Professional Documents
Culture Documents
OPERNS.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
SECTION 07820
CERT
SKYLIGHTS
PART 01 - GENERAL
ENG’G
__ ________ _
D. Section 07720 Roof and Deck Insulation
DATE: ________
PROJECT E. Section 07620 Sheet Metal Flashing and Trim.
ENGINEER
____________
DATE ______ F. Section 07920 Sealants and Caulking.
CERTIFIED
G. Section 08800 Glazing.
_ __________
DATE: ________
. H. Section 01352 LEED Requirements
CONSTRUCTION
AGENCY
________________
I. Section 01524 – Construction Waste Management
DATE: _________
OPERATIONS
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
Difference.
A. Design Requirements:
CERTIFIED
A. Submit under provision of Saudi Aramco Contract Documents.
C. Submit:
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
SECTION 07820
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
loads.
ENG’G
G. LEED Submittals
1. Product Data for Credit EQ 4.1: For Sealants and Adhesives
used at Project site, including printed statement of VOC content.
preparation at the job site, erection and glazing of the skylight system
shall be the responsibility of the skylight manufacturer. The
DISCIPLINE
ENGINEER manufacturer shall be regularly engaged in the preceding phases of
__ ________ _
construction of skylights and be able to demonstrate that he has
DATE: ________ successfully performed on comparable projects over the previous five
PROJECT years.
ENGINEER
____________
DATE ______ 1.06 WARRANTY
CERTIFIED
A. Certify that skylight frame is free of defects in design, material, and
_ __________ construction for a period of 10 days from the date of Substantial
DATE: ________
Completion.
CONSTRUCTION
AGENCY
________________
B. Warrant glass against defective materials, delamination, seal failure,
DATE: _________ deficient wrapping and defects in manufacture per the glass
OPERATIONS manufacturer’s standard warranties.
______________
DATE:_________
C. Warrant structural sealant for a period of 10 years per sealant
manufacturer’s standard warranty of merchantable quality.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
PART 02 - PRODUCTS
Date:
By:
2.01 MATERIALS
OF THIS DRAWING IS COVERED, FOR ALL
A. Framework:
REVISION CERTIFICATION
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
equal.
ENG’G
B. Glazing Strips:
__ ________ _
d. Color: black.
DATE: ________
PROJECT 2. Compression Set: ASTM D395 Method B, 22 hours @ 212 deg.
ENGINEER
F.: 25% (max.)
____________
DATE ______
CONSTRUCTION
AGENCY
b. ASTM D2240 Hardness Change: +5 durometer.
________________
DATE: _________ c. ASTM D412 Tensile Change: -10%.
OPERATIONS
C. Setting Blocks:
OF THIS DRAWING IS COVERED, FOR ALL
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
b. Color: Black.
ENG’G
D. Fasteners:
F. Sealants:
DISCIPLINE
ENGINEER 1. Structural Flush Glazed Joints: High performance silicone
__ ________ _
sealant applied in accordance with manufacturer’s
DATE: ________ recommendations.
PROJECT
ENGINEER
2. Non-structural Flush Glazed Joints and Weather Seal Joints;
____________
DATE ______ Silicone sealants applied in accordance with manufacturer’s
CERTIFIED recommendations.
2.02 FABRICATION
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
SECTION 07820
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
F. Design Snap-On cap retainer fasteners to provide not more than 10 lbs.
per lineal in. or compression on the glazing strips and glass edge.
J. Use silicone setting blocks to support glass and to provide proper edge
REV.
NO.
finishes (as specified) to achieve the best overall visual effect in work,
as determined in consultation with a SAUDI ARAMCO Representative.
OF THIS DRAWING IS COVERED, FOR ALL
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
A. 1. ALUMACO
Aluminum Manufacturing Co. Ltd.
Tel: 03-859 4555
Fax: 03-857 2081
DESCRIPTION
B. Or approved equal.
PART 3 - EXECUTION
DATE JOB/EWO
3.01 EXAMINATION
substrate to determine that they are properly prepared, sized, and ready
to receive the skylight work included herein.
DISCIPLINE
ENGINEER
__ ________ _
3.02 PREPARATION
DATE: ________
PROJECT A. Contact between aluminum and dissimilar metals shall receive a
ENGINEER
protective coating of asphaltic paint for the prevention of electrolytic
____________
DATE ______ action and corrosion.
CERTIFIED
3.03 INSTALLATION
_ __________
DATE: ________
A. Install skylight frame, glass and accessory items as needed in
CONSTRUCTION
AGENCY
accordance with manufacturer’s instructions.
________________
DATE: _________ B. Install skylight system under the direction of the skylight manufacturer’s
OPERATIONS own experienced mechanics.
______________
DATE:_________
C. Erect the System in proper alignment and relation to established lines
and grades as shown on approved shop drawings.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
between glass panels and silicone sealant to wet seal joints between
Snap-On cap retainers and glass.
REVISION CERTIFICATION
SECTION 07820
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
3.06 TOLERANCES
DESCRIPTION
3.07 CLEANING
DATE JOB/EWO
_ __________
DATE: ________
CONSTRUCTION
AGENCY
________________
DATE: _________
OPERATIONS
______________
DATE:_________
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
Date:
By:
OF THIS DRAWING IS COVERED, FOR ALL
SECTION 07820
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.