BILL OF QUANTITY

.
STEAK 21 Lippo Mall Puri
Status: New, 440sqm
Location: Lippo Mall Puri
Duration: Mei Juni 2023
Date: 12 Mei 2023

BILL NO. 1: CIVIL - INTERIOR MILL WORK

CONTRACTOR:
SUMMARY:
DESCRIPTION ON CONTRACT

I.1 PRELIMINARY WORKS Rp.


I.2 SHOPFRONT & OUTDOOR AREA Rp.
I.3 DINING AREA Rp.
I.4 POST CONSTRUCTION WORKS Rp.
TOTAL BASED ON CONTRACT Rp. 2,035,334,050
PEMBULATAN Rp. 2,035,000,000

NO TENDER/ CONTRACT
DESCRIPTION Unit Qty Unit Total
Price

I BILL NO. 1: CIVIL - INTERIOR MILL WORK


I.1 PRELIMINARY WORKS
1 Demoliton works ls 1.00
take off exixting condition

2 Transportation & Material Support ls 1.00


3 Accomodation ls 1.00
4 Water & Electricity ls 1.00
5 Temporary partition: ls 1.00
Hoarding partition, incl hollow framing 40/40
sub total
I.2 SHOPFRONT & OUTDOOR AREA
EL.01 - SHOPFRONT
1 Bungkus tiang shopfornt: Eurogrey Mirror m2 35.30 1,500,000 52,950,000
Multipleks 9-18mm, rangka hollow,
edging solid kayu sungkai finish melamik
2 Low partition with synthetic rattan + keramik printing
w: 1300mm H: 900mm see detail dwg unit 0.00 600,000
frame: multipleks 9-18mm lapis veneer melamik,
3 Paraphet Front m2 0.00 1,500,000
gypsum partition, rangka hollow, + solid wooden list
veneer walnut + solid kayu sungkai finish melamik
include LED strip
4 Rolling door full perforated m2 22.70 1,250,000 28,375,000
area kasir saja
one sheet almunium, aanodized, 0.45mm. Ex Super Teknik
5 Box Rolling door ls 1.00 1,500,000 1,500,000
spec same as paraphet
NO TENDER/ CONTRACT
DESCRIPTION Unit Qty Unit Total
Price
6 Logo Steak 21 unit 2.00 by owner
size: t 1500mm, spec: standar steak21
7 Low wooden partition LIGHTED (backing booth) m1 59.40 1,500,000 89,100,000
Multipleks 9-18mm, veneer walnut + solid kayu sungkai finish melamik
top: terazo, LED Strip
skirting : ss gold
8 Partisi satu muka belakang kasir m2 17.60 1,300,000 22,880,000
Multipleks 9-18mm, veneer walnut
solid KAYU sungkai finish melamik
see detail dwg
9 Planter box unit 2.00 3,000,000 6,000,000
Multipleks 9-18mm, rangka hollow,
veneer walnut + solid kayu sungkai finish melamik

I.3 DINING AREA


A ALL FLOOR TREATMENT
AR.FC.100
1 Supply & Install floor tile @Dining Area :
- CT 01 : Dining Area m2 223.30 150,000 33,495,000
Keramik ex Megaglazer Fuselli Grey 800x800mm
2 - CT 02 : VIP Room + smoking room m2 179.30 150,000 26,895,000
Keramik ex Valentino mahogahny rust 150x600mm
3 - CT 03 : Kitchen / service area floor m2 57.86 150,000 8,679,000
Granit Tiles 60x60 ex. Roman TGT 338550CR D'Tambora Perla
3 S/S inlay gold 10mm m1 130.00 75,000 9,750,000
4 Plin lantai 100mm plat gold m1 0.00
5 Raised floor +30cm all area m2 440.00 225,000 99,000,000
by celcon block, include 1x screed

B WALL & PARTITION


All New Celcon Partition
1 Pasangan dinding celcon m2 51.37 350,000 17,979,500
2 Plaster finish m2 102.74 155,000 15,924,700
3 Partisi gypsum 1 muka m2 87.01 300,000 26,103,000
4 Partisi gypsum 1 muka + rockwool (VIP Medium dan Large) m2 63.90 425,000 27,157,500
5 Partisi gypsum 2 muka + rockwool (VIP, Parameter) m2 200.00 600,000 120,000,000

C SPECIAL TREATMENT
Pekerjaan Kayu menggunakan ANTI API dan ANTI RAYAP
ELEV A
1 Partisi satu muka veneer kayu + rotan synthetic (area kasir) m2 27.30 1,500,000 40,950,000
MDF 9-18mm, rangka hollow, synthetic rattan, LIGHTED
2 Partisi dua muka synthetic rattan+solid sungkai 20/20mm duco teal m2 9.24 1,800,000 16,632,000
size: 1200x3300mm (VIP Room Small 2-3)
MDF 9-18mm, rangka hollow, synthetic rattan,
Moru Glass+ Clear mirror
3 Partisi kayu Venner 1 side + Solid sungkai 20/20mm m2 5.58 1,500,000 8,362,500
Multipleks 9-18mm, rangka hollow,
veneer walnut + solid kayu sungkai finish melamik
4 Pimtu VIP Room Small 2&3 unit 2.00 6,500,000 13,000,000
size: 1000x3200mm
MDF 9-18mm, kaca moru 6mm
veneer walnut + solid kayu sungkai finish melamik
incl engsel dorma, door closer, custom hadle dll

ELEV B
1 Partisi satu muka veneer kayu + rotan synthetic m2 0.00
MDF 9-18mm, rangka hollow, synthetic rattan, LIGHTED
2 Partisi dua muka synthetic rattan+solid sungkai 20/20mm duco teal m2 21.30 1,800,000 38,340,000
size: 1200x3300mm (VIP Room Small 4-7)
NO TENDER/ CONTRACT
DESCRIPTION Unit Qty Unit Total
Price
MDF 9-18mm, rangka hollow, synthetic rattan,
Moru Glass+ Clear mirror
3 Partisi kayu Venner 1 side + Solid sungkai 20/20mm m2 20.02 1,500,000 30,030,000
Multipleks 9-18mm, rangka hollow,
veneer walnut + solid kayu sungkai finish melamik
4 Pimtu VIP Room Small 2&3 unit 4.00 6,500,000 26,000,000
size: 1000x3200mm
MDF 9-18mm, kaca moru 6mm
veneer walnut + solid kayu sungkai finish melamik
incl engsel dorma, door closer, custom hadle dll
5 Lemari server M1 & M2 unit 1.00 3,000,000 3,000,000
size: 1100x3250mm
Multipleks 9-18mm, rangka hollow
veneer walnut + solid kayu sungkai finish melamik
inside melaminto

ELEV C
1 Partisi satu muka veneer kayu + rotan synthetic m2 0.00
MDF 9-18mm, rangka hollow, synthetic rattan, LIGHTED
2 Partisi dua muka synthetic rattan+solid sungkai 20/20mm duco teal m2 14.26 1,800,000 25,660,800
size: 1200x3300mm (VIP Room Small 7)
MDF 9-18mm, rangka hollow, synthetic rattan,
Moru Glass+ Clear mirror
3 Partisi kayu Venner 1 side + Solid sungkai 20/20mm m2 2.86 1,500,000 4,290,000
Multipleks 9-18mm, rangka hollow,
veneer walnut + solid kayu sungkai finish melamik

ELEV D
1 Partisi satu muka veneer kayu + rotan synthetic m2 29.30 1,500,000 43,950,000
MDF 9-18mm, rangka hollow, synthetic rattan, LIGHTED
2 Partisi dua muka synthetic rattan+solid sungkai 20/20mm duco teal m2 3.96 1,800,000 7,128,000
size: 1200x3300mm (VIP Room Small 1)
MDF 9-18mm, rangka hollow, synthetic rattan,
Moru Glass+ Clear mirror
3 Partisi kayu Venner 1 side + Solid sungkai 20/20mm m2 13.07 1,500,000 19,602,000
Multipleks 9-18mm, rangka hollow,
veneer walnut + solid kayu sungkai finish melamik
4 Pimtu VIP Room M 1&2, S1, L1 unit 4.00 6,500,000 26,000,000
size: 1000x3200mm
MDF 9-18mm, kaca moru 6mm
veneer walnut + solid kayu sungkai finish melamik
incl engsel dorma, door closer, custom hadle dll
5 Lemari server L1 unit 1.00 3,000,000 3,000,000
size: 1100x3250mm
Multipleks 9-18mm, rangka hollow
veneer walnut + solid kayu sungkai finish melamik
inside melaminto

ELEV E
1 Partisi satu muka veneer kayu + cermin euro grey m2 16.09 1,500,000 24,131,250
MDF 9-18mm, rangka hollow,
2 Partisi dua muka synthetic rattan+solid sungkai 20/20mm duco teal m2 0.00
size: 1200x3300mm (VIP Room Small 1)
MDF 9-18mm, rangka hollow, synthetic rattan,
Moru Glass+ Clear mirror
3 Partisi kayu Venner 1 side + Solid sungkai 20/20mm m2 13.86 1,500,000 20,790,000
Multipleks 9-18mm, rangka hollow,
veneer walnut + solid kayu sungkai finish melamik
4 Lemari server L1 unit 1.00 3,000,000 3,000,000
size: 1100x3250mm
Multipleks 9-18mm, rangka hollow
NO TENDER/ CONTRACT
DESCRIPTION Unit Qty Unit Total
Price
veneer walnut + solid kayu sungkai finish melamik
inside melaminto

VIP M1
1 Panel Gypsum keliling + rockwool m2 66.99 425,000 28,470,750
gypsum 1 muka with hollow frame
2 Skirting 20cm + list kayu 5cm atas panel proyektor M1 19.14 150,000 2,871,000
Multipleks 9-18mm, veneer walnut + solid kayu sungkai finish melamik
3 Partisi satu muka Kayu Venner + Solid sungkai 20/20mm m2 0.00
Multipleks 9-18mm, rangka hollow, indirect light keliling
veneer walnut + solid kayu sungkai finish melamik
"+ cutting tulisan steak21
4 Partisi MDF lengkung atas proyektor m1 19.14 900,000 17,226,000
radius 60cm, finish cat hitam

VIP M2
1 Panel Gypsum keliling + rockwool m2 66.99 425,000 28,470,750
gypsum 1 muka with hollow frame
2 Skirting 20cm + list kayu 5cm atas panel proyektor M1 19.14 150,000 2,871,000
Multipleks 9-18mm, veneer walnut + solid kayu sungkai finish melamik
3 Partisi satu muka Kayu Venner + Solid sungkai 20/20mm m2 0.00
Multipleks 9-18mm, rangka hollow, indirect light keliling
veneer walnut + solid kayu sungkai finish melamik
"+ cutting tulisan steak21
4 Partisi MDF lengkung atas proyektor m1 19.14 900,000 17,226,000
radius 60cm, finish cat hitam

VIP L1
1 Panel Gypsum keliling + rockwool m2 90.86 425,000 38,615,500
gypsum 1 muka with hollow frame
2 Skirting 20cm + list kayu 5cm atas panel proyektor M1 25.96 150,000 3,894,000
Multipleks 9-18mm, veneer walnut + solid kayu sungkai finish melamik
3 Partisi satu muka Kayu Venner + Solid sungkai 20/20mm m2 0.00
Multipleks 9-18mm, rangka hollow, indirect light keliling
veneer walnut + solid kayu sungkai finish melamik
"+ cutting tulisan steak21
4 Partisi MDF lengkung atas proyektor m1 25.96 900,000 23,364,000
radius 60cm, finish cat hitam

VIP S1 - S7
1 Panel Gypsum keliling + rockwool m2 330.80 425,000 140,590,000
gypsum 1 muka with hollow frame
2 Partisi satu muka Kayu Venner + Solid sungkai 20/20mm M2 24.64 1,500,000 36,960,000
Multipleks 9-18mm,veneer teak finish melamik
3 Partisi satu muka m2 68.99 1,500,000 103,488,000
Padded wall + veneer melamik
synthetic rattan+solid sungkai 20/20mm, finish melamik
4 Partisi satu muka Kayu Venner + Solid sungkai 20/20mm M2 45.74 1,600,000 73,180,800
Multipleks 9-18mm, rangka hollow, indirect light keliling
veneer walnut + solid kayu sungkai finish melamik
"+ cutting tulisan steak21
5 Cabinet TV dan multimedia karaoke unit 7.00 8,000,000 56,000,000
size:2200x3200x450mm
NO TENDER/ CONTRACT
DESCRIPTION Unit Qty Unit Total
Price

OTHERS
1 Low wooden partition for bench/ double bench LIGHTED m1 10.01 3,000,000 30,030,000
Multipleks 9-18mm, veneer walnut + solid kayu sungkai finish melamik
top: terazo + standing lamp
skirting : ss gold
2 Bungkus tiang dining area: m2 59.42 1,500,000 89,133,000
Multipleks 9-18mm, rangka hollow, Veneer walnut finish melamik
edging solid kayu sungkai finish melamik

CEILING
All gypsum spec. by Elephant / Knauff Gypsum
1 All Ceilling Flat +3.40, +3.20, +3.350 m2 402.60 300,000 120,780,000
hollow frame 0.7mm, gypsum 9mm
2 Drop ceilling m1 72.60 225,000 16,335,000
hollow frame 0.7mm, multipleks 9mm
3 Drop ceilling with ss gold unit 1.00 6,000,000 6,000,000
Multipleks 9-18mm,edging with SS gold
size: 9000x2950mm
4 Drop ceilling VIP room
VIP M1 & M2 unit 2.00 900,000 1,800,000
size: 3200x2250mm
VIP L1 unit 1.00 900,000 900,000
size: 5900x3200mm
VIP S1-7 unit 7.00 900,000 6,300,000
size: 2560x1650mm
5 Drop Mozaics
Hanging Box up multipleks lapis keramik printing ex ceraqua m2 54.12 1,700,000 92,004,000
Multipleks 9-18mm, rangka hollow, keramik printing ex ceraqua
list ss gold, veneer walnut finish melamik

E PAINT WORKS
1 Water based paint, ex. Dullux, color : Inspiration White m2 100.00 75,000 7,500,000
for wall
2 Water based paint, ex. Dullux, color : Brilliant White m2 402.60 75,000 30,195,000
for ceiling
3 Cat kamprot di drop vertikal m2 0.00

I.4 KITCHEN & SERVICE AREA


Screeding menggunakan dry mortar mix
A FLOOR
1 Raised floor +20cm area kitchen, janitor, washtafel m2 0.00
by celcon block
include 1x screed
2 Water Proofing 2x, by sheet / membran m2 91.24 425,000 38,777,000
incl. screeding
3 Tanggulan finish keramik m1 2.00 600,000 1,200,000

B WALL & PARTITION


1 Wall Ceramic, ex Roman putih 30x30cm m2 109.20 150,000 16,380,000
3m (level ceilling kitchen)
2 Oil based paint, ex Dullux Oil Based, White area washtafel m2 41.00 80,000 3,280,000
3 Pasangan keramik venus 50/300mm putih bevel di ddg luar dapur m2 53.90 150,000 8,085,000

C CEILING
ceilling menggunakan fire resistance
1 Solid Gypsum ceiling 9 mm w/ hollow frame 0.5mm m2 62.40 400,000 24,960,000
2 Ceilling Paint, ex Vinilex m2 62.40 80,000 4,992,000
NO TENDER/ CONTRACT
DESCRIPTION Unit Qty Unit Total
Price
D WASHBASIN
LIHAT GAMBAR DETAIL
1 Wasbasin ex TOTO LW817J unit 1.00 1,500,000 1,500,000
complete set with faucet & accessories
2 Granite latch + structure to wall (FF09) unit 1.00 3,000,000 3,000,000
Top + Skirting : niro assuluto
Cover pipe by multipleks 9-18mm
HPL ex Taco Bologna Terraz TH989J
3 Mirror + cove frame + indirect light (see detail dwg) unit 1.00 1,300,000 1,300,000
size: 900x2200mm

D DOORS
please see door schedule:
1 D1 (kitchen entry: Hidden door) unit 1.00 6,000,000 6,000,000
size: 1000 x 2400mm
spec: Multipleks 9-12mm, finish duco
include engsel dorma, plat stenles, kaca 6mm, door closer
2 D2 (pintu Janitor) unit 1.00 5,000,000 5,000,000
3 D3 (pintu R. Bakar) unit

1.4 POST CONSTRUCTION WORKS


1 General Cleaning m2 200.00 35,000 7,000,000
2 Pembongkaran karena perubahan ls 1.00

Note:
Semua item diatas telah dijelaskan dengan baik oleh marketing/ architect PT.Ardeco Karya Global

Mengetahui:
Jakarta,

Agus Suwanto
kerja tambahan mall lipo puri
NO
description Unit Total
Price
1 jenis pekerjaan

2 kramik 74,000,000 74,000,000


3 Relokasi titik spingkler 40,000,000 40,000,000
4 instalasi gas 45,000,000 45,000,000
5 smoke alrm detektor 19,800,000 19,800,000
6 cabel touvoer 28,250,000 28,250,000
7
8
9 sub total 207,050,000 207,050,000

1 jenis pekerjaan

2 CIVIL 2,035,000,000 2,035,000,000


3 M.E 350,000,000.0 350,000,000.0
4 PEKERJAAN TAMBAHAN 207,050,000 207,050,000
5
6
7

TOTAL
2,592,050,000 2,592,050,000
STEAK 21
Status : new,438sqm
Location : mall gandaria city
Duration : May-23
Date : Jun-23

BILL NO. I : MECHANICAL & ELECTRICAL AND HVAC WORK


CONTRACTOR : kirun

TENDER / CONTRACT
NO. DESCRIPTION QTY UNIT PRICE
UNIT AMOUNT
kontrak Rp.

V.1. PRELIMNARY, ACCOMODATION & TRANSPORTATION LOT 1.0


V.2. ELECTRICITY WORKS LOT 1.0
V.3. PLUMBING WORKS LOT 1.0
V.4. DRAINAGE WORKS LOT 1.0
V.5. GAS WORKS LOT 1.0
V.6. ARMATURE / OTHERS LOT 1.0
V.7. AIR CONDITIONING WORKS LOT 1.0
V.8. MECHANICAL VENTILATION WORKS LOT 1.0
V.9. OTHER LOT 1.0

AMOUNT CONTRACT 358,016,500.0

PEMBULATAN 350,000,000.0

V.1. PRELIMNARY, ACCOMODATION & TRANSPORTATION


A. PRELIMNARY WORKS
1 Temporary Site Office & Store lot
2 Water Elctric Power & Telephone lot
3 Mobilization lot
4 Site Transportation lot 1.0
5 Security lot
6 Cleaning Area lot
Design Fee, Asbuild Drawing, Shop Drawing lot 1.0
Sub - Total

B. ACCOMODATION & TRANSPORTATION


1 Transportation Man Power, VV org
2 Accomodation Man Power, 4 Weeks (Housing) bulan 1.0
3 Extra Meal Man Power org
4 Transportation Site Engineer, VV org
5 Accomodation Site Engineer org
6 Transportation & Accomodation Supervision, VV time
7 Stand by Tecknician for 2 (two) Weeks person
Sub - Total

Total V.1.
V.2. ELECTRICITY WORKS
1 Wiring Installation Lighting, NYM 3 x 2,5 mm2 c/w Conduit points 110.0 324,000.0 35,640,000.0
2 3P Socket Outlet &Wiring Installation For FAN points 2.0 550,000.0 1,100,000.0
NYY 4 x 2,5 mm2 c/w Conduit
3 3P Socket Outlet & Wiring Installation Equipment points
NYY 4 x 4 mm2 c/w Conduit
4 1P Socket Outlet & Wiring Installation Equipment points 98.0 324,000.0 31,752,000.0
NYM 3 x 2,5 mm2 c/w Conduit
5 1P Socket Outlet &Wiring Installation Emergency lamp points 13.0 290,000.0 3,770,000.0
NYM 3 x 2,5 mm2 c/w Conduit
6 1P Wiring Inst. Neon/Cloud Sign NYM 3 x 2,5 mm2 c/w Conduit points 3.0 430,000.0 1,290,000.0
7 1P Wiring Installation AC NYM 3 x 2.5 mm2 points
8 Socket Outlet Data & Wiring Installation Equipment points 3.0 500,000.0 1,500,000.0
UTP Cat 5e c/w conduit
9 Push Botton 3P c/w Magnetic Switch, 400 V, Mitsubishi, 3 kW unit 1.0 1,000,000.0 1,000,000.0
10 Push Botton 3P c/w Magnetic Switch, 400 V, Mitsubishi, 5 kW unit 1.0 1,400,000.0 1,400,000.0
11 Grid Switch 5 Gang for Master Switch unit 4.0 1,500,000.0 6,000,000.0
12 Grid Switch 4 Gang for Master Switch unit 2.0 843,000.0 1,686,000.0
13 Grid Switch 3 Gang for Master switch unit 6.0 678,000.0 4,068,000.0
14 Switch Double for Lighting pcs 10.0 150,000.0 1,500,000.0
15 Switch Single Lighting pcs 3.0 150,000.0 450,000.0
16 Power Outlet 13A ex Clipsal pcs 94.0 150,000.0 14,100,000.0
17 Floor Outlet ex Albion pcs
18 Electricity Panel c/w Component unit 1.0 15,000,000.0 15,000,000.0
19 Electricity Panel power generator c/w Component unit 1.0 4,000,000.0 4,000,000.0
20 Toevoer Cable NYY 4 x 6 mm2 + NYA 6 mm NYY 4X10mm2 m 150,000.0 -
21 Toevoer Cable NYY 4 x 4 mm2 + NYA 4 mm m
22 Power Cable for fan NYY 4 x 2.5 mm2 c/w konduit m 10.0 250,000.0 2,500,000.0
23 Outlet Telepon unit 1.0 250,000.0 250,000.0
24 Outlet Data Cat 5e unit 8.0 200,000.0 1,600,000.0
25 Grounding System, R < 10 Ohm lot 12.0 185,000.0 2,220,000.0
26 Wiring Installation Telephone Lines & Intercom c/w Conduit points 1.0 300,000.0 300,000.0
27 Installation Bell NYMHY Cable c/w Conduit points
28 Installation Speaker NYMHY Cable c/w Conduit points 16.0 280,000.0 4,480,000.0
29 kabel perangkat rom room 1,2,3,4,5,6 lot - 10,500,000.0 -
titik audio sabwofer points 6.0 280,000.0 1,680,000.0
Socket Outlet & Wiring Installation TV points 1.0 280,000.0 280,000.0
Coaxial Cable RG 6/5 C c/w Conduit
Total V.2. 137,566,000.0
V.3. PLUMBING WORKS
A. COLD WATER INSTALLATION WORKS
1 Polypropylene Pipe, Agrusan / ATP Toro Dia 1/2" c/w Accessories m 35.0 150,000.0 5,250,000.0
2 Polypropylene Pipe, Agrusan / ATP Toro Dia 3/4" c/w Accessories m
3 Polypropylene Pipe, Agrusan / ATP Toro Dia 1" c/w Accessories m 15.0 189,000.0 2,835,000.0
4 Ball Valve Dia 20, Kitz pcs
5 Ball Valve Dia 25, Kitz pcs 2.0 300,000.0 600,000.0
6 Ball Valve Dia 15, Kitz pcs 16.0 220,000.0 3,520,000.0
7 Check Valve Dia 25 pcs
8 Ball Tap Valve Dia 25 pcs
9 Wall Faucet T 23-13 V7N, ex Toto pcs by other
10 Wash basin / Lavatory pcs by other
Sub - Total 12,205,000.0

B. HOT WATER INSTALLATION WORKS


1 Electricity Water Heater Cap 100 l, Ariston ( install only ) unit 1.0 150,000.0 150,000.0
2 Polypropylene Pipe, Agrusan / ATP Toro Dia 3/4" c/w Accessories m 5.0 250,000.0 1,250,000.0
3 Polypropylene Pipe, Agrusan / ATP Toro Dia 1/2" c/w Accessories m 13.5 189,000.0 2,551,500.0
4 Ball valve Dia 1/2", Kitz pcs 2.0 180,000.0 360,000.0
Total V.3. 4,311,500.0
V.4. DRAINAGE WORKS
1 Control Box 300 x 300 unit 4.0 110,000.0 440,000.0
2 Control Box 600x300 c/w Cover unit
3 Control Cover box c/w Filter S/S, t = 0,6 Size 300 x 300 unit 4.0 150,000.0 600,000.0
4 Floor Drain Dia 2", ex Toto pcs 1.0 250,000.0 250,000.0
5 Floor Drain Dia 4", Cast Iron pcs
6 Drainage Installation Pipe, PVC Pipe,
Rucika AW Type c/w Accessories
1 Dia 4" m 15.0 280,000.0 4,200,000.0
2 Dia 3" m 4.0 247,000.0 988,000.0
3 Dia 2" m 20.0 170,000.0 3,400,000.0
4 Dia 1 1/2" m 4.0 160,000.0 640,000.0
5 Coring Floor Drain lot 0 17,000,000.0 -
6 Clean Out (CO) Dia 4", chrome type points 1.0 343,000.0 343,000.0
7 Grease Trap S/S 1000 x 800 x 600 mm unit BY SIPIL
8 Grease Trap Concrete c/w Cover 1000 x 800 x 600 mm unit BY SIPIL
Total V.4. 10,861,000.0
V.5. GAS WORKS ( Asumsi kontraktor Gas yang dipakai adalah tidak bersertifikasi Gas PGN )
1 Black Steel Pipe Sch 40 Seamless Dia 15 c/w Accessories m by other
2 Black Steel Pipe Sch 40 Seamless Dia 20 c/w Accessories m by other
3 Black Steel Pipe Sch 40 Seamless Dia 25 c/w Accessories m by other
4 Black Steel Pipe Sch 40 Seamless Dia 32 c/w Accessories m by other
5 Black Steel Pipe Sch 40 Seamless Dia 50 c/w Accessories m by other
6 Ball Valve 20K, dia 20, Kitz pcs by other
7 Ball Valve 20K, dia 25, Kitz pcs by other
8 Ball Valve 20K, dia 15, Kitz pcs by other
9 Regulator medium Pressure 567 FB, Rego unit by other
10 Regulator Low Pressure R 552 DFF, Fisher unit by other
11 Pressure Gauge c/w Valve, Yamamoto Range 0-10 Bar unit by other
12 Pressure Gauge c/w Valve, Yamamoto Range 0-5 Bar unit by other
13 Pressure Gauge c/w Valve, Yamamoto Range 0-60 m bar unit by other
14 Supply Gas Installation
15 Header BS Pipe Sch 40 Seamless Dia 50 m by other
16 Pig Tail Hose, Bridge Stone Dia 15 unit by other
17 Ball Valve Dia 15, Kitz pcs by other
18 Ball Valve Dia 50, Kitz pcs by other
19 Gas Detector, Cosmos, 3 % - 20 % LEL, XH-227B unit by other
20 Gas Alarm Control Panel, 4 Zone unit by other
21 Solenoid Valve Dia 1", NO. Burkert unit by other
22 Control Installation, NYMHY 4c x 1,5 mm2 + PVC Conduit points by other
23 Bell Alarm (Security Building) pcs by other
24 Indicator Lamp (Security Building) pcs by other
25 Wiring to Main Control Building System points by other
Total V.5.
Asumsi kontraktor Gas yang dipakai adalah tidak bersertifikasi Gas PGN
V.6. ARMATURE / OTHERS ( INSTALL ONLY )
1 Down Light Inbow area dining nos 63.0 97,000.0 6,111,000.0
2 Down Light, dapur nos 20.0 97,000.0 1,940,000.0
3 Halogen 50 W, 12 V, Adjustable ex Creation nos 42.0 97,000.0 4,074,000.0
4 Hanging lamp (LED) 50 W, Fix type ex Creation nos 18 97,000.0 1,746,000.0
5 inderek lamp led selang nos 57.0 97,000.0 5,529,000.0
6 foon counter lamp nos 3.0 97,000.0 291,000.0
7 Metal Halide 150 w nos
8 Pendant Lamp, IL 1 x 40 W, ex Class Int. INSTALL ONLY nos 16.0 97,000.0 1,552,000.0
9 Wall Lamp, IL 1 x 25 W, Tuliva Savila ex Class Int. nos 5.0 97,000.0 485,000.0
10 standing lamp. nos 6.0 97,000.0 582,000.0
11 FL 18 W, Portable Emergency Lamp nos 12.0 97,000.0 1,164,000.0
12 exhoust celling nos 11.0 97,000.0 1,067,000.0
13 Hood Lamp IL 60, Moisture roof, frosted Cover nos
14 Chiller Lamp IL 60, Moisture roof, frosted Cover nos
15 Nigth Lamp 50 w nos 4.0 97,000.0 388,000.0
16 Speaker 3 Way, 8 ohm, Clasic / equal ( install only ) unit 4.0 97,000.0 388,000.0
17 Sound System Equipment : CD, Cassette, Tunner, Equalizer set 1.0 55,000.0 55,000.0
18 Min. 3.500 PMPO, Sony / equal ( install only )
19 Electric Bell + Push Button, MK (Two Sound) set by other
20 Intercom Unit unit
21 Neon Sign unit by other
22 Cloud Sign unit by other

Total V.6 25,372,000


V.7. AIR CONDITIONING WORKS m2 45.0 550,000.0 24,750,000.0
1 Ducting System BJLS 60 + Insulation m2
2 Ducting System BJLS 80 + Insulation m2 35.0 550,000.0 19,250,000.0
3 Flexible Duct Dia 10" + Insulation m1 93.0 135,000.0 12,555,000.0
4 Relay-out Diffuser unit 1.0
5 Diffuser l[neir unit 16.0 245,000.0 3,920,000.0
6 Supply grille 48" x 4" m' 8.0 187,000.0 1,496,000.0
7 Return grille 36" x 10" bh 6.0 178,000.0 1,068,000.0
8 Return grille 24" x 8" m' 4.0
9 Drain Pan Unit unit
10 Wiring Power Cable for AC 36.000 btu/h NYY 4x4mm unit
spigot bh 20.0 190,800.0 3,816,000.0
1 Upah pasang FCU unit -
2 DOP instalasi Existing set -
3 Bongkar Ducting Existing unit 4.0 176,000.0 704,000.0
unit -

Total V.7 67,559,000.0


V.8. MECHANICAL VENTILATION WORKS
1 E.A.F.A Ducting BJLS 80 m2 53.0 600,000.0 31,800,000.0
2 E.A.F.A Ducting BJLS 60 m2 47.0 600,000.0 28,200,000.0
3 Exhaust Fan, Centrifugal Type, Cap 5.000 cfm, SP = 1,50" WG unit 1.0 20,000,000.0 20,000,000.0
4 National, KDK, Kruger , CKE
5 Fresh Air Fan, Axial Type , Cap 2.700 cfm, SP = 0.65" WG unit 1.0 14,500,000.0 14,500,000.0
1450 rpm, National, KDK, Kruger, CKE bh
6 nampan 1000 x 800 bh 1.0 450,000.0 450,000.0
7 Volume Damper For Fresh Air bh 2.0
8 Flexble Duct Dia 8" m1 30.0
9 Exhaust Air Grille 300 x 300 c/w Louvre unit
10 Exhaust Air Grille 800 x 400 c/w Louvre unit
11 Exhaust Air Grille 1500 x 150 c/w Louvre unit
11 Fresh Air Grille 750 x 450 c/w Louvre unit 6.0 224,000.0 1,344,000.0
12 Fresh Air Grille 1500 x 150 c/w Louvre unit
12 Fresh Air Grille 500 x 150 c/w Louvre unit 4.0 187,000.0 748,000.0
13 spigot unit 10.0 150,000.0 1,500,000.0
14 Kain Kanvas unit 4.0 400,000.0 1,600,000.0
Bongkar Ducting Existing unit

Total V.8. 100,142,000.0


V.9. OTHER
1 Relocation Head Sprinkler point
2 Relocation Sprinkler and New Head 90° C (for Kitchen) point
3 Relocation Detector Fire Alarm point 1.0
4 Bobokan lot
5 Pengosongan Air Untuk Sprinkler lot
6 Pipa BS Sched 40 Dia 25 mm m'
7 Pipa BS Sched 40 Dia 40 mm m'
8 Fitting lot
9 Sprinkler Head Pendant type 60° C bh
10 Sprinkler Head Pendant type 98° C bh
11 Hanger Support lot
12 Biaya Testing dan commisioning lot 1.0
Total V.9.