1 Skilled Labour Masson day 575.00 620.00 1050.00 1050.00 1070.00


2 Skilled Labour Plumber day 575.00 620.00 1050.00 1050.00 1070.00
3 Un skilled Labour day 385.00 475.00 735.00 735.00 750.00
4 P or S trap. No 644.00 644.00 550.00 577.50 577.50
5 White glazed footrest No 290.00 290.00 419.00 419.00
6 32 mm pvc bottle trap including 32mm CP waste No 832.00 832.00 1246.00 1246.00 1246.00
7 Waste coupling 32mm No 247.50 247.50 290.00 304.50 304.50
8 1.5cm (½" ) dia.CP Sink cock No 765.49 765.49 1309.00 1309.00 1309.00
9 10.0 ltr.porcelain clay low level flushing cistern complete
4032.00 4032.00
accessories Set 3300.00 3300.00 3840.00
10 10.0 ltr.PVC low level flushing cistern complete accessories Set 2200.00 2310.00 2500.00 2625.00 2625.00
11 32mmx60mm size flushing CP pipe No 467.50 467.50 540.00 567.00 567.00
12 1.5x45 cm(½" x18") PVC pipe connector No 137.50 137.50 160.00 160.00 160.00
13 Bracket No 135.00 135.00 135.00 135.00
14 580 mm Porcelain clay white glaze Orissa Pan (Hindustan,
Parryware, Classica, cera or equivalent No 1550.00 1627.50 1870.00 1963.50 1963.50
15 580 mm Porcelain clay white glazed indian Pan (Hindustan,
Parryware, Classica, cera or equivalent ) No 1320.00 1320.00 1760.00 1884.00 1785.00
16 530 mm Porcelain clay white glaze Orissa Pan (Hindustan,
Parryware, Classica,cera or equivalent ) No 1250.00 1785.00 800.00 840.00 840.00
17 Porcelain clay white glaze Indian Pattern Comode (Hindustan,
Parryware, Classica, cera or equivalent ) regular Set 9700.00 9700.00 9700.00 9700.00
18 Porcelain clay first colour glaze Indian Pattern Comode , cistern,
seat cover all complete set (Hindustan, Parryware, Classica, cera Set 16440.00 16440.00 18119.00 18119.00
19 or equivalent
Porcelain clay) Constellation
white glaze type,
Indiancascade
Patterntype
Comode all complete
set(Hindustan, Parryware, Classica, cera or equivalent ) Set 4586.00 4586.00 4586.00 4586.00
20 Constellation
6/3 ltr.porcelaintype,
claycascade typedual flushing cistern complete
low level Set 3300.00 3465.00 2966.00 2966.00
21 accessories,Constellation type
Bakelite toilet seat cover premium Set 880.00 880.00 276.00 276.00
22 Porcelain clay white glaze European Pattern Comode with
cistern ,seat cover One piece Ellisa, Plaza, Lexigton or Set 26200.00 26200.00 28875.00 28875.00 28875.00
equivalent( American standard) Cotto or equivalent )
23 Porcelain clay white glaze European Pattern Comode with
cistern ,seat cover Two piece ( American standard) Cotto or
equivalent ) Set 12500.00 12500.00 12500.00 12500.00
24 55x40cm Porcelain clay Oval white glaze Wash basin (Hindustan,
Parryware, Classica, cera or equivalent ) regular Set 1320.00 1320.00 1850.00 1850.00
25 15 mm CP basin mixer jaquar,nova , Ark or equivalent Set 3200.00 3200.00 3150.00 3307.50 3307.50
Porcelain clay white glaze Semi Pedestal (Hindustan, Parryware,
26 Classica, cera or equivalent ) Set 1980.00 1980.00 2288.00 2288.00
27 55x40cm Porcelain clay white glaze Wash basin (Hindustan,
Parryware, Classica, cera or equivalent ) regular No 1320.00 1386.00 1880.00 1974.00 1974.00
28 55x40cm Porcelain clay first color glazed Wash basin
(Hindustan, Parryware, Classica, cera or equivalent )
constallation type with pedestal. No 2937.00 2937.00 2937.00 2937.00
29 Porcelain clay white glaze Pedestal for wash basin (Hindustan,
Parryware, Classica, cera or equivalent ) 1980.00 1980.00 2288.00 2402.40 2402.40
30 40x40cm Porcelain clay white glaze Corner Wash basin
(Hindustan, Parryware, Classica, cera or equivalent ) No 1046.00 1046.00 1201.00 1201.00 1201.00
31 45x30x15 Cm (18"x12"x6") White glaze sink with C I bracket
(Hindustan, Parryware, Classica, cera or equivalent) Set 1210.00 1210.00 1490.00 1564.50 1564.50
32 53x43x18 (21"x17"x7") White glaze sink with C I bracket
(Hindustan, Parryware, Classica, cera or equivalent ) Set 1705.00 1705.00 2200.00 2310.00 2310.00
33 60x45x25Cm (24"x18"x10") White glaze sink with bracket
(Hindustan, Parryware, Classica, cera or equivalent ) Set 2310.00 2425.50 2860.00 3003.00 3003.00
34 Small Flat back White glazed urinal with bracket, Constellation
1880.00 1880.00
type, cascade type. Set 1340.00 1340.00 1880.00
35 Small Flat back First color glazed urinal with bracket, Constellation
1880.00 1880.00
type, cascade type. Set 2200.00 2200.00 1880.00
36 46.5x35.5x26.5 cm White glaze flat back Urinal (Hindustan,
Parryware, Classica,cera or equivalent ) Set 770.00 808.50 950.00 997.50 997.50
37 61x41x38 cm Large Flat back White glazed urinal with bracket
(Hindustan, Parryware, Classica, cera or equivalent.) Set 4125.00 4125.00 4174.00 4174.00 4174.00
38 1½" Ø C.P. bottle trap including 1½" Ø PVC. waste coupling. Set 900.00 900.00 1246.00 1246.00 1246.00
1
Material Rate of Sanitary Works 2078/79 Kaski

Per 2077/078wit 2078/079wit


S.N Description of material 068/69 071/72 076/77
Unit h 0% Transp h 0% Transp

39 17"X14"X13 White glaze Angle back Urinal (Hindustan) No 770.00 770.00 950.00 997.50 997.50
23"X14" White glaze squatting plate urinal (Hindustan or
40 equivalent) No 825.00 825.00 1212.00 1212.00 1212.00
41 68X30 cm White glaze Division plate urinal Partation (Hindustan
1690.00 1690.00
or equivalent) 1751.00 1751.00 1690.00
42 300 ltr with 3 panel solar water heater 59251.20 59251.20 72000.00 72000.00
43 200Gallons net capacity G. I. water tank with Inlet, outlet, over
flow, cleanout hole etc.20 GUAGE No 6820.00 6820.00 7100.00 7455.00 7455.00
44 300 Gallons net capacity G. I. Water tank with Inlet, outlet, over
flow, cleanout hole etc.17 GUAGE No 15955.00 15955.00 15955.00 15955.00 15955.00
45 400Gallons net capacity G. I. water tank with Inlet, outlet, over
flow, cleanout hole etc. 16 GUAGE No 16000.00 16000.00 15000.00 15750.00 15750.00
46 500 Gallons net capacity G. I. water tank with Inlet, outlet, over
flow, cleanout
1000Ltr. PVC hole
wateretc. 17(NS)
tank GUAGE
with Inlet, outlet, over flow, cleanout No 22365.00 22365.00 22365.00 22365.00 22365.00
47 hole etc. No 11000.00 9770.00 19000.00 11550.00 11550.00
500 ltr PVC water tank (NS) with Inlet, outlet, over flow, cleanout
48 hole etc. No 5500.00 4885.00 12500.00 5775.00 5775.00
2000 Ltr.PVC water tank (NS) with Inlet, outlet, over flow, cleanout
49 hole etc. No 22000.00 19540.00 34500.00 23100.00 23100.00
50 1 HP Chinese pump No 3024.00 3024.00 3270.00 3270.00 3270.00
51 1 HP Chinese submersible pump No 9240.00 9240.00 9240.00 9240.00
52 1.0 H P Electric motor pump (Submersible) Italian or equivalent No 21930.00 21930.00 26089.00 26089.00 26089.00
0.5 H P Electric motor pump with base plate nuts, bolts etc.set
53 monoblock type No 6000.00 6000.00 6258.00 6258.00 6258.00
1.0 H P Electric motor pump with base plate nuts,bolts,etc.set-
54 indian No 11000.00 11000.00 9465.00 9465.00 9465.00
55 1 H P Electric motor pump with base plate nuts, bolts etc. multi
9465.00 9465.00 9465.00
crompton monoblockpump
2 H P Electricmotor type with base plate nuts, bolts etc.set No 13000.00 13000.00
56 crompton 3 phage type No 26000.00 26000.00 19200.00 19200.00
3 H P Electricmotor pump with base plate nuts, bolts etc.set
57 crompton No 30000.00 30000.00 24500.00 24500.00
5 H P Electricmotor pump with base plate nuts, bolts etc.set
58 crompton 3 phage type No 35000.00 35000.00 28656.00 28656.00 28656.00
59 White glaze toilet paper holder (Recessed type)-Cotto No 680.00 680.00 929.00 929.00
60 White glaze toilet paper holder No 450.00 450.00 1157.00 1157.00
61 Chrome plate toilet paper holder No 360.00 360.00 400.00 462.00 462.00
62 Recess SOAP DISH. ( American standard) Cotto No 2783.00 2783.00 1042.00 1042.00
63 White glaze soap tray No 490.00 490.00 490.00 490.00
64 C P towel rod 1.5x60cm (½"x 24.") American standard No 1468.00 1468.00 1663.00 1663.00 1663.00
65 C.P Soap dish No 283.00 297.35 1042.00 1042.00 1042.00
66 C P Towel rod (1/2 x18) No 600.00 590.97 650.00 682.50 682.50
67 C PTowel rod (1/2 x24) No 630.00 599.34 750.00 787.50 787.50
68 C P Glass Shelf No 486.00 486.00 680.00 680.00 680.00
69 Bevelled edge looking mirror No 650.00 650.00 650.00 750.00 750.00
70 Looking Mirror Modi guard 450x600mm (18"x 24") No 1324.00 1324.00 1459.00 1459.00 1459.00
71 Bevelled edge looking mirror 50x40 cm No 650.00 650.00 650.00 650.00
72 Bevelled edge looking europen pattern No 1800.00 1800.00 1800.00 1800.00
73 7.5cm dia shower rose fancy type with 30cm c p rod No 950.00 950.00 906.00 906.00 906.00
74
1350.00 1350.00
Pressure Adjustable Shower rose, Jaquar, Essco, ark or equivalent No 1350.00 1350.00
75 Shower rose ordinary type (5.0 to 10.00 cm) No 700.00 700.00 640.00 672.00 672.00
76 Shower head with arm and flange No 2500.00 2014.00 2014.00 2500.00 2014.00
77 C.P Flush valve Euorpean pattern No 3494.00 3494.00 3494.00 3494.00
78 C.P Flush valve for urinal sensor type electric Euorpean pattern No 16000.00 16000.00 16000.00 16000.00
79 15mm fancy type bib cock heavy type No 830.00 980.31 1361.00 1361.00
80 15mm fancy type bib cock No 765.00 803.76 650.00 682.50 682.50
81 15mm fancy type angle valve No 600.00 600.00 1244.00 1244.00
82 15mm Auto closing bib cock with aerator No 2160.00 2160.00 2612.00 2612.00
83 15mm Urinal Auto closing Valve with built in control cock No 2082.00 2082.00 2694.00 2694.00
84 15mm fancy type angle valve -cotto No 850.00 850.00 1244.00 1244.00
85 15mm two way angle valve, jaquar, essco, or equivalent No 1150.00 1150.00 1150.00 1150.00

2
Material Rate of Sanitary Works 2078/79 Kaski

Per 2077/078wit 2078/079wit


S.N Description of material 068/69 071/72 076/77
Unit h 0% Transp h 0% Transp

86 CP Piller Cock good No 780.00 780.00 1263.00 1263.00


87 CP Piller Cock ordinary No 600.00 600.00 1054.00 1054.00
88 15mm, concealed stop cock No 1680.00 994.25 1078.00 1078.00
89 15mm gate valve No 742.00 780.15 822.00 822.00 822.00
90 20 mm gate valve No 1066.00 1066.00 1143.00 1143.00 1143.00
91 25mm gate valve No 1619.00 1619.00 1744.00 1744.00 1744.00
92 32 mm gate valve No 2416.00 2416.00 2624.00 2624.00 2624.00
93 40mm gate valve No 3091.00 3091.00 3367.00 3367.00 3367.00
94 50 mm gate valve No 5090.00 5090.00 5500.00 5500.00 5500.00
95 65 mm gate valve No 9996.00 9996.00 11451.00 11451.00 11451.00
96 80 mm gate valve No 15222.00 15222.00 17440.00 17440.00 17440.00
97 100 mm gate valve No 23716.00 23716.00 31393.00 31393.00
98 15 mm G M check valve No 400.00 462.00 400.00 400.00 400.00
99 20 mm G M check valve No 629.00 629.00 629.00 629.00 629.00
100 25 mm G M check valve No 1373.00 1373.00 1373.00 1373.00 1373.00
101 32 mm G M check valve No 2327.00 2327.00 2327.00 2327.00 2327.00
102 50 mm G M check valve No 5236.00 5236.00 5236.00 5236.00 5236.00
103 65 mm G M check valve No 9114.00 9114.00 9114.00 9114.00 9114.00
104 80 mm G M check valve No 12545.00 12545.00 12545.00 12545.00 12545.00
105 100mm GM CHECK VALVE with flange No 19252.00 19252.00 16270.00 16270.00 16270.00
106 Floor Trap 11x7.5cm (4" X 2½") No 350.00 350.00 350.00 350.00
107 C P GRATTING 100 mm DIA SIZE STEEL DOME No 44.00 44.00 50.00 50.00 50.00
108 C P GRATTING 12.5cm (5") DIA SIZE No 55.00 55.00 62.00 62.00 62.00
109 Aluminium Grating 100 mm No 25.00 25.00 43.00 43.00
110 150 mm dia cast iron pipe d/s Rm 2466.07 2466.07 2466.07 2466.07
111 110 mm dia cast iron pipe d/s Rm 1263.11 1263.11 1263.11 1263.11
112 75 mm dia cast iron pipe d/s Rm 1082.66 1082.66 1082.66 1082.66
113 50 mm dia cast iron pipe d/s Rm 799.97 799.97 799.97 799.97
114 15 mm G. I . Pipe 'B ' class Rm 192.00 192.00 192.00 192.00 192.00
115 20 mm G. I . Pipe B' class Rm 244.00 244.00 244.00 244.00 244.00
116 25 mm G. I . Pipe B ' class Rm 373.00 373.00 373.00 373.00 373.00
117 32 mm G. I . Pipe 'B' class Rm 486.00 486.00 486.00 486.00 486.00
118 40 mm G. I . Pipe 'B ' class Rm 560.00 560.00 560.00 560.00 560.00
119 50 mm G. I . Pipe 'B ' class Rm 770.00 770.00 770.00 770.00 770.00
120 80 mm G. I . Pipe 'B ' class Rm 1225.00 1225.00 1225.00 1225.00 1225.00
121 99% Pure lead Kg 200.00 200.00 200.00 200.00
122 50 mm dia. Pvc pipe Rm 125.00 131.25 138.00 150.00 150.00
123 75 mm dia. Pvc pipe Rm 250.00 262.50 262.00 285.00 285.00
124 110 m m dia. Pvc pipe Rm 350.00 367.50 387.00 420.00 420.00
125 15.0 Ltr water heater including copper pipe connector with
11770.00 11770.00
coupling and other necessary fittings complete American. Set 11175.00 11175.00
126 25.0 Ltr water heater including copper pipe connector with
16826.00 16826.00 16826.00
coupling and other necessary fittings complete. Set 10805.00 10805.00
127 35.0 Ltr water heater including copper pipe connector with
20919.00 20919.00
coupling and other necessary fittings complete. Set 12348.00 12348.00 20919.00
128 50.0 Ltr water heater including copper pipe connector with
25011.00 25011.00
coupling and other necessary fittings complete. Set 14658.00 14658.00 25011.00
129 70.0 Ltr water heater including copper pipe connector with
32000.00 32000.00
coupling and other necessary fittings complete. Set 0.00 32000.00
130 100.0 Ltr water heater including copper pipe connector with
40000.00 40000.00
coupling and other necessary fittings complete Set 0.00 40000.00
131 Bath tub 5"-6"x2"-6" with complete fittings.-fiber No 7725.00 7725.00 11500.00 12075.00 12075.00
132 Bath tub spout (Hot and cold) with Telephonic shower. No 3680.00 3680.00 4169.00 4169.00

3
Material Rate of Sanitary Works 2078/79 Kaski

Per 2077/078wit 2078/079wit


S.N Description of material 068/69 071/72 076/77
Unit h 0% Transp h 0% Transp

133 Acrylic Type shower tray70x70cm (29"x29") with complete fittings. No 4226.00 4226.00 4226.00 4226.00
134 15mm CP Bath spout Euorpean pattern No 1455.00 1455.00 2021.00 2021.00
135 Sensor mixer for basin (Battery operating) No 21000.00 21000.00 20481.00 20481.00
136 Sink mixture complete set. No 2600.00 2600.00 3675.00 3675.00
137 CI Cover 45x45cm (18" X 18") No 1500.00 1500.00 2408.00 2408.00 2408.00
94 CI Cover 22" X 22" No 2200.00 2200.00 3108.00 3108.00 3108.00
95 ½" push valve No 915.00 915.00 915.00 915.00
96 Spreader No 400.00 400.00 940.00 940.00
97 Motor starter switch (Cromption) No 3398.00 3398.00 4120.00 4120.00
98 Pressure senser switch (Italian) No 3675.00 3675.00 3675.00 3675.00
99 Fire post complete set Set 27214.00 27214.00 27214.00 27214.00
Fire pump 20 HP two pump set with panel board and acessories
100 pedrollo, Italian, Set 408000.00 408000.00 408000.00 408000.00
101 Swinging hose reel with 20 mm hydraulic rubber braided hose 30
mt. Long, swinging up to 170° nozzle Set 19700.00 19700.00 19700.00 19700.00
102 Euro Guard Water purification set (one litre per minute) Set 16263.00 16263.00 22000.00 22000.00
103 Stainless steel, 90x45 size Bowl with drain board. Ordinary type Set 2100.00 2100.00 2530.00 2530.00
104 Stainless steel, 62" x 20" size Bowl with drain board.Ordinary type 5250.00 5250.00
Set 5250.00 5250.00
105 Flange 80 mm dia. No 2187.00 2187.00 2187.00 2187.00 2187.00
106 Flange 100 mm dia. No 2110.00 2110.00 2982.00 2982.00 2982.00
107 Water spray (Health faucet) with 1.2 m. long flexible pipe. Set 925.00 800.00 900.00 945.00 945.00
108 High density polethene pipe 50mm. Rm 88.83 88.83 98.28 103.19 103.19
109 High density polethene pipe 110mm. Rm 400.21 400.21 442.78 464.92 464.92
110 High density polethene pipe 125 mm. Rm 537.92 537.92 595.14 624.90 624.90
111 High density polethene pipe 140mm.dia. Rm 681.74 681.74 725.25 761.51 761.51
112 High density polethene pipe 160mm. Dia Rm 784.00 784.00 943.25 990.41 990.41
113 High density polethene pipe 180mm. Rm 1199.07 1199.07 1190.50 1250.03 1250.03
114 High density polethene pipe 200mm. Rm 1384.15 1384.15 1472.50 1546.13 1546.13
115 G.M. 25mm float valve No 965.00 965.00 1975.00 1975.00 1975.00
116 Grab bar American standard-30cm long No 4343.00 4343.00 5360.00 5360.00
117 Hand drayer with complete accessories No 6500.00 6500.00 6500.00 6500.00
118 15 mm Insulation for hot water pipe 'Aeroflex" of 6 mm wall
thickness No 84.00 84.00 84.00 84.00
119 25 mm Insulation for hot water pipe 'Aeroflex" of 6 mm wall
thickness No 126.00 126.00 126.00 126.00
120 32 mm Insulation for hot water pipe 'Aeroflex" of 6 mm wall
thickness No 158.00 158.00 158.00 158.00
121 15 mm (1/2") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 143.00 143.00 203.40 203.40
122 20 mm (3/4") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 200.00 200.00 317.70 317.70
123 25 mm (1") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 265.00 265.00 465.30 465.30
124 32 mm (1 1/4") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 312.00 312.00 692.10 692.10
125 40 mm (1 1/2") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 398.00 965.70 965.70
126 50 mm (2") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 573.00 573.00 1627.20 1627.20
127 5 kg Fire extingusher ABC type minimax No 5040.00 5040.00 7130.00 7130.00
128 208 kg CI heavy Manhole cover. Set 12535.00 12535.00 32347.00 32347.00
129 15 mm CPVC ball valve, CTS sockets, No 863.00 863.00 547.56 547.56 547.56
130 20 mm CPVC ball valve, CTS sockets, No 1051.00 1051.00 724.55 724.55 724.55
131 25 mm CPVC ball valve, CTS sockets, No 1202.00 1202.00 1020.66 1020.66 1020.66
132 32 mm CPVC ball valve, CTS sockets, No 2452.00 2452.00 2012.41 2012.41 2012.41
133 40 mm CPVC ball valve, CTS sockets, No 3120.00 3120.00 2803.55 2803.55 2803.55
134 50 mm CPVC ball valve, CTS sockets, No 4013.00 4013.00 4053.74 4053.74 4053.74
135 16 mm multi-layer composite pap pipe, rm 92.00 92.00 111.00 111.00 111.00
136 20 mm multi-layer composite pap pipe, rm 109.00 109.00 141.00 141.00 141.00
137 25 mm multi-layer composite pap pipe, rm 165.00 165.00 208.00 208.00 208.00
138 32 mm multi-layer composite pap pipe, rm 258.00 258.00 302.00 302.00 302.00
139 40 mm multi-layer composite pap pipe, rm 375.00 375.00 465.00 465.00 465.00

4
Material Rate of Sanitary Works 2078/79 Kaski

Per 2077/078wit 2078/079wit


S.N Description of material 068/69 071/72 076/77
Unit h 0% Transp h 0% Transp

140 50 mm multi-layer composite pap pipe, rm 650.00 650.00 650.00 650.00 650.00
141 150 mm NP-2 RCC hump pipe rm 517.55 517.55 608.16 632.00 632.00
142 200 mm NP-2 RCC hump pipe rm 670.61 670.61 789.80 816.00 816.00
143 300 mm NP-2 RCC hump pipe rm 1116.73 1116.73 1318.37 1388.00 1388.00
144 400 mm NP-2 RCC hump pipe rm 1597.55 1597.55 1612.24 1597.55 1612.24
145 600 mm NP-2 RCC hump pipe rm 2493.06 2493.06 2908.16 3008.00 3008.00
146 150 mm NP-3 RCC hump pipe rm 1089.39 1089.39 1306.12 1368.00 1368.00
147 200 mm NP-3 RCC hump pipe rm 1449.39 1449.39 1726.53 1820.00 1820.00
148 300 mm NP-3 RCC hump pipe rm 2594.69 2594.69 3148.98 3320.00 3320.00
149 400 mm NP-3 RCC hump pipe rm 3334.69 3334.69 4012.24 4196.00 4196.00
150 600 mm NP-3 RCC hump pipe rm 4931.02 4931.02 6163.27 6356.00 6356.00
151 50 mm Plain Tee No 44.00 44.00 89.56 89.56 89.56
152 50 mm Bend 90 degree No 30.00 30.00 61.32 61.32 61.32
153 50 mm Bend 45 degree No 29.00 29.00 61.32 61.32 61.32
154 75 mm Vent cowl No 35.26 35.26 67.16 67.16 67.16
155 75 mm Plain tee No 94.71 94.71 197.61 197.61 197.61
156 75 mm Plain door tee No 112.62 112.62 231.68 231.68 231.68
157 75 mm Bend 90 degree No 72.33 72.33 143.09 143.09 143.09
158 75 mm Door bend No 92.14 92.14 183.98 183.98 183.98
159 75 mm Bend 45 degree No 58.54 58.54 116.81 116.81 116.81
160 75 mm Y- Branch No 105.75 105.75 249.20 249.20 249.20
161 75 mm Cross tee No 282.90 282.90 293.98 293.98 293.98
162 75 mm Pipe clip No 11.00 11.00 32.12 32.12 32.12
163 110 mm Vent cowl No 58.73 58.73 116.08 116.81 116.81
164 110 mm Plain tee No 420.00 420.00 369.91 369.91 369.91
165 110 mm Door tee No 194.24 194.24 429.29 429.29 429.29
166 110 mm Bend 90 degree No 120.54 120.54 264.78 264.78 264.78
167 110 mm Door bend No 148.08 148.08 320.27 320.27 320.27
168 110 mm Bend 45 degree No 99.87 99.87 209.30 209.30 209.30
169 110 mm Y- Branch No 204.88 204.88 452.65 452.65 452.65
170 110 mm Cross tee No 460.22 460.22 727.16 727.16 727.16
171 110 mm Pipe clip No 20.47 20.47 43.80 43.80 43.80
172 110 mm Gully trap No 515.00 515.00 515.00 515.00
Cast Iron fittings Specials
173 50 mm Bend 90 degree No 276.00 276.00 276.00 276.00
174 50 mm Vent cowl No 240.00 240.00 240.00 240.00
175 50 mm Door tee No 531.00 531.00 531.00 531.00
176 50 mmTrap p or s No 325.00 325.00 325.00 325.00
177 50 mm Plain tee No 215.00 215.00 215.00 215.00
178 50 mm Y- Branch No 432.00 432.00 432.00 432.00
179 50 mm Door bend No 404.00 404.00 404.00 404.00
180 75 mm Bend 90 degree No 368.00 368.00 368.00 368.00
181 75 mm Vent cowl No 283.00 283.00 283.00 283.00
182 75 mm Door tee No 701.00 701.00 701.00 701.00
183 75 mmTrap p or s No 381.00 381.00 381.00 381.00
184 75 mm Plain tee No 566.00 566.00 566.00 566.00
185 75 mm T- Branch No 673.00 673.00 673.00 673.00
186 75 mm Door bend No 517.00 517.00 517.00 517.00
187 110 mmBend 90 degree No 587.00 587.00 587.00 587.00
188 110 mmVent cowl No 404.00 404.00 404.00 404.00
189 110 mmDoor tee No 935.00 935.00 935.00 935.00
5
Material Rate of Sanitary Works 2078/79 Kaski

Per 2077/078wit 2078/079wit


S.N Description of material 068/69 071/72 076/77
Unit h 0% Transp h 0% Transp

190 110 mm Trap p or s No 512.00 512.00 512.00 512.00


191 110 mm Plain tee No 786.00 786.00 786.00 786.00
192 110 mm Y- Branch No 955.00 955.00 955.00 955.00
193 110 mm Door bend No 630.00 630.00 630.00 630.00
194 4' Ø R.C.C. Ring -5cm th. Rm 4306.00 4306.00 5530.00 5865.00 5865.00
195 3' 6"Ø R.C.C. Ring Rm 3590.00 3590.00 4175.00 4430.00 4430.00
196 3' Ø R.C.C. Ring Rm 3166.66 3166.66 3590.00 3810.00 3810.00
197 2' 6"Ø R.C.C. Ring Rm 2562.50 2562.50 2900.00 3075.00 3075.00
198 Seat Cover No 880.00 880.00 1100.00 1155.00 1155.00
Special Sanitary Fittings
1 IPWC Comode with low level cistern set (Constellation type) Set 20389.00 20389.00
2 Wash Basin Pedastal White Glazed No 6232.00 6232.00
3 Wash Basin Pedastal White Glazed Color No 9785.00 9785.00

Note :
1) * without Transpotation

6
Remark

kaski +
kaski +
kaski +
kaski +
ktm
ktm
kaski
ktm

kaski +
kaski +
kaski
kaski
ktm

kaski +

kaski +

kaski +

Market Rate

ktm

Market Rate
ktm
ktm

ktm

Market Rate

kaski
kaski +
kaski

kaski +

ktm

kaski +

ktm

kaski +

kaski +

kaski +

ktm

ktm

kaski +

ktm
ktm
7
Remark

kaski +
ktm

ktm
Market Rate

kaski +

ktm

kaski +

ktm
kaski
kaski
kaski
ktm
Market Rate
ktm
ktm
ktm

ktm
kaski
Market Rate
ktm
Market Rate
ktm
kaski +
ktm
Market Rate
ktm
ktm
kaski +
kaski +
ktm
Market Rate
ktm
ktm
ktm
ktm

Market Rate
kaski +
ktm
Market Rate
Market Rate
ktm
kaski +
ktm
ktm
ktm
ktm
Market Rate

8
Remark

ktm
ktm
ktm
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
Market Rate
ktm
ktm
ktm
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski
kaski +
kaski +
kaski +

ktm

ktm

ktm

ktm

Market Rate

Market Rate
kaski +
ktm

9
Remark

Market Rate
ktm
ktm
kaski +
ktm
ktm
Market Rate
ktm
Market Rate
Market Rate
Market Rate
Market Rate

Market Rate
Market Rate
Market Rate
Market Rate
kaski +
kaski +
kaski +
4kg/cm2
4kg/cm2
4kg/cm2
4kg/cm2
4kg/cm3
4kg/cm2
4kg/cm2
kaski +
ktm
Market Rate

ktm

ktm

ktm
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
ktm
ktm
kaski +
kaski +
kaski +
kaski +
kaski +
kaski
ktm
ktm
ktm
ktm
ktm

10
Remark

ktm
kaski
kaski
kaski
kaski
kaski
kaski
kaski
kaski
kaski
kaski
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
ktm
kaski
Market Rate

Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
11
Remark

Market Rate
Market Rate
Market Rate
Market Rate
ktm
ktm
ktm
ktm
kaski

Market Rate
Market Rate
Market Rate

12
SANITARY WORKS : 078-79 Kaski

Table of Content
Sanitary Analysis 2078/079
S.No Description P.G. Rs. Rate Per
1001 580 mm Porcelain clay white glaze Orissa Pan complete set. 1 Rs. 14674.00 Set
1002 500mm Indian Pan with low level cistern complete set … 1 Rs. 14997.72 Set
1003 530mm Orissa pan with low level cistern complete set …………… 1 Rs. 13381.97 Set
1004 580mm Orissa pan complete set ………………………….………... 2 Rs. 5015.15 Set
1005 10.0 Ltr. Low level Porceline glazed cistern complete set … 2 Rs. 9658.85 Set
1006 10.0 Ltr. Low level PVC cistern complete set ………………… 2 Rs. 8040.80 Set
1007 I.P.W C. Commode with low level cistern complete set. 2 Rs. 24263.85 Set
1008 I.P.W C. Commode with cistern and seat cover complete set. 3 Rs. 27328.60 Set
1009 I.P.W C. Commode with cistern and seat cover complete set. 3 Rs. 15493.95 Set
1010 E.P.W.C.Commode Euorpean pattern(Cotto)with complete set. 3 Rs. 21518.80 Set
1011 E.P.W.C.Commode Euorpean pattern(Cotto)with complete set. 4 Rs. 40350.05 Set
1012 55x40cm Oval Wash basin with mixer complete set ………. 4 Rs. 11570.72 Set
1013 55x40cm Oval Wash basin Euorpean pattern complete set ……… 4 Rs. 11938.72 Set
1014 55x40cm Wash basin Euorpean pattern (cotto) complete set … 5 Rs. 14569.92 Set
1015 55x40cm Wash basin constallation type 1st color complete set 5 Rs. 9827.80 Set
1016 55x40cm Wash basin with mixer and Pedestal complete set …… 5 Rs. 13596.58 Set
1017 55x40cm Wash basin complete set ………………………….………. 6 Rs. 9679.55 Set
1018 40x40cm Corner Wash basin complete set …………………… 6 Rs. 8790.60 Set
1019 45x30x15cm Small Lavotary sink complete set ………………… 6 Rs. 8265.62 Set
1020 53x43X18cm Lavotary sink complete set ……………………………. 7 Rs. 9122.95 Set
1021 60x45x25cm Kitchen sink complete set …………………………….. 7 Rs. 10966.40 Set
1022 46.5x35.5x26.5cm Urinal constallation type complete set 7 Rs. 8092.89 Set
1023 44.5x31.5x26.5cm Urinal color constallation type complete set 7 Rs. 8092.89 Set
1024 46.5x35.5x26.5cm Urinal complete set …………………………...…… 8 Rs. 5025.50 Set
1025 61x41x38cm Large flat back Urinal complete set ……………… 8 Rs. 11670.20 Set
1026 45x35x27.5cm Angle back Urinal complete set ………………… 8 Rs. 6108.22 Set
1027 45x35cm Squatting plate Urinal complete set …………………… 8 Rs. 4738.00 Set
1028 Urinal Partation 68x30cm size complete set………………. 9 Rs. 3010.70 Set
1029 300 Ltr. 3 Panel solar heater with elecric booster set……….. 9 Rs. 89107.75 Set
1030 900 ltr. (200.0 gls.) G I water tank …………………………………... 9 Rs. 15875.75 nos
1031 1350 Ltr. (300.0 gls.) G I water tank …………………………………. 9 Rs. 26524.75 nos
1032 1800 Ltr. (400.0 gls.) G I water tank …………………………………. 9 Rs. 25069.59 nos
1033 2250Ltr. (500.0 gls.) G I water tank ………………………………….. 10 Rs. 37714.25 nos
1034 1000.0 ltr. PVC water tank ………………………………………….. 10 Rs. 20654.00 nos
1035 500.0 ltr. PVC water tank …………………………………………... 10 Rs. 13955.25 nos
1036 2000.0 ltr. PVC water tank …………………………………………... 10 Rs. 35661.50 nos
1037 1 HP Chinese Pump …………………………………………………… 11 Rs. 10436.25 nos
1038 1 HP Chinese Pump sumersible ……………………………… 11 Rs. 17319.00 nos
1039 1.0 H.P.Electrical motor water pump,Submersible pump Italian 11 Rs. 36675.80 nos
1040 0.5 H P Electric motor pump monoblock (Crompton) ………... 11 Rs. 13872.45 nos
1041 1.0 H P Electric motor pump monoblock (Crompton) …… 11 Rs. 17560.50 nos
1042 1 H P Electric motor pump Multi stage coupled (Crompton) …… 12 Rs. 17560.50 nos
1043 2.0 H P Electric motor pump multi stage couple (Cromp 12 Rs. 29635.50 nos
1044 3.0 H P Electric motor pump monoblock (Crompton) …… 12 Rs. 36604.50 nos
1045 5.0 H P Electric motor pump monoblock (Crompton) …… 12 Rs. 43856.40 nos
1046 Porceline Clay Toilet Paper Holder (Recessed type)American standard 12 Rs. 1215.20 nos
1047 Porcelain clay toilet paper holder (Recessed type) ……… 13 Rs. 1477.40 nos

13
SANITARY WORKS : 078-79 Kaski

Sanitary Analysis 2078/079


S.No Description P.G. Rs. Rate Per
1048 Chrome plate toilet paper holder ………………………………….…… 13 Rs. 678.15 nos
1049 Recess Soap Dish ( American standard) Cotto 13 Rs. 1345.15 nos
1050 Porcelain clay soap tray 15x15 cm size (Recessed t 13 Rs. 710.35 nos
1051 Chrome plate soap tray ………………………………….………... 13 Rs. 1345.15 nos
1052 C P towel rod 1.5x60cm (½"x 24.") American standard 13 Rs. 2197.39 nos
1053 Chrome plate Towel rod 1.5 x 60cm size …………………………… 14 Rs. 1067.08 nos
1054 Chrome plate Towel rod 1.5 x 45cm size …………………………… 14 Rs. 1190.29 nos
1055 Glass shelf …………………………………………...……………… 14 Rs. 1066.67 nos
1056 Porcelain clay GlassShelf Euorpean pattern(American standard) 14 Rs. 1629.92 nos
1057 Looking mirror 55x40cm size ………………………………………….. 14 Rs. 1280.06 nos
1058 Looking Mirror Modi guard 450x600mm (18"x 24") 14 Rs. 2099.52 nos
1059 Looking mirror 50x40cm size ………………………………………...… 15 Rs. 1165.06 nos
1060 Looking mirror Euorpean pattern(American standard)...………. 15 Rs. 2491.67 nos
1061 Chrome plate shower rose 7.5cm dia………………………………… 15 Rs. 1447.96 nos
1062 Pressure Adjustable Shower rose jaquar or equivalent. 15 Rs. 1958.56 nos
1063 Chrome plate shower rose ordinary type ………………………… 15 Rs. 1178.86 nos
1064 Shower head with arm and flange Euorpean pattern( American sta 15 Rs. 2726.27 nos
1065 C.P . FLUSH VALVE ( American standard) Cotto 16 Rs. 4153.45 nos
1066 SENSOR FLUSH VALVE FOR URINAL ( American standard) Cotto 16 Rs. 18535.35 nos
1067 15mm CP Bib Cock Heavy type 16 Rs. 1701.87 nos
1068 C P 15 mm bib cock ordinary type …………………………………… 16 Rs. 920.23 nos
1069 15mm Auto closing Bib Cock with aerator, jaquar or eqv. 16 Rs. 3139.15 nos
1070 15mm Urinal Auto closing Valve with built in control cock 16 Rs. 3233.45 nos
1071 C.P. 15mm Angle valve European pattern 17 Rs. 1565.95 nos
1072 C P 15 mm Angle valve ordinary type ………………………………… 17 Rs. 1565.95 nos
1073 15mm two way angle valve 17 Rs. 1457.85 nos
1074 C P 15 mm Piller cock ordinary type …………………………………. 17 Rs. 1347.45 nos
1075 C P 15 mm Concealled valve ordinary type …………………… 17 Rs. 1375.05 nos
1076 G.M. 15mm Gate valve …………………………………..……………… 17 Rs. 1080.65 nos
1077 G.M. 20mm Gate valve …………………………………..……………… 18 Rs. 1449.80 nos
1078 G.M. 25mm Gate valve …………………………………..……………… 18 Rs. 2276.31 nos
1079 G.M 32mm Gate valve …………………………………..……………… 18 Rs. 3288.31 nos
1080 G.M .40mm Gate valve …………………………………..……………… 18 Rs. 4413.47 nos
1081 G.M. 50mm Gate valve …………………………………..……………… 18 Rs. 6866.42 nos
1082 G.M 65mm Gate valve …………………………………..……………… 18 Rs. 13710.07 nos
1083 G.M.80mm Gate valve ……………………………………….………… 19 Rs. 21040.40 nos
1084 G.M. 100mm Gate valve ……………………………………….. 19 Rs. 37086.35 nos
1085 G.M. 15mm Check valve …………………………………..…………… 19 Rs. 595.35 nos
1086 G.M. 20mm Check valve …………………………………..…………… 19 Rs. 994.06 nos
1087 G.M. 25mm Check valve …………………………………..…………… 19 Rs. 1849.66 nos
1088 G.M.32mm Check valve …………………………………..…………… 19 Rs. 2946.76 nos
1089 G.M. 50mm Check valve ……………………………………..……… 19 Rs. 6427.46 nos
1090 G.M. 65mm Check valve …………………………………..…………… 20 Rs. 11022.52 nos
1091 G.M. 80mm Check valve ……………………………………..……… 20 Rs. 14968.17 nos
1092 G.M. 100mm Check valve with flange..……..………………….. 20 Rs. 19257.39 nos
1093 PVC Floor trap 11x7.5cm …………………………………..………… 20 Rs. 592.48 nos
1094 ALUMINIUM GRATING 100mm (4") dia 20 Rs. 123.28 nos
1095 C P Gratting 125mm dia size ………………………………………….. 20 Rs. 145.13 nos
1096 C P Gratting 100mm dia size ………………………………………….. 21 Rs. 131.33 nos
1097 150mm dia Cast iron pipe ……………………………………………... 21 Rs. 4755.10 Rm

14
SANITARY WORKS : 078-79 Kaski

Sanitary Analysis 2078/079


S.No Description P.G. Rs. Rate Per
1098 110mm dia Cast iron pipe ……………………………………………... 21 Rs. 2694.92 Rm
1099 75mm dia Cast iron pipe ……………………………………………….. 21 Rs. 2010.03 Rm
1100 50mm dia Cast iron pipe ……………………………………………….. 21 Rs. 1684.94 Rm
1101 15mm dia. G I pipe ( Medium ) …………………………………………. 22 Rs. 609.04 Rm
1102 20mm dia. G I pipe ( Medium ) …………………………………………. 22 Rs. 668.84 Rm
1103 25mm dia. G I pipe ( Medium ) …………………………………………. 22 Rs. 955.19 Rm
1104 32mm dia. G I pipe ( Medium ) …………………………………………. 22 Rs. 1093.19 Rm
1105 40mm dia. G I pipe ( Medium ) …………………………………………. 22 Rs. 1289.03 Rm
1106 50mm dia. G I pipe ( Medium ) …………………………………………. 23 Rs. 1530.53 Rm
1107 80mm dia. G I pipe ( Medium ) …………………………………………. 23 Rs. 2062.98 Rm
1108 50mm lead caulked joint @ 3 lbs per joint ……………………………. 23 Rs. 655.28 nos
1109 75mm lead caulked joint @ 3 lbs per joint ………………………… 23 Rs. 729.11 nos
1110 110mm lead caulked joint @ 4 lbs per joint ………………………… 23 Rs. 1067.44 nos
1111 150mm lead caulked joint @ 4 lbs per joint …………………………. 24 Rs. 1073.19 nos
1112 50 mm PVC Pipe 4 kg/cm . ………………………………….………...……..
2
24 Rs. 338.33 Rm
1113 75 mm PVC pipe 4 kg\cm2. ……. ………………………………………...……... 24 Rs. 563.73 Rm
1114 110 mm PVC Pipe 4 kg\cm . ……. …………………………………...……..…..
2
24 Rs. 870.43 Rm
1115 15.0 Ltr Water Heater ( Aeroston ) American standard 24 Rs. 19055.50 nos
1116 25.0 ltr. Electric water heater (Geyser ) ……………………………… 25 Rs. 24869.90 nos
1117 35.0 ltr. Electric water heater (Geyser ) ……………………………… 25 Rs. 30439.35 nos
1118 50.0 ltr. Electric water heater (Geyser ) ……………………………… 25 Rs. 36007.65 nos
1119 Acrylic type Bath tub 5'-6" x2'-6" size …………………………………. 25 Rs. 20636.75 nos
1120 C P Telephonic shower with mixer ………………………………….. 25 Rs. 6898.85 nos
1121 Acrylic type Shower tray ……………………………...………….. 26 Rs. 9141.35 nos
1122 15mm CP Bath spout Euorpean pattern( American st.) Cotto 26 Rs. 2356.73 nos
1123 Sensor mixer for basin (Battery operating) 26 Rs. 24881.40 nos
1124 C P Sink mixture ………………………………………………….. 26 Rs. 4459.35 nos
1125 C I cover 45x45cm ( medium ) ………………………………….. 26 Rs. 3175.26 nos
1126 C I cover 55x55cm (medium ) ………………………………….. 26 Rs. 3980.26 nos
1127 1.5cm C P flush cock with spreader ……………………………… 27 Rs. 2440.87 nos
1128 Flange 80 mm dia………………………………………………….. 27 Rs. 2651.77 nos
1129 Flange 100 mm dia………………………………………………… 27 Rs. 3566.02 nos
1130 Motor starter switch …………………………………………………… 27 Rs. 5192.25 Set
1131 Pressure Senser Switch …………………………………………… 27 Rs. 4680.50 Set
1132 Fire post complete set ………………………………………… 28 Rs. 39173.60 Set
1133 20 HP Electric Motor Pump. ………………………………………… 28 Rs. 480033.00 Set
1134 Fire hose reel complete set …………………………………… 28 Rs. 29302.00 Set
1135 G.M. 25mm float valve …………………………………………. 28 Rs. 2544.69 nos
1136 Grab bar American standard ………………………………….. 28 Rs. 6460.44 nos
1137 Euro guard ( filter ) complete set ………………………… 29 Rs. 30716.50 Set
1138 Kitchen Sink Stainless steel 90cm long ……………… 29 Rs. 9191.95 Set
1139 Kitchen Sink Stainless steel 150cm long …………… 29 Rs. 14412.95 Set
1140 CP Water Spray 1.5cm …………………………………………… 29 Rs. 1541.00 nos
1141 Hand drayer chinese ……………………………………………… 29 Rs. 7611.72 nos
1142 4 Kg/cm2, High Density Polethene Pipe 50mm ………………… 30 Rs. 500.35 Rm
1143 4 kg\cm2 (110 mm) HDP pipe ……………………………………………………………….. 30 Rs. 916.34 Rm
1144 4 kg\cm (125 mm) HDP pipe ………………………………………………………………..
2
30 Rs. 1100.32 Rm
1145 4 kg\cm2 (140mm) HDP pipe ……………………………………………………………….. 30 Rs. 1337.46 Rm
1146 4 kg\cm (150mm) HDP pipe ………………………………………………………………..
2
30 Rs. 1731.22 Rm

15
SANITARY WORKS : 078-79 Kaski

Sanitary Analysis 2078/079


S.No Description P.G. Rs. Rate Per
1147 4 kg\cm (180mm) HDP pipe ………………………………………………………………..
2
31 Rs. 2274.84 Rm
1148 4 kg\cm (200mm) HDP pipe ………………………………………………………………..
2
31 Rs. 2824.54 Rm
1149 5 kg Fire Extingusher ………………………………………………… 31 Rs. 9430.00 nos
1150 560mm dia 228kg CI heavy cover ………………………… 31 Rs. 41017.05 Set
1151 15mm dia aeroflex insulation for hot water pipe 31 Rs. 231.95 Rm
1152 25 mm dia aeroflex insulation for hot water pipe 31 Rs. 280.25 Rm
1153 32 mm dia aeroflex insulation for hot water pipe 32 Rs. 317.05 Rm
1154 15 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 32 Rs. 369.84 Rm
1155 20 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 32 Rs. 501.28 Rm
1156 25 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 32 Rs. 680.01 Rm
1157 32 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 32 Rs. 940.83 Rm
1158 40 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 33 Rs. 1255.47 Rm
1159 50 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 33 Rs. 2016.20 Rm
1160 15 mm CPVC ball valve, CTS sockets, ………………………… 33 Rs. 765.04 nos
1161 20 mm CPVC ball valve, CTS sockets, ………………………… 33 Rs. 968.58 nos
1162 25 mm CPVC ball valve, CTS sockets, …………………………. 33 Rs. 1309.11 nos
1163 32 mm CPVC ball valve, CTS sockets, …………………………. 33 Rs. 2449.62 nos
1164 40 mm CPVC ball valve, CTS sockets, …………………………. 34 Rs. 3359.43 nos
1165 50 mm CPVC ball valve, CTS sockets, …………………………. 34 Rs. 4797.15 nos
1166 16 mm mulitlayer composite PAP Pipe ………………………….. 34 Rs. 275.08 Rm
1167 20 mm mulitlayer composite PAP Pipe ………………………….. 34 Rs. 309.58 Rm
1168 25 mm mulitlayer composite PAP Pipe ………………………….. 34 Rs. 386.63 Rm
1169 32 mm mulitlayer composite PAP Pipe ………………………….. 35 Rs. 494.73 Rm
1170 40 mm mulitlayer composite PAP Pipe ………………………….. 35 Rs. 682.18 Rm
1171 50 mm mulitlayer composite PAP Pipe …………………………. 35 Rs. 894.93 Rm
1172 150 mm RCC hump pipe NP2…………………………………… 35 Rs. 1316.57 Rm
1173 200 mm RCC hump pipe NP2…………………………………….. 36 Rs. 1725.81 Rm
1174 300 mm RCC hump pipe NP2…………………………………….. 36 Rs. 2576.58 Rm
1175 400 mm RCC hump pipe NP2……………………………………. 36 Rs. 2877.98 Rm
1176 600 mm RCC hump pipe NP2……………………………………. 36 Rs. 5102.82 Rm
1177 150 mm RCC hump pipe NP3……………………………………. 37 Rs. 2225.34 Rm
1178 200 mm RCC hump pipe NP3……………………………………… 37 Rs. 2966.48 Rm
1179 300 mm RCC hump pipe NP3…………………………………….. 37 Rs. 4960.85 Rm
1180 400 mm RCC hump pipe NP3…………………………………….. 37 Rs. 6001.61 Rm
1181 600 mm RCC hump pipe NP3……………………………………… 38 Rs. 9145.47 Rm
1182 140 mm Plastic Gutter water pipe (Half round)…………………… 38 Rs. 1129.41 Rm
1183 180 mm Plastic Gutter water pipe (Half round)……………… 38 Rs. 1247.61 Rm
1184 250 mm Plastic Gutter water pipe (Half round)…………………… 39 Rs. 2158.34 Rm
UPVC Bend Specials
1185 50 mm Plain Tee ………………………………………………………… 40 Rs. 228.46 nos
1186 50 mm Bend 90 degree ……………………………………………… 40 Rs. 195.98 nos
1187 50 mm Bend 45 degree……………………………………………… 40 Rs. 195.98 nos
1188 75 mm Vent cowl………………………………………………………… 40 Rs. 228.11 nos
1189 75 mm Plain tee………………………………………………………… 40 Rs. 378.13 nos
1190 75 mm Plain door tee………………………………………………… 40 Rs. 417.31 nos
1191 75 mm Bend 90 degree……………………………………………… 40 Rs. 315.43 nos
1192 75 mm Door bend……………………………………………………… 40 Rs. 362.46 nos
1193 75 mm Bend 45 degree……………………………………………… 40 Rs. 285.21 nos
1194 75 mm Y- Branch………………………………………………………… 40 Rs. 437.46 nos
1195 75 mm Cross tee………………………………………………………… 40 Rs. 488.96 nos

16
SANITARY WORKS : 078-79 Kaski

Sanitary Analysis 2078/079


S.No Description P.G. Rs. Rate Per
1196 75 mm Pipe clip………………………………………………………… 40 Rs. 39.24 nos
1197 110 mm Vent cowl……………………………………………………… 40 Rs. 385.61 nos
1198 110 mm Plain tee………………………………………………………… 40 Rs. 676.67 nos
1199 110 mm Door tee………………………………………………………… 40 Rs. 744.96 nos
1200 110 mm Bend 90 degree…………………………………………… 40 Rs. 555.77 nos
1201 110 mm Door bend……………………………………………………… 40 Rs. 619.58 nos
1202 110 mm Bend 45 degree…………………………………………… 40 Rs. 491.97 nos
1203 110 mm Y- Branch……………………………………………………… 40 Rs. 771.82 nos
1204 110 mm Cross tee……………………………………………………… 40 Rs. 1087.51 nos
1205 110 mm Pipe clip………………………………………………………… 40 Rs. 54.17 nos
1206 110 mm Gully trap……………………………………………………… 40 Rs. 843.53 nos
Cast Iron fittings Specials
1207 50 mm Bend 90 degree……………………………………………… 41 Rs. 474.67 nos
1208 50 mm Vent cowl………………………………………………………… 41 Rs. 433.27 nos
1209 50 mm Door tee………………………………………………………… 41 Rs. 767.92 nos
1210 50 mmTrap p or s……………………………………………………… 41 Rs. 531.02 nos
1211 50 mm Plain tee………………………………………………………… 41 Rs. 404.52 nos
1212 50 mm Y- Branch………………………………………………………… 41 Rs. 654.07 nos
1213 50 mm Door bend……………………………………………………… 41 Rs. 621.87 nos
1214 75 mm Bend 90 degree……………………………………………… 41 Rs. 639.71 nos
1215 75 mm Vent cowl………………………………………………………… 41 Rs. 541.96 nos
1216 75 mm Door tee………………………………………………………… 41 Rs. 1022.66 nos
1217 75 mmTrap p or s……………………………………………………… 41 Rs. 654.66 nos
1218 75 mm Plain tee………………………………………………………… 41 Rs. 867.41 nos
1219 75 mm Y- Branch………………………………………………………… 41 Rs. 990.46 nos
1220 75 mm Door bend……………………………………………………… 41 Rs. 811.06 nos
1221 110 mmBend 90 degree……………………………………………… 41 Rs. 932.96 nos
1222 110 mmVent cowl……………………………………………………… 41 Rs. 722.51 nos
1223 110 mmDoor tee………………………………………………………… 41 Rs. 1333.16 nos
1224 110 mm Trap p or s…………………………………………………… 41 Rs. 846.71 nos
1225 110 mm Plain tee………………………………………………………… 41 Rs. 1161.81 nos
1226 110 mm Y- Branch……………………………………………………… 41 Rs. 1356.16 nos
1227 110 mm Door bend……………………………………………………… 41 Rs. 982.41 nos
1228 Hard Soil Cutting (for Well)……………………………………… 42 Rs. 3820.01 M3
1229 4' Ø R.C.C. Ring for Well fitting……………………………… 42 Rs. 7268.00 Rm
1230 3'6" Ø R.C.C. Ring for Well fitting………………………… 43 Rs. 5617.75 Rm
1231 3' Ø R.C.C. Ring for Well fitting……………………………… 43 Rs. 4904.75 Rm
1232 2'6" Ø R.C.C. Ring for Well fitting………………………… 43 Rs. 4059.50 Rm

17
Sanitary Works 078/79 for KASKI
1001
580 mm size Orissa pan with low level cistern complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. 580 mm Porcelain clay white glaze Orissa Pan
(Hindustan, Parryware, Classica, cera or equi.) 1 nos 1963.50 1963.50
b. P or S trap. 1 nos 577.50 577.50
c.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories (Internal PVC fittings) 1 nos 4032.00 4032.00
d. 32mmx60mm size flushing CP pipe 1 nos 567.00 567.00
e.1.5x45 cm(½" x18") PVC pipe connector 1 nos 160.00 160.00 7300.00
Actual rate 12760.00
15% contractor overhead 1914.00
Rate per set Rs. 14674.00 Total (Rs.) 14674.00

1002
580 mm IPWC with low level cistern (Indian pan)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. 580 mm Porcelain clay white glaze Indian Pan 1 nos 1785.00 1785.00
(Hindustan, Parryware, Classica, cera or equi. )
b. P or S trap. 1 nos 577.50 577.50
c. White glazed foot rest 2 nos 230.00 460.00
d.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories (Internal PVC fittings) 1 nos 4032.00 4032.00
e. 32mmx60mm size flushing CP pipe 1 nos 567.00 567.00
f. 1.5x45 Cm (½" x18") PVC pipe connector 1 nos 160.00 160.00 7581.50
Actual rate 13041.5
15% contractor overhead 1956.22
Rate per set Rs. 14997.72 Total (Rs.) 14997.72

1003
530 mm Orissa pan with low level cistern complete set.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. 530 mm Porcelain clay white glaze Orissa Pan
(Hindustan, Parryware, Classica,cera or equi.) 1 nos 840.00 840.00
b. P or S trap. 1 nos 577.50 577.50
c.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories (Internal PVC fittings) 1 nos 4032.00 4032.00
d. 32mmx60mm size flushing CP pipe 1 nos 567.00 567.00
e.1.5x45 Cm (½" x18") PVC pipe connector 1 nos 160.00 160.00 6176.50
Actual rate 11636.50
15% contractor overhead 1745.47
Rate per set Rs. 13381.97 Total (Rs.) 13381.97

18
1004
580 mm Orissa pan complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1 nos 1070.00 1070.00
un skilled 1 nos 750.00 750.00 1820.00
a. 580 mm Porcelain clay white glaze Orissa Pan
materials (Hindustan, Parryware, Classica, cera or equivalent ) 1 nos 1963.50 1963.50
b. P or S trap. 1 nos 577.50 577.50 2541.00
Actual rate 4361.00
15% contractor overhead 654.15
Rate per set Rs. 5015.15 Total (Rs.) 5015.15

1005
10.0 Lit. Porceline clay Cistern complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
materials a.10.0 ltr.porcelain clay low level flushing cistern 1 nos 4032.00 4032.00
complete accessories flushing CP pipe
b.3.2x60 Cm(1¼"x24") 1 nos 567.00 567.00
c. 1.5x45 Cm(½" x18") pipe connector 1 nos 160.00 160.00 4759.00
Actual rate 8399.00
15% contractor overhead 1259.85
Rate per set Rs. 9658.85 Total (Rs.) 9658.85

1006
10.0 Lit. PVC Cistern complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a.10.0 ltr.PVC low level flushing cistern complete
materials accessories 1 nos 2625.00 2625.00
b.3.2x60 Cm(1¼"x24") flushing CP pipe 1 nos 567.00 567.00
c. 1.5x45 Cm(½" x18") pipe connector 1 nos 160.00 160.00 3352.00
Actual rate 6992.00
15% contractor overhead 1048.8
Rate per set Rs. 8040.8 Total (Rs.) 8040.8
1007
I.P W C. COMODE with low level cistern complete set.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. Porcelain clay white glaze Indian Pattern Comode
(Hindustan, Parryware, Classica, cera or equivalent ) 1 nos 9700.00 9700.00
regular
c.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories( Internal PVC fittings) 1 nos 4032.00 4032.00
c .Bakelite toilet seat cover 1 nos 1155.00 1155.00
c. 3.2x60 Cm (1 1/4"x24") flushing CP pipe 1 nos 567.00 567.00
d. 1.5x45 CM (½" x18") PVC pipe connector 1 nos 160.00 160.00
e. screw, etc. Ls 25.00 15639.00
Actual rate 21099.00
15% contractor overhead 3164.85
Rate per set Rs. 24263.85 Total (Rs.) 24263.85

19
1008
I.P W C. COMODE with cistern and seat cover complete set. 1st Colour

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. Porcelain clay first colour glaze Indian Pattern
Comode , cistern, seat cover all complete set
(Hindustan, Parryware, Classica, cera or equivalent )
materials Constellation type, cascade type 1 nos 18119.00 18119.00
b.1.5x45 cm(½" x18") PVC pipe connector 1 nos 160.00 160.00
c. screw, etc. 1 25.00 25.00 18304.00
Actual rate 23764.00
15% contractor overhead 3564.6
Rate per set Rs. 27328.6 Total (Rs.) 27328.6

1009
I.P W C. COMODE with cistern and seat cover complete set.( constallation type)

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. Porcelain clay white glaze Indian Pattern Comode
all complete set(Hindustan, Parryware, Classica, cera
or equivalent ) Constellation type, cascade type 1 nos 4586.00 4586.00
b.6/3 ltr.porcelain clay low level dual flushing cistern
materials complete accessories,Constellation type 1 nos 2966.00 2966.00
c .Bakelite toilet seat cover premium 1 nos 276.00 276.00
d.1.5x45 cm(½" x18") PVC pipe connector 1 nos 160.00 160.00
e. screw, etc. 1 25.00 25.00 8013.00
Actual rate 13473.00
15% contractor overhead 2020.95
Rate per set Rs. 15493.95 Total (Rs.) 15493.95
1010

E.P. W C. COMODE with Cistern seat cover complete set. Euorpean pattern( American standard) Cotto

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. Porcelain clay white glaze European Pattern
Comode with cistern ,seat cover ( American standard)
Cotto or equivalent ) 1 nos 12500.00 12500.00
materials b. 32mmx60mm size flushing CP pipe 1 nos 567.00 567.00
c.1.5x45 cm(½" x18") PVC pipe connector 1 nos 160.00 160.00
d. screw, etc. 1 25.00 25.00 13252.00
Actual rate 18712.00
15% contractor overhead 2806.8
Rate per set Rs. 21518.8 Total (Rs.) 21518.8

20
1011

E.P W C. COMODE with Cistern seat cover complete set. Euorpean pattern( American standard) Cotto

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. Porcelain clay white glaze European Pattern
Comode with cistern , slow falling seat cover One
piece Ellisa, Plaza, mogen or equivalent ( American
materials standard) Cotto or equivalent ) 1 nos 28875.00 28875.00
b. 32mmx60mm size flushing CP pipe 1 nos 567.00 567.00
c.1.5x45 cm(½" x18") PVC pipe connector 1 nos 160.00 160.00
d. screw, etc. 1 25.00 25.00
Actual rate 35087.00
15% contractor overhead 5263.05
Rate per set Rs. 40350.05 Total (Rs.) 40350.05

1012
OVAL WASH BASIN with mixer COMPLETE SET 55x40cm

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a. 55x40cm Porcelain clay Oval white glaze Wash
basin (Hindustan, Parryware, Classica, cera or
equivalent ) regular 1 nos 1850.00 1850.00
b. 32 mm pvc bottle trap including 32mm CP waste
materials coupling with CP chain and rubber plug etc. 1 nos 1246.00 1246.00
c. 15 mm CP basin mixer jaquar,ark , ess-ess or
equivalent 1 nos 3307.50 3307.50
d. screw etc 1 18.00 18.00 6421.50
Actual rate 10061.5
15% contractor overhead 1509.22
Total (Rs.) 11570.72
Rate per set Rs. 11570.72
1013
OVAL WASH BASIN with mixer COMPLETE SET 55x40cm Euorpean pattern( American standard) Cotto

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a. 55x40cm Porcelain clay Oval white glaze Wash
materials basin 1 nos 1850.00 1850.00
b. 32 mm pvc bottle trap including 32mm CP waste 1 nos 1246.00 1246.00
coupling with CP chain and rubber plug etc.
c.15 mm CP basin mixer jaquar,ess-ess or equivalent 1 nos 3307.50 3307.50
d. 1.5x45Cm (½"x18") PVC pipe connector 2 nos 160.00 320.00
e. screw etc 1 18.00 18.00
Actual rate 10381.50
15% contractor overhead 1557.22

21
Rate per set Rs. 11938.72 Total (Rs.) 11938.72

22
1014
55x40cm Euorpean pattern( American standard) Cotto Wash BASIN with mixer and Semi pedestal COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a .55x40cm Porcelain clay Oval white glaze Wash
basin (Hindustan, Parryware, Classica, cera or
materials equivalent ) regular 1 nos 1850.00 1850.00
b. 32 mm pvc bottle trap including 32mm CP waste 1 nos
coupling with CP chain and rubber plug etc. 1246.00 1246.00
c.15 mm CP basin mixer jaquar,ess-ess or equivalent 1 nos 3307.50 3307.50
d. 1.5x45Cm (½"x18") PVC pipe connector 2 nos 160.00 320.00
e. screw etc 1 18.00 18.00
f. semi pedestal 1 2288.00 2288.00
Actual rate 12669.50
15% contractor overhead 1900.42
Rate per set Rs. 14569.92 Total (Rs.) 14569.92
1015
55x40cm WASH BASIN with Pedestal Constellation first color, COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a. 55x40cm Porcelain clay first color glaze Wash
basin complete set(Hindustan, Parryware, Classica,
cera or equivalent ) Constellation type, cascade type
with pedestal 1 nos 2937.00 2937.00
materials b. Bracket 1 nos 135.00 135.00
c. 32 mm pvc bottle trap including 32mm CP waste
coupling with CP chain and rubber plug etc. 1 nos 447.12 447.12
d. 15mm fancy type cp pillar cock 1 nos 1244.00 1244.00
e. 1.5x45 cm PVC pipe connector 1 nos 160.00 124.80
f. screw etc 1 18.00 18.00 4905.92
Actual rate 8545.92
15% contractor overhead 1281.88
Rate per set Rs. 9827.8 Total (Rs.) 9827.8
1016
IPWC WASH BASIN COMPLETE SET WITH PEDESTAL AND MIXER 55x40cm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a. 55x40cm Porcelain clay white glaze Wash basin
(Hindustan, Parryware, Classica, cera or equivalent )
regular 1 nos 1974.00 1209.22
b. 32 mm pvc bottle trap including 32mm CP waste
materials coupling with CP chain and rubber plug etc. 1 nos 1246.00 1246.00
c. 15 mm CP basin mixer jaquar,ark , ess-ess or
equivalent 1 nos 3307.50 3307.50
d. pedestal 1 nos 2402.40 2402.40
e. screw etc 1 18.00 18.00 8183.12
Actual rate 11823.12
15% contractor overhead 1773.46

23
Rate per nos Rs. 13596.58 Total (Rs.) 13596.58

24
1017
WASH BASIN COMPLETE SET 55X40 CM
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a) 55x40cm Porcelain clay white glaze Wash basin
(Hindustan, Parryware, Classica, cera or equivalent )
Regular 1 nos 1974.00 1974.00
materials b. bracket 1 set 135.00 135.00
c.32 mm PVC bottle trap including 32mm cp waste
coupling with CP chain and rubber plug etc. 1 set 1246.00 1246.00
d. 15 mm fancy type CP pillar cock 1 nos 1244.00 1244.00
e. 1.5x45cm (½"x18") PVC pipe connector 1 nos 160.00 160.00
f. screw etc Ls 18.00 18.00 4777.00
Actual rate 8417.00
15% contractor overhead 1262.55
Rate per set Rs. 9679.55 Total (Rs.) 9679.55
1018
CORNER WASH BASIN COMPLETE SET 40X40 CM
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a. 40x40cm Porcelain clay white glaze Corner Wash
basin (Hindustan, Parryware, Classica, cera or
equivalent ) 1 nos 1201.00 1201.00
materials b. bracket 1 set 135.00 135.00
c. 32 mm PVC bottle trap including 32mm cp waste 1 set 1246.00 1246.00
coupling with CP chain and rubber plug etc.
d. 15 mm fancy type CP pillar cock 1 nos 1244.00 1244.00
f. 1.5x45cm (½"x18") PVC pipe connector 1 nos 160.00 160.00
g. screw etc Ls 18.00 18.00 4004.00
Actual rate 7644.00
15% contractor overhead 1146.6
Rate per set Rs. 8790.6 Total (Rs.) 8790.6

1019
SMALL LAVATORY SINK COMPLETE SET 45x30x15 (18"X12"X6")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a. 45x30x15 Cm (18"x12"x6") White glaze sink with C
I bracket (Hindustan, Parryware, Classica, cera or
equivalent) 1 nos 1564.50 1564.50
b. PVC bottle trap including 4cm waste coupling with
CP chain and rubber plug etc. 1 nos 1246.00 1246.00
materials c. 1.5cm (½" ) dia.CP Sink cock 1 nos 1309.00 1309.00
d.1.5x45 (½" x18") PVC pipe connector 1 nos 160.00 160.00
e.screw etc. Ls 18.00 4297.50
Actual rate 7187.50
15% contractor overhead 1078.12

25
Rate per set Rs. 8265.62 Total (Rs.) 8265.62

26
1020
LARGE LAVATORY SINK COMPLETE SET 53x43x18cm ( 21"x17"x7") size
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a. 53x43x18 (21"x17"x7") White glaze sink with C I
bracket (Hindustan, Parryware, Classica, cera or
equivalent ) 1 nos 2310.00 2310.00
b.PVC bottle trap including 4Cm waste coupling with
CP chain and rubber plug etc. 1 set 1246.00 1246.00
materials c. 1.5Cm (½") dia.Cp Sink cock 1 nos 1309.00 1309.00
d.1.5x45 (½"x18") Pvc pipe connector 1 nos 160.00 160.00
e.screw etc. Ls 18.00 5043.00
Actual rate 7933.00
15% contractor overhead 1189.95
Rate per set Rs. 9122.95 Total (Rs.) 9122.95

1021
KITCHEN SINK COMPLETE SET 60x45x25Cm ( 24"x18"x10") size LARGE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 1 nos 750.00 750.00 3960.00
a. 60x45x25Cm (24"x18"x10") White glaze sink with
bracket (Hindustan, Parryware, Classica, cera or
equivalent ) 1 nos 3003.00 3003.00
b.Pvc bottle trap including 1½" waste coupling with c
p chain and rubber plug etc. 1 set 1246.00 1246.00
materials c. ½" Ø Sink cock 1 nos 1309.00 1309.00
d.screw etc. Ls 18.00 5576.00
Actual rate 9536.00
15% contractor overhead 1430.4
Rate per set Rs. 10966.4 Total (Rs.) 10966.40

1022
Small Flat back Urinal , 44x31.5x26.5 cm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. Small Flat back White glazed urinal with bracket,
materials Constellation type, cascade type. 1 nos 1880.00 1880.00
b. 32 mm Waste coupling 1 nos 304.50 304.50
c. 1.5x45 cm PVC pipe connector 1 nos 160.00 124.80
d.screw etc. Ls 18.00 2327.30
Actual rate 7037.30
15% contractor overhead 1055.59
Rate per set Rs. 8092.89 Total (Rs.) 8092.89

27
1023
Flat back Urinal Small , 44x31.5x26.5 cm first colour
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. Small Flat back First color glazed urinal with
materials bracket, Constellation type, cascade type. 1 nos 1880.00 1880.00
b. 32 mm Waste coupling 1 nos 304.50 304.50
c. 1.5x45 cm PVC pipe connector 1 nos 160.00 124.80
d.screw etc. Ls 18.00 2327.30
Actual rate 7037.30
15% contractor overhead 1055.59
Rate per set Rs. 8092.89 Total (Rs.) 8092.89
1024
URINAL COMPLETE SET 46.5x35.5x26.5 cm SIZE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a. 46.5x35.5x26.5 cm White glaze flat back Urinal
materials (Hindustan, Parryware, Classica,cera or equi.) 1 nos 997.50 997.50
b. Waste coupling 32mm 1 nos 304.50 304.50
c.½" x18" Pvc pipe connector 1 nos 160.00 160.00
d.screw etc. Ls 18.00 1480.00
Actual rate 4370.00
15% contractor overhead 655.5
Rate per set Rs. 5025.5 Total (Rs.) 5025.5

1025
Large Flat back Urinal 61x41x38 cm size
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a.61x41x38 cm Large Flat back White glazed urinal
with bracket (Hindustan, Parryware, Classica, cera or
materials equivalent.) 1 nos 4174.00 4174.00
b. 1½" Ø C.P. bottle trap including 1½" Ø PVC.
waste coupling. 1 nos 1246.00 1246.00
c.screw etc. Ls 18.00 5438.00
Actual rate 10148.00
15% contractor overhead 1522.2
Rate per set Rs. 11670.2 Total (Rs.) 11670.20

28
1026
ANGLE BACK URINAL COMPLETE SET 45x35x27.5cm (18"X14"X11") SIZE (CORNER )
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a.17"X14"X13" White glaze Angle back back Urinal
materials cascade type (Hindustan equi.) 1 nos 997.50 997.50
b. 1½" waste coupling with CP chain including PVC
bottle trap 1 nos 1246.00 1246.00
c.½" x18" Pvc pipe connector 1 nos 160.00 160.00
d.screw etc. Ls 18.00 2421.50
Actual rate 5311.50
15% contractor overhead 796.72
Rate per set Rs. 6108.22 Total (Rs.) 6108.22
1027
SQUATTING PLATE URINAL 45x35cm (23"X14")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a. 23"X14" White glaze squatting plate urinal
materials (Hindustan or equivalent) 1 nos 1212.00 1212.00
b.screw etc. Ls 18.00 1230.00
Actual rate 4120.00
15% contractor overhead 618
Rate per set Rs. 4738 Total (Rs.) 4738

1028
URINAL Partation 68x30cm size
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 1070.00 535.00
un skilled 0.5 nos 750.00 375.00 910.00
a.68X30 cm White glaze Division plate urinal
materials Partation (Hindustan or equivalent) 1 nos 1690.00 1690.00
b.screw etc. Ls 18.00 1708.00
Actual rate 2618.00
15% conctractor overhead 392.7
Rate per set Rs. 3010.70 Total (Rs.) 3010.70

1029
300 ltr with 3 panel solar water heater with electric booster
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3.00 nos 1070.00 3210.00
3.00 nos 750.00 2250.00
materials a. 300 ltr with 3 panel solar water heater 1 nos 72000.00 72000.00
b.Zink oxide screw etc. Ls 25.00
Actual rate 77485.00
15% contractor overhead 11622.75
Rate per nos Rs. 89107.75 Total (Rs.) 89107.75

29
1030
900 Ltr. (200 GALLONS) G.I. WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 4 nos 750.00 3000.00 6210.00
a. 200Gallons net capacity G. I. water tank with Inlet,
materials outlet, over flow, cleanout hole etc.17 GUAGE 1 nos 7455.00 7455.00
b.Tanki nipples etc. Ls 140.00 7595.00
Actual rate 13805.00
15% contractor overhead 2070.75
Rate per nos Rs. 15875.75 Total (Rs.) 15875.75

1031
1350 Ltr. (300 GALLONS) G.I. WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 5 nos 750.00 3750.00 6960.00
a.300 Gallons net capacity G. I. Water tank with Inlet,
materials outlet, over flow, cleanout hole etc.17 GUAGE 1 nos 15955.00 15955.00
b.Tanki nipples etc. Ls 150.00 16105.00
Actual rate 23065.00
15% contractor overhead 3459.75
Rate per nos Rs. 26524.75 Total (Rs.) 26524.75

1032
1800 Ltr. (400 GALLONS) G.I. WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 6 nos 750.00 4500.00 7710.00
a.400Gallons net capacity G. I. water tank with Inlet,
materials outlet, over flow, cleanout hole etc. 17 GUAGE 1 nos 15750.00 15750.00
b.Tanki nipples etc. Ls 150.00 15900.00
Actual rate 23610.00
15% contractor overhead 3541.5
Rate per nos Rs. 27151.50 Total (Rs.) 27151.50

1033
2250 Ltr. (500 GALLONS) G.I. WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 8 nos 750.00 6000.00 10280.00
a. 500Gallons net capacity G. I. water tank with Inlet,
materials outlet, over flow, cleanout hole etc. 17 GUAGE 1 nos 22365.00 22365.00
b.Tanki nipples etc. Ls 150.00 22515.00

Actual rate 32795.00

15% contractor overhead 4919.25

Rate per nos Rs. 37714.25 Total (Rs.) 37714.25

30
1034
1000 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 4 nos 750.00 3000.00 6210.00
a. 1000Ltr. PVC water tank with Inlet, outlet, over
materials flow, cleanout hole etc. 1 nos 11550.00 11550.00
b.Tanki nipples with wash out plug etc. Ls 200.00 11750.00
Actual rate 17960.00
15% contractor overhead 2694.00
Rate per nos Rs. 20654.00 Total (Rs.) 20654.00
1035
500 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 4 nos 750.00 3000.00 6210.00
a. 500 ltr PVC water tank with Inlet, outlet, over flow,
materials cleanout hole etc. 1 nos 5775.00 5775.00
b.Tanki nipples with wash out plug etc. Ls 150.00 5925.00

Actual rate 12135.00

15% contractor overhead 1820.25

Rate per nos Rs. 13955.25 Total (Rs.) 13955.25

1036
2000 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 6 nos 750.00 4500.00 7710.00
a.2000 Ltr.PVC water tank with Inlet, outlet, over
materials flow, cleanout hole etc. 1 nos 23100.00 23100.00
b.Tanki nipples with wash out plug etc. Ls 200.00 23300.00

Actual rate 31010.00

15% contractor overhead 4651.5

Rate per nos Rs. 35661.50 Total (Rs.) 35661.5

1037
1 HP Chinese Pump
sources Level Qty Unit Rate/unit cost Total cost

labour skilled 4 nos 1070.00 4280.00


un skilled 2 nos 750.00 1500.00 5780.00
materials a. 1 HP Chinese pump 1 sets 3270.00 3270.00
b. Zink Oxide, screw etc. LS 25.00 3295.00
Actual rate 9075.00
15% contractor overhead 1361.25
Rate per nos Rs. 10436.25 Total (Rs.) 10436.25

31
1038
1 HP Chinese Pump (Submersible)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
materials a. 1 HP Chinese submersible pump 1 sets 9240.00 9240.00
b. Zink Oxide screw etc. LS 40.00 9280.00
Actual rate 15060.00
15% contractor overhead 2259.00
Rate per nos Rs. 17319.00 Total (Rs.) 17319

1039
1.0 H.P. Electrical motor water pump, Submersible pump Italian
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
a.1.0 H P Electric motor pump (Submersible) Italian
materials or equivalent 1 nos 26089.00 26089.00
b.Zink oxide screws etc. Ls 23.00 26112.00

Actual rate 31892.00


15% contractor overhead 4783.8
Rate per nos Rs. 36675.8 Total (Rs.) 36675.8

1040
0.5 H.P. Electrical motor water pump, Monoblock type (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
a.0.5 H P Electric motor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 6258.00 6258.00
b.Zink oxide screws etc. Ls 25.00 6283.00
Actual rate 12063.00
15% contractor overhead 1809.45
Rate per nos Rs. 13872.45 Total (Rs.) 13872.45

1041
1.0 H.P. Electrical motor water pump, Monoblock type (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
a.1.0 H P Electric motor pump with base plate
materials nuts,bolts,etc.set 1 nos 9465.00 9465.00
b.Zink oxide screws etc. Ls 25.00 9490.00
Actual rate 15270.00
15% contractor overhead 2290.5
Rate per nos Rs. 17560.5 Total (Rs.) 17560.5

32
1042
1 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
a.1 H P Electric motor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 9465.00 9465.00
b.Zink oxide screws etc. Ls 25.00 9490.00
Actual rate 15270.00
15% contractor overhead 2290.5
Rate per nos Rs. 17560.50 Total (Rs.) 17560.5

1043
2 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 3 nos 750.00 2250.00 6530.00
a.2 H P Electricmotor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 19200.00 19200.00
b.Zink oxide screws etc. Ls 40.00 19240.00
Actual rate 25770.00
15% contractor overhead 3865.5
Rate per nos Rs. 29635.50 Total (Rs.) 29635.5

1044
3 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 4 nos 750.00 3000.00 7280.00
a. 3 H P Electricmotor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 24500.00 24500.00
b.Zink oxide screws etc. Ls 50.00 24550.00
Actual rate 31830.00
15% contractor overhead 4774.5
Rate per nos Rs. 36604.5 Total (Rs.) 36604.5

1045
5 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 4 nos 750.00 3000.00 9420.00
a. 5 H P Electricmotor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 28656.00 28656.00
b.Zink oxide screws etc. Ls 60.00 28716.00
Actual rate 38136.00
15% contractor overhead 5720.4
Rate per nos Rs. 43856.4 Total (Rs.) 43856.4

33
1046

PORCELAIN CLAY TOILET PAPER HOLDER (Recessed type) American standard


sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/9) 0.11 nos 1070.00 117.70
materials a. WHITE GLAZE TOILET PAPER HOLDER 1 nos 929.00 929.00
b. Zink oxide screw etc. Ls 10.00 1056.70
Actual rate 1056.70
15% conctractor overhead 158.5
Rate per nos Rs. 1215.20 Total (Rs.) 1215.20

1047
PORCELAIN CLAY TOILET PAPER HOLDER (Recessed type)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/9) 0.11 nos 1070.00 117.70 117.70
materials a. WHITE GLAZE TOILET PAPER HOLDER 1 nos 1157.00 1157.00
b. Zink oxide screw etc. Ls 10.00 1167.00
Actual rate 1284.70
15% contractor overhead 192.7
Rate per nos Rs. 1477.40 Total (Rs.) 1477.40

1048
CHROME PLATE TOILET PAPER HOLDER
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a.Chrome plate toilet paper holder 1 nos 462.00 462.00
b.Zink oxide screw etc. Ls 10.00 472.00
Actual rate 589.70
15% contractor overhead 88.45
Rate per nos Rs. 678.15 Total (Rs.) 678.15

1049
Recess SOAP DISH. ( American standard) Cotto

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. Soap dish 1 nos 1042.00 1042.00
b.Zink oxide screw etc. Ls 10.00 1052.00
Actual rate 1169.70
15% contractor overhead 175.45
Rate per nos Rs. 1345.15 Total (Rs.) 1345.15

1050
PORCELAIN CLAY SOAP TRAY 15x15 cm (6"X 6") SIZE (Recessed type)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a.White glaze soap tray 1 nos 490.00 490.00
b.Zink oxide screw etc. Ls 10.00 500.00
Actual rate 617.70
15% contractor overhead 92.65
Rate per nos Rs. 710.35 Total (Rs.) 710.35

34
1051
CHROME PLATE SOAP DISH.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a.C.P Soap dish 1 nos 1042.00 1042.00
b.Zink oxide screw etc. Ls 10.00 1052.00
Actual rate 1169.70

15% contractor overhead 175.45


Rate per nos Rs. 1345.15 Total (Rs.) 1345.15
1052
C P towel rod 1.5x60cm (½"x 24.") American standard

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 0.222 nos 1070.00 237.78 237.78
materials a . C PTowel rod 1 nos 1663.00 1663.00
b. Screws etc. Ls 10.00 1673.00
Actual rate 1910.78

15% contractor overhead 286.61


Rate per nos Rs. 2197.39 Total (Rs.) 2197.39

1053
C P towel rod 1.5x60cm (½"x 24")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(2/9) 0.22 nos 1070.00 235.40 235.40
materials a .C P Towel rod 1 nos 682.50 682.50
b. Screws Ls 10.00 692.50
Actual rate 927.90
15% contractor overhead 139.18
Rate per nos Rs. 1067.08 Total (Rs.) 1067.08

1054
C P towel rod 1.5x45cm (½"x 18")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.222 nos 1070.00 237.54 237.54
materials a . C PTowel rod 1 nos 787.50 787.50
b. Screws etc. Ls 10.00 797.50
Actual rate 1035.04
15% contractor overhead 155.25
Rate per nos Rs. 1190.29 Total (Rs.) 1190.29

1055
CP Glass Shelf
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.222 nos 1070.00 237.54 237.54
materials a. C P Guard rail with glass 1 nos 680.00 680.00
b. Screws etc. Ls 10.00 690.00
Actual rate 927.54
15% contractor overhead 139.13
Rate per nos Rs. 1066.67 Total (Rs.) 1066.67

35
1056
Porcelain clay Glass Shelf Euorpean pattern( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.222 nos 1070.00 237.78 237.78
materials a. Porcelain clay basin shelf 1 nos 1169.55 1169.55
b. Screws etc. Ls 10.00 1179.55
Actual rate 1417.33
15% contractor overhead 212.59
Rate per nos Rs. 1629.92 Total (Rs.) 1629.92

1057
Looking Mirror 55x40cm (22"x 16")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/3) 0.33 nos 1070.00 353.10 353.10
materials a.Bevelled edge looking mirror 1 nos 750.00 750.00
b . Screws Ls 10.00 760.00
Actual rate 1113.10
15% contractor overhead 166.96
Rate per nos Rs. 1280.06 Total (Rs.) 1280.06

1058
Looking Mirror Modi guard 450x600mm (18"x 24")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 356.67 356.67
materials a.Bevelled edge looking mirror 50x40 cm 1 nos 1459.00 1459.00
b . Screws Ls 10.00 1469.00
Actual rate 1825.67
15% contractor overhead 273.85
Rate per nos Rs. 2099.52 Total (Rs.) 2099.52

1059
Looking Mirror 50x40cm (20"x 16")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials a.Bevelled edge looking mirror 50x40 cm 1 nos 650.00 650.00
b . Screws Ls 10.00 660.00
Actual rate 1013.10
15% contractor overhead 151.96
Rate per nos Rs. 1165.06 Total (Rs.) 1165.06

1060
Looking Mirror european pattern
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 356.67 356.67
materials a.Bevelled edge looking europen pattern 1 nos 1800.00 1800.00
b . Screws Ls 10.00 1810.00
Actual rate 2166.67
15% contractor overhead 325.00
Rate per nos Rs. 2491.67 Total (Rs.) 2491.67

36
1061
CP Shower rose 7.5 cm (3") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials a.7.5cm dia shower rose fancy type with 30cm CP rod
1 nos 906.00 906.00 906.00
Actual rate 1259.10
15% contractor overhead 188.86
Rate per nos Rs. 1447.96 Total (Rs.) 1447.96

1062
Pressure Adjustable Shower rose
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials a.Pressure Adjustable Shower rose, Jaquar, Essco,
ark or equivalent 1 nos 1350.00 1350.00 1350.00
Actual rate 1703.10
15% contractor overhead 255.46
Rate per nos Rs. 1958.56 Total (Rs.) 1958.56

1063
Shower Rose Ordinary type
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials a. Shower rose ordinary type (5.0 to 10.00 cm) 1 nos 672.00 672.00 672.00
Actual rate 1025.10
15% contractor overhead 153.76
Rate per nos Rs. 1178.86 Total (Rs.) 1178.86

1064

Shower head with arm and flange Euorpean pattern( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 356.67 356.67
materials a. Shower head with arm and flange 1 nos 2014.00 2014.00 2014.00
Actual rate 2370.67
15% contractor overhead 355.6
Rate per nos Rs. 2726.27 Total (Rs.) 2726.27

1065
C.P . FLUSH VALVE ( American standard) Cotto

sources Level Qty Unit Rate/unit cost Total Cost


labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. C.P Flush valve Euorpean pattern 1 nos 3494.00 3494.00 3494.00
Actual rate 3611.70
15% conctractor overhead 541.75
Rate per nos Rs. 4153.45 Total (Rs.) 4153.45

37
1066
SENSOR FLUSH VALVE FOR URINAL ( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. C.P Flush valve for urinal sensor type electric Euor 1 nos 16000.00 16000.00 16000.00
Actual rate 16117.70
15% contractor overhead 2417.65
Rate per nos Rs. 18535.35 Total (Rs.) 18535.35

1067
15mm CP Bib Cock Heavy type
sources Level Qty Unit Rate/unit cost Total Cost

labour skilled 0.11 nos 1070.00 118.89 118.89


materials a. 15mm fancy type bib cock 1 nos 1361.00 1361.00 1361.00
Actual rate 1479.89
15% contractor overhead 221.98
Rate per nos Rs. 1701.87 Total (Rs.) 1701.87

1068
15mm CP Bib Cock Ordinary type
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15mm fancy type bib cock 1 nos 682.50 682.50 682.50
Actual rate 800.20
15% contractor overhead 120.03
Rate per nos Rs. 920.23 Total (Rs.) 920.23

1069
15mm Auto closing Bib Cock with aerator
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15mm Auto closing bib cock with aerator 1 nos 2612.00 2612.00 2612.00
Actual rate 2729.70

15% contractor overhead 409.45

Rate per nos Rs. 3139.15 Total (Rs.) 3139.15

1070
15mm Urinal Auto closing Valve with built in control cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15mm Urinal Auto closing valve with 1 nos 2694.00 2694.00 2694.00
built - in control cock
Actual rate 2811.70

15% contractor overhead 421.75

Rate per nos Rs. 3233.45 Total (Rs.) 3233.45

38
1071
C.P. 15mm Angle valve European pattern
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15mm fancy type angle valve -cotto 1 nos 1244.00 1244.00 1244.00
Actual rate 1361.70
15% contractor overhead 204.25
Rate per nos Rs. 1565.95 Total (Rs.) 1565.95

1072
C.P. 15mm Angle valve Ordinary type
sources Level Qty Unit Rate/unit cost Total Cost

labour skilled 0.11 nos 1070.00 117.70 117.70


materials a. 15mm fancy type angle valve 1 nos 1244.00 1244.00 1244.00
Actual rate 1361.70
15% contractor overhead 204.25
Rate per nos Rs. 1565.95 Total (Rs.) 1565.95

1073
15mm two way angle valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15mm two way angle valve, jaquar, essco, or equiv 1 nos 1150.00 1150.00 1150.00
Actual rate 1267.70
15% contractor overhead 190.15
Rate per nos Rs. 1457.85 Total (Rs.) 1457.85

1074
C.P. Pillar Cock 15mm dia Ordinary type
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. CP Piller Cock 1 nos 1054.00 1054.00 1054.00
Actual rate 1171.70
15% contractor overhead 175.75
Rate per nos Rs. 1347.45 Total (Rs.) 1347.45

1075
15mm CP concealed stop cock ordinary
sources Level Qty Unit Rate/unit cost Total Cost

labour skilled 0.11 nos 1070.00 117.70


un skilled 117.70
materials a. 15mm, concealed stop cock 1 nos 1078.00 1078.00 1078.00
Actual rate 1195.70
15% contractor overhead 179.35
Rate per nos Rs. 1375.05 Total (Rs.) 1375.05

39
1076
G.M.15 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost

labour skilled 0.11 nos 1070.00 117.70 117.70


materials a. 15mm gate valve 1 nos 822.00 822.00 822.00
Actual rate 939.70
15% contractor overhead 140.95
Rate per nos Rs. 1080.65 Total (Rs.) 1080.65

1077
G.M. 20 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a.20 mm gate valve 1 nos 1143.00 1143.00 1143.00
Actual rate 1260.70
15% contractor overhead 189.10
Rate per nos Rs. 1449.80 Total (Rs.) 1449.80

1078
G.M. 25mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 235.40 235.40
materials a 25mm gate valve 1 nos 1744.00 1744.00 1744.00
Actual rate 1979.40
15% contractor overhead 296.91
Rate per nos Rs. 2276.31 Total (Rs.) 2276.31

1079

G.M.32 mm Gate Valve


sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 235.40 235.40
materials a.32 mm gate valve 1 nos 2624.00 2624.00 2624.00
Actual rate 2859.40
15% contractor overhead 428.91
Rate per nos Rs. 3288.31 Total (Rs.) 3288.31

1080
G.M. 40 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost

labour skilled 0.44 nos 1070.00 470.80 470.80


materials a.40mm gate valve 1 nos 3367.00 3367.00 3367.00
Actual rate 3837.80

15% contractor overhead 575.67


Rate per nos Rs. 4413.47 Total (Rs.) 4413.47

40
1081
G.M. 50 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 1070.00 470.80 470.80
materials a.50 mm gate valve 1 nos 5500.00 5500.00 5500.00
Actual rate 5970.80

15% contractor overhead 895.62


Rate per nos Rs. 6866.42 Total (Rs.) 6866.42

1082
G.M.65 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 1070.00 470.80 470.80
materials a.65 mm gate valve 1 nos 11451.00 11451.00 11451.00
Actual rate 11921.80
15% contractor overhead 1788.27
Rate per nos Rs. 13710.07 Total (Rs.) 13710.07

1083
G.M 80 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.80 nos 1070.00 856.00 856.00
materials a.80 mm gate valve 1 nos 17440.00 17440.00 17440.00
Actual rate 18296.00
15% contractor overhead 2744.4
Rate per nos Rs. 21040.40 Total (Rs.) 21040.40

1084
G.M.100 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.80 nos 1070.00 856.00 856.00
materials a 100 mm gate valve 1 nos 31393.00 31393.00 31393.00
Actual rate 32249.00
15% contractor overhead 4837.35
Rate per nos Rs. 37086.35 Total (Rs.) 37086.35

1085
15 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15 mm G M check valve 1 nos 400.00 400.00 400.00
Actual rate 517.70
15% contractor overhead 77.65
Rate per nos Rs. 595.35 Total (Rs.) 595.35

41
1086
20 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 235.40 235.40
materials a. 20 mm G M check valve 1 nos 629.00 629.00 629.00
Actual rate 864.40
15% contractor overhead 129.66
Rate per nos Rs. 994.06 Total (Rs.) 994.06

1087
25 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 235.40 235.40
materials a.25 mm G M check valve 1 nos 1373.00 1373.00 1373.00
Actual rate 1608.40
15% contractor overhead 241.26
Rate per nos Rs. 1849.66 Total (Rs.) 1849.66

1088
32 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 235.40 235.40
materials a.32 mm G M check valve 1 nos 2327.00 2327.00 2327.00
Actual rate 2562.40
15% contractor overhead 384.36
Rate per nos Rs. 2946.76 Total (Rs.) 2946.76

1089
50mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials a 50 mm G M check valve 1 nos 5236.00 5236.00 5236.00
Actual rate 5589.10
15% contractor overhead 838.36
Rate per nos Rs. 6427.46 Total (Rs.) 6427.46

1090
65mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 1070.00 470.80 470.80
materials a. 65 mm G M check valve 1 nos 9114.00 9114.00 9114.00
Actual rate 9584.80
15% contractor overhead 1437.72
Rate per nos Rs. 11022.52 Total (Rs.) 11022.52

1091
80mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 1070.00 470.80 470.80
materials a.80 mm G M check valve 1 nos 12545.00 12545.00 12545.00
Actual rate 13015.80
15% contractor overhead 1952.37

42
Rate per nos Rs. 14968.17 Total (Rs.) 14968.17

43
1092
100mm GM CHECK VALVE with flange
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 1070.00 475.56 475.56
materials 100mm GM CHECK VALVE with flange 1 nos 16270.00 16270.00 16270.00
Actual rate 16745.56
15% contractor overhead 2511.83
Rate per nos Rs. 19257.39 Total (Rs.) 19257.39

1093
PVC FLOOR TRAP 11x7.5cm (4" X 2½")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
un skilled 0.10 475.00 47.50 165.20
materials Floor Trap 11x7.5cm (4" X 2½") 1 nos 350.00 350.00 350.00
Actual rate 515.20
15% contractor overhead 77.28
Rate per nos Rs. 592.48 Total (Rs.) 592.48

1094
ALUMINIUM GRATING 100mm (4") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.06 nos 1070.00 64.20 64.20
materials Aluminium Grating 100 mm 1 nos 43.00 43.00 43.00
Actual rate 107.20
15% contractor overhead 16.08
Rate per nos. Rs. 123.28 Total (Rs.) 123.28

1095
C P GRATING 12.5cm (5") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.06 nos 1070.00 64.20 64.20
materials C P GRATTING 12.5cm (5") DIA SIZE 1 nos 62.00 62.00 62.00
Actual rate 126.20
15% contractor overhead 18.93
Rate per nos. Rs. 145.13 Total (Rs.) 145.13

1096
C P GRATING 110mm (4") dia
sources Level Qty Unit Rate/unit cost Total Cost

labour skilled 0.06 nos 1070.00 64.20 64.20


materials C P GRATTING 110 mm (4") DIA SIZE 1 nos 50.00 50.00 50.00
Actual rate 114.20
15% contractor overhead 17.13
Rate per nos. Rs. 131.33 Total (Rs.) 131.33

44
1097
150mm dia CAST IRON PIPE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1.09 nos 1070.00 1166.30
un skilled 0.65 nos 750.00 487.50 1653.80
materials 150 mm dia cast iron pipe d/s 1 Rm 2466.07 2466.07
b.Anti- corrosive paint, nails etc L.s 15.00 2481.07
Actual rate 4134.87
15% contractor overhead 620.23
Rate per Rm Rs. 4755.10 Total (Rs.) 4755.10

1098
110mm dia CAST IRON PIPE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.54 nos 1070.00 577.80
un skilled 0.65 nos 750.00 487.50 1065.30
materials a 110 mm dia cast iron pipe d/s 1 Rm 1263.11 1263.11
b.Anti- corrosive paint, nails etc L.s 15.00 1278.11
Actual rate 2343.41
15% contractor overhead 351.51
Rate per Rm Rs. 2694.92 Total (Rs.) 2694.92

1099
75mm dia CAST IRON PIPE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.36 nos 1070.00 385.20
un skilled 0.36 nos 750.00 270.00 655.20
materials a.75 mm dia cast iron pipe d/s 1 Rm 1082.66 1082.66
b.Anti- corrosive paint, nails etc L.s 10.00 1092.66
Actual rate 1747.86
15% contractor overhead 262.17
Rate per Rm Rs. 2010.03 Total (Rs.) 2010.03

1100
50mm dia CAST IRON PIPE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.36 nos 1070.00 385.20
un skilled 0.36 nos 750.00 270.00 655.20
materials a.50 mm dia cast iron pipe d/s 1 Rm 799.97 799.97
b.Anti- corrosive paint ,nails etc L.s 10.00 809.97
Actual rate 1465.17
15% contractor overhead 219.77
Rate per Rm Rs. 1684.94 Total (Rs.) 1684.94

45
1101
15mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 1070.00 192.60
un skilled 0.16 nos 750.00 120.00 312.60
materials a.15 mm G. I . Pipe 'B ' class 1 Rm 192.00 192.00
b. G I fitting and painting Ls 20.00
c. Jointing materials Ls 5.00 217.00
Actual rate 529.60
15% contractor overhead 79.44
Rate per Rm Rs. 609.04 Total (Rs.) 609.04

1102
20 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 1070.00 192.60
un skilled 0.16 nos 750.00 120.00 312.60
materials a. 20 mm G. I . PipeB' class 1 Rm 244.00 244.00
b. G I fitting and painting Ls 20.00
c. Jointing materials Ls 5.00 269.00
Actual rate 581.60
15% contractor overhead 87.24
Rate per Rm Rs. 668.84 Total (Rs.) 668.84

1103
25 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 1070.00 192.60
un skilled 0.32 nos 750.00 240.00 432.60
materials a. 25 mm G. I . Pipe B ' class 1 Rm 373.00 373.00
b. G I fitting and painting Ls 20.00
c. Jointing materials Ls 5.00 398.00
Actual rate 830.60
15% contractor overhead 124.59
Rate per Rm Rs. 955.19 Total (Rs.) 955.19

1104
32 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 1070.00 192.60
un skilled 0.32 nos 750.00 240.00 432.60
materials a. 32 mm G. I . Pipe 'B' class 1 Rm 486.00 486.00
b. G I fitting and painting Ls 25.00
c. Jointing materials Ls 7.00 518.00
Actual rate 950.60
15% contractor overhead 142.59
Rate per Rm Rs. 1093.19 Total (Rs.) 1093.19

46
1105
40 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.27 nos 1070.00 288.90
un skilled 0.32 nos 750.00 240.00 528.90
materials a.40 mm G. I . Pipe 'B ' class 1 Rm 560.00 560.00
b. G I fitting and painting Ls 25.00
c. Jointing materials Ls 7.00 592.00
Actual rate 1120.90
15% contractor overhead 168.13
Rate per Rm Rs. 1289.03 Total (Rs.) 1289.03

1106
50mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.27 nos 1070.00 288.90
un skilled 0.32 nos 750.00 240.00 528.90
materials a 50 mm G. I . Pipe 'B ' class 1 Rm 770.00 770.00
b. G I fitting and painting Ls 25.00
c. Jointing materials Ls 7.00 802.00
Actual rate 1330.90
15% contractor overhead 199.63
Rate per Rm Rs.. 1530.53 Total (Rs.) 1530.53

1107
80mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit Cost Total Cost
labour skilled 0.27 nos 1070.00 288.90
un skilled 0.32 nos 750.00 240.00 528.90
materials a 80 mm G. I . Pipe 'B ' class 1 Rm 1225.00 1225.00
b. G I fitting and painting Ls 30.00
c. Jointing materials Ls 10.00 1265.00
Actual rate 1793.90
15% contractor overhead 269.08
Rate per Rm Rs.. 2062.98 Total (Rs.) 2062.98

1108
50 mm LEAD CAULKED JOINT @ 3 LBS PER JOINT
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
un skilled 0.20 nos 750.00 150.00 267.70
materials a. 99% Pure lead 3 Lbs. 90.70 272.11
b. Kerosence ,oil etc. Ls 30.00 302.11

Actual rate 569.81


15% contractor overhead 85.47
Rate per joint Rs. 655.28 Total (Rs.) 655.28

47
1109
75 mm LEAD CAULKED JOINT @ 3 LBS PER JOINT
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/6) 0.17 nos 1070.00 181.90
un skilled(1/5) 0.20 nos 750.00 150.00 331.90
materials a. 99% Pure lead 3 Lbs. 90.70 272.11
b. Kerosence ,oil etc. Ls 30.00 302.11
Actual rate 634.01
15% contractor overhead 95.10

Rate per joint Rs. 729.11 Total (Rs.) 729.11

1110
110 mm LEAD CAULKED JOINT @ 4 LBS PER JOINT
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(2/9) 0.22 nos 1070.00 235.40
un skilled(2/5) 0.40 nos 750.00 300.00 535.40
materials a. 99% Pure lead 4 Lbs. 90.70 362.81
b. Kerosence ,oil etc. Ls 30.00 392.81
Actual rate 928.21
15% contractor overhead 139.23
Rate per joint Rs. 1067.44 Total (Rs.) 1067.44

1111
150 mmLEAD CAULKED JOINT @ 4 LBS PER JOINT
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 235.40
un skilled 0.40 nos 750.00 300.00 535.40
materials a. 99% Pure lead 4 Lbs. 90.70 362.81
b. Kerosence, oil etc. Ls 35.00 397.81
Actual rate 933.21
15% contractor overhead 139.98
Rate per joint Rs. 1073.19 Total (Rs.) 1073.19

1112
50 mm dia PVC PIPE 4 KG/CM. SQ.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/18) 0.06 nos 1070.00 64.20
un skilled(1/10) 0.10 nos 750.00 75.00 139.20
materials a.50 mm dia. Pvc pipe 1 RM 150.00 150.00
b. Jointing materialsetc. Ls 5.00 155.00
Actual rate 294.20
15% contractor overhead 44.13
Rate per Rm Rs. 338.33 Total (Rs.) 338.33
1113
75 mm dia PVC PIPE 4 KG/CM. SQ
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
un skilled 0.11 nos 750.00 82.50 200.20
materials a.75 mm dia. Pvc pipe 1 Rm 285.00 285.00
b. Jointing materialsetc. Ls 5.00 290.00
Actual rate 490.20
15% contractor overhead 73.53
Rate per Rm Rs. 563.73 Total (Rs.) 563.73

48
1114
110 mm dia PVC PIPE 4 KG/CM. SQ
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.17 nos 1070.00 181.90
un skilled 0.20 nos 750.00 150.00 331.90
materials a.110 m m dia. Pvc pipe 1 Rm 420.00 420.00
b. Jointing material setc. Ls 5.00 425.00
Actual rate 756.90
15% contractor overhead 113.53
Rate per nos Rs. 870.43 Total (Rs.) 870.43

1115
15.0 Ltr WATER HEATER ( Aeroston Geyser)American standard
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. 15.0 Ltr wate heater including copper pipe
connector with coupling and other necessary fittings
materials complete. 1 nos 11770.00 11770.00
b. Jointing materialsetc. Ls 90.00 11860.00
Actual rate 16570.00
15% contractor overhead 2485.50
Rate per nos Rs. 19055.50 Total (Rs.) 19055.50

1116
25.0 Ltr WATER HEATER (Geyser)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. 25.0 Ltr wate heater including copper pipe
connector with coupling and other necessary fittings
materials complete. 1 nos 16826.00 16826.00
b. Jointing materialsetc. Ls 90.00 16916.00
Actual rate 21626.00
15% contractor overhead 3243.90
Rate per nos Rs. 24869.90 Total (Rs.) 24869.90

1117
35.0 Ltr WATER HEATER (Geyser)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a.35.0 Ltr wate heater including copper pipe
connector with coupling and other necessary fittings
materials complete. 1 nos 20919.00 20919.00
b. Jointing material set. Ls 90.00 21009.00
Actual rate 26469.00
15% contractor overhead 3970.35
Rate per nos Rs. 30439.35 Total (Rs.) 30439.35

49
1118
50.0 Ltr WATER HEATER (Geyser)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 4 nos 750.00 3000.00 6210.00
a.50.0 Ltr wate heater including copper pipe
connector with coupling and other necessary fittings
materials complete. 1 nos 25011.00 25011.00
b. Jointing material set. Ls 90.00 25101.00
Actual rate 31311.00
15% contractor overhead 4696.65
Rate per nos Rs. 36007.65 Total (Rs.) 36007.65

1119
Acrylic Type BATH TUB
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00

materials a. Bath tub 5"-6"x2"-6" with complete fittings. 1 nos 12075.00 12075.00
b. Jointing material set. Ls 90.00 12165.00
Actual rate 17945.00

15% contractor overhead 2691.75


Rate per nos Rs. 20636.75 Total (Rs.) 20636.75

1120
C.P. TELEPHONIC SHOWER with mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1 nos 1070.00 1070.00
un skilled 1 nos 750.00 750.00 1820.00
materials a. Bath tub spout(Hot and cold) with Telephonic shower. 1 nos 4169.00 4169.00
b. Jointing material set. Ls 10.00 4179.00
Actual rate 5999.00
15% contractor overhead 899.85
Rate per set Rs. 6898.85 Total (Rs.) 6898.85

1121
Acrylic Type SHOWER TRAY 70x70cm (29"x29)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a. Acrylic Type shower tray70x70cm (29"x29") with
materials complete fittings. 1 nos 4226.00 4226.00
b. Jointing material set. Ls 83.00 4309.00
Actual rate 7949.00
15% contractor overhead 1192.35
Rate per set Rs. 9141.35 Total (Rs.) 9141.35

1122
15mm CP Bath spout Euorpean pattern( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 255.00 28.33 28.33
materials a. 15mm CP Bath spout Euorpean pattern 1 nos 2021.00 2021.00 2021.00
Actual rate 2049.33
15% contractor overhead 307.4

50
Rate per nos Rs. 2356.73 Total (Rs.) 2356.73
1123
Sensor mixer for basin (Battery operating)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1.00 nos 1070.00 1070.00 1070.00
materials a. Basin mixture complete set. 1 nos 20481.00 20481.00
b. Jointing material set. 85.00 20566.00
Actual rate 21636.00
15% contractor overhead 3245.4
Rate per set Rs. 24881.40 Total (Rs.) 24881.40

1124
C.P. SINK Mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. Sink mixture complete set. 1 nos 3675.00 3675.00
b. Jointing material set. 85.00 3760.00
Actual rate 3877.70
15% contractor overhead 581.65
Rate per set Rs. 4459.35 Total (Rs.) 4459.35

1125
C I Cover 45x45cm (18"X18") (Medium)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials CI Cover 45x45cm (18" X 18") 1 nos 2408.00 2408.00
2408.00
Actual rate 2761.10
15% contractor overhead 414.16
Rate per set Rs. 3175.26 Total (Rs.) 3175.26
1126
C I Cover 55x55cm (22"X 22") (Medium)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials CI Cover 22" X 22" 1 nos 3108.00 3108.00
3108.00
Actual rate 3461.10
15% contractor overhead 519.16
Rate per set Rs. 3980.26 Total (Rs.) 3980.26
1127
1.5 cm CP Flush cock with Spreader
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.25 nos 1070.00 267.50 267.50
materials a. ½" push valve 1 nos 915.00 915.00
b. Spreader 1 nos 940.00 940.00 1855.00
Actual rate 2122.50
15% contractor overhead 318.37
Rate per set Rs. 2440.87 Total (Rs.) 2440.87
1128
Flange 80 mm dia.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 118.89 118.89
materials Flange 80 mm dia. 1 nos 2187.00 2187.00 2187.00
Actual rate 2305.89
15% contractor overhead 345.88

51
Rate per nos Rs. 2651.77 Total (Rs.) 2651.77

52
1129

Flange 100 mm dia.


sources Level Qty Unit Rate/unit cost Total Cost

labour skilled 0.11 nos 1070.00 118.89 118.89


materials Flange 100 mm dia. 1 nos 2982.00 2982.00 2982.00
Actual rate 3100.89
15% contractor overhead 465.13
Rate per nos Rs. 3566.02 Total (Rs.) 3566.02

1130
Motor Starter Switch
sources Level Qty Unit Rate/unit cost Total cost

labour skilled 0.25 nos 1070.00 267.50

un skilled 0.17 nos 750.00 127.50 395.00


a. Motor Starter Switch (Cromption)
materials 1 nos 4120.00 4120.00 4120.00
Actual rate 4515.00
15% contractor overhead 677.25
Rate per set Rs. 5192.25 Total (Rs.) 5192.25

1131
Pressure Senser Switch
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.25 nos 1070.00 267.50
un skilled 0.17 nos 750.00 127.50 395.00
materials a. Pressure Senser Switch (Italian) 1 nos 3675.00 3675.00 3675.00
Actual rate 4070.00
15% contractor overhead 610.5
Rate per set Rs. 4680.50 Total (Rs.) 4680.50

1132
Fire Post
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 5 nos 1070.00 5350.00
un skilled 2 nos 750.00 1500.00 6850.00
materials a. Landinng valve ISI marked is : 5290, Hose

box 18 gauge mild steel, 75x60x25cm (30"x24"x10")


to accommodate two hose length of 15 meters each
and one branch pipes with locking arrangement, 2
lengths Jayashree RRL hose

(ISI is : 636 in 15 meter length with male and female


coupling dully binded with wires, Branch pipe short
GM.)( minimax) 1 sets 27214 27214.00 27214
Actual rate 34064.00
15% contractor overhead 5109.60
Rate per set Rs. 39173.60 Total (Rs.) 39173.60

53
1133
20 HP Electric motor pump.
sources Level Qty Unit Rate/unit cost Total cost

labour skilled 6 nos 1070.00 6420.00

un skilled 4 nos 750.00 3000.00 9420.00


a. Fire pump 20 HP two pump set with panel board
materials and acessories pedrollo, Italian, 1 sets
408000.00 408000.00 408000
Actual rate 417420.00
15% contractor overhead 62613.00
Rate per set Rs. 480033.00 Total (Rs.) 480033.00

1134
Fire hose reel
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
a. Swinging hose reel with 20 mm hydraulic rubber
braided hose 30 mt. Long, swinging up to 170°
materials
nozzle, U shape reel carriel, diamension 31½" heigth
over all 29" projection from wall (minimax) 1 sets 19700.00 19700.00
19700.00
Actual rate 25480.00
15% conctractor overhead 3822.00
Rate per set Rs. 29302.00 Total (Rs.) 29302.00
1135
G.M. 25mm float valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 237.78 237.78
materials G.M. 25mm float valve 1 nos 1975.00 1975.00 1975.00
Actual rate 2212.78
15% contractor overhead 331.91
Rate per nos Rs. 2544.69 Total (Rs.) 2544.69

1136
Grab bar American standard
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/9) 0.222 nos 1070.00 237.78 237.78
materials Grab bar American standard 1 nos 5360.00 5360.00
b. Zink oxide screw etc. Ls 20.00 5380.00
Actual rate 5617.78
15% contractor overhead 842.66
Rate per nos Rs. 6460.44 Total (Rs.) 6460.44

1137
Euro Guard (Filter)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. Euro Guard Water purification set (one litre per
materials
minute) 1 sets 22000 22000.00 22000
Actual rate 26710
15% conctractor overhead 4006.5

54
Rate per set Rs. 30716.5 Total (Rs.) 30716.50

55
1138
Kitchen Sink 90cm long stainless steel
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a. Stainless steel, 90x45 size Bowl with drain board.
materials
Ordinary type 1 sets 2530.00 2530.00
b. Pvc bottle trap with 32mm Dia CP waste coupling
with CP chain and rubber. 1 nos 1246.00 1246.00
c. Zink Oxide screw etc. LS 18.00 18.00
d. ½" dia CP sink cock. 1 nos 1309.00 1309.00 5103.00
Actual rate 7993.00
15% contractor overhead 1198.95
Rate per set Rs. 9191.95 Total (Rs.) 9191.95

1139
Kitchen Sink 150 cm long
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. Stainless steel, 62" x 20" size Bowl with drain
materials
board.Ordinary type 1 sets 5250.00 5250.00
b. 32 cm PVC bottle with cleaning hole and CP waste
coupling with CP chain and rubber. 1 nos 1246.00 1246.00
c. Zink Oxide screw etc. LS 18.00 18.00
d. ½" dia CP bib cock. 1 nos 1309.00 1309.00 7823.00
Actual rate 12533.00
15% contractor overhead 1879.95
Rate per Set Rs. 14412.95 Total (Rs.) 14412.95

1140
C.P. Water Spray 1.5cm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.25 nos 1070.00 267.50
un skilled 0.17 nos 750.00 127.50 395.00
a.Water spray (Health faucet) with 1.2 m. long flexible
materials
pipe. 1 sets 945.00 945.00
945.00
Actual rate 1340.00
15% contractor overhead 201
Rate per No Rs. 1541.00 Total (Rs.) 1541.00

1141
Hand drayer chinese
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 118.89 118.89
materials a) Hand drayer with complete accessories 1 nos 6500.00 6500.00 6500.00
Actual rate 6618.89
15% contractor overhead 992.83
Rate per nos Rs. 7611.72 Total (Rs.) 7611.72

56
1142
4 Kg/cm2, High Density Polethene Pipe 50mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.17 nos 1070.00 181.90
un skilled 0.20 nos 750.00 150.00 331.90
materials a.High density polethene pipe 50mm. 1 RM 103.19 103.19
103.19
Actual rate 435.09
15% contractor overhead 65.26

Rate per Rm Rs. 500.35 Total (Rs.) 500.35

1143
4 Kg/cm2, High Density Polethene Pipe 110mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.17 nos 1070.00 181.90
un skilled 0.20 nos 750.00 150.00 331.90
materials a.High density polethene pipe 110mm. 1 RM 464.92 464.92
464.92
Actual rate 796.82
15% contractor overhead 119.52
Rate per Rm Rs. 916.34 Total (Rs.) 916.34

1144
4 Kg/cm2, High Density Polethene Pipe 125 mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.17 nos 1070.00 181.90
un skilled 0.20 nos 750.00 150.00 331.90
materials a.High density polethene pipe 125 mm. 1 RM 624.90 624.90
624.90
Actual rate 956.80
15% contractor overhead 143.52
Rate per Rm Rs. 1100.32 Total (Rs.) 1100.32
1145
4 Kg/cm2, High Density Polethene Pipe 140mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.20 nos 1070.00 214.00
un skilled 0.25 nos 750.00 187.50 401.50

materials a.High density polethene pipe 140mm.dia. 1 RM 761.51 761.51


761.51
Actual rate 1163.01

15% contractor overhead 174.45


Rate per Rm Rs. 1337.46 Total (Rs.) 1337.46
1146
4 Kg/cm2, High Density Polethene Pipe 150mm
sources Level Qty Unit Rate/unit cost Total cost

labour skilled 0.25 nos 1070.00 267.50


un skilled 0.33 nos 750.00 247.50 515.00

materials a.High density polethene pipe 150mm. Dia 1.0 RM 990.41 990.41
990.41
Actual rate 1505.41
15% contractor overhead 225.81
Rate per Rm Rs. 1731.22 Total (Rs.) 1731.22

57
1147
4 Kg/cm2, High Density Polethene Pipe 180mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 1070.00 353.10
un skilled 0.50 nos 750.00 375.00 728.10

materials a.High density polethene pipe 180mm. 1.0 RM 1250.03 1250.03


1250.03
Actual rate 1978.13
15% contractor overhead 296.71
Rate per Rm Rs. 2274.84 Total (Rs.) 2274.84

1148
4 Kg/cm2, High Density Polethene Pipe 200mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.50 nos 1070.00 535.00
un skilled 0.50 nos 750.00 375.00 910.00
materials a.High density polethene pipe 200mm. 1.0 RM 1546.13 1546.13
1546.13
Actual rate 2456.13
15% contractor overhead 368.41
Rate per Rm Rs. 2824.54 Total (Rs.) 2824.54

1149
5 kg Fire extingusher
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 1.0 nos 1070.00 1070.00
un skilled 1070.00
materials a.5 kg Fire extingusher ABC type minimax 1.0 nos 7130.00 7130.00
7130.00
Actual rate 8200
15% contractor overhead 1230.00
Rate per set Rs. 9430 Total (Rs.) 9430.00

1150
560 mm dia 228 kg CI heavy Cover
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 1.0 nos 1070.00 1070.00
un skilled 3.0 nos 750.00 2250.00 3320.00
materials a.228 kg CI heavy Manhole cover. 1.0 sets 32347.00 32347.00
32347.00
Actual rate 35667.00
15% contractor overhead 5350.05
Rate per set Rs. 41017.05 Total (Rs.) 41017.05

1151
15mm dia aeroflex insulation for hot water pipe
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials 15mm dia insulation aeroflex for hot water pipe 1 rm 84.00 84.00 84.00
Actual rate 201.70
15% contractor overhead 30.25
Rate per Rm Rs. 231.95 Total (Rs.) 231.95

58
1152
25 mm dia aeroflex insulation for hot water pipe
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials 25 mm dia insulation aeroflex for hot water pipe 1 rm 126.00 126.00 126.00
Actual rate 243.70
15% contractor overhead 36.55
Rate per Rm Rs. 280.25 Total (Rs.) 280.25

1153
32 mm dia aeroflex insulation for hot water pipe
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials 32 mm dia insulation aeroflex for hot water pipe 1 rm 158.00 158.00 158.00
Actual rate 275.70
15% contractor overhead 41.35
Rate per Rm Rs. 317.05 Total (Rs.) 317.05

1154
CPVC Pipe SDR 13.5, 15mm (1/2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a. 15 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 203.40 203.40
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 303.40
Actual rate 321.60
15% contractor overhead 48.24
Rate per Rm Rs. 369.84 Total (Rs.) 369.84

1155
CPVC Pipe SDR 13.5, 20mm (3/4") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a. 20 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 317.70 317.70
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 417.70
Actual rate 435.90

15% contractor overhead 65.38


Rate per Rm Rs. 501.28 Total (Rs.) 501.28

1156
CPVC Pipe SDR 13.5, 25mm (1") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 1070.00 11.77
un skilled 0.019 nos 750.00 14.25 26.02
materials a. 25 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 465.30 465.30
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 565.30
Actual rate 591.32
15% contractor overhead 88.69
Rate per Rm Rs. 680.01 Total (Rs.) 680.01

59
1157
CPVC Pipe SDR 13.5, 32mm (1 1/4") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 1070.00 11.77
un skilled 0.019 nos 750.00 14.25 26.02
materials a. 32 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 692.10 692.10
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 792.10
Actual rate 818.12
15% contractor overhead 122.71
Rate per Rm Rs. 940.83 Total (Rs.) 940.83

1158
CPVC Pipe SDR 13.5, 40mm (1 1/2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 1070.00 11.77
un skilled 0.019 nos 750.00 14.25 26.02
materials a. 40 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 965.70 965.70
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 1065.70
Actual rate 1091.72
15% contractor overhead 163.75
Rate per Rm Rs. 1255.47 Total (Rs.) 1255.47

1159
CPVC Pipe SDR 13.5, 50mm (2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 1070.00 11.77
un skilled 0.019 nos 750.00 14.25 26.02
materials a. 50 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 1627.20 1627.20
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 1727.20
Actual rate 1753.22
15% contractor overhead 262.98
Rate per Rm Rs. 2016.20 Total (Rs.) 2016.20

1160
CPVC CTS.15 mm ball Valve( 1/2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 15 mm CPVC ball valve, CTS sockets, 1 Rm 547.56 547.56 665.26
Actual rate 665.26
15% contractor overhead 99.78
Rate per Rm Rs. 765.04 Total (Rs.) 765.04

1161
CPVC CTS. 20 mm ball Valve( 3/4")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 20 mm CPVC ball valve, CTS sockets, 1 Rm 724.55 724.55 842.25
Actual rate 842.25
15% contractor overhead 126.33
Rate per Rm Rs. 968.58 Total (Rs.) 968.58

60
1162
CPVC CTS. 25 mm ball Valve (1")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 25 mm CPVC ball valve, CTS sockets, 1 Rm 1020.66 1020.66 1138.36
Actual rate 1138.36
15% contractor overhead 170.75
Rate per Rm Rs. 1309.11 Total (Rs.) 1309.11

1163
CPVC CTS. 32 mm ball Valve (1 1/4")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 32 mm CPVC ball valve, CTS sockets, 1 Rm 2012.41 2012.41 2130.11
Actual rate 2130.11
15% contractor overhead 319.51
Rate per Rm Rs. 2449.62 Total (Rs.) 2449.62

1164
CPVC CTS. 40 mm ball Valve (1 1/2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 40 mm CPVC ball valve, CTS sockets, 1 Rm 2803.55 2803.55 2921.25
Actual rate 2921.25
15% contractor overhead 438.18
Rate per Rm Rs. 3359.43 Total (Rs.) 3359.43

1165
CPVC CTS. 50 mm ball Valve (2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 50 mm CPVC ball valve, CTS sockets, 1 Rm 4053.74 4053.74 4171.44
Actual rate 4171.44
15% contractor overhead 625.71
Rate per Rm Rs. 4797.15 Total (Rs.) 4797.15

1166
Multilayer composite PEX/AL/PEX Pipe , 16mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.16 mm mulitlayer composite PAP Pipe 60 kg/cm2 1 Rm 111.00 111.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 221.00
Actual rate 239.20
15% contractor overhead 35.88
Rate per Rm Rs. 275.08 Total (Rs.) 275.08

61
1167
Multilayer composite PEX/AL/PEX Pipe , 20mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.20 mm mulitlayer composite PAP Pipe 60 kg/cm2 1 Rm 141.00 141.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 251.00
Actual rate 269.20
15% contractor overhead 40.38
Rate per Rm Rs. 309.58 Total (Rs.) 309.58

1168
Multilayer composite PEX/AL/PEX Pipe , 25mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.25 mm mulitlayer composite PAP Pipe 70 kg/cm2 1 Rm 208.00 208.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 318.00
Actual rate 336.20
15% contractor overhead 50.43
Rate per Rm Rs. 386.63 Total (Rs.) 386.63
1169
Multilayer composite PEX/AL/PEX Pipe , 32mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.32 mm mulitlayer composite PAP Pipe, 40 kg/cm2 1 Rm 302.00 302.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 412.00
Actual rate 430.20
15% contractor overhead 64.53
Rate per Rm Rs. 494.73 Total (Rs.) 494.73
1170
Multilayer composite PEX/AL/PEX Pipe , 40 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.40 mm mulitlayer composite PAP Pipe, 40 kg/cm2 1 Rm 465.00 465.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 575.00
Actual rate 593.20
15% contractor overhead 88.98
Rate per Rm Rs. 682.18 Total (Rs.) 682.18
1171
Multilayer composite PEX/AL/PEX Pipe , 50 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.50 mm mulitlayer composite PAP Pipe,30.5 kg/cm2 1 Rm 650.00 650.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 760.00
Actual rate 778.20
15% contractor overhead 116.73
Rate per Rm Rs. 894.93 Total (Rs.) 894.93

62
1172
150 mm RCC hump pipe NP2
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 15 nos 750.00 11250.00 14460.00
materials a.150 mm RCC hump pipe np2 32 Rm 632.00 20224.00
b.150 mm RCC collar 13 nos 111.78 1453.14
c. cement 0.035 mt 10369.92 362.95
d. sand 0.05 cum 1096.37 54.82
e. Jute 1.6 kg 50.00 80.00 22174.91
Actual rate 36634.91
15% contractor overhead 5495.23
Rate per Rm Rs. 1316.57 Total (Rs.) 42130.14
1173
200 mm RCC hump pipe NP2
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 20 nos 750.00 15000.00 19280.00
materials a.200 mm RCC hump pipe np2 32 Rm 816.00 26112.00
b.200 mm RCC collar 13 nos 144.90 1883.70
c. cement 0.052 mt 10369.92 539.24
d. sand 0.08 cum 1096.37 87.71
e. Jute 2.4 kg 50.00 120.00 28742.65
Actual rate 48022.65
15% contractor overhead 7203.39
Rate per Rm Rs. 1725.81 Total (Rs.) 55226.04

1174
300 mm RCC hump pipe NP2
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 22 nos 750.00 16500.00 22920.00
materials a.300 mm RCC hump pipe np2 32 Rm 1388.00 44416.00
b.300 mm RCC collar 13 nos 244.26 3175.38
c. cement 0.083 mt 10369.92 860.70
d. sand 0.13 cum 1096.37 142.53
e. Jute 3.63 kg 50.00 181.50 48776.11
Actual rate 71696.11
15% contractor overhead 10754.41
Rate per Rm Rs. 2576.58 Total (Rs.) 82450.52

1175
400 mm RCC hump pipe NP2
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 22 nos 750.00 16500.00 22920.00
materials a.400 mm RCC hump pipe np2 32 Rm 1612.24 51591.84
b.400 mm RCC collar 13 nos 337.41 4386.33
c. cement 0.083 mt 10369.92 860.70
d. sand 0.13 cum 1096.37 142.53
e. Jute 3.63 kg 50.00 181.50 57162.90
Actual rate 80082.90
15% contractor overhead 12012.43
Rate per Rm Rs. 2877.98 Total (Rs.) 92095.33

63
1176
600 mm RCC hump pipe NP2
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 9 nos 1070.00 9630.00
un skilled 35 nos 750.00 26250.00 35880.00
materials a.600 mm RCC hump pipe np2 32 Rm 3008.00 96256.00
b.600 mm RCC collar 13 nos 531.99 6915.87
c. cement 0.218 mt 10369.92 2260.64
d. sand 0.3 cum 1096.37 328.91
e. Jute 7 kg 50.00 350.00 106111.42
Actual rate 141991.42
15% contractor overhead 21298.71
Rate per Rm Rs. 5102.82 Total (Rs.) 163290.13

1177
150 mm RCC hump pipe NP3
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 15 nos 750.00 11250.00 14460.00
materials a.150 mm RCC hump pipe np3 32 Rm 1368.00 43776.00
b.150 mm RCC collar 13 nos 245.30 3188.84
c. cement 0.035 mt 10369.92 362.95
d. sand 0.05 cum 1096.37 54.82
e. Jute 1.6 kg 50.00 80.00 47462.60
Actual rate 61922.60
15% contractor overhead 9288.39
Rate per Rm Rs. 2225.34 Total (Rs.) 71210.99

1178
200 mm RCC hump pipe NP3
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 20 nos 750.00 15000.00 19280.00
materials a.200 mm RCC hump pipe np3 32 Rm 1820.00 58240.00
b.200 mm RCC collar 13 nos 329.13 4278.69
c. cement 0.052 mt 10369.92 539.24
d. sand 0.08 cum 1096.37 87.71
e. Jute 2.4 kg 50.00 120.00 63265.64
Actual rate 82545.64
15% contractor overhead 12381.84
Rate per Rm Rs. 2966.48 Total (Rs.) 94927.48

1179
300 mm RCC hump pipe NP3
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 22 nos 750.00 16500.00 22920.00
materials a.300 mm RCC hump pipe np3 32 Rm 3320.00 106240.00
b.300 mm RCC collar 13 nos 592.02 7696.26
c. cement 0.083 mt 10369.92 860.70
d. sand 0.13 cum 1096.37 142.53
e. Jute 3.63 kg 50.00 181.50 115120.99
Actual rate 138040.99
15% contractor overhead 20706.14
Rate per Rm Rs. 4960.85 Total (Rs.) 158747.13

64
1180
400 mm RCC hump pipe NP3
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 22 nos 750.00 16500.00 22920.00
materials a.400 mm RCC hump pipe np3 32 Rm 4196.00 134272.00
b.400 mm RCC collar 13 nos 663.44 8624.66
c. cement 0.083 mt 10369.92 860.70
d. sand 0.13 cum 1096.37 142.53
e. Jute 3.63 kg 50.00 181.50 144081.39
Actual rate 167001.39
15% contractor overhead 25050.2
Rate per Rm Rs. 6001.61 Total (Rs.) 192051.59

1181
600 mm RCC hump pipe NP3
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 9 nos 1070.00 9630.00
un skilled 35 nos 750.00 26250.00 35880.00
materials a.600 mm RCC hump pipe np3 32 Rm 6356.00 203392.00
b.600 mm RCC collar 13 nos 943.92 12270.96
c. cement 0.218 mt 10369.92 2260.64
d. sand 0.3 cum 1096.37 328.91
e. Jute 7 kg 50.00 350.00 218602.51
Actual rate 254482.51
15% contractor overhead 38172.37
Rate per Rm Rs. 9145.47 Total (Rs.) 292654.88

1182
140 mm Plastic Gutter WATER PIPE ( HALF ROUND) for 30 m
b/ ljZn]if0fsf] nflu #) ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 9 nos 750.00 6750.00 13170.00
materials a. 140 mm Plastic water pipe (Half round Gutter) 30 Rm 183.20 5495.85
b. Joint Bracket 8 nos 285.00 2280.00
c. Short Stop End 1 nos 106.00 106.00
d. Stop End Outlet 1 nos 339.00 339.00
e. Running Outlet 2 nos 391.00 782.00
f. Elbow 90 Degree (with or w/o outlet) 1 nos 480.00 480.00
g. Support Bracket 30 nos 85.00 2550.00
h. Rafter Bracket 30 nos 86.00 2580.00
i. Top Bracket 30 nos 56.00 1680.00 16292.85
Actual rate 29462.85
15% contractor overhead 4419.42
Rate per Rm Rs. 1129.41 Total (Rs.) 33882.27

65
1183
180 mm Plastic Gutter WATER PIPE ( HALF ROUND) for 30. m
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 9 nos 750.00 6750.00 13170.00
materials a. 180 mm Plastic water pipe (Half round Gutter) 10 Rm 346.73 3467.25
b. Joint Bracket 8 nos 398.00 3184.00
c. Short Stop End 1 nos 156.00 156.00
d. Stop End Outlet 1 nos 471.00 471.00
e. Running Outlet 2 nos 575.00 1150.00
f. Elbow 90 Degree (with or w/o outlet) 1 nos 658.00 658.00
g. Support Bracket 30 nos 120.00 3600.00
h. Rafter Bracket 30 nos 122.00 3660.00
i. Top Bracket 30 nos 101.00 3030.00 19376.25
Actual rate 32546.25
15% contractor overhead 4881.93
Rate per Rm Rs. 1247.61 Total (Rs.) 37428.18

1184
250 mm Plastic Gutter WATER PIPE ( HALF ROUND) for 30. m
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 9 nos 750.00 6750.00 13170.00
materials a. 250 mm Plastic water pipe (Half round Gutter) 10 Rm 672.75 6727.50
b. Joint Bracket 8 nos 682.00 5456.00
c. Short Stop End 1 nos 335.00 335.00
d. Stop End Outlet 1 nos 891.00 891.00
e. Running Outlet 2 nos 1072.00 2144.00
f. Elbow 90 Degree (with or w/o outlet) 1 nos 1541.00 1541.00
g. Support Bracket 30 nos 333.00 9990.00
h. Rafter Bracket 30 nos 353.00 10590.00
i. Top Bracket 30 nos 182.00 5460.00 43134.50
Actual rate 56304.50
15% contractor overhead 8445.67
Rate per Rm Rs. 2158.34 Total (Rs.) 64750.17

66
110 mm dia UPVC pipe specials supplying , fixing,Jointing, laying all complete
UNIT : 1.0 nos

Materials cost Labour cost


Total
Description of Net Overhead
S.N Jointing Total Skilled Unskilled @Rs Total amount
materials Fittings amount 15%
material amount @Rs720.0/day 500/day labour (Rs.)
No Amount No Amount amount
8 Cross tee 727.16 3.30 730.46 0.16 115.20 0.20 100.00 215.20 945.66 141.85 1087.51
9 Pipe clip 43.80 3.30 47.10 0.00 0.00 0.00 0.00 0.00 47.10 7.07 54.17

41
UNIT : 1.0 nos

Remark

41
!@@* ;fx|f] k|sf/sf] df6f] 9'Ëf lsl;dsf] ^ ld6/;Ddsf] ulx/f] vGg] /
@$ r &=%) ld6/ lnˆ6 ug]{ sfo{ .
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf] -Ogf/ ;Ddsf] nflu_
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds
HofdL 4.30 hjfg 750.00 3225.00 3225.00

lgdf{0f ;fdu|L

oflGqs pk/s0f #Ü n] 96.75


jf:tljs b//]6 3321.75
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 498.26
?= 3820.01 k}= hDdf b/ /]6 3820.01

!@@(

4' Ø R.C.C. Ring ;fO6df k'¥ofO{ Ogf/df lkm6 ug]{ sfo{


b/ ljZn]if0fsf] nflu ! /=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
l;kfn' 0.25 cGbfhL -hjfg_ 1070.00 267.50
>lds
HofdL 0.25 cGbfhL -hjfg_ 750.00 187.50 455.00

cf/=l;=l;=l/Ë 1.00 /=dL= 5865.00 5865.00


lgdf{0f ;fdu|L
5865.00
jf:tljs b//]6 6320.00
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 948.00
?= 7268.00 k}= hDdf b/ /]6 7268.00

43
1230
3'6" Ø R.C.C. Ring ;fO6df k'¥ofO{ Ogf/df lkm6 ug]{ sfo{
b/ ljZn]if0fsf] nflu ! /=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
l;kfn' 0.25 cGbfhL -hjfg_ 1070.00 267.50
>lds
HofdL 0.25 cGbfhL -hjfg_ 750.00 187.50 455.00
cf/=l;=l;=l/Ë 1.00 /=dL= 4430.00 4430.00
lgdf{0f ;fdu|L
4430.00
jf:tljs b//]6 4885.00
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 732.75
?= 5617.75 k}= hDdf b/ /]6 5617.75

1231
3' Ø R.C.C. Ring ;fO6df k'¥ofO{ Ogf/df lkm6 ug]{ sfo{
b/ ljZn]if0fsf] nflu ! /=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
l;kfn' 0.25 cGbfhL -hjfg_ 1070.00 267.50
>lds
HofdL 0.25 cGbfhL -hjfg_ 750.00 187.50 455.00
cf/=l;=l;=l/Ë 1.00 /=dL= 3810.00 3810.00
lgdf{0f ;fdu|L
3810.00
jf:tljs b//]6 4265.00
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 639.75
?= 4904.75 k}= hDdf b/ /]6 4904.75

1232 2'6" Ø R.C.C. Ring ;fO6df k'¥ofO{ Ogf/df lkm6 ug]{ sfo{
b/ ljZn]if0fsf] nflu ! /=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
l;kfn' 0.25 cGbfhL -hjfg_ 1070.00 267.50
>lds
HofdL 0.25 cGbfhL -hjfg_ 750.00 187.50 455.00

cf/=l;=l;=l/Ë 1.00 /=dL= 3075.00 3075.00


lgdf{0f ;fdu|L
3075.00
jf:tljs b//]6 3530.00
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 529.50
?= 4059.50 k}= hDdf b/ /]6 4059.50