Professional Documents
Culture Documents
COMBINED FOOTING
CF1
Col/Ped.Des 131 Col/Ped.Des 132
P= 40.33 T P= 40.339 T
Mz = 8.14 T-m Mz = 7.262 T-m
My = 5.19 T-m My = 3.450 T-m
fy = 500 N/sqmm
fck = 25 N/sqmm
SBC = 6.5 T/sqm
131 132
L= 4.90
P2 1.8
P1
1.4 1.4
a c B = 3.63
b d
1.550 0.900 0.900 1.550
Z
P4
P3
1.4000 1.4000
P1 P2
40.333 40.33853
131 0.900 0.900 132
1.8
b1
57.530 T 57.537 T
23.483 T/m
20 21.139
10
0 0
-10 0 0 1 2 3 4 5 6
-20
21.130817 36.39875956
-30 -21.131
-40 SFD-36.399
-50
DISTANCE
1.550 1.8 1.550
BM DIAGRAM
28.209039 28.20904
30 28.209
4.409 18.69484
25
23.013 23.013
20 0.900 0.900
BMD
15 18.702
10
5
0
BMD
0 1 2 3 4 5 6
DISTANCE
Max BM in direction Z C
1.4
6.469 T/m2 C
Direction BM(T-m) Steel Position D(mm) deff(mm) k pt(req) pt(provi) Ast(mm2) ζc(N/mm2)
Y 6.340 BOT.STEEL 450 390 0.625 0.148 0.203 577.956838 0.333
Y 5.152 BOT.STEEL 450 390 0.508 0.120 0.203 468 0.333
Z 6.340 BOT.STEEL 450 390 0.625 0.148 0.203 577.956838 0.333
Direction Y V= 6.53 T
ζve = 0.25 N/sqmm
ζc = 0.33 N/sqmm OK
Direction Z V= 6.53 T
ζve = 0.25 N/sqmm
ζc = 0.33 N/sqmm OK