139

CHAPTER EIGHT
DESIGN OF OVERHEAD WATER TANK &
UNDERGROUND WATER RESERVOIR

8.1 Design of Overhead water tank


There are two overhead water tanks constructed over stairs. The design of this water tank
will be done as per WSD.

Determination of Tank size:

Length = 22'
Width = 20'9
Tank height =6'
Free board = 1'
Total tank height = 6 1 = 7'

Select tank size = 15' 10' 7'

Wall Design

= = 1.06 < 2

Here h’ = = = 1.5' < 1 m = 3.28'

Select h’ = 3.28 ft H
D p
h’

Water pressure at point D

W= 62.5 lb/cft

= 62.5 (7 3.28)
= 170psf

a) Determination of moment:
Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
140

L
=22 ft

= 20.75 ft
B

Figure 11.1: Fixed End Moment Acting on Water Tank Walls

Fixed end –ve moment for long wall = = = 6856.67 lb ft/ ft

Fixed end –ve moment for short wall = = = 6099.63 lb ft/ ft

Center +ve moment for long wall = = = 5142.50lb ft/ ft

Center +ve moment for short wall = = = 4574.73 lb ft/ ft

b) Determination of Direct Tension:

Direct tension on long wall = w = 170 × = 1763.75 lb

Direct tension on short wall = w = 232.5× = 1870 lb

c) Determination of Cantilever Moment:


Moment = Force Distance

= H
h’

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
141

= 672.4 lb- ft/ ft

d) Calculation of Wall Thickness:

= 4000 psi

= 0.45 = 0.45 4000 = 1800 psi

= 60,000 psi.

= 0.50 = 0.50 60000 = 30000 psi

= 29 psi

= 57,000 = 3.6 psi

= = =8

= = = 16.67

K = = = 0.324

J=1 =1 = 0.892

Considering bending effect alone,


Design moment M = 6856.67 lb-ft/ft

M=

 6856.67 12 = 0.324 0.892 12

 d = 5.13 inch
h = Effective depth + Clear Cover = 5.13 + 1.5 = 6.53 inch =7inch
Provide h = 7inch; d = 5.5 inch.

e) Reinforcement for long wall:


Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
142

Middle section

for bending moment = = = .395 / ft

for direct tension = = = 0.059 / ft

Total steel requirement = (.395 + 059) = 0.454 / ft X=d

Use 12mm, spacing =  5" c/c = 5.5 - = 2 in

Provide 12mm @ 5" c/c alt. ckd. bars.

Corner Section

for bending moment = X=d

= = .66 / ft = 5.5 - = 2 in

for direct tension = = = .059 / ft

Total steel requirement = (.66 + .059) = 0.72 / ft

Required extra top = = 0.40 / ft

2 12mm extra top in between ckd.

f) Reinforcement for short wall:

Middle Section
 for bending moment =

= = 0.35 / ft

 for direct tension = = = 0.062 / ft

Total steel requirement = (0.35+ 0.062) = 0.41 / ft

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
143

Use 10mm, spacing = c/c

Provide 10mm @ 3" c/c alt. ckd. bars.

Corner Section
 for bending moment =

= = 0.47 / ft

 for direct tension = = = 0.062 / ft

Total steel requirement = (0. 47 + 0.06) = 0.53 / ft

Required extra top = =0.13250 / ft

Provide 112mm extra top in between ckd.

g) Design of Vertical Reinforcement:

M = 672.4 lb-ft/ft
As = / ft (Govern)

As, min = 0.003bt = 0.003 ×12×7.0 = 0.25 / ft

Select As = 0. 25 / ft

Use 10mm, spacing =

Provide 10mm @ 5.0" c/c.

Distribution Steel which is half of the main steel


Asd = / ft

Use 10mm @10.0" c/c.

h) Slab design

Bottom Slab

= = 1.06 < 2

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
144

So, it is a two way slab.

Minimum thickness = =5.70 ≈ 6inch, say 6 inch thick slab.

Load calculation:
Dead load of water = 62.5x (6 1) =312.5 psf
Self weight of the slab = ×150 = 62.5 psf

Floor finish (Assume) = 10.0 psf


Total Dead load = 385.0 psf = 0.385 ksf
Live Load = 10 psf = 0.01 ksf

Moment calculation:
= = 0.93

Case 1
=0

=0

For positive moment, = 0.043

= 0.043
= 0.031
Cb ll = 0.031
= (0.043 0. 385 ) + (0.043 0.01 )) = 87.4K-in

= (0.031 0. 385 ) + (0.031 0.01 ) = 71.11 K-in

Check for depth d:


M= Kjb

= = = 5.29" > of 5" (not ok)

So, d = 6"
Assume h =7"

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
145

Dead load of water = 62.5 (7 1) = 375 psf

Now,

Self weight of the slab = 150 = 75 psf

Floor finish (Assume) = 10.0 psf


Total Dead load = 460 psf = 0.460 ksf
Live Load = 10 psf = 0.01 ksf

= (0.043 0.46 ) + (0.043 0.01 ) = 104.70 K-in

= (0.031 0.46 ) + (0.031 0.01 ) = 84.62 K-in

M= Kjb

= = = 5.792" < 6.0"

So, ok.

Reinforcement calculation:

 Steel for short direction, = = = 0.65 / ft

Minm steel = 0.003bh=0.003×12×7.0 = 0.252 / ft

Use 12mm, spacing =

Provide 12mm @3.5"c/c.

 Steel for long direction = = = 0.527 / ft

Minm steel = 0.003bh=0.003×12×7.0 = 0.252 / ft

Use 10mm, spacing = =4.5"

Provide 12mm @ 4.5"c/c

b) Design of top slab

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
146

= = 1.06 < 2

So, it is a two way slab.

Minimum thickness = = 6 inch.

Load calculation:
Self weight of the slab = ×150 = 62.5 psf

Floor finish (Assume) = 10.0 psf


Total Dead load = 72.5 psf = .072 ksf
Live Load = 10 psf = 0.01 ksf
Moment calculation:
= = 0.93

Case 1
=0

=0

For positive moment, = 0.043

= 0.043
= 0.031

= 0.031
= (0.043 0.072 ) + (0.043 0.01 ) = 18.22K-in

= (0.031 0.072 ) + (0.031 0.01 ) = 14.76 K-in

Check for depth d:


M= Kjb

= = = 1.38" < of 5" (ok)

Reinforcement calculation:

 Steel for short direction, = = = 0.14 / ft

Minm steel = 0.003bh=0.003×12×6 = 0.216 / ft

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
147

Use 10mm, spacing =

Provide 10mm @6.5"c/c.

 Steel for long direction = = = 0.11 / ft

Minm steel = 0.003bh=0.003×12×6 = 0.216 / ft

Use 10mm, spacing =

Provide 10mm @ 10.0"c/c

Reinforcement details of overhead water tank are shown in Figures 8.2~8.6.

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
147

Figure 8.2: Details of Reinforcement Arrangement of Wall of the Overhead Water Tank

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
148

Figure 8.3: Details of Section A-A

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
149

Figure 8.4: Details of Section B-B

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
150

Figure 8.5: Reinforcement Details of Bottom Slab

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
151

Figure 8.6: Reinforcement Details of Top Slab

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
152

8.2 Design of Underground water reservoir

There are two underground water reservoirs (49' x 23' each) at basement floor for
fulfilling the water demand of the commercial and official purposes. Water storage is
made also considering one hour Fire Fighting works. The design of this water tank will be
done as per WSD.

Determination of water requirement

* Official purposes
Water requirement = 45 L/P/D
No. of floor = 15
No. of unit = 30
No. of person = 20 (Assume)
Total required volume of water = 45× 15× 30 × 20 = 405000 L

* Commercial purposes
Water requirement = 45 L/P/D
No. of floor = 10
No. of person = 440 (Assume)/floor
Total required volume of water = 45× 10 × 440 = 198000 L

* Garage purposes
Water requirement = 70 L/P/D
No. of floor = 1
No. of person = 45 (Assume)
Total required volume of water = 70× 1× 45 = 3150 L

* Fire safety purposes


Consider, water storage for 1 hr. fighting,
Water requirement for 1 floor = 250 gal/min
= 250 × 60 gal/hr = 15000 gal/hr
Water requirement for two floor = 2 × 15000 gal = 30000 gal
= 113562.36 L = 113563 L

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
153

Total water requirement for whole structures = (113563 +198000 + 3150 +113563)
= 719713 L
There are two underground water tanks,

Water requirement for per tank = = 359857L = 359m3

= 359× 3.283 ft3


= 12668.2312 ft3
Tank dimension
Let,
Inside width dimension, B =23 ft = 7.01m.
Height = 9.5 ft
Free board = 0.5 ft
Final height = 9.5+0.5=10 ft =3.048 m.

So inside length dimension, L =

Design of long & short walls


The water tank is surrounded by mat foundation .So, the long and short walls are not
required for design as same as other type of underground reservoirs surrounded by earth.
The walls of this reservoirs will be constructed by providing minimum thickness and
reinforcing bars.
The thickness of all walls = 10 inch

Vertical & Horizontal reinforcement:

Use 12mm bars

6.67 inch  6.50 inch c/c

So use 12mm bars @ 6.50 inch c/c

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
154

Design of top slab

= = 2.39 > 2

So, it is a one way slab.


Minimum thickness = 20 inch (Assume)

Load calculation:
Live load = 50.0 psf

Self weight of the slab = ×150 = 250 psf

Floor finish (assume) = 10.0 psf

Total load = 310 psf = 0.31 ksf

d check:

[L= 21.33 + = 23 ft]

M=

Steel calculation:

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
155

 Main steel

Use 16mm bars

Spacing = = 2.81 inch  2.5 inch c/c

Use 16mm @ 2.5" c/c.

 Distribution Reinforcement
Minimum reinforcement = 0.003bt = 0.003×12×20 = 0.72
Use 12mm bars

3.33 inch  3 inch c/c

Use 12mm bars @ 3 inch c/c.

Design of bottom slab


Since the water tank is surrounded by mat foundation. So, design of bottom slab is not
required.

Reinforcement details of underground water reservoir are shown in Figures 8.7~8.8.

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
155

Figure 8.7: Details of Reinforcement Arrangement of Wall of

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
156

the Underground Water Reservoir

Planning & Design of a 25 Storied Modern Shear Wall Rigid Frame Commercial Structure
157

Figure 8.8: Reinforcement Details of Top Slab of Underground Water Reservoir