ROYAL COMMISSION FOR RIYADH CITY BILL NO.

03: OPERATION, CONTROL MAINTENANCE BUILDING


KING SALMAN PARK-PHASE 1 PACKAGE BUILDING WORKS
BOQ for Loop & Boulevaed Bridge
Date 25-11-2021
Rev-01
S.N description UNIT Quantity Unit Rate (SR) Tota Price (SR)
1 Loop Bridge LB1-structural steel MT 2,570.00 2,500.00 6,425,000.00
2 Loop Bridge LB2-structural steel MT 1,890.00 2,500.00 4,725,000.00
3 Loop Bridge LB3-structural steel MT 1,035.00 2,500.00 2,587,500.00
4 Loop Bridge LB7-structural steel MT 1,080.00 2,500.00 2,700,000.00
5 Loop Bridge LB8-structural steel MT 1,235.00 2,500.00 3,087,500.00
6 Boulevaed Bridge B1-structural steel MT 137.00 2,500.00 342,500.00
7 Boulevaed Bridge B2-structural steel MT 125.00 2,500.00 312,500.00
Total 8,072

BILL NO.3
BOQ /1 of 1