You are on page 1of 5

RAJASTHAN RAJYA VIDYUT UTAPADAN NIGAM

OFFICE OF THE CHIEF ENGINEER


SUPER CRITICAL POWER STATION, CHHABRA
No./RVUN/CsCPP/CE/SE(E&M/XEn(CM&C/F..D.4 2.32dt.1703|Is
From
The Superintending Engineer (E&M)
Super Critical Power Station, Motipura Chowki,
CHHABRA-325220

To
M/s M.C. Sharma Engineering Works
Nanta Road Naka Chungi Chouraha
Shop No. 4, Kunlhadi Kota-8.
with driver (12 Hrs.)
Sub:- Annual contract for hiring of 06 Nos.Bolero Diesel Vehicle
driver (12 Hrs.) for Chhabra
and 03 Nos. Scorpio/Xylo Diesel vehicle alongwith
Super Critical Power Project, Chhabra against TN-SC-03/2014-15.

Ref: (i) Your offer dated NIL & Part A opened on 14.08.2014
22.09.2014 for
(ii)This office Letter No. RVUNL/CSCPP/CE/F./D-627 dated
price bid opening
(iii) Price bid opened on 24.09.2014
(iv)Your letter dated 05.02.2015.
D
(v) Our LOI confirmed vide letter no. RVUNL/CE/ CSCPP/Chhabra/ F./
1074 date 06.02,2015
Dear Sir,
With reference to your above cited offer & subsequent correspondence, the
detailed work order is hereby placed on you for hiring of 06 Nos.Bolero
Diesel Vehicle with driver (12 Hrs.) and 03 Nos. Scorpio/ Xylo Diesel vehicle
alongwith driver (12 Hrs.) for Chhabra Super Critical Power Station, Chhabra
on the terms and condition mentioned here under:

1.0 SCHEDULEOF WORK AND PRICES:


Qty. Rate per Total Annual
S month for
Particulars No. of No. of
each vehicle
Amount excluding
No. Vehicle Month Service Tax (Rs.)
(Rs.)
Hiring of Scorpio/xylo
diesel vehicle of model year
1. 2014 or latest model 3 12 33,000.00/ 11S800
alongwith driver for 12 Hrs.
service with each vehicle
Hiring of Bolero diesel
vehicle of model year 2014
2 or latest modal alongwith 30,300.00/ 2181600
driver for 12 Hrs. service
with each vehicle
Total Rs. 3369600

(Rupees Thirty Three Lacs Sixty Nine Thousand Six Hundred Only)
.oMo -
1839,
2.00 RATES:
charges,
in all respect iholusive of all taxes, duties, Labour
2.01 The rates are firm except service tax. The service
inisurance, statutory levies
T&P, consumable, Service Tax
deposited/ paid 'extra by RVUNL, as per
taxshall be
Rules/norms.
to get registered themselves with Central Excise
2.02 The contractor; will have
bill.
Service Tax, before claimingthefirst
Department for
contractor will,submit the documëntary proof of quarterly deposit of
2.03 The undertaking that if the service tax
deposited is
Service Tax, and also give an in
ground by Excise Department the same shall be deposited
refunded on any
RVUNL.
CONTRACTOR:
3.00 LIABILITIY OF THE
suitable skilled driver as per requirement of the
3.01 The contractor shall provide
work will be checked by the Engineer In-charge at the site.
work. The
4.00 ENGINEER-IN-CHARGE:
incharge
concern Engineer In-charge / Officer, CSCPP, Chhabra will be
The allotted as authorized by Chief
of the vehicleto whom vehicle will be
Engineer, CSCPP, Chhabra.
5.00 CONTRACT PERIOD:
date
normally for a period of one year from the
The period of contract shall be LOI on
commencement of work (súpply of vehicle) or after one month of
of
06.02.2015 (which is earlier) However; RVUNL reserves the right to
dated
period of one year beyond one
extend the period of the contractor for further
terms and conditions.
year on the same rates,

6.00 TERMS OF PAYMENT: Account COfficer, CSCPP,RVUNL,


6.01 100% payment shall be made by the
of work done on the monthly
Chhabra against satisfactory performancework.
basis from the date of commencement of
in-charge
triplicate to the
6.02 The Contractor will submit the monthly bill in will be duly verified
of vehicle as mentioned at clause no. 4.00 & same
Account Officer CSCPP,
by respective in-charge & forward the bill to
Chhabra for arranging payment.
7.00 SECURITY DEPOSIT: 2

from running account bills of


7.01 The Security Deposit @10% #ill bideducted converted/
deposited will be
the contractor. The earnest money, if any,
adjusted into Security Depgsit.

retained/ forfeited by
7.02 Unless otherwise specially required to be
be refundable on the
CSCPP(RVUN) in part or full, the Security Deposit shall completion of entire
3(three) month of
written request of the contractor after
Engineer In-charge/ Officer, CSCPP,
contract period to the satisfactioD of
furnishing statement from PF
RVUN, Chhabra subject to compliance of
If the contractor fails or
department as per Clause No. 15.00 (Section-B).
obligations under the contract, it
neglect to observed or perform any of the
forfeit either in whole or in part the
will be lawful for CSCPP (RVUN) for
above security deposit.
7.03 No interest is payable on this security deposit.
8.00 INSURANCE:
contractor to get his workmen
insured under
It issole responsibility of the
relevant
compernsation Act & Rules, while at work, as required by
workman
workmen compensation and pay compensation, as per act and
rules and
under.
provision/ rules made there
CONTRACTOR:
PASSES TO WORKERS ENGAGED BY
9.00 ISSUE OF GATE
M/s M.C. Sharma Engineering Works, Kota will
After award of the contract, engaged by him indicating their
of skilled drivers to be
furnish the list Engineer-in- charge for
photograph to the
particulars with pass port size which are required to be produce
security officer
arranging gate passes from plant and to be kept always displayed
entry into the
for security check before
working hours in the plant.
by them during
10.00 DISPUTES:
of the Chief Engineer, CSCPP, RVUN,
dispute, the decision
In case of any will be at Baran.
otherwise, jurisdiction of court
Chhabra willbe final or
CONTRACT:
TERMINATION OF without
11.00
cancel the contract at any moment
reserves the right to satisfactory work
11,01 CSCPP contractor fails to carry out
any reason. If the
assigning work done by another
discretion, get the
CSCPP at its right
under thiscontract, the
without prejudice to the RVUN'S
risk and cost
or parties at his
under the terms & conditiohs 'of this contract by giving a seven (07) days
notice to the contractor in this, re ard and any extra expenditure involved in
this regards, shall be recovered ftormthe contractor.

11.02 The contractor shall be required to deposit the amount of the recoveries
finalized within a perigd of 30 days of receipt of intimation failing which the
dues at allbe recovered from the financial hold of the supplier available with
the Nigam. In case where the amounts of recoveries against a firm/supplier
exceed its financial hold, the Nigamn will be at liberty to effect such recoveries
out of the financial hold/ pending payments of the supplier/ contractor
available with other successor companies of erstwhile RSEB/ with other
power generating units of RVUNL.
12.00 CONSUMABLE:

12.01 Althe consumable shall be arranged by the contractor at his own cost and
consumable such as pipe for washing, cleaning, Brush, Powder, Jute, Old
cotton sharee shall be kept to ready stock by contractor. Consumables like
washing powder, Phenyl Balls, Liquid Soap and Colin etc. required for
cleaning and up-keeping shallalso be provided by contractor.
13.00 TOOLS & PLANTS ETC::
13.01 Alirequired general tools arnd plants for completing the specified work shall
be provided by the contractor, however the major special T&P shall be
provided by the Nigam available for completion of work. Any damage to the
Nigam's tools & plant shall b recovered from the contractor.
14.00 CONTRACT DOCUMENT AND AGREEMENT:

14.01 The order placed under these specifications shallbe governed by terms and
conditions as incorporated in this section of the specification and as given in
the "Work Order" and ie's Annexure(s). The terms and conditions specified in
this section if differ from the terms as indicated in the work order and its
annexure(s), the later shall prevail. The contract shall for all purpose be
constructed according to the laws of India and subject to jurisdiction of Baran
cOurt only. For the due fulfilment of the contract, the contractor shall execute
an agreement in triplicate in the prescribed from to be obtained fromn the
order placing authority on non judicial stamp paper worth Rs.1000/- or as per
the stamp duty applicable in Govt. of Räjasthan. Such agreement shall be
executed & signed by the competent authority of the contractor on each page

Qhereof The original copy is only to be executed on the stamp paper. The
remaining two copies may be executed on simple paper. Such complete
agreement form along with the contract document shall be required to be
submitted tothe order placing authority with in a period of 15 days from the
receipt of the order. One copy of the accepted agreement duly signed by
order placing authority shall be sent to the contractor for his reference.
The contract documents shallbe include the following:
1
Contract Agreement.
2 Order and it Annexure(s).
3. Terms &Conditions under Section-B of the tender Specification.
4.
Scope of work under Section-C of tender specification.

14.02 Al the charges in respect of execution of the contract agreement shall be


borne by the contractor. The contractor shall be furnished with an executed
Counter part of the agreement.

Encl: - 1. Annexure-I

2. Annexure-|

Thanking you,
Your Sincerely

SKCNagori)
Superintending bngineer (E&M)
CSCPP, RVUN,Chhabra
Copy submitted/ forwarded to the following for information and necessary action:

1. The Chief Engineer, CSCPP, RVUNL, Chhabra.


2. The Addl. Chief Engineer(Civil), RVUNL,Chhabra
3. The Chief Accounts Oficer,CTPP, RVUNL, Chhabra.
4. The Superintending Engineer, (......) CSCPP, RVUNL, Chhabra
5. The Executive Engineer (...........), CSCPP/CTPP,RVUN, Chhabra.
has been sanction by
6: The Accounts Officer, CSCPP, RVUNL, Chhabra. The case
the Committee at Para- 55 /N of Note file.
Kota.
7. The Commissioner Income Tax/Sales Tax,

Supettending Engineer (E&M)


CSCPP, RVUN,Chhabra