COMBINED FOOTING

CF1
Col F1 Col F2
P= 96 T P= 191 T
Mz = 0 T-m Mz = 0 T-m
My = 0 T-m My = 0 T-m
fy = 500 N/sqmm
fck = 20 N/sqmm
SBC = 18 T/sqm

Pedestal -P1 Pedestal -P1


a= 0.3 m c= 0.9 m
b= 0.45 m d= 0.5 m
dli
C/C Distance between F1 AND F2 = 2.4 m Quantity(EQL)=
Quantity(DL+LL)=
Footing Size ( B X L ) mts 3.75 6.00

L reqrd for EarthQuake Load= 0.00


F1 F2
L= 6.00
P2 2.4
P1

1.725 1.425

c B = 3.75
a

b d
1.800 1.597 0.803 1.800
Z P4
P3
1.5750 1.5500

P/A= 12.756 T/sqm


Mz/Z= 5.067 T/sqm
My/Z= 0.000 T/sqm

P1 =P/A+Mz/Z+My/Z = 17.822 T/sqm


P2 =P/A-Mz/Z+My/Z = 7.689 T/sqm
< SBC, Hence SAFE
P3 =P/A+Mz/Z-My/Z = 17.822 T/sqm
P4=P/A+Mz/Z+My/Z = 7.689 T/sqm

P1 P2
96 191
F1 1.597 0.803 F2

2.4
b1

e= (P1x b1)/(P1+P2) = 0.803 m


ecc for moments= 0.3972125 m
M_ecc= 114 T-m
Factor = 1.3972125

134.1324 T 266.8676 T

1.800 2.4 1.800

66.833 T/m
SH EA R FO R C E

120.3 146.5676

SFD
200

150 146.568
120.300
100
50

0 0 0
-13.832
13.832404 120.3
0 1 2 3 4 5 6 7
-50
-100 SFD -120.300
-150
DISTANCE

1.800 2.4 1.800


BM DIAGRAM
108.27 108.27

120
108.270
106.839 108.270
BMD

100

80 82.894 0.207 2.193


80.284

60
-52.44367
40

20

0 BMD
0 1 2 3 4 5 6 7
DISTANCE

Max BM in direction Z C

1.725

17.822 T/m2 C

BM at section C-C = 26.516 T-m


Depth of footing Required d= 653.72 mm say de = 850
D= 900 DIA 16

Direction BM(T-m) Steel Position D(mm) deff(mm) k pt(req) pt(provi) Ast(mm2) ζc(N/mm2) SAPCING
Y 22.105 BOT.STEEL 900 850 0.348 0.120 0.120 1080 0.260 186.1926
Y 28.490283 BOT.STEEL 900 850 0.449 0.152 0.152 1369.4783 0.289 146.8355
Z 26.516 BOT.STEEL 900 850 0.418 0.142 0.142 1274.5839 0.280 157.7676

NOTE
Check for one way : :
shear IF NO TOP STEEL IS SHOWN THEN MINIMUM STEEL SHOULD BE PROVIDED @ TOP

Direction Y V= 12.92 T
ζve = 0.23 N/sqmm
ζc = 0.29 N/sqmm OK

Direction Z V= 15.59 T
ζve = 0.28 N/sqmm
ζc = 0.28 N/sqmm OK

Check for two way Shear :

For F1 For F2

P= 96 tonnes P= 191 tonnes

ped1= 0.3 1150 ped1= 0.9 1750


ped2= 0.45 1300 ped2= 0.5 1350
ζp = 0.337 N/mm2 ζp = 0.521 N/mm2
ζper = 1.118 N/mm2 SAFE ζper = 1.118 N/mm2 SAFE
COMBINED FOOTING
CF1
Col F1 Col F2
P= 166.4 T P= 67.6 T
Mz = 0 T-m Mz = 0 T-m
My = 0 T-m My = 0 T-m
fy = 500 N/sqmm
fck = 20 N/sqmm
SBC = 18 T/sqm

Pedestal -P1 Pedestal -P1


a= 0.3 m c= 0.38 m
b= 0.75 m d= 0.23 m
dli
C/C Distance between F1 AND F2 = 2.255 m Quantity(EQL)=
Quantity(DL+LL)=
Footing Size ( B X L ) mts 3.60 5.50

L reqrd for EarthQuake Load= 0.00


F1 F2
L= 5.50
2.255
P2 P1

1.65 1.61

B = 3.60
a c

b d
1.623 0.651 1.604 1.623
Z
P4
P3
1.2475 1.5075

P/A= 11.818 T/sqm


Mz/Z= 6.138 T/sqm
My/Z= 0.000 T/sqm

P1 =P/A+Mz/Z+My/Z = 17.956 T/sqm


P2 =P/A-Mz/Z+My/Z = 5.681 T/sqm
< SBC, Hence SAFE
P3 =P/A+Mz/Z-My/Z = 17.956 T/sqm
P4=P/A+Mz/Z+My/Z = 5.681 T/sqm

P1 P2
166.4 67.6
F1 0.651 1.604 F2

2.255
b1

e= (P1x b1)/(P1+P2) = 1.604 m


ecc for moments= 0.4760556 m
M_ecc= 111.397 T-m
Factor = 1.5193333

252.81707 T 102.70693 T

1.623 2.255 1.623

64.641 T/m
SH EA R FO R C E

104.87958

SFD
150

100 104.880

50

0 0 -2.173 0
0 1 2 3 4 5 6
-50
147.93749 104.87958
-100 -104.880
-150 -147.937 SFD
-200
DISTANCE

1.623 2.255 1.623


BM DIAGRAM
85.083559 85.083559

100 85.1889
80 85.084 85.084
73.450
BMD

60
50.299
2.222 0.033
40
20
0
-20 0 1 2 3 4 5 6
-40
-60
-80 BMD -84.060
-100
DISTANCE

Max BM in direction Z C

1.65

17.956 T/m2 C

BM at section C-C = 24.442 T-m


Depth of footing Required d= 605.50 mm say de = 850
D= 900 DIA 16

Direction BM(T-m) Steel Position D(mm) deff(mm) k pt(req) pt(provi) Ast(mm2) ζc(N/mm2) SAPCING
Y 20.403 BOT.STEEL 900 850 0.322 0.120 0.120 1080 0.260 186.1926
Y -23.35008 TOP STEEL 900 850 0.368 0.120 0.120 1080 0.260 186.1926
Z 24.442 BOT.STEEL 900 850 0.385 0.131 0.131 1174.8976 0.270 171.1536

NOTE
Check for one way : :
shear IF NO TOP STEEL IS SHOWN THEN MINIMUM STEEL SHOULD BE PROVIDED @ TOP

Direction Y V= 11.81 T
ζve = 0.21 N/sqmm
ζc = 0.26 N/sqmm OK

Direction Z V= 14.36 T
ζve = 0.25 N/sqmm
ζc = 0.27 N/sqmm OK

Check for two way Shear :

For F1 For F2

P= 166.4 tonnes P= 67.6 tonnes

ped1= 0.3 1150 ped1= 0.38 1230


ped2= 0.75 1600 ped2= 0.23 1080
ζp = 0.521 N/mm2 ζp = 0.252 N/mm2
ζper = 1.118 N/mm2 SAFE ζper = 1.118 N/mm2 SAFE
PROJECT SEMAC PVT LTD, BANGALORE
TITLE DESIGNED CHKD DATE SHEET NO.

COMBINED FOOTING
CF3
Col/Ped.Des C2/p2 Col/Ped.Des C10/p10
P= 115.8 T P= 132.5 T
Mz = 0 T-m Mz = 0 T-m
My = 0 T-m My = 0 T-m
fy = 500 N/sqmm
fck = 20 N/sqmm
SBC = 12 T/sqm

Pedestal -P1 Pedestal -P1


a= 0.23 m c= 0.3 m
b= 0.6 m d= 0.6 m

C/C Distance between C2/p2 AND C10/p10 = 3.095 m (Drn Y)


C/C Distance between C2/p2 AND C10/p10 = 0.315 m (Drn z)

Footing Size ( B X L ) mts 3.40 6.10

C2/p2 C10/p10
L= 6.10
P2 3.095
P1
1.235
1.7530930326
c 0.147
0.315 B = 3.40
d 0.168
a 1.865
b
Z 1.398 1.652 1.443 1.607
P4
P3
1.0984 1.3066

P/A= 11.972 T/sqm


Mz/Z= 0.000 T/sqm
My/Z= 0.000 T/sqm

P1 =P/A+Mz/Z+My/Z = 11.972 T/sqm


P2 =P/A-Mz/Z+My/Z = 11.972 T/sqm
< SBC, Hence SAFE
P3 =P/A+Mz/Z-My/Z = 11.972 T/sqm
P4=P/A+Mz/Z+My/Z = 11.972 T/sqm

P1 P2
115.8 132.5
C2/p2 1.652 1.443 C10/p10

3.095
b1
e= (P1x b1)/(P1+P2) = 1.443 m
Factor = 1

115.8 T 132.5 T

1.398 3.095 1.607

40.705 T/m
SH EA R FO R C E

56.922541 67.104262

SFD
80
67.104
60 56.923
40
20
0 0
0 158.877459 2 3 65.395738
4 5
-20
-40
-60 -58.877 SFD
-65.396
-80
DISTANCE

1.398 3.095 1.607


BM DIAGRAM
39.800789 52.531767

60
50 52.532
BMD

40 39.801
1.446 1.649
34.745
30
24.556
20
-2.780739
10
0 -2.781
0 1 2 3 4 5
-10 BMD

DISTANCE

ECCENTRICITY in direction Z

P1 P2
115.8 132.5
C2/p2 0.168 0.147 C10/p10

0.315
b1

e= (P1x b1)/(P1+P2) = 0.147 m


Max BM in direction Z C

1.8650

11.972 T/m2 C

BM at section C-C = 20.821 T-m

Depth of footing Required d= 721.47 mm say de = 750


D= 800

Direction BM(T-m) Steel Position D(mm) deff(mm) k pt(req) pt(provi) Ast(mm2) ζc(N/mm2)
Y 10.219 BOT.STEEL 800 750 0.207 0.120 0.120 900 0.260
Y -0.817864 TOP STEEL 800 750 0.017 0.120 0.120 900 0.260
Z 20.821 BOT.STEEL 800 750 0.422 0.132 0.132 990.45279 0.272

Check for one way shear :

Direction Y V= 6.66 T
ζve = 0.13 N/sqmm
ζc = 0.26 N/sqmm OK

Direction Z V= 13.35 T
ζve = 0.27 N/sqmm
ζc = 0.27 N/sqmm OK

Check for two way Shear :

For C2/p2 For C10/p10

P= 115.8 tonnes P= 132.5 tonnes

ped1= 0.23 980 ped1= 0.3 1050


ped2= 0.6 1350 ped2= 0.6 1350
ζp = 0.490 N/mm2 ζp = 0.543 N/mm2
ζper = 1.118 N/mm2 SAFE ζper = 1.118 N/mm2 SAFE
Vertical
Node Fy kN L B D a bar b bar c bar
CF1 12 1251 7 3.65 0.7 #12-100 #12-100 #12-100
24 1480

CF2 14 1146 6.6 3.5 0.7 #12-100 #12-100 #12-100


26 1336
16 1314
28 1270
17 1334
29 1256
18 1212
30 1371
15 1019
27 1248

CF3 13 1158 6.1 3.4 0.8 #12-100 #12-100 #12-100


25 1325
d bar
#12-100

#12-100

#12-100