Professional Documents
Culture Documents
OPERNS.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
SECTION 04100
MORTAR AND MASONRY GROUT
CERT
PART 01 GENERAL
ENG’G
3. Grouting
DISCIPLINE
D. Section 04300 Unit Masonry System
ENGINEER
E. Section 04451 Cut Stone Veneer
½
__ ________ _
¾ DATE: ________
PROJECT
ENGINEER F. Section 01352 LEED Requirements
____________
DATE G. Section 01524-Construction Waste Management
CERTIFIED
1.03 REFERENCES
_ __________
DATE: ________
CONSTRUCTION
A. ACI 530 Building Code Requirements for Masonry Structures.
AGENCY
________________ B. ACI 530.1 Specifications for Masonry Structures.
DATE:
SECTION 04100
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
CONSTRUCTION
AGENCY
B. Include design mix, indicate whether the Proportion or Property
________________
specification of ASTM C 270 is to be used, required environmental
DATE: conditions, and admixture limitations.
OPERATIONS
______________ C. Samples: Submit two samples of each type of mortar, illustrating mortar
DATE:_________
color and color range.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
SECTION 04100
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
H. A tabulation of each material used on the project that is being tracked for
recycled content. The tabulation must include the following:
1. Description of the material,
2. Material manufacturer
DESCRIPTION
3. Product cost
4. Pre-consumer and/or post-consumer recycled content percentage,
5. Source of the recycled content data.
I. A tabulation of each material used on the project that is being tracked for
regional content. The following information to be included:
6. Product name for each tracked material;
7. Material manufacturer;
DATE JOB/EWO
site;
11. Distance between the project site and the final manufacturing
DISCIPLINE
ENGINEER location.
½
__ ________ _
¾ DATE: ________ J. A tabulation of each construction waste material on the project that is being
PROJECT tracked by the construction waste management plan. The following
ENGINEER
information to be included:
____________
DATE 1. General description of each type/category of waste generated;
CERTIFIED 2. Location of receiving agent (recycler/landfill) for waste;
3. Quantity of waste diverted (by category) in tons, or cubic yards.
_ __________
DATE: ________
K. Product data for credit EQ 4.1 low emitting adhesives and sealants
CONSTRUCTION
AGENCY
including printed statement of VOC content.
________________
DATE:
Date:
By:
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
PART 02 PRODUCTS
2.01 MATERIALS
DESCRIPTION
CERTIFIED A. Admixtures for mixes may only be used with the approval of the Engineer
and then in strict accordance with the manufacturers instructions.
_ __________
DATE: ________
2.04 MORTAR MIXES
CONSTRUCTION
AGENCY
________________
A. Mortar for load bearing walls and partitions: ASTM C 270 Type "M" using
DATE: the property specification.
OPERATIONS
______________ B. Mortar for non-load bearing walls and partitions: ASTM C 270 Type "O"
DATE:_________
using property specification.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
C. Pointing mortar: ASTM C 270 Type "O" using property specification with
EDSD
D. Stain resistant pointing mortar: One part Portland Cement, 1/8 part
OF THIS DRAWING IS COVERED, FOR ALL
hydrate lime, and two parts graded (80 mesh) aggregate, proportioned by
volume. Add aluminum tristearate, calcium stearate, or ammonium
REVISION CERTIFICATION
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
TABLE 1
Proportion by Volume
DESCRIPTION
Class
Cement Lime Sand
1 1 - 4
2 1 1 6
F. Class 1 mortar shall be used for work below ground utilizing sulfate-
resisting cement unless otherwise specified.
DATE JOB/EWO
SECTION 04100
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
C. Test grout mix in accordance with ASTM C 1019 for slump and
compressive strength.
PART 03 EXECUTION
DESCRIPTION
3.01 EXAMINATION
3.02 PREPARATION
B. Plug clean-out holes with block masonry units. Brace masonry for wet
grout pressure.
REV.
NO.
3.03 INSTALLATION
DISCIPLINE
ENGINEER A. Install mortar in accordance with ASTM C 270. Install grout in accordance
with ASTM C 476.
½
__ ________ _
¾ DATE: ________
PROJECT B. Work grout into masonry cores and cavities to eliminate voids.
ENGINEER
____________
DATE C. Do not install grout in lifts greater than 400 mm or two CMU courses
CERTIFIED without consolidating grout by rodding.
CONSTRUCTION
AGENCY
E. Remove excess mortar from grout spaces.
________________
DATE: 3.04 FIELD QUALITY CONTROL
OPERATIONS
______________ A. Test and evaluate mortar in accordance with ASTM C 780.
DATE:_________
C. Test mortar and masonry units to ASTM C 1072, E 447 and E 518; test in
conjunction with masonry unit sections specified.
Date:
By:
A. Use materials with recycled content such that the sum of post-consumer
REVISION CERTIFICATION
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
total of at least 20%, based on cost, of the total value of the materials in
the project.
CERT
½
__ ________ _
¾ DATE: ________
PROJECT
ENGINEER
____________
DATE
CERTIFIED
_ __________
DATE: ________
CONSTRUCTION
AGENCY
________________
DATE:
OPERATIONS
______________
DATE:_________
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
Date:
By:
OF THIS DRAWING IS COVERED, FOR ALL
SECTION 04100
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.