INTERSECT Workshop - using PETREL Field Management GUI


Agenda

• What is FM ?
• The reservoir
• Scope of work and exercise highlights
• Installations key elements
• Scenarios description and results
Field Management

• Water Flooding voidage replacement ?


• WAG cycle ?
• Shut Well completion subject dynamic criteria ( eg WCT > 0.95) ?
• Pressure Maintenance using PID controller ?
• Optimize Field/Group oil production subject to operational constraints ?
• Etc….

FM perform all of these and beyond


Flexible Field Management
Standard INTERSECT
n Pre defined well rates n Mix rates as you want
n ‘Stiff’ actions n Complex actions
– Absolute and fixed by date – Logic dependant
– Simulator is REACTIVE – Simulator is PROACTIVE
n Unaware of available resources n Resources can limit strategies

Bottom line: closer to real asset


management
The reservoir – primary depletion
Water flooding to increase recovery
• Water P/I scheme
– Oil Producers
• WOPR = 5000 STB/d - BHPlimit = 250 psia
– Water Injectors
• INJ1
– WWIR=9000 STB/d - BHPmax =3035 psia
• Hrz
– WWIR=9000 STB/d - BHPmax =3035 psia

• Center
– PROD1, PROD2, PROD3, PROD4
– INJ1
• West
– Hrz producer
– Hrz injector
INTERSECT Workshop - SOW
§ Create history and add region reporting
§ Familiarize with FM GUI and IXF scripts
§ Prediction water flooding strategy 4 cases
§ Various scenarios and different control
Prediction Scenarios – Investigate incremental recovery
§ Case 1 : Balancing action
§ RVPR(CENTER)==1.5*RVIR(CENTER)
§ RVPR(WEST)==RVIR(WEST)
§ Case 2 : Economic limits
§ Case 1
§ Shut Completion using a dynamic criterion : water cut >
0.95
§ Shut well if WOPR < 100 STB/d

§ Case 3 : Switch to voidage replacement triggered


by a criterion
§ Case 2
§ Switch to voidage replacement when RVPR(WEST)<=
0.99* RVIR(WEST)

§ Case 4 : Combined actions


§ RVPR(CENTER)<=1.5*RVI(CENTER)
§ Using LP optimizer (@ each time step)
§ Maximize OPR(WEST)
§ subject to (RVPR(CENTER)==1.5*RVI(CENTER)
and OPR(CCENTER)<=400 STB/d
Extra Exercises –

• Use Make development Strategy to generate the HM FM


and compare genuine HM FM
• Expose of FM Strategy to U&O
Installations and supporting Materials - Checklist
• Petrel 2012.2 or later
• INTERSECT 2012.2
• INTERSECT Connector
Processes used for IX FM workshop
Results : Case 1(green)
Results : Case 2 (Red)
Results : Case 3 (Blue)
Results : Case 4 (Black)