PROJECT CHANGE ROOM PORTION

TITLE squash building DESIGNED CHKD DATE SHEET NO.


SADAGOBAN KANAL 09.12.2022

COMBINED FOOTING
CF1
Col/Ped.Des 131 Col/Ped.Des 132
P= 40.33 T P= 40.339 T
Mz = 8.14 T-m Mz = 7.262 T-m
My = 5.19 T-m My = 3.450 T-m
fy = 500 N/sqmm
fck = 25 N/sqmm
SBC = 6.5 T/sqm

Pedestal -P1 Pedestal -P2


a= 0.83 m c= 0.83 m
b= 0.3 m d= 0.3 m

C/C Distance between 131 AND 132 = 1.8 m

Footing Size ( B X L ) mts 3.63 4.90

131 132
L= 4.90
P2 1.8
P1

1.4 1.4

a c B = 3.63

b d
1.550 0.900 0.900 1.550
Z
P4
P3
1.4000 1.4000

P/A= 4.535 T/sqm


Mz/Z= 0.857 T/sqm
My/Z= 1.077 T/sqm

P1 =P/A+Mz/Z+My/Z = 6.469 T/sqm


P2 =P/A-Mz/Z+My/Z = 4.755 T/sqm
< SBC, Hence SAFE
P3 =P/A+Mz/Z-My/Z = 4.316 T/sqm
P4=P/A+Mz/Z+My/Z = 2.602 T/sqm

P1 P2
40.333 40.33853
131 0.900 0.900 132

1.8
b1

e= (P1x b1)/(P1+P2) = 0.900 m


Factor = 1.426365

57.530 T 57.537 T

1.550 1.8 1.550

23.483 T/m

36.39876 SFD 21.13870989


50
40
36.399
30
SHEAR FORCE

20 21.139
10
0 0
-10 0 0 1 2 3 4 5 6
-20
21.130817 36.39875956
-30 -21.131
-40 SFD-36.399
-50
DISTANCE
1.550 1.8 1.550
BM DIAGRAM
28.209039 28.20904
30 28.209
4.409 18.69484
25
23.013 23.013
20 0.900 0.900
BMD

15 18.702

10
5
0
BMD
0 1 2 3 4 5 6
DISTANCE

Max BM in direction Z C

1.4

6.469 T/m2 C

BM at section C-C = 6.340 T-m


Depth of footing Required d= mm say de = 390.00 mm
D= 450 mm

Direction BM(T-m) Steel Position D(mm) deff(mm) k pt(req) pt(provi) Ast(mm2) ζc(N/mm2)
Y 6.340 BOT.STEEL 450 390 0.625 0.148 0.203 577.956838 0.333
Y 5.152 BOT.STEEL 450 390 0.508 0.120 0.203 468 0.333
Z 6.340 BOT.STEEL 450 390 0.625 0.148 0.203 577.956838 0.333

Check for one way shear :

Direction Y V= 6.53 T
ζve = 0.25 N/sqmm
ζc = 0.33 N/sqmm OK

Direction Z V= 6.53 T
ζve = 0.25 N/sqmm
ζc = 0.33 N/sqmm OK

Check for two way Shear :

For 131 For 132

P= 40.333 tonnes P= 40.33853 tonnes

ped1= 0.83 1220 ped1= 0.83 1220


ped2= 0.3 690 ped2= 0.3 690
ζp = 0.390 N/mm2 ζp = 0.390 N/mm2
ζper = 1.250 N/mm2 SAFE ζper = 1.250 N/mm2 SAFE