Doc.

Ref HM/MY06PH3/HSE/FRM/015
HUASHI (MALAYSIA) SDN BHD Rev. No. 0
Issued Date 28 November 2022
EXCAVATION CHECKLIST
Page No. Page 1 of 1
MY06PH3 PROJECT BUTTERFLY
DESIGN AND BUILD CSA MAIN CONTRACT FOR THE DETAILED DESIGN, AUTHORITY SUBMISSIONS,SUPPLY, DELIVERY, INSTALLATION,
TESTING AND COMMISSIONING, OBTAIN CERTIFICATE OF COMPLETION & COMPLIANCE, SUPPORT DURING DEFECTS LIABILITY PERIOD AND
MAINTENANCE OF PROJECT BUTTERFLY 03 - A NEW 40MW IT, GREENFIELD CENTRE (PHASE 3) FOR BRIDGE DATA CENTRE MALAYSIA III
SDN BHD ON HS (D) 78142 PTD 32674

PROJECT NAME INSPECTION DATE

EXCAVATION LOCATION INSPECTION TIME


EXCAVATION DEPTH & EXCAVATION CONSIDERED CONFINED SPACE:
D: W:
WIDTH YES/NO
PROTECTION SYSTEM
BENCHING / BATTERING / SHORING
USED
ACTIVITIES CARRIED OUT INSIDE
EXCAVATION:

NO DESCRIPTION YES NO N/A


A GENERAL
1 Appropriate personal protective equipment (PPE) by the scope of work.
2 Plant & equipment is set back at least 1.5 meter from the edge of excavation.
3 Spoils / material are set back at least 1.5 meter from the edge of excavation.
4 Hard barricades are provided surrounding the work zone with signage.
5 Proper access and egress is provided into the work zone.
6 Safe access is secured and extend 1 meter above the surface of the excavation.
7 Protection system (above 1.5m depth) is installed according to risk assessment.

B UNDERGROUND SERVICES

1 Identify cable marking route from underground mapping drawing.


2 Underground services are pegged with spray paint prior to excavation.
3 Spotter is in place to monitor excavation for any possible contact with services.
4 All underground services excavated are protected against falling materials.

C WET CONDITION
Precautions are taken to protect personnel from water accumulation through
1 continuous dewatering
Surface water or runoff is diverted / controlled to prevent accumulation in the
2 excavation.
Comments:
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
I have inspected the excavation and confirm it is safe for entry and is in accordance with the excavation requirements.

PTW / Safety Assessor : ____________________ PTW Approval : _____________________

Signature : ____________________ Signature : _____________________