YA450a10_v3
The checklist can be used throughout the process but the major time stamps are:
First Customer Meeting:
Share with the customer the Key Success Factors to be able to predict the completion of the site preparation so that the installation can start & end
on-time.
Construction Progress:
Maintain focus on the items and understanding the impact of items that are not complete. For each item that is open make sure that a responsible
Project representative has a plan to complete prior to the projected system delivery day.
Moving System into Frozen Period:
Maintain focus on the items and understand the impact of items that are not complete. For each item that is open make sure that a responsible
Project representative has a plan to complete prior to the projected system delivery day. Remember at this point the project manager is making a
decision to have the factory build the system which will have inventory impact if the delivery / installation start date is delayed.
Final Site Readiness Check:
Understand the impact of items that are not complete. For each item that is open make sure that a responsible Project representative has a plan to
complete prior to the projected system delivery day. Remember at this point the project manager is making a decision to have the system either
delivered to the site or put into storage which will have inventory impact.
This inventory impact needs to be balanced against the loss of productivity due to incomplete site preparation using the following general rules:
Less than 50% means DO NOT deliver since major items are not done
Between 50% and 90 % means system can be delivered but the installation will not be fully productive.
Above 90% means very good shape, minimum loss of productivity
C. INSTRUCTIONS FOR USE OF THE WORKBOOK / SPREADSHEET
1. Select the MR, CT, AMI, DXR or IXR checklist
2. Enter order header information
3. In column "Applicable" select each item that applies to this order / site
4. Printout copy to mark-up during site inspection by evaluating each item or fill in electronically
5. Enter data in columns "Complete", "Open" & "Remarks"
6. Enter the Project Manager’s and Installer’s name
7. Check the scoring section at the bottom of the sheet to see that the words " Calculation Verified " are visible.
8. If the word "ERROR" is visible then an item marked as Applicable has no status Page 2 of 6
9. Save the document in DMS and print
1. Select the MR, CT, AMI, DXR or IXR checklist
2. Enter order header information
3. In column "Applicable" select each item that applies to this order / site
README INSTRUCTIONS
4. Printout copy to mark-up during site inspection by evaluating each item or fill in electronically Final Checklist
5. Enter data in columns "Complete", "Open" & "Remarks"
6. Enter the Project Manager’s and Installer’s name
7. Check the scoring section at the bottom of the sheet to see that the words " Calculation Verified " are visible.
8. If the word "ERROR" is visible then an item marked as Applicable has no status
9. Save the document in DMS and print
Page 3 of 6
Site Readiness Checklist CT YA450a10_v3
1 X Customer site preparation verified in general against the Philips Final Planning Drawings. yes complete
Gantry, couch move-in through wall-, roof- or floor- opening is prepared as committed,
2 X
checked for size, weight, elevator lift capy/size and that all non-moveable obstacles removed yes complete
along the entire delivery path. Verifyed floorloading capacity. Transport & handling tools
(crane, forklift, wheels, trolleys) have been specified with the rigging company.
Levelness of floor checked with Laser Level to Philips Final Planning Drawings
5 X
tolerance. Floor concrete specification and strength verified with system PRD yes open
requirements. Anchors must hold torque specifications as provided in Philips Final
Planning Drawings.
6 X
Air Conditioning is installed and functioning properly to maintain room temperature and yes open
humidity within system specifications.
7 X
Space for cables checked, openings for cables cut or arranged. All cable raceways/conduits yes complete
are installed and cable run lengths verified.
8 X Radiation shielding installed (windows, doors, walls, clg, floor). yes open
Magnetic fields witin vacinity of CT/ NM/ X-ay equipment have been determined as
9 X yes complete
acceptacble for CT system components.
10 X
Network connection planned are the connectors / interfaces are prepared as specified. yes select:
Network questionnaire filled out (RSN).
11 X
Gantry and Table Anchoring method has been identified and all anchoring materials other yes select:
than those shipped with the system are available.
All network connections hardware is installed and active. All network information i.e. IP
12 X adresses (static only), AE Titles, SNM, GTWY and DNS server are available. Network yes select:
connection point available and prepared for RSN as well as contact details for facility IT
Access is available or has been arranged for needed rooms including after-hours. Storage for
13 X no select:
tools, parts, covers and packing material has been arranged.
14 X
Xray on light and associated cabling and cutout switch installed in the scanner room. Door no select:
interlock switch and cabling installed if required.
All project members (PMS, Customer, vendors) have been identified. Escalation
15 X procedures are known. Schedules after system delivery have been coordinated between no select:
Philips, our vendors, the customer, and the customer's vendors.
16 X Installation Team has received the room drawings and points of contact phone numbers. no select:
17 X
All construction and building work is finished around the installation area. Including no select:
windows, doors and lighting.
18 X All control room funiture is installed. no select:
19 X
Performance testing requirements identified (NEMA), test kits ordered and a schedule has no select:
been determined. (If NEMA required)
20 X If necessary, excess cable storage has been identified and allowed for. no select:
For detailed specification, please refer to the PRD on InCenter (hyperlink ) for the specific system in question
Space reserved to optionally include pictures of the technical, examination and operator room(insert - picture - select picture - insert)