLUENCE WIDTH 8 M
2532. **** = (1.3+0.2)X0.96X4
2533. **** = 5.76 KN/M
2534. 447 UNI GX 5.76 2 6
40-007-CS-8180-03043 Revision 02C Page 89 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2535. **** INFLUENCE WIDTH 5 M


2536. **** = (1.3+0.2)X0.79X2.5
2537. **** = 2.9625 KN/M
2538. 133 UNI GX 2.9625
2539. 435 UNI GX 2.9625 0 2
2540. **** INFLUENCE WIDTH 5 M
2541. **** = (1.3+0.2)X0.96X2.5
2542. **** = 3.6 KN/M
2543. 435 UNI GX 3.6 2 6
2544. **** INFLUENCE WIDTH 5 M
2545. **** = (1.3+0.2)X0.79X2.5
2546. **** = 2.9625 KN/M
2547. 138 UNI GX 2.9625
2548. 438 UNI GX 2.9625 0 2
2549. **** INFLUENCE WIDTH 5 M
2550. **** = (1.3+0.2)X0.96X2.5
2551. **** = 3.6 KN/M
2552. 438 UNI GX 3.6 2 6
2553. **** INFLUENCE WIDTH 4.8 M
2554. **** = (1.3+0.2)X0.79X2.4
2555. **** = 2.844 KN/M
2556. 136 UNI GX 2.844
2557. 330 UNI GX 2.844 0 1.1
2558. **** INFLUENCE WIDTH 4.8 M
2559. **** = (1.3+0.2)X0.79X2.4
2560. **** = 2.844 KN/M
2561. 156 UNI GX 2.844
2562. **** INFLUENCE WIDTH 5.225 M
2563. **** = (0.5+0.2)X0.79X2.6125
2564. **** = 1.4447125 KN/M
2565. 140 387 UNI GZ -1.44471
2566. **** INFLUENCE WIDTH 5.225 M
2567. **** = (0.5+0.2)X0.96X2.6125
2568. **** = 1.7556 KN/M
2569. 433 UNI GZ -1.7556
2570. **** INFLUENCE WIDTH 5.225 M
2571. **** = (0.5+0.2)X0.79X2.6125
2572. **** = 1.4447125 KN/M
2573. 149 UNI GZ -1.44471
2574. 444 UNI GZ -1.44471 0 2
2575. **** INFLUENCE WIDTH 5.225 M
2576. **** = (0.5+0.2)X0.96X2.6125
2577. **** = 1.7556 KN/M
2578. 444 UNI GZ -1.7556 2 6
2579. **** INFLUENCE WIDTH 10.45 M
2580. **** = (0.5+0.2)X0.79X5.225
2581. **** = 2.889425 KN/M
2582. 150 UNI GZ -2.88943
2583. 445 UNI GZ -2.88943 0 2
2584. **** INFLUENCE WIDTH 10.45 M
2585. **** = (0.5+0.2)X0.96X5.225
2586. **** = 3.5112 KN/M
2587. 445 UNI GZ -3.5112 2 6
2588. **** INFLUENCE WIDTH 5.225 M
40-007-CS-8180-03043 Revision 02C Page 90 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2589. **** = (0.5+0.2)X0.79X2.6125


2590. **** = 1.4447125 KN/M
2591. 151 UNI GZ -1.44471
2592. 446 UNI GZ -1.44471 0 2
2593. **** INFLUENCE WIDTH 5.225 M
2594. **** = (0.5+0.2)X0.96X2.6125
2595. **** = 1.7556 KN/M
2596. 446 UNI GZ -1.7556 2 6
2597. **** INFLUENCE WIDTH 5 M
2598. **** = (0.5+0.2)X0.79X2.5
2599. **** = 1.3825 KN/M
2600. 142 UNI GZ -1.3825
2601. 439 UNI GZ -1.3825 0 2
2602. **** INFLUENCE WIDTH 5 M
2603. **** = (0.5+0.2)X0.96X2.5
2604. **** = 1.68 KN/M
2605. 439 UNI GZ -1.68 2 6
2606. **** INFLUENCE WIDTH 10 M
2607. **** = (0.5+0.2)X0.79X5
2608. **** = 2.765 KN/M
2609. 143 UNI GZ -2.765
2610. 440 UNI GZ -2.765 0 2
2611. **** INFLUENCE WIDTH 10 M
2612. **** = (0.5+0.2)X0.96X5
2613. **** = 3.36 KN/M
2614. 440 UNI GZ -3.36 2 6
2615. **** INFLUENCE WIDTH 5 M
2616. **** = (0.5+0.2)X0.79X2.5
2617. **** = 1.3825 KN/M
2618. 144 UNI GZ -1.3825
2619. 448 UNI GZ -1.3825 0 2
2620. **** INFLUENCE WIDTH 5 M
2621. **** = (0.5+0.2)X0.96X2.5
2622. **** = 1.68 KN/M
2623. 448 UNI GZ -1.68 2 6
2624. **** INFLUENCE WIDTH 2.4 M
2625. **** = (-0.85+0.2)X0.79X1.2
2626. **** = -0.6162 KN/M
2627. 153 331 UNI GZ -0.6162
2628. 432 UNI GZ -0.6162 0 0.9
2629. **** INFLUENCE WIDTH 6.9 M
2630. **** = (-0.85+0.2)X0.96X3.45
2631. **** = -2.1528 KN/M
2632. 432 UNI GZ -2.1528 0.9 2.4
2633. **** INFLUENCE WIDTH 4.5 M
2634. **** = (-0.85+0.2)X0.79X2.25
2635. **** = -1.155375 KN/M
2636. 155 UNI GZ -1.15538
2637. **** INFLUENCE WIDTH 4.5 M
2638. **** = (-0.85+0.2)X0.79X2.25
2639. **** = -1.155375 KN/M
2640. 155 UNI GZ -1.15538
2641. **** INFLUENCE WIDTH 5.225 M
2642. **** = (-0.85+0.2)X0.79X2.6125
40-007-CS-8180-03043 Revision 02C Page 91 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2643. **** = -1.34151875 KN/M


2644. 136 330 UNI GZ -1.34152
2645. 431 UNI GZ -1.34152 0 0.9
2646. **** INFLUENCE WIDTH 12.1225 M
2647. **** = (-0.85+0.2)X0.96X6.06125
2648. **** = -3.78222 KN/M
2649. 431 UNI GZ -3.78222 0.9 2.4 0
2650. **** INFLUENCE WIDTH 5.225 M
2651. **** = (-0.85+0.2)X0.96X2.6125
2652. **** = -1.6302 KN/M
2653. 463 UNI GZ -1.6302
2654. **** INFLUENCE WIDTH 10.45 M
2655. **** = (-0.85+0.2)X0.79X5.225
2656. **** = -2.6830375 KN/M
2657. 137 UNI GZ -2.68304
2658. 437 UNI GZ -2.68304 0 1.3
2659. **** INFLUENCE WIDTH 10.45 M
2660. **** = (-0.85+0.2)X0.96X5.225
2661. **** = -3.2604 KN/M
2662. 437 UNI GZ -3.2604 1.3 6
2663. **** INFLUENCE WIDTH 10.45 M
2664. **** = (-0.85+0.2)X0.79X5.225
2665. **** = -2.6830375 KN/M
2666. 138 UNI GZ -2.68304
2667. 438 UNI GZ -2.68304 0 1.3
2668. **** INFLUENCE WIDTH 10.45 M
2669. **** = (-0.85+0.2)X0.96X5.225
2670. **** = -3.2604 KN/M
2671. 438 UNI GZ -3.2604 1.3 6
2672. **** INFLUENCE WIDTH 5 M
2673. **** = (-0.85+0.2)X0.79X2.5
2674. **** = -1.28375 KN/M
2675. 133 UNI GZ -1.28375
2676. 435 UNI GZ -1.28375 0 1.3
2677. **** INFLUENCE WIDTH 5 M
2678. **** = (-0.85+0.2)X0.96X2.5
2679. **** = -1.56 KN/M
2680. 435 UNI GZ -1.56 1.3 6
2681. **** INFLUENCE WIDTH 10 M
2682. **** = (-0.85+0.2)X0.79X5
2683. **** = -2.5675 KN/M
2684. 134 UNI GZ -2.5675
2685. 436 UNI GZ -2.5675 0 1.3
2686. **** INFLUENCE WIDTH 10 M
2687. **** = (-0.85+0.2)X0.96X5
2688. **** = -3.12 KN/M
2689. 436 UNI GZ -3.12 1.3 6
2690. **** INFLUENCE WIDTH 5 M
2691. **** = (-0.85+0.2)X0.79X2.5
2692. **** = -1.28375 KN/M
2693. 135 UNI GZ -1.28375
2694. 447 UNI GZ -1.28375 0 1.3
2695. **** INFLUENCE WIDTH 5 M
2696. **** = (-0.85+0.2)X0.96X2.5
40-007-CS-8180-03043 Revision 02C Page 92 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2697. **** = -1.56 KN/M


2698. 447 UNI GZ -1.56 1.3 6
2699. MEMBER LOAD
2700. 391 402 405 408 415 418 423 426 UNI Y 3.57
2701. 392 403 406 409 416 419 424 427 UNI Y 10
2702. 393 404 407 410 417 420 425 428 UNI Y 6
2703.
**************************************************************************
*****
2704. *LOAD FOR STABILITY CHECK ONLY
2705.
**************************************************************************
*****
2706. LOAD COMB 101 1.0DL + 1.0LL
2707. 1 1.0 2 1.0
2708. LOAD COMB 102 1.0DL + 1.0WL+X(CPE+CPI)
2709. 1 1.0 3 1.0
2710. LOAD COMB 103 1.0DL + 1.0WL+X(CPE-CPI)
2711. 1 1.0 4 1.0
2712. LOAD COMB 104 1.0DL + 1.0WL-X(CPE+CPI)
2713. 1 1.0 5 1.0
2714. LOAD COMB 105 1.0DL + 1.0WL-X(CPE-CPI)
2715. 1 1.0 6 1.0
2716. LOAD COMB 106 1.0DL + 1.0WL+Z(CPE+CPI)
2717. 1 1.0 7 1.0
2718. LOAD COMB 107 1.0DL + 1.0WL+Z(CPE-CPI)
2719. 1 1.0 8 1.0
2720. LOAD COMB 108 1.0DL + 1.0WL-Z(CPE+CPI)
2721. 1 1.0 9 1.0
2722. LOAD COMB 109 1.0DL + 1.0WL-Z(CPE-CPI)
2723. 1 1.0 10 1.0
2724. LOAD COMB 110 1.0DL + 1.0LL + 1.0WL+X(CPE+CPI)
2725. 1 1.0 2 1.0 3 1.0
2726. LOAD COMB 111 1.0DL + 1.0LL + 1.0WL+X(CPE-CPI)
2727. 1 1.0 2 1.0 4 1.0
2728. LOAD COMB 112 1.0DL + 1.0LL + 1.0WL-X(CPE+CPI)
2729. 1 1.0 2 1.0 5 1.0
2730. LOAD COMB 113 1.0DL + 1.0LL + 1.0WL-X(CPE-CPI)
2731. 1 1.0 2 1.0 6 1.0
2732. LOAD COMB 114 1.0DL + 1.0LL + 1.0WL+Z(CPE+CPI)
2733. 1 1.0 2 1.0 7 1.0
2734. LOAD COMB 115 1.0DL + 1.0LL + 1.0WL+Z(CPE-CPI)
2735. 1 1.0 2 1.0 8 1.0
2736. LOAD COMB 116 1.0DL + 1.0LL + 1.0WL-Z(CPE+CPI)
2737. 1 1.0 2 1.0 9 1.0
2738. LOAD COMB 117 1.0DL + 1.0LL + 1.0WL-Z(CPE-CPI)
2739. 1 1.0 2 1.0 10 1.0
2740.
**************************************************************************
*****
2741. ** LOAD COMBINATIONS FOR COLUMN AND FOUNDATION DESIGN *
2742.
**************************************************************************
*****
40-007-CS-8180-03043 Revision 02C Page 93 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2743. LOAD COMB 201 1.4DL + 1.6LL


2744. 1 1.4 2 1.6
2745.
**************************************************************************
*****
2746. *** LOAD COMBINATIONS FOR WIND LOADS ARE TAKEN AS PER
BS:***********
2747.
**************************************************************************
*****
2748. *******************BENEFICAIAL**********
2749. LOAD COMB 202 1DL + 1.4WL+X(CPE+CPI)
2750. 1 1.0 3 1.4
2751. LOAD COMB 203 1DL + 1.4WL+X(CPE-CPI)
2752. 1 1.0 4 1.4
2753. LOAD COMB 204 1DL + 1.4WL-X(CPE+CPI)
2754. 1 1.0 5 1.4
2755. LOAD COMB 205 1DL + 1.4WL-X(CPE-CPI)
2756. 1 1.0 6 1.4
2757. LOAD COMB 206 1DL + 1.4WL+Z(CPE+CPI)
2758. 1 1.0 7 1.4
2759. LOAD COMB 207 1DL + 1.4WL+Z(CPE-CPI)
2760. 1 1.0 8 1.4
2761. LOAD COMB 208 1DL + 1.4WL-Z(CPE+CPI)
2762. 1 1.0 9 1.4
2763. LOAD COMB 209 1DL + 1.4WL-Z(CPE-CPI)
2764. 1 1.0 10 1.4
2765. ********************ADVERSE********************
2766. LOAD COMB 210 1.4DL + 1.4WL+X(CPE+CPI)
2767. 1 1.4 3 1.4
2768. LOAD COMB 211 1.4DL + 1.4WL+X(CPE-CPI)
2769. 1 1.4 4 1.4
2770. LOAD COMB 212 1.4DL + 1.4WL-X(CPE+CPI)
2771. 1 1.4 5 1.4
2772. LOAD COMB 213 1.4DL + 1.4WL-X(CPE-CPI)
2773. 1 1.4 6 1.4
2774. LOAD COMB 214 1.4DL + 1.4WL+Z(CPE+CPI)
2775. 1 1.4 7 1.4
2776. LOAD COMB 215 1.4DL + 1.4WL+Z(CPE-CPI)
2777. 1 1.4 8 1.4
2778. LOAD COMB 216 1.4DL + 1.4WL-Z(CPE+CPI)
2779. 1 1.4 9 1.4
2780. LOAD COMB 217 1.4DL + 1.4WL-Z(CPE-CPI)
2781. 1 1.4 10 1.4
2782. ************************************************
2783. LOAD COMB 218 1.2DL + 1.2LL + 1.2WL+X(CPE+CPI)
2784. 1 1.2 2 1.2 3 1.2
2785. LOAD COMB 219 1.2DL + 1.2LL + 1.2WL+X(CPE-CPI)
2786. 1 1.2 2 1.2 4 1.2
2787. LOAD COMB 220 1.2DL + 1.2LL + 1.2WL-X(CPE+CPI)
2788. 1 1.2 2 1.2 5 1.2
2789. LOAD COMB 221 1.2DL + 1.2LL + 1.2WL-X(CPE-CPI)
2790. 1 1.2 2 1.2 6 1.2
2791. LOAD COMB 222 1.2DL + 1.2LL + 1.2WL+Z(CPE+CPI)
40-007-CS-8180-03043 Revision 02C Page 94 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

2792. 1 1.2 2 1.2 7 1.2


2793. LOAD COMB 223 1.2DL + 1.2LL + 1.2WL+Z(CPE-CPI)
2794. 1 1.2 2 1.2 8 1.2
2795. LOAD COMB 224 1.2DL + 1.2LL + 1.2WL-Z(CPE+CPI)
2796. 1 1.2 2 1.2 9 1.2
2797. LOAD COMB 225 1.2DL + 1.2LL + 1.2WL-Z(CPE-CPI)
2798. 1 1.2 2 1.2 10 1.2
2799.
**************************************************************************
*****
2800. PERFORM ANALYSIS

P R O B L E M S T A T I S T I C S
-----------------------------------

NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS = 305/ 569/ 30

SOLVER USED IS THE OUT-OF-CORE BASIC SOLVER

ORIGINAL/FINAL BAND-WIDTH= 220/ 40/ 234 DOF


TOTAL PRIMARY LOAD CASES = 10, TOTAL DEGREES OF FREEDOM = 1725
SIZE OF STIFFNESS MATRIX = 404 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE = 17.6/ 0.0 MB

**** WARNING : AVAILABLE HARD DISK SPACE MAY NOT BE


ENOUGH TO COMPLETE EXECUTION. IF YOUR AVAILABLE HARD DISK
SPACE ON THE ANALYSIS DRIVE IS GREATER THAN 3GB THIS MESSAGE
MAY BE ERRONEOUS

2801. LOAD LIST 101 TO 117


2802. PRINT SUPPORT REACTION
STAAD SPACE -- PAGE NO.
2

SUPPORT REACTIONS -UNIT KN METE STRUCTURE TYPE = SPACE


-----------------

JOINT LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM-Y MOM Z

1 101 -42.48 1535.33 0.76 0.00 0.00 0.00


102 -9.61 1070.36 4.10 0.00 0.00 0.00
103 -12.33 1073.15 3.47 0.00 0.00 0.00
104 -24.04 1067.37 3.60 0.00 0.00 0.00
40-007-CS-8180-03043 Revision 02C Page 95 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

105 -26.76 1070.17 2.98 0.00 0.00 0.00


106 -30.23 1067.67 -3.02 0.00 0.00 0.00
107 -35.63 1066.42 -2.69 0.00 0.00 0.00
108 -29.45 1072.64 10.18 0.00 0.00 0.00
109 -34.84 1071.39 10.51 0.00 0.00 0.00
110 -32.83 1533.75 3.40 0.00 0.00 0.00
111 -35.55 1536.54 2.78 0.00 0.00 0.00
112 -47.26 1530.77 2.91 0.00 0.00 0.00
113 -49.99 1533.56 2.28 0.00 0.00 0.00
114 -53.45 1531.07 -3.72 0.00 0.00 0.00
115 -58.85 1529.81 -3.38 0.00 0.00 0.00
116 -52.67 1536.03 9.48 0.00 0.00 0.00
117 -58.06 1534.78 9.81 0.00 0.00 0.00
2 101 81.10 1873.73 5.42 0.00 0.00 0.00
102 19.95 1332.83 4.06 0.00 0.00 0.00
103 30.37 1337.64 3.85 0.00 0.00 0.00
104 32.91 1331.20 3.98 0.00 0.00 0.00
105 43.33 1336.02 3.78 0.00 0.00 0.00
106 46.87 1328.50 -1.82 0.00 0.00 0.00
107 51.68 1328.04 -2.21 0.00 0.00 0.00
108 44.78 1341.53 13.90 0.00 0.00 0.00
109 49.58 1341.07 13.51 0.00 0.00 0.00
110 64.76 1870.38 4.89 0.00 0.00 0.00
111 75.17 1875.20 4.68 0.00 0.00 0.00
112 77.72 1868.76 4.81 0.00 0.00 0.00
113 88.14 1873.57 4.60 0.00 0.00 0.00
114 91.68 1866.06 -0.99 0.00 0.00 0.00
115 96.48 1865.59 -1.39 0.00 0.00 0.00
116 89.59 1879.09 14.73 0.00 0.00 0.00
117 94.39 1878.62 14.33 0.00 0.00 0.00
3 101 19.54 996.96 11.70 0.00 0.00 0.00
102 2.67 448.05 4.00 0.00 0.00 0.00
103 8.46 446.47 3.33 0.00 0.00 0.00
104 0.55 446.82 4.09 0.00 0.00 0.00
105 6.34 445.24 3.42 0.00 0.00 0.00
106 5.65 443.89 0.59 0.00 0.00 0.00
107 4.89 442.22 -0.16 0.00 0.00 0.00
108 5.35 455.83 12.82 0.00 0.00 0.00
109 4.59 454.16 12.07 0.00 0.00 0.00
110 15.21 995.55 10.06 0.00 0.00 0.00
111 21.00 993.97 9.39 0.00 0.00 0.00
112 13.09 994.32 10.15 0.00 0.00 0.00
113 18.88 992.74 9.48 0.00 0.00 0.00
114 18.19 991.39 6.66 0.00 0.00 0.00
115 17.43 989.72 5.91 0.00 0.00 0.00
116 17.89 1003.33 18.88 0.00 0.00 0.00
117 17.13 1001.66 18.13 0.00 0.00 0.00
4 101 10.18 1584.22 -5.09 0.00 0.00 0.00
102 -2.37 1245.70 -8.34 0.00 0.00 0.00
103 5.51 1250.97 -9.12 0.00 0.00 0.00
104 -5.61 1243.91 -8.25 0.00 0.00 0.00
105 2.26 1249.18 -9.04 0.00 0.00 0.00
106 1.79 1236.74 -18.18 0.00 0.00 0.00
107 0.64 1236.58 -19.43 0.00 0.00 0.00
40-007-CS-8180-03043 Revision 02C Page 96 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

108 0.14 1256.57 10.39 0.00 0.00 0.00


109 -1.01 1256.41 9.14 0.00 0.00 0.00
110 4.51 1581.64 -8.11 0.00 0.00 0.00
111 12.39 1586.91 -8.90 0.00 0.00 0.00
112 1.27 1579.85 -8.03 0.00 0.00 0.00
113 9.15 1585.12 -8.82 0.00 0.00 0.00
114 8.67 1572.68 -17.96 0.00 0.00 0.00
115 7.53 1572.52 -19.21 0.00 0.00 0.00
116 7.02 1592.51 10.61 0.00 0.00 0.00
117 5.87 1592.35 9.36 0.00 0.00 0.00
5 101 -15.47 715.83 70.15 0.00 0.00 0.00
102 -11.29 677.82 88.66 0.00 0.00 0.00
103 -2.33 677.07 105.20 0.00 0.00 0.00
104 -16.71 677.80 88.67 0.00 0.00 0.00
105 -7.75 677.06 105.21 0.00 0.00 0.00
106 -8.72 689.18 26.24 0.00 0.00 0.00
107 -10.64 689.15 42.83 0.00 0.00 0.00
108 -10.77 665.16 53.15 0.00 0.00 0.00
109 -12.69 665.13 69.74 0.00 0.00 0.00
110 -20.96 716.46 103.38 0.00 0.00 0.00
111 -12.00 715.71 119.92 0.00 0.00 0.00
112 -26.39 716.44 103.38 0.00 0.00 0.00
113 -17.43 715.70 119.92 0.00 0.00 0.00
114 -18.40 727.82 40.95 0.00 0.00 0.00
115 -20.32 727.79 57.54 0.00 0.00 0.00
116 -20.44 703.80 67.86 0.00 0.00 0.00
117 -22.36 703.77 84.45 0.00 0.00 0.00
6 101 -15.94 645.27 -8.38 0.00 0.00 0.00
102 -10.99 628.83 -10.07 0.00 0.00 0.00
103 -6.39 616.55 -9.49 0.00 0.00 0.00
104 -13.70 634.39 -9.63 0.00 0.00 0.00
105 -9.09 622.10 -9.06 0.00 0.00 0.00
106 -9.66 647.56 -25.88 0.00 0.00 0.00
107 -10.62 650.14 -25.66 0.00 0.00 0.00
108 -10.58 596.25 7.44 0.00 0.00 0.00
109 -11.54 598.83 7.66 0.00 0.00 0.00
110 -18.78 655.64 -8.97 0.00 0.00 0.00
111 -14.18 643.36 -8.40 0.00 0.00 0.00
112 -21.49 661.20 -8.54 0.00 0.00 0.00
113 -16.89 648.92 -7.97 0.00 0.00 0.00
114 -17.46 674.37 -24.78 0.00 0.00 0.00
115 -18.41 676.95 -24.56 0.00 0.00 0.00
116 -18.38 623.07 8.53 0.00 0.00 0.00
117 -19.33 625.65 8.75 0.00 0.00 0.00
7 101 -5.26 1416.16 -3.65 0.00 0.00 0.00
102 -8.45 1105.74 -3.91 0.00 0.00 0.00
103 0.27 1107.84 -3.92 0.00 0.00 0.00
104 -10.43 1104.88 -3.94 0.00 0.00 0.00
105 -1.71 1106.98 -3.95 0.00 0.00 0.00
106 -1.61 1116.29 -7.19 0.00 0.00 0.00
107 -1.93 1115.99 -7.32 0.00 0.00 0.00
108 -6.34 1096.56 1.15 0.00 0.00 0.00
109 -6.66 1096.26 1.02 0.00 0.00 0.00
110 -11.29 1414.60 -3.80 0.00 0.00 0.00
40-007-CS-8180-03043 Revision 02C Page 97 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

111 -2.57 1416.71 -3.81 0.00 0.00 0.00


112 -13.27 1413.74 -3.83 0.00 0.00 0.00
113 -4.55 1415.85 -3.84 0.00 0.00 0.00
114 -4.45 1425.15 -7.08 0.00 0.00 0.00
115 -4.77 1424.86 -7.21 0.00 0.00 0.00
116 -9.18 1405.42 1.26 0.00 0.00 0.00
117 -9.50 1405.13 1.13 0.00 0.00 0.00
8 101 -6.64 1029.42 -7.95 0.00 0.00 0.00
102 -11.93 794.47 -6.89 0.00 0.00 0.00
103 -2.04 794.86 -6.65 0.00 0.00 0.00
104 -14.18 795.19 -6.94 0.00 0.00 0.00
105 -4.30 795.58 -6.70 0.00 0.00 0.00
106 -4.19 804.51 -9.64 0.00 0.00 0.00
107 -4.53 805.06 -9.40 0.00 0.00 0.00
108 -9.80 784.28 -5.74 0.00 0.00 0.00
109 -10.14 784.84 -5.50 0.00 0.00 0.00
110 -13.39 1029.46 -7.37 0.00 0.00 0.00
111 -3.51 1029.84 -7.13 0.00 0.00 0.00
112 -15.65 1030.18 -7.42 0.00 0.00 0.00
113 -5.76 1030.57 -7.18 0.00 0.00 0.00
114 -5.66 1039.50 -10.12 0.00 0.00 0.00
115 -6.00 1040.05 -9.88 0.00 0.00 0.00
116 -11.27 1019.27 -6.22 0.00 0.00 0.00
117 -11.61 1019.82 -5.98 0.00 0.00 0.00
9 101 -4.65 713.53 -5.73 0.00 0.00 0.00
102 -9.73 587.30 -7.89 0.00 0.00 0.00
103 -4.38 577.38 -8.32 0.00 0.00 0.00
104 -10.70 592.00 -7.85 0.00 0.00 0.00
105 -5.36 582.09 -8.28 0.00 0.00 0.00
106 -5.27 600.11 -13.90 0.00 0.00 0.00
107 -5.35 602.91 -14.59 0.00 0.00 0.00
108 -8.34 558.08 2.99 0.00 0.00 0.00
109 -8.42 560.88 2.30 0.00 0.00 0.00
110 -8.38 723.59 -7.40 0.00 0.00 0.00
111 -3.03 713.67 -7.83 0.00 0.00 0.00
112 -9.36 728.29 -7.36 0.00 0.00 0.00
113 -4.01 718.38 -7.79 0.00 0.00 0.00
114 -3.93 736.40 -13.42 0.00 0.00 0.00
115 -4.01 739.20 -14.10 0.00 0.00 0.00
116 -7.00 694.37 3.48 0.00 0.00 0.00
117 -7.08 697.17 2.79 0.00 0.00 0.00
11 101 -1.42 1137.28 7.48 0.00 0.00 0.00
102 -1.34 834.33 9.40 0.00 0.00 0.00
103 3.86 810.42 9.09 0.00 0.00 0.00
104 -0.99 832.89 9.17 0.00 0.00 0.00
105 4.21 808.98 8.86 0.00 0.00 0.00
106 3.87 821.26 6.53 0.00 0.00 0.00
107 4.11 805.46 6.63 0.00 0.00 0.00
108 3.86 830.24 12.05 0.00 0.00 0.00
109 4.11 814.43 12.15 0.00 0.00 0.00
110 -6.05 1110.31 8.55 0.00 0.00 0.00
111 -0.85 1086.40 8.25 0.00 0.00 0.00
112 -5.71 1108.87 8.33 0.00 0.00 0.00
113 -0.50 1084.96 8.02 0.00 0.00 0.00
40-007-CS-8180-03043 Revision 02C Page 98 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

114 -0.84 1097.24 5.69 0.00 0.00 0.00


115 -0.60 1081.44 5.79 0.00 0.00 0.00
116 -0.85 1106.22 11.20 0.00 0.00 0.00
117 -0.61 1090.41 11.30 0.00 0.00 0.00
12 101 0.39 1857.91 4.49 0.00 0.00 0.00
102 -10.61 1354.32 4.75 0.00 0.00 0.00
103 -2.15 1346.74 4.56 0.00 0.00 0.00
104 -10.17 1353.95 4.63 0.00 0.00 0.00
105 -1.71 1346.36 4.44 0.00 0.00 0.00
106 -2.05 1356.35 -1.05 0.00 0.00 0.00
107 -1.83 1349.60 -1.42 0.00 0.00 0.00
108 -2.28 1347.27 14.05 0.00 0.00 0.00
109 -2.06 1340.52 13.68 0.00 0.00 0.00
110 -7.68 1835.96 4.08 0.00 0.00 0.00
111 0.79 1828.38 3.89 0.00 0.00 0.00
112 -7.23 1835.59 3.96 0.00 0.00 0.00
113 1.23 1828.00 3.77 0.00 0.00 0.00
114 0.88 1837.99 -1.72 0.00 0.00 0.00
115 1.10 1831.24 -2.09 0.00 0.00 0.00
116 0.66 1828.91 13.38 0.00 0.00 0.00
117 0.87 1822.16 13.01 0.00 0.00 0.00
13 101 -22.03 761.74 -12.31 0.00 0.00 0.00
102 -13.53 384.26 -0.81 0.00 0.00 0.00
103 -6.58 385.07 -1.20 0.00 0.00 0.00
104 -12.12 383.48 -0.76 0.00 0.00 0.00
105 -5.16 384.30 -1.16 0.00 0.00 0.00
106 -5.25 386.73 -5.45 0.00 0.00 0.00
107 -4.56 386.76 -5.92 0.00 0.00 0.00
108 -5.40 379.03 7.39 0.00 0.00 0.00
109 -4.71 379.06 6.92 0.00 0.00 0.00
110 -28.62 762.32 -13.34 0.00 0.00 0.00
111 -21.66 763.13 -13.73 0.00 0.00 0.00
112 -27.20 761.54 -13.29 0.00 0.00 0.00
113 -20.25 762.36 -13.69 0.00 0.00 0.00
114 -20.33 764.79 -17.98 0.00 0.00 0.00
115 -19.64 764.82 -18.45 0.00 0.00 0.00
116 -20.48 757.09 -5.14 0.00 0.00 0.00
117 -19.79 757.12 -5.61 0.00 0.00 0.00
14 101 5.62 1446.98 1.18 0.00 0.00 0.00
102 -4.97 1172.07 -2.79 0.00 0.00 0.00
103 -1.48 1166.71 -4.16 0.00 0.00 0.00
104 -4.07 1173.57 -2.65 0.00 0.00 0.00
105 -0.59 1168.21 -4.02 0.00 0.00 0.00
106 -0.54 1180.53 -13.62 0.00 0.00 0.00
107 -0.15 1182.37 -15.10 0.00 0.00 0.00
108 -0.58 1146.72 17.99 0.00 0.00 0.00
109 -0.20 1148.57 16.50 0.00 0.00 0.00
110 2.10 1455.05 -2.09 0.00 0.00 0.00
111 5.59 1449.69 -3.46 0.00 0.00 0.00
112 3.00 1456.55 -1.94 0.00 0.00 0.00
113 6.48 1451.19 -3.31 0.00 0.00 0.00
114 6.53 1463.50 -12.91 0.00 0.00 0.00
115 6.92 1465.34 -14.39 0.00 0.00 0.00
116 6.49 1429.70 18.69 0.00 0.00 0.00
40-007-CS-8180-03043 Revision 02C Page 99 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

117 6.87 1431.54 17.21 0.00 0.00 0.00


15 101 -9.93 756.49 -67.40 0.00 0.00 0.00
102 -14.73 704.18 -86.16 0.00 0.00 0.00
103 -5.31 715.23 -102.47 0.00 0.00 0.00
104 -16.49 702.63 -86.13 0.00 0.00 0.00
105 -7.08 713.68 -102.43 0.00 0.00 0.00
106 -8.19 702.66 -46.05 0.00 0.00 0.00
107 -8.76 701.31 -62.51 0.00 0.00 0.00
108 -8.25 729.06 -28.66 0.00 0.00 0.00
109 -8.83 727.70 -45.12 0.00 0.00 0.00
110 -17.72 744.51 -100.50 0.00 0.00 0.00
111 -8.30 755.55 -116.81 0.00 0.00 0.00
112 -19.48 742.95 -100.47 0.00 0.00 0.00
113 -10.06 754.00 -116.78 0.00 0.00 0.00
114 -11.17 742.98 -60.40 0.00 0.00 0.00
115 -11.74 741.63 -76.85 0.00 0.00 0.00
116 -11.24 769.38 -43.00 0.00 0.00 0.00
117 -11.81 768.03 -59.46 0.00 0.00 0.00
16 101 -12.37 635.46 12.40 0.00 0.00 0.00
102 -15.09 624.36 10.07 0.00 0.00 0.00
103 -8.60 609.53 10.14 0.00 0.00 0.00
104 -15.86 627.51 10.51 0.00 0.00 0.00
105 -9.37 612.69 10.58 0.00 0.00 0.00
106 -10.10 588.79 -4.15 0.00 0.00 0.00
107 -10.34 589.66 -4.44 0.00 0.00 0.00
108 -9.85 641.81 29.00 0.00 0.00 0.00
109 -10.09 642.68 28.72 0.00 0.00 0.00
110 -18.01 647.06 10.79 0.00 0.00 0.00
111 -11.52 632.24 10.86 0.00 0.00 0.00
112 -18.78 650.21 11.22 0.00 0.00 0.00
113 -12.29 635.39 11.29 0.00 0.00 0.00
114 -13.02 611.49 -3.44 0.00 0.00 0.00
115 -13.26 612.36 -3.73 0.00 0.00 0.00
116 -12.77 664.51 29.72 0.00 0.00 0.00
117 -13.01 665.38 29.43 0.00 0.00 0.00
17 101 -2.66 1083.36 2.51 0.00 0.00 0.00
102 -2.08 879.75 2.84 0.00 0.00 0.00
103 2.61 889.88 2.61 0.00 0.00 0.00
104 -2.90 879.87 2.73 0.00 0.00 0.00
105 1.80 890.00 2.50 0.00 0.00 0.00
106 1.04 884.98 -3.52 0.00 0.00 0.00
107 0.69 884.42 -3.88 0.00 0.00 0.00
108 1.90 897.57 12.86 0.00 0.00 0.00
109 1.55 897.01 12.50 0.00 0.00 0.00
110 -6.87 1071.57 2.18 0.00 0.00 0.00
111 -2.17 1081.70 1.95 0.00 0.00 0.00
112 -7.69 1071.69 2.07 0.00 0.00 0.00
113 -2.99 1081.82 1.84 0.00 0.00 0.00
114 -3.74 1076.80 -4.18 0.00 0.00 0.00
115 -4.09 1076.23 -4.54 0.00 0.00 0.00
116 -2.89 1089.38 12.20 0.00 0.00 0.00
117 -3.24 1088.82 11.84 0.00 0.00 0.00
18 101 5.37 632.94 7.06 0.00 0.00 0.00
102 -6.69 376.68 -0.28 0.00 0.00 0.00
40-007-CS-8180-03043 Revision 02C Page 100 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

103 3.17 376.73 -0.37 0.00 0.00 0.00


104 -6.61 374.90 -0.31 0.00 0.00 0.00
105 3.26 374.96 -0.40 0.00 0.00 0.00
106 2.82 371.98 -6.57 0.00 0.00 0.00
107 2.74 371.25 -6.78 0.00 0.00 0.00
108 3.26 377.77 7.64 0.00 0.00 0.00
109 3.18 377.04 7.44 0.00 0.00 0.00
110 -4.43 633.59 6.67 0.00 0.00 0.00
111 5.43 633.64 6.58 0.00 0.00 0.00
112 -4.35 631.81 6.64 0.00 0.00 0.00
113 5.52 631.87 6.55 0.00 0.00 0.00
114 5.08 628.89 0.38 0.00 0.00 0.00
115 5.00 628.16 0.17 0.00 0.00 0.00
116 5.52 634.68 14.59 0.00 0.00 0.00
117 5.44 633.95 14.39 0.00 0.00 0.00
19 101 -1.69 1083.28 0.69 0.00 0.00 0.00
102 -9.36 917.20 -3.21 0.00 0.00 0.00
103 -4.51 906.53 -4.00 0.00 0.00 0.00
104 -8.70 918.68 -3.11 0.00 0.00 0.00
105 -3.84 908.01 -3.91 0.00 0.00 0.00
106 -4.25 901.55 -15.00 0.00 0.00 0.00
107 -4.05 901.19 -16.57 0.00 0.00 0.00
108 -3.41 923.67 20.02 0.00 0.00 0.00
109 -3.21 923.30 18.46 0.00 0.00 0.00
110 -6.77 1090.04 -3.28 0.00 0.00 0.00
111 -1.92 1079.36 -4.07 0.00 0.00 0.00
112 -6.11 1091.51 -3.18 0.00 0.00 0.00
113 -1.26 1080.84 -3.97 0.00 0.00 0.00
114 -1.67 1074.39 -15.07 0.00 0.00 0.00
115 -1.46 1074.02 -16.63 0.00 0.00 0.00
116 -0.82 1096.50 19.95 0.00 0.00 0.00
117 -0.62 1096.14 18.39 0.00 0.00 0.00
20 101 -2.21 1113.17 6.81 0.00 0.00 0.00
102 -2.64 888.63 6.30 0.00 0.00 0.00
103 2.03 892.40 6.15 0.00 0.00 0.00
104 -3.37 888.02 6.19 0.00 0.00 0.00
105 1.30 891.78 6.03 0.00 0.00 0.00
106 0.49 895.06 -0.12 0.00 0.00 0.00
107 0.13 890.48 -0.44 0.00 0.00 0.00
108 1.74 889.12 16.30 0.00 0.00 0.00
109 1.38 884.54 15.97 0.00 0.00 0.00
110 -6.58 1089.50 6.54 0.00 0.00 0.00
111 -1.91 1093.26 6.39 0.00 0.00 0.00
112 -7.31 1088.88 6.43 0.00 0.00 0.00
113 -2.64 1092.65 6.28 0.00 0.00 0.00
114 -3.45 1095.93 0.12 0.00 0.00 0.00
115 -3.81 1091.35 -0.20 0.00 0.00 0.00
116 -2.20 1089.98 16.54 0.00 0.00 0.00
117 -2.56 1085.40 16.21 0.00 0.00 0.00
21 101 3.63 702.28 -4.90 0.00 0.00 0.00
102 -8.80 409.92 -3.21 0.00 0.00 0.00
103 2.47 409.99 -2.92 0.00 0.00 0.00
104 -8.16 408.08 -3.28 0.00 0.00 0.00
105 3.11 408.15 -3.00 0.00 0.00 0.00
40-007-CS-8180-03043 Revision 02C Page 101 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

106 1.55 416.64 -11.05 0.00 0.00 0.00


107 1.42 415.17 -10.89 0.00 0.00 0.00
108 5.35 404.37 3.94 0.00 0.00 0.00
109 5.22 402.90 4.10 0.00 0.00 0.00
110 -8.86 700.67 -4.48 0.00 0.00 0.00
111 2.41 700.74 -4.20 0.00 0.00 0.00
112 -8.22 698.83 -4.56 0.00 0.00 0.00
113 3.05 698.90 -4.27 0.00 0.00 0.00
114 1.49 707.39 -12.33 0.00 0.00 0.00
115 1.36 705.92 -12.16 0.00 0.00 0.00
116 5.29 695.12 2.66 0.00 0.00 0.00
117 5.16 693.65 2.83 0.00 0.00 0.00
22 101 2.31 1079.98 4.49 0.00 0.00 0.00
102 -7.37 909.54 0.14 0.00 0.00 0.00
103 -2.14 898.18 -0.93 0.00 0.00 0.00
104 -6.50 910.03 0.25 0.00 0.00 0.00
105 -1.27 898.68 -0.82 0.00 0.00 0.00
106 -1.78 903.93 -11.22 0.00 0.00 0.00
107 -1.61 906.14 -12.81 0.00 0.00 0.00
108 -0.13 879.54 22.65 0.00 0.00 0.00
109 0.04 881.75 21.07 0.00 0.00 0.00
110 -3.65 1096.60 0.70 0.00 0.00 0.00
111 1.58 1085.24 -0.38 0.00 0.00 0.00
112 -2.78 1097.09 0.81 0.00 0.00 0.00
113 2.45 1085.74 -0.26 0.00 0.00 0.00
114 1.94 1090.99 -10.67 0.00 0.00 0.00
115 2.11 1093.20 -12.25 0.00 0.00 0.00
116 3.59 1066.60 23.21 0.00 0.00 0.00
117 3.76 1068.81 21.63 0.00 0.00 0.00
23 101 2.62 535.69 6.69 0.00 0.00 0.00
102 -2.95 461.08 6.28 0.00 0.00 0.00
103 3.37 476.33 6.14 0.00 0.00 0.00
104 -2.99 460.70 6.22 0.00 0.00 0.00
105 3.33 475.95 6.08 0.00 0.00 0.00
106 1.92 461.26 3.14 0.00 0.00 0.00
107 1.62 459.41 2.91 0.00 0.00 0.00
108 5.74 502.76 11.68 0.00 0.00 0.00
109 5.44 500.91 11.46 0.00 0.00 0.00
110 -4.32 516.39 6.44 0.00 0.00 0.00
111 2.00 531.64 6.30 0.00 0.00 0.00
112 -4.36 516.01 6.38 0.00 0.00 0.00
113 1.96 531.26 6.24 0.00 0.00 0.00
114 0.55 516.56 3.29 0.00 0.00 0.00
115 0.25 514.71 3.07 0.00 0.00 0.00
116 4.37 558.07 11.84 0.00 0.00 0.00
117 4.07 556.22 11.62 0.00 0.00 0.00
24 101 -0.40 966.74 7.01 0.00 0.00 0.00
102 -14.06 789.95 5.16 0.00 0.00 0.00
103 -1.74 788.95 4.57 0.00 0.00 0.00
104 -13.89 791.05 5.20 0.00 0.00 0.00
105 -1.57 790.04 4.61 0.00 0.00 0.00
106 -4.20 782.94 5.20 0.00 0.00 0.00
107 -4.69 782.33 4.65 0.00 0.00 0.00
108 3.11 806.21 8.54 0.00 0.00 0.00
40-007-CS-8180-03043 Revision 02C Page 102 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

109 2.62 805.60 7.99 0.00 0.00 0.00


110 -14.04 964.24 5.91 0.00 0.00 0.00
111 -1.72 963.23 5.32 0.00 0.00 0.00
112 -13.86 965.33 5.94 0.00 0.00 0.00
113 -1.54 964.33 5.35 0.00 0.00 0.00
114 -4.17 957.22 5.95 0.00 0.00 0.00
115 -4.67 956.61 5.40 0.00 0.00 0.00
116 3.14 980.49 9.29 0.00 0.00 0.00
117 2.65 979.88 8.74 0.00 0.00 0.00
25 101 -2.60 593.21 5.15 0.00 0.00 0.00
102 -11.37 526.73 2.65 0.00 0.00 0.00
103 -5.01 508.87 2.00 0.00 0.00 0.00
104 -11.15 526.70 2.72 0.00 0.00 0.00
105 -4.79 508.84 2.07 0.00 0.00 0.00
106 -6.14 494.23 -3.31 0.00 0.00 0.00
107 -6.36 492.49 -4.25 0.00 0.00 0.00
108 -2.23 540.43 15.16 0.00 0.00 0.00
109 -2.45 538.69 14.22 0.00 0.00 0.00
110 -9.74 605.40 2.92 0.00 0.00 0.00
111 -3.38 587.54 2.26 0.00 0.00 0.00
112 -9.53 605.37 2.98 0.00 0.00 0.00
113 -3.17 587.51 2.33 0.00 0.00 0.00
114 -4.51 572.90 -3.04 0.00 0.00 0.00
115 -4.73 571.16 -3.98 0.00 0.00 0.00
116 -0.61 619.10 15.42 0.00 0.00 0.00
117 -0.83 617.36 14.49 0.00 0.00 0.00
29 101 5.69 887.55 -0.29 0.00 0.00 0.00
102 8.66 712.10 -0.25 0.00 0.00 0.00
103 12.51 721.65 -0.48 0.00 0.00 0.00
104 6.67 708.55 -0.54 0.00 0.00 0.00
105 10.53 718.11 -0.77 0.00 0.00 0.00
106 10.22 725.08 -4.50 0.00 0.00 0.00
107 9.69 723.98 -4.20 0.00 0.00 0.00
108 8.18 703.89 2.86 0.00 0.00 0.00
109 7.65 702.79 3.16 0.00 0.00 0.00
110 3.67 880.73 1.43 0.00 0.00 0.00
111 7.52 890.29 1.20 0.00 0.00 0.00
112 1.69 877.19 1.15 0.00 0.00 0.00
113 5.54 886.75 0.92 0.00 0.00 0.00
114 5.23 893.72 -2.82 0.00 0.00 0.00
115 4.70 892.61 -2.52 0.00 0.00 0.00
116 3.19 872.53 4.55 0.00 0.00 0.00
117 2.66 871.43 4.85 0.00 0.00 0.00
10 101 9.62 139.34 4.78 6.76 -1.78 -6.38
102 -4.97 110.66 6.09 14.58 -0.60 12.94
103 8.29 124.06 5.12 11.29 -0.94 -6.79
104 -3.08 111.51 6.12 14.43 -0.65 10.34
105 10.18 124.92 5.15 11.15 -0.98 -9.39
106 9.81 128.82 2.47 2.21 -0.17 -8.78
107 10.68 124.80 2.92 3.31 -0.26 -10.01
108 9.49 127.73 7.93 21.01 -1.88 -8.27
109 10.36 123.71 8.38 22.12 -1.96 -9.50
110 -3.21 107.60 7.62 15.05 -1.55 12.59
111 10.05 121.00 6.65 11.76 -1.88 -7.15
40-007-CS-8180-03043 Revision 02C Page 103 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

112 -1.32 108.45 7.65 14.90 -1.60 9.99


113 11.94 121.85 6.69 11.61 -1.93 -9.74
114 11.56 125.76 4.00 2.67 -1.12 -9.13
115 12.43 121.73 4.45 3.78 -1.21 -10.36
116 11.25 124.66 9.47 21.48 -2.82 -8.62
117 12.12 120.64 9.92 22.59 -2.91 -9.85
26 101 0.22 39.88 1.02 3.43 0.00 -0.80
102 -1.33 21.03 1.51 5.69 0.00 5.04
103 0.10 18.46 0.78 3.01 0.00 -0.36
104 -1.26 21.00 1.46 5.50 0.00 4.77
105 0.17 18.43 0.73 2.82 0.00 -0.62
106 -0.04 21.27 -0.27 -1.03 0.00 0.17
107 -0.07 17.56 -0.38 -1.38 0.00 0.27
108 0.49 23.19 2.40 9.06 0.00 -1.84
109 0.46 19.47 2.28 8.71 0.00 -1.74
110 -1.35 26.63 1.32 4.80 0.00 5.13
111 0.08 24.05 0.59 2.12 0.00 -0.27
112 -1.28 26.59 1.27 4.61 0.00 4.86
113 0.15 24.02 0.54 1.93 0.00 -0.53
114 -0.06 26.86 -0.46 -1.92 0.00 0.26
115 -0.09 23.15 -0.57 -2.27 0.00 0.36
116 0.47 28.78 2.21 8.17 0.00 -1.75
117 0.44 25.07 2.10 7.82 0.00 -1.65
27 101 -8.88 252.53 -25.99 -17.63 1.75 7.68
102 -12.78 244.16 -20.34 -12.78 1.23 13.05
103 -8.77 240.54 -20.51 -13.60 0.43 6.43
104 -12.27 245.00 -20.55 -13.18 1.47 13.21
105 -8.26 241.38 -20.72 -14.00 0.68 6.59
106 -7.25 244.97 -32.27 -33.51 1.50 5.15
107 -7.15 246.22 -32.89 -34.97 1.37 5.34
108 -8.58 229.53 -1.30 22.09 1.79 7.36
109 -8.47 230.78 -1.92 20.63 1.66 7.55
110 -13.18 258.09 -26.61 -19.36 1.71 14.29
111 -9.18 254.47 -26.79 -20.18 0.92 7.67
112 -12.68 258.93 -26.82 -19.76 1.95 14.45
113 -8.67 255.31 -27.00 -20.58 1.16 7.83
114 -7.66 258.90 -38.55 -40.09 1.98 6.39
115 -7.56 260.15 -39.16 -41.55 1.85 6.58
116 -8.98 243.46 -7.58 15.51 2.27 8.60
117 -8.88 244.71 -8.20 14.05 2.15 8.79
28 101 7.92 272.86 -20.41 2.62 1.41 -4.89
102 5.67 258.69 -25.01 -7.67 0.95 -0.60
103 9.89 263.64 -27.90 -14.67 0.32 -7.37
104 4.29 258.04 -24.66 -7.16 1.14 0.76
105 8.51 262.98 -27.55 -14.15 0.51 -6.02
106 9.07 264.55 -25.25 -9.16 1.52 -7.17
107 8.48 264.51 -27.49 -14.43 1.37 -6.53
108 7.68 258.52 -8.01 30.62 1.43 -4.92
109 7.09 258.49 -10.25 25.34 1.28 -4.28
110 4.37 269.05 -24.61 -6.64 1.23 1.25
111 8.60 273.99 -27.50 -13.63 0.60 -5.53
112 2.99 268.39 -24.26 -6.13 1.42 2.60
113 7.21 273.34 -27.14 -13.12 0.79 -4.17
114 7.78 274.90 -24.85 -8.12 1.80 -5.32
40-007-CS-8180-03043 Revision 02C Page 104 of 105
SHELL MARINA LOBP – GMP PROJECT

Pile Load Calculation - Main Substation

115 7.19 274.87 -27.09 -13.40 1.65 -4.69


116 6.39 268.87 -7.61 31.65 1.72 -3.07
117 5.80 268.84 -9.85 26.38 1.56 -2.44
30 101 0.38 91.33 2.32 7.76 0.00 -1.31
102 -1.26 28.78 1.01 3.83 0.00 4.83
103 0.16 16.05 0.20 1.00 0.00 -0.58
104 -1.19 29.77 0.95 3.58 0.00 4.55
105 0.24 17.04 0.14 0.75 0.00 -0.85
106 0.03 31.50 -0.66 -2.52 0.00 -0.07
107 -0.01 16.30 -1.17 -4.21 0.00 0.06
108 0.58 34.20 2.50 9.47 0.00 -2.14
109 0.54 19.01 1.99 7.78 0.00 -2.01
110 -1.26 50.01 1.57 5.50 0.00 4.82
111 0.17 37.28 0.75 2.67 0.00 -0.59
112 -1.18 51.00 1.50 5.25 0.00 4.55
113 0.25 38.27 0.69 2.42 0.00 -0.86
114 0.04 52.73 -0.11 -0.85 0.00 -0.08
115 0.00 37.53 -0.62 -2.54 0.00 0.06
116 0.59 55.43 3.05 11.14 0.00 -2.14
117 0.55 40.24 2.54 9.45 0.00 -2.01

************** END OF LATEST ANALYSIS RESULT **************

2803. FINISH

*********** END OF THE STAAD.Pro RUN ***********

**** DATE= OCT 14,2013 TIME= 10:54:56 ****

************************************************************
* For questions on STAAD.Pro, please contact *
* Bentley Systems or Partner offices *
* *
* Telephone Web / Email *
* USA +1 (714) 974-2500 *
* UK +44 (0) 808 101 9246 *
* SINGAPORE +65 6225-6158 *
* FRANCE +33 (0) 1 55238400 *
* GERMANY +49 0931 40468 *
* INDIA +91 (033) 4006-2021 *
* JAPAN +81 (03)5952-6500 http://www.ctc-g.co.jp *
* CHINA +86 21 6288 4040 *
* THAILAND +66 (0)2645-1018/19 partha.p@reisoftwareth.com*
* *
* Worldwide http://selectservices.bentley.com/en-US/ *
* *
************************************************************

40-007-CS-8180-03043 Revision 02C Page 105 of 105