39 17"X14"X13 White glaze Angle back Urinal (Hindustan) No 770.00 770.00 950.00 997.50 997.50
23"X14" White glaze squatting plate urinal (Hindustan or
40 equivalent) No 825.00 825.00 1212.00 1212.00 1212.00
41 68X30 cm White glaze Division plate urinal Partation (Hindustan
1690.00 1690.00
or equivalent) 1751.00 1751.00 1690.00
42 300 ltr with 3 panel solar water heater 59251.20 59251.20 72000.00 72000.00
43 200Gallons net capacity G. I. water tank with Inlet, outlet, over
flow, cleanout hole etc.20 GUAGE No 6820.00 6820.00 7100.00 7455.00 7455.00
44 300 Gallons net capacity G. I. Water tank with Inlet, outlet, over
flow, cleanout hole etc.17 GUAGE No 15955.00 15955.00 15955.00 15955.00 15955.00
45 400Gallons net capacity G. I. water tank with Inlet, outlet, over
flow, cleanout hole etc. 16 GUAGE No 16000.00 16000.00 15000.00 15750.00 15750.00
46 500 Gallons net capacity G. I. water tank with Inlet, outlet, over
flow, cleanout
1000Ltr. PVC hole
wateretc. 17(NS)
tank GUAGE
with Inlet, outlet, over flow, cleanout No 22365.00 22365.00 22365.00 22365.00 22365.00
47 hole etc. No 11000.00 9770.00 19000.00 11550.00 11550.00
500 ltr PVC water tank (NS) with Inlet, outlet, over flow, cleanout
48 hole etc. No 5500.00 4885.00 12500.00 5775.00 5775.00
2000 Ltr.PVC water tank (NS) with Inlet, outlet, over flow, cleanout
49 hole etc. No 22000.00 19540.00 34500.00 23100.00 23100.00
50 1 HP Chinese pump No 3024.00 3024.00 3270.00 3270.00 3270.00
51 1 HP Chinese submersible pump No 9240.00 9240.00 9240.00 9240.00
52 1.0 H P Electric motor pump (Submersible) Italian or equivalent No 21930.00 21930.00 26089.00 26089.00 26089.00
0.5 H P Electric motor pump with base plate nuts, bolts etc.set
53 monoblock type No 6000.00 6000.00 6258.00 6258.00 6258.00
1.0 H P Electric motor pump with base plate nuts,bolts,etc.set-
54 indian No 11000.00 11000.00 9465.00 9465.00 9465.00
55 1 H P Electric motor pump with base plate nuts, bolts etc. multi
9465.00 9465.00 9465.00
crompton monoblockpump
2 H P Electricmotor type with base plate nuts, bolts etc.set No 13000.00 13000.00
56 crompton 3 phage type No 26000.00 26000.00 19200.00 19200.00
3 H P Electricmotor pump with base plate nuts, bolts etc.set
57 crompton No 30000.00 30000.00 24500.00 24500.00
5 H P Electricmotor pump with base plate nuts, bolts etc.set
58 crompton 3 phage type No 35000.00 35000.00 28656.00 28656.00 28656.00
59 White glaze toilet paper holder (Recessed type)-Cotto No 680.00 680.00 929.00 929.00
60 White glaze toilet paper holder No 450.00 450.00 1157.00 1157.00
61 Chrome plate toilet paper holder No 360.00 360.00 400.00 462.00 462.00
62 Recess SOAP DISH. ( American standard) Cotto No 2783.00 2783.00 1042.00 1042.00
63 White glaze soap tray No 490.00 490.00 490.00 490.00
64 C P towel rod 1.5x60cm (½"x 24.") American standard No 1468.00 1468.00 1663.00 1663.00 1663.00
65 C.P Soap dish No 283.00 297.35 1042.00 1042.00 1042.00
66 C P Towel rod (1/2 x18) No 600.00 590.97 650.00 682.50 682.50
67 C PTowel rod (1/2 x24) No 630.00 599.34 750.00 787.50 787.50
68 C P Glass Shelf No 486.00 486.00 680.00 680.00 680.00
69 Bevelled edge looking mirror No 650.00 650.00 650.00 750.00 750.00
70 Looking Mirror Modi guard 450x600mm (18"x 24") No 1324.00 1324.00 1459.00 1459.00 1459.00
71 Bevelled edge looking mirror 50x40 cm No 650.00 650.00 650.00 650.00
72 Bevelled edge looking europen pattern No 1800.00 1800.00 1800.00 1800.00
73 7.5cm dia shower rose fancy type with 30cm c p rod No 950.00 950.00 906.00 906.00 906.00
74
1350.00 1350.00
Pressure Adjustable Shower rose, Jaquar, Essco, ark or equivalent No 1350.00 1350.00
75 Shower rose ordinary type (5.0 to 10.00 cm) No 700.00 700.00 640.00 672.00 672.00
76 Shower head with arm and flange No 2500.00 2014.00 2014.00 2500.00 2014.00
77 C.P Flush valve Euorpean pattern No 3494.00 3494.00 3494.00 3494.00
78 C.P Flush valve for urinal sensor type electric Euorpean pattern No 16000.00 16000.00 16000.00 16000.00
79 15mm fancy type bib cock heavy type No 830.00 980.31 1361.00 1361.00
80 15mm fancy type bib cock No 765.00 803.76 650.00 682.50 682.50
81 15mm fancy type angle valve No 600.00 600.00 1244.00 1244.00
82 15mm Auto closing bib cock with aerator No 2160.00 2160.00 2612.00 2612.00
83 15mm Urinal Auto closing Valve with built in control cock No 2082.00 2082.00 2694.00 2694.00
84 15mm fancy type angle valve -cotto No 850.00 850.00 1244.00 1244.00
85 15mm two way angle valve, jaquar, essco, or equivalent No 1150.00 1150.00 1150.00 1150.00
2
Material Rate of Sanitary Works 2078/79 Kaski
3
Material Rate of Sanitary Works 2078/79 Kaski
133 Acrylic Type shower tray70x70cm (29"x29") with complete fittings. No 4226.00 4226.00 4226.00 4226.00
134 15mm CP Bath spout Euorpean pattern No 1455.00 1455.00 2021.00 2021.00
135 Sensor mixer for basin (Battery operating) No 21000.00 21000.00 20481.00 20481.00
136 Sink mixture complete set. No 2600.00 2600.00 3675.00 3675.00
137 CI Cover 45x45cm (18" X 18") No 1500.00 1500.00 2408.00 2408.00 2408.00
94 CI Cover 22" X 22" No 2200.00 2200.00 3108.00 3108.00 3108.00
95 ½" push valve No 915.00 915.00 915.00 915.00
96 Spreader No 400.00 400.00 940.00 940.00
97 Motor starter switch (Cromption) No 3398.00 3398.00 4120.00 4120.00
98 Pressure senser switch (Italian) No 3675.00 3675.00 3675.00 3675.00
99 Fire post complete set Set 27214.00 27214.00 27214.00 27214.00
Fire pump 20 HP two pump set with panel board and acessories
100 pedrollo, Italian, Set 408000.00 408000.00 408000.00 408000.00
101 Swinging hose reel with 20 mm hydraulic rubber braided hose 30
mt. Long, swinging up to 170° nozzle Set 19700.00 19700.00 19700.00 19700.00
102 Euro Guard Water purification set (one litre per minute) Set 16263.00 16263.00 22000.00 22000.00
103 Stainless steel, 90x45 size Bowl with drain board. Ordinary type Set 2100.00 2100.00 2530.00 2530.00
104 Stainless steel, 62" x 20" size Bowl with drain board.Ordinary type 5250.00 5250.00
Set 5250.00 5250.00
105 Flange 80 mm dia. No 2187.00 2187.00 2187.00 2187.00 2187.00
106 Flange 100 mm dia. No 2110.00 2110.00 2982.00 2982.00 2982.00
107 Water spray (Health faucet) with 1.2 m. long flexible pipe. Set 925.00 800.00 900.00 945.00 945.00
108 High density polethene pipe 50mm. Rm 88.83 88.83 98.28 103.19 103.19
109 High density polethene pipe 110mm. Rm 400.21 400.21 442.78 464.92 464.92
110 High density polethene pipe 125 mm. Rm 537.92 537.92 595.14 624.90 624.90
111 High density polethene pipe 140mm.dia. Rm 681.74 681.74 725.25 761.51 761.51
112 High density polethene pipe 160mm. Dia Rm 784.00 784.00 943.25 990.41 990.41
113 High density polethene pipe 180mm. Rm 1199.07 1199.07 1190.50 1250.03 1250.03
114 High density polethene pipe 200mm. Rm 1384.15 1384.15 1472.50 1546.13 1546.13
115 G.M. 25mm float valve No 965.00 965.00 1975.00 1975.00 1975.00
116 Grab bar American standard-30cm long No 4343.00 4343.00 5360.00 5360.00
117 Hand drayer with complete accessories No 6500.00 6500.00 6500.00 6500.00
118 15 mm Insulation for hot water pipe 'Aeroflex" of 6 mm wall
thickness No 84.00 84.00 84.00 84.00
119 25 mm Insulation for hot water pipe 'Aeroflex" of 6 mm wall
thickness No 126.00 126.00 126.00 126.00
120 32 mm Insulation for hot water pipe 'Aeroflex" of 6 mm wall
thickness No 158.00 158.00 158.00 158.00
121 15 mm (1/2") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 143.00 143.00 203.40 203.40
122 20 mm (3/4") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 200.00 200.00 317.70 317.70
123 25 mm (1") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 265.00 265.00 465.30 465.30
124 32 mm (1 1/4") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 312.00 312.00 692.10 692.10
125 40 mm (1 1/2") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 398.00 965.70 965.70
126 50 mm (2") CPVC Pipe SDR 13.5 (3mtrs) CTS Rm 573.00 573.00 1627.20 1627.20
127 5 kg Fire extingusher ABC type minimax No 5040.00 5040.00 7130.00 7130.00
128 208 kg CI heavy Manhole cover. Set 12535.00 12535.00 32347.00 32347.00
129 15 mm CPVC ball valve, CTS sockets, No 863.00 863.00 547.56 547.56 547.56
130 20 mm CPVC ball valve, CTS sockets, No 1051.00 1051.00 724.55 724.55 724.55
131 25 mm CPVC ball valve, CTS sockets, No 1202.00 1202.00 1020.66 1020.66 1020.66
132 32 mm CPVC ball valve, CTS sockets, No 2452.00 2452.00 2012.41 2012.41 2012.41
133 40 mm CPVC ball valve, CTS sockets, No 3120.00 3120.00 2803.55 2803.55 2803.55
134 50 mm CPVC ball valve, CTS sockets, No 4013.00 4013.00 4053.74 4053.74 4053.74
135 16 mm multi-layer composite pap pipe, rm 92.00 92.00 111.00 111.00 111.00
136 20 mm multi-layer composite pap pipe, rm 109.00 109.00 141.00 141.00 141.00
137 25 mm multi-layer composite pap pipe, rm 165.00 165.00 208.00 208.00 208.00
138 32 mm multi-layer composite pap pipe, rm 258.00 258.00 302.00 302.00 302.00
139 40 mm multi-layer composite pap pipe, rm 375.00 375.00 465.00 465.00 465.00
4
Material Rate of Sanitary Works 2078/79 Kaski
140 50 mm multi-layer composite pap pipe, rm 650.00 650.00 650.00 650.00 650.00
141 150 mm NP-2 RCC hump pipe rm 517.55 517.55 608.16 632.00 632.00
142 200 mm NP-2 RCC hump pipe rm 670.61 670.61 789.80 816.00 816.00
143 300 mm NP-2 RCC hump pipe rm 1116.73 1116.73 1318.37 1388.00 1388.00
144 400 mm NP-2 RCC hump pipe rm 1597.55 1597.55 1612.24 1597.55 1612.24
145 600 mm NP-2 RCC hump pipe rm 2493.06 2493.06 2908.16 3008.00 3008.00
146 150 mm NP-3 RCC hump pipe rm 1089.39 1089.39 1306.12 1368.00 1368.00
147 200 mm NP-3 RCC hump pipe rm 1449.39 1449.39 1726.53 1820.00 1820.00
148 300 mm NP-3 RCC hump pipe rm 2594.69 2594.69 3148.98 3320.00 3320.00
149 400 mm NP-3 RCC hump pipe rm 3334.69 3334.69 4012.24 4196.00 4196.00
150 600 mm NP-3 RCC hump pipe rm 4931.02 4931.02 6163.27 6356.00 6356.00
151 50 mm Plain Tee No 44.00 44.00 89.56 89.56 89.56
152 50 mm Bend 90 degree No 30.00 30.00 61.32 61.32 61.32
153 50 mm Bend 45 degree No 29.00 29.00 61.32 61.32 61.32
154 75 mm Vent cowl No 35.26 35.26 67.16 67.16 67.16
155 75 mm Plain tee No 94.71 94.71 197.61 197.61 197.61
156 75 mm Plain door tee No 112.62 112.62 231.68 231.68 231.68
157 75 mm Bend 90 degree No 72.33 72.33 143.09 143.09 143.09
158 75 mm Door bend No 92.14 92.14 183.98 183.98 183.98
159 75 mm Bend 45 degree No 58.54 58.54 116.81 116.81 116.81
160 75 mm Y- Branch No 105.75 105.75 249.20 249.20 249.20
161 75 mm Cross tee No 282.90 282.90 293.98 293.98 293.98
162 75 mm Pipe clip No 11.00 11.00 32.12 32.12 32.12
163 110 mm Vent cowl No 58.73 58.73 116.08 116.81 116.81
164 110 mm Plain tee No 420.00 420.00 369.91 369.91 369.91
165 110 mm Door tee No 194.24 194.24 429.29 429.29 429.29
166 110 mm Bend 90 degree No 120.54 120.54 264.78 264.78 264.78
167 110 mm Door bend No 148.08 148.08 320.27 320.27 320.27
168 110 mm Bend 45 degree No 99.87 99.87 209.30 209.30 209.30
169 110 mm Y- Branch No 204.88 204.88 452.65 452.65 452.65
170 110 mm Cross tee No 460.22 460.22 727.16 727.16 727.16
171 110 mm Pipe clip No 20.47 20.47 43.80 43.80 43.80
172 110 mm Gully trap No 515.00 515.00 515.00 515.00
Cast Iron fittings Specials
173 50 mm Bend 90 degree No 276.00 276.00 276.00 276.00
174 50 mm Vent cowl No 240.00 240.00 240.00 240.00
175 50 mm Door tee No 531.00 531.00 531.00 531.00
176 50 mmTrap p or s No 325.00 325.00 325.00 325.00
177 50 mm Plain tee No 215.00 215.00 215.00 215.00
178 50 mm Y- Branch No 432.00 432.00 432.00 432.00
179 50 mm Door bend No 404.00 404.00 404.00 404.00
180 75 mm Bend 90 degree No 368.00 368.00 368.00 368.00
181 75 mm Vent cowl No 283.00 283.00 283.00 283.00
182 75 mm Door tee No 701.00 701.00 701.00 701.00
183 75 mmTrap p or s No 381.00 381.00 381.00 381.00
184 75 mm Plain tee No 566.00 566.00 566.00 566.00
185 75 mm T- Branch No 673.00 673.00 673.00 673.00
186 75 mm Door bend No 517.00 517.00 517.00 517.00
187 110 mmBend 90 degree No 587.00 587.00 587.00 587.00
188 110 mmVent cowl No 404.00 404.00 404.00 404.00
189 110 mmDoor tee No 935.00 935.00 935.00 935.00
5
Material Rate of Sanitary Works 2078/79 Kaski
Note :
1) * without Transpotation
6
Remark
kaski +
kaski +
kaski +
kaski +
ktm
ktm
kaski
ktm
kaski +
kaski +
kaski
kaski
ktm
kaski +
kaski +
kaski +
Market Rate
ktm
Market Rate
ktm
ktm
ktm
Market Rate
kaski
kaski +
kaski
kaski +
ktm
kaski +
ktm
kaski +
kaski +
kaski +
ktm
ktm
kaski +
ktm
ktm
7
Remark
kaski +
ktm
ktm
Market Rate
kaski +
ktm
kaski +
ktm
kaski
kaski
kaski
ktm
Market Rate
ktm
ktm
ktm
ktm
kaski
Market Rate
ktm
Market Rate
ktm
kaski +
ktm
Market Rate
ktm
ktm
kaski +
kaski +
ktm
Market Rate
ktm
ktm
ktm
ktm
Market Rate
kaski +
ktm
Market Rate
Market Rate
ktm
kaski +
ktm
ktm
ktm
ktm
Market Rate
8
Remark
ktm
ktm
ktm
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
Market Rate
ktm
ktm
ktm
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski
kaski +
kaski +
kaski +
ktm
ktm
ktm
ktm
Market Rate
Market Rate
kaski +
ktm
9
Remark
Market Rate
ktm
ktm
kaski +
ktm
ktm
Market Rate
ktm
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
kaski +
kaski +
kaski +
4kg/cm2
4kg/cm2
4kg/cm2
4kg/cm2
4kg/cm3
4kg/cm2
4kg/cm2
kaski +
ktm
Market Rate
ktm
ktm
ktm
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
ktm
ktm
kaski +
kaski +
kaski +
kaski +
kaski +
kaski
ktm
ktm
ktm
ktm
ktm
10
Remark
ktm
kaski
kaski
kaski
kaski
kaski
kaski
kaski
kaski
kaski
kaski
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
kaski +
ktm
kaski
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
Market Rate
11
Remark
Market Rate
Market Rate
Market Rate
Market Rate
ktm
ktm
ktm
ktm
kaski
Market Rate
Market Rate
Market Rate
12
SANITARY WORKS : 078-79 Kaski
Table of Content
Sanitary Analysis 2078/079
S.No Description P.G. Rs. Rate Per
1001 580 mm Porcelain clay white glaze Orissa Pan complete set. 1 Rs. 14674.00 Set
1002 500mm Indian Pan with low level cistern complete set … 1 Rs. 14997.72 Set
1003 530mm Orissa pan with low level cistern complete set …………… 1 Rs. 13381.97 Set
1004 580mm Orissa pan complete set ………………………….………... 2 Rs. 5015.15 Set
1005 10.0 Ltr. Low level Porceline glazed cistern complete set … 2 Rs. 9658.85 Set
1006 10.0 Ltr. Low level PVC cistern complete set ………………… 2 Rs. 8040.80 Set
1007 I.P.W C. Commode with low level cistern complete set. 2 Rs. 24263.85 Set
1008 I.P.W C. Commode with cistern and seat cover complete set. 3 Rs. 27328.60 Set
1009 I.P.W C. Commode with cistern and seat cover complete set. 3 Rs. 15493.95 Set
1010 E.P.W.C.Commode Euorpean pattern(Cotto)with complete set. 3 Rs. 21518.80 Set
1011 E.P.W.C.Commode Euorpean pattern(Cotto)with complete set. 4 Rs. 40350.05 Set
1012 55x40cm Oval Wash basin with mixer complete set ………. 4 Rs. 11570.72 Set
1013 55x40cm Oval Wash basin Euorpean pattern complete set ……… 4 Rs. 11938.72 Set
1014 55x40cm Wash basin Euorpean pattern (cotto) complete set … 5 Rs. 14569.92 Set
1015 55x40cm Wash basin constallation type 1st color complete set 5 Rs. 9827.80 Set
1016 55x40cm Wash basin with mixer and Pedestal complete set …… 5 Rs. 13596.58 Set
1017 55x40cm Wash basin complete set ………………………….………. 6 Rs. 9679.55 Set
1018 40x40cm Corner Wash basin complete set …………………… 6 Rs. 8790.60 Set
1019 45x30x15cm Small Lavotary sink complete set ………………… 6 Rs. 8265.62 Set
1020 53x43X18cm Lavotary sink complete set ……………………………. 7 Rs. 9122.95 Set
1021 60x45x25cm Kitchen sink complete set …………………………….. 7 Rs. 10966.40 Set
1022 46.5x35.5x26.5cm Urinal constallation type complete set 7 Rs. 8092.89 Set
1023 44.5x31.5x26.5cm Urinal color constallation type complete set 7 Rs. 8092.89 Set
1024 46.5x35.5x26.5cm Urinal complete set …………………………...…… 8 Rs. 5025.50 Set
1025 61x41x38cm Large flat back Urinal complete set ……………… 8 Rs. 11670.20 Set
1026 45x35x27.5cm Angle back Urinal complete set ………………… 8 Rs. 6108.22 Set
1027 45x35cm Squatting plate Urinal complete set …………………… 8 Rs. 4738.00 Set
1028 Urinal Partation 68x30cm size complete set………………. 9 Rs. 3010.70 Set
1029 300 Ltr. 3 Panel solar heater with elecric booster set……….. 9 Rs. 89107.75 Set
1030 900 ltr. (200.0 gls.) G I water tank …………………………………... 9 Rs. 15875.75 nos
1031 1350 Ltr. (300.0 gls.) G I water tank …………………………………. 9 Rs. 26524.75 nos
1032 1800 Ltr. (400.0 gls.) G I water tank …………………………………. 9 Rs. 25069.59 nos
1033 2250Ltr. (500.0 gls.) G I water tank ………………………………….. 10 Rs. 37714.25 nos
1034 1000.0 ltr. PVC water tank ………………………………………….. 10 Rs. 20654.00 nos
1035 500.0 ltr. PVC water tank …………………………………………... 10 Rs. 13955.25 nos
1036 2000.0 ltr. PVC water tank …………………………………………... 10 Rs. 35661.50 nos
1037 1 HP Chinese Pump …………………………………………………… 11 Rs. 10436.25 nos
1038 1 HP Chinese Pump sumersible ……………………………… 11 Rs. 17319.00 nos
1039 1.0 H.P.Electrical motor water pump,Submersible pump Italian 11 Rs. 36675.80 nos
1040 0.5 H P Electric motor pump monoblock (Crompton) ………... 11 Rs. 13872.45 nos
1041 1.0 H P Electric motor pump monoblock (Crompton) …… 11 Rs. 17560.50 nos
1042 1 H P Electric motor pump Multi stage coupled (Crompton) …… 12 Rs. 17560.50 nos
1043 2.0 H P Electric motor pump multi stage couple (Cromp 12 Rs. 29635.50 nos
1044 3.0 H P Electric motor pump monoblock (Crompton) …… 12 Rs. 36604.50 nos
1045 5.0 H P Electric motor pump monoblock (Crompton) …… 12 Rs. 43856.40 nos
1046 Porceline Clay Toilet Paper Holder (Recessed type)American standard 12 Rs. 1215.20 nos
1047 Porcelain clay toilet paper holder (Recessed type) ……… 13 Rs. 1477.40 nos
13
SANITARY WORKS : 078-79 Kaski
14
SANITARY WORKS : 078-79 Kaski
15
SANITARY WORKS : 078-79 Kaski
16
SANITARY WORKS : 078-79 Kaski
17
Sanitary Works 078/79 for KASKI
1001
580 mm size Orissa pan with low level cistern complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. 580 mm Porcelain clay white glaze Orissa Pan
(Hindustan, Parryware, Classica, cera or equi.) 1 nos 1963.50 1963.50
b. P or S trap. 1 nos 577.50 577.50
c.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories (Internal PVC fittings) 1 nos 4032.00 4032.00
d. 32mmx60mm size flushing CP pipe 1 nos 567.00 567.00
e.1.5x45 cm(½" x18") PVC pipe connector 1 nos 160.00 160.00 7300.00
Actual rate 12760.00
15% contractor overhead 1914.00
Rate per set Rs. 14674.00 Total (Rs.) 14674.00
1002
580 mm IPWC with low level cistern (Indian pan)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. 580 mm Porcelain clay white glaze Indian Pan 1 nos 1785.00 1785.00
(Hindustan, Parryware, Classica, cera or equi. )
b. P or S trap. 1 nos 577.50 577.50
c. White glazed foot rest 2 nos 230.00 460.00
d.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories (Internal PVC fittings) 1 nos 4032.00 4032.00
e. 32mmx60mm size flushing CP pipe 1 nos 567.00 567.00
f. 1.5x45 Cm (½" x18") PVC pipe connector 1 nos 160.00 160.00 7581.50
Actual rate 13041.5
15% contractor overhead 1956.22
Rate per set Rs. 14997.72 Total (Rs.) 14997.72
1003
530 mm Orissa pan with low level cistern complete set.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. 530 mm Porcelain clay white glaze Orissa Pan
(Hindustan, Parryware, Classica,cera or equi.) 1 nos 840.00 840.00
b. P or S trap. 1 nos 577.50 577.50
c.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories (Internal PVC fittings) 1 nos 4032.00 4032.00
d. 32mmx60mm size flushing CP pipe 1 nos 567.00 567.00
e.1.5x45 Cm (½" x18") PVC pipe connector 1 nos 160.00 160.00 6176.50
Actual rate 11636.50
15% contractor overhead 1745.47
Rate per set Rs. 13381.97 Total (Rs.) 13381.97
18
1004
580 mm Orissa pan complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1 nos 1070.00 1070.00
un skilled 1 nos 750.00 750.00 1820.00
a. 580 mm Porcelain clay white glaze Orissa Pan
materials (Hindustan, Parryware, Classica, cera or equivalent ) 1 nos 1963.50 1963.50
b. P or S trap. 1 nos 577.50 577.50 2541.00
Actual rate 4361.00
15% contractor overhead 654.15
Rate per set Rs. 5015.15 Total (Rs.) 5015.15
1005
10.0 Lit. Porceline clay Cistern complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
materials a.10.0 ltr.porcelain clay low level flushing cistern 1 nos 4032.00 4032.00
complete accessories flushing CP pipe
b.3.2x60 Cm(1¼"x24") 1 nos 567.00 567.00
c. 1.5x45 Cm(½" x18") pipe connector 1 nos 160.00 160.00 4759.00
Actual rate 8399.00
15% contractor overhead 1259.85
Rate per set Rs. 9658.85 Total (Rs.) 9658.85
1006
10.0 Lit. PVC Cistern complete set
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a.10.0 ltr.PVC low level flushing cistern complete
materials accessories 1 nos 2625.00 2625.00
b.3.2x60 Cm(1¼"x24") flushing CP pipe 1 nos 567.00 567.00
c. 1.5x45 Cm(½" x18") pipe connector 1 nos 160.00 160.00 3352.00
Actual rate 6992.00
15% contractor overhead 1048.8
Rate per set Rs. 8040.8 Total (Rs.) 8040.8
1007
I.P W C. COMODE with low level cistern complete set.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a. Porcelain clay white glaze Indian Pattern Comode
(Hindustan, Parryware, Classica, cera or equivalent ) 1 nos 9700.00 9700.00
regular
c.10.0 ltr.porcelain clay low level flushing cistern
materials complete accessories( Internal PVC fittings) 1 nos 4032.00 4032.00
c .Bakelite toilet seat cover 1 nos 1155.00 1155.00
c. 3.2x60 Cm (1 1/4"x24") flushing CP pipe 1 nos 567.00 567.00
d. 1.5x45 CM (½" x18") PVC pipe connector 1 nos 160.00 160.00
e. screw, etc. Ls 25.00 15639.00
Actual rate 21099.00
15% contractor overhead 3164.85
Rate per set Rs. 24263.85 Total (Rs.) 24263.85
19
1008
I.P W C. COMODE with cistern and seat cover complete set. 1st Colour
1009
I.P W C. COMODE with cistern and seat cover complete set.( constallation type)
E.P. W C. COMODE with Cistern seat cover complete set. Euorpean pattern( American standard) Cotto
20
1011
E.P W C. COMODE with Cistern seat cover complete set. Euorpean pattern( American standard) Cotto
1012
OVAL WASH BASIN with mixer COMPLETE SET 55x40cm
21
Rate per set Rs. 11938.72 Total (Rs.) 11938.72
22
1014
55x40cm Euorpean pattern( American standard) Cotto Wash BASIN with mixer and Semi pedestal COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a .55x40cm Porcelain clay Oval white glaze Wash
basin (Hindustan, Parryware, Classica, cera or
materials equivalent ) regular 1 nos 1850.00 1850.00
b. 32 mm pvc bottle trap including 32mm CP waste 1 nos
coupling with CP chain and rubber plug etc. 1246.00 1246.00
c.15 mm CP basin mixer jaquar,ess-ess or equivalent 1 nos 3307.50 3307.50
d. 1.5x45Cm (½"x18") PVC pipe connector 2 nos 160.00 320.00
e. screw etc 1 18.00 18.00
f. semi pedestal 1 2288.00 2288.00
Actual rate 12669.50
15% contractor overhead 1900.42
Rate per set Rs. 14569.92 Total (Rs.) 14569.92
1015
55x40cm WASH BASIN with Pedestal Constellation first color, COMPLETE SET
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a. 55x40cm Porcelain clay first color glaze Wash
basin complete set(Hindustan, Parryware, Classica,
cera or equivalent ) Constellation type, cascade type
with pedestal 1 nos 2937.00 2937.00
materials b. Bracket 1 nos 135.00 135.00
c. 32 mm pvc bottle trap including 32mm CP waste
coupling with CP chain and rubber plug etc. 1 nos 447.12 447.12
d. 15mm fancy type cp pillar cock 1 nos 1244.00 1244.00
e. 1.5x45 cm PVC pipe connector 1 nos 160.00 124.80
f. screw etc 1 18.00 18.00 4905.92
Actual rate 8545.92
15% contractor overhead 1281.88
Rate per set Rs. 9827.8 Total (Rs.) 9827.8
1016
IPWC WASH BASIN COMPLETE SET WITH PEDESTAL AND MIXER 55x40cm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a. 55x40cm Porcelain clay white glaze Wash basin
(Hindustan, Parryware, Classica, cera or equivalent )
regular 1 nos 1974.00 1209.22
b. 32 mm pvc bottle trap including 32mm CP waste
materials coupling with CP chain and rubber plug etc. 1 nos 1246.00 1246.00
c. 15 mm CP basin mixer jaquar,ark , ess-ess or
equivalent 1 nos 3307.50 3307.50
d. pedestal 1 nos 2402.40 2402.40
e. screw etc 1 18.00 18.00 8183.12
Actual rate 11823.12
15% contractor overhead 1773.46
23
Rate per nos Rs. 13596.58 Total (Rs.) 13596.58
24
1017
WASH BASIN COMPLETE SET 55X40 CM
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a) 55x40cm Porcelain clay white glaze Wash basin
(Hindustan, Parryware, Classica, cera or equivalent )
Regular 1 nos 1974.00 1974.00
materials b. bracket 1 set 135.00 135.00
c.32 mm PVC bottle trap including 32mm cp waste
coupling with CP chain and rubber plug etc. 1 set 1246.00 1246.00
d. 15 mm fancy type CP pillar cock 1 nos 1244.00 1244.00
e. 1.5x45cm (½"x18") PVC pipe connector 1 nos 160.00 160.00
f. screw etc Ls 18.00 18.00 4777.00
Actual rate 8417.00
15% contractor overhead 1262.55
Rate per set Rs. 9679.55 Total (Rs.) 9679.55
1018
CORNER WASH BASIN COMPLETE SET 40X40 CM
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a. 40x40cm Porcelain clay white glaze Corner Wash
basin (Hindustan, Parryware, Classica, cera or
equivalent ) 1 nos 1201.00 1201.00
materials b. bracket 1 set 135.00 135.00
c. 32 mm PVC bottle trap including 32mm cp waste 1 set 1246.00 1246.00
coupling with CP chain and rubber plug etc.
d. 15 mm fancy type CP pillar cock 1 nos 1244.00 1244.00
f. 1.5x45cm (½"x18") PVC pipe connector 1 nos 160.00 160.00
g. screw etc Ls 18.00 18.00 4004.00
Actual rate 7644.00
15% contractor overhead 1146.6
Rate per set Rs. 8790.6 Total (Rs.) 8790.6
1019
SMALL LAVATORY SINK COMPLETE SET 45x30x15 (18"X12"X6")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a. 45x30x15 Cm (18"x12"x6") White glaze sink with C
I bracket (Hindustan, Parryware, Classica, cera or
equivalent) 1 nos 1564.50 1564.50
b. PVC bottle trap including 4cm waste coupling with
CP chain and rubber plug etc. 1 nos 1246.00 1246.00
materials c. 1.5cm (½" ) dia.CP Sink cock 1 nos 1309.00 1309.00
d.1.5x45 (½" x18") PVC pipe connector 1 nos 160.00 160.00
e.screw etc. Ls 18.00 4297.50
Actual rate 7187.50
15% contractor overhead 1078.12
25
Rate per set Rs. 8265.62 Total (Rs.) 8265.62
26
1020
LARGE LAVATORY SINK COMPLETE SET 53x43x18cm ( 21"x17"x7") size
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a. 53x43x18 (21"x17"x7") White glaze sink with C I
bracket (Hindustan, Parryware, Classica, cera or
equivalent ) 1 nos 2310.00 2310.00
b.PVC bottle trap including 4Cm waste coupling with
CP chain and rubber plug etc. 1 set 1246.00 1246.00
materials c. 1.5Cm (½") dia.Cp Sink cock 1 nos 1309.00 1309.00
d.1.5x45 (½"x18") Pvc pipe connector 1 nos 160.00 160.00
e.screw etc. Ls 18.00 5043.00
Actual rate 7933.00
15% contractor overhead 1189.95
Rate per set Rs. 9122.95 Total (Rs.) 9122.95
1021
KITCHEN SINK COMPLETE SET 60x45x25Cm ( 24"x18"x10") size LARGE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 1 nos 750.00 750.00 3960.00
a. 60x45x25Cm (24"x18"x10") White glaze sink with
bracket (Hindustan, Parryware, Classica, cera or
equivalent ) 1 nos 3003.00 3003.00
b.Pvc bottle trap including 1½" waste coupling with c
p chain and rubber plug etc. 1 set 1246.00 1246.00
materials c. ½" Ø Sink cock 1 nos 1309.00 1309.00
d.screw etc. Ls 18.00 5576.00
Actual rate 9536.00
15% contractor overhead 1430.4
Rate per set Rs. 10966.4 Total (Rs.) 10966.40
1022
Small Flat back Urinal , 44x31.5x26.5 cm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. Small Flat back White glazed urinal with bracket,
materials Constellation type, cascade type. 1 nos 1880.00 1880.00
b. 32 mm Waste coupling 1 nos 304.50 304.50
c. 1.5x45 cm PVC pipe connector 1 nos 160.00 124.80
d.screw etc. Ls 18.00 2327.30
Actual rate 7037.30
15% contractor overhead 1055.59
Rate per set Rs. 8092.89 Total (Rs.) 8092.89
27
1023
Flat back Urinal Small , 44x31.5x26.5 cm first colour
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. Small Flat back First color glazed urinal with
materials bracket, Constellation type, cascade type. 1 nos 1880.00 1880.00
b. 32 mm Waste coupling 1 nos 304.50 304.50
c. 1.5x45 cm PVC pipe connector 1 nos 160.00 124.80
d.screw etc. Ls 18.00 2327.30
Actual rate 7037.30
15% contractor overhead 1055.59
Rate per set Rs. 8092.89 Total (Rs.) 8092.89
1024
URINAL COMPLETE SET 46.5x35.5x26.5 cm SIZE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a. 46.5x35.5x26.5 cm White glaze flat back Urinal
materials (Hindustan, Parryware, Classica,cera or equi.) 1 nos 997.50 997.50
b. Waste coupling 32mm 1 nos 304.50 304.50
c.½" x18" Pvc pipe connector 1 nos 160.00 160.00
d.screw etc. Ls 18.00 1480.00
Actual rate 4370.00
15% contractor overhead 655.5
Rate per set Rs. 5025.5 Total (Rs.) 5025.5
1025
Large Flat back Urinal 61x41x38 cm size
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a.61x41x38 cm Large Flat back White glazed urinal
with bracket (Hindustan, Parryware, Classica, cera or
materials equivalent.) 1 nos 4174.00 4174.00
b. 1½" Ø C.P. bottle trap including 1½" Ø PVC.
waste coupling. 1 nos 1246.00 1246.00
c.screw etc. Ls 18.00 5438.00
Actual rate 10148.00
15% contractor overhead 1522.2
Rate per set Rs. 11670.2 Total (Rs.) 11670.20
28
1026
ANGLE BACK URINAL COMPLETE SET 45x35x27.5cm (18"X14"X11") SIZE (CORNER )
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a.17"X14"X13" White glaze Angle back back Urinal
materials cascade type (Hindustan equi.) 1 nos 997.50 997.50
b. 1½" waste coupling with CP chain including PVC
bottle trap 1 nos 1246.00 1246.00
c.½" x18" Pvc pipe connector 1 nos 160.00 160.00
d.screw etc. Ls 18.00 2421.50
Actual rate 5311.50
15% contractor overhead 796.72
Rate per set Rs. 6108.22 Total (Rs.) 6108.22
1027
SQUATTING PLATE URINAL 45x35cm (23"X14")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a. 23"X14" White glaze squatting plate urinal
materials (Hindustan or equivalent) 1 nos 1212.00 1212.00
b.screw etc. Ls 18.00 1230.00
Actual rate 4120.00
15% contractor overhead 618
Rate per set Rs. 4738 Total (Rs.) 4738
1028
URINAL Partation 68x30cm size
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.5 nos 1070.00 535.00
un skilled 0.5 nos 750.00 375.00 910.00
a.68X30 cm White glaze Division plate urinal
materials Partation (Hindustan or equivalent) 1 nos 1690.00 1690.00
b.screw etc. Ls 18.00 1708.00
Actual rate 2618.00
15% conctractor overhead 392.7
Rate per set Rs. 3010.70 Total (Rs.) 3010.70
1029
300 ltr with 3 panel solar water heater with electric booster
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3.00 nos 1070.00 3210.00
3.00 nos 750.00 2250.00
materials a. 300 ltr with 3 panel solar water heater 1 nos 72000.00 72000.00
b.Zink oxide screw etc. Ls 25.00
Actual rate 77485.00
15% contractor overhead 11622.75
Rate per nos Rs. 89107.75 Total (Rs.) 89107.75
29
1030
900 Ltr. (200 GALLONS) G.I. WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 4 nos 750.00 3000.00 6210.00
a. 200Gallons net capacity G. I. water tank with Inlet,
materials outlet, over flow, cleanout hole etc.17 GUAGE 1 nos 7455.00 7455.00
b.Tanki nipples etc. Ls 140.00 7595.00
Actual rate 13805.00
15% contractor overhead 2070.75
Rate per nos Rs. 15875.75 Total (Rs.) 15875.75
1031
1350 Ltr. (300 GALLONS) G.I. WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 5 nos 750.00 3750.00 6960.00
a.300 Gallons net capacity G. I. Water tank with Inlet,
materials outlet, over flow, cleanout hole etc.17 GUAGE 1 nos 15955.00 15955.00
b.Tanki nipples etc. Ls 150.00 16105.00
Actual rate 23065.00
15% contractor overhead 3459.75
Rate per nos Rs. 26524.75 Total (Rs.) 26524.75
1032
1800 Ltr. (400 GALLONS) G.I. WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 6 nos 750.00 4500.00 7710.00
a.400Gallons net capacity G. I. water tank with Inlet,
materials outlet, over flow, cleanout hole etc. 17 GUAGE 1 nos 15750.00 15750.00
b.Tanki nipples etc. Ls 150.00 15900.00
Actual rate 23610.00
15% contractor overhead 3541.5
Rate per nos Rs. 27151.50 Total (Rs.) 27151.50
1033
2250 Ltr. (500 GALLONS) G.I. WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 8 nos 750.00 6000.00 10280.00
a. 500Gallons net capacity G. I. water tank with Inlet,
materials outlet, over flow, cleanout hole etc. 17 GUAGE 1 nos 22365.00 22365.00
b.Tanki nipples etc. Ls 150.00 22515.00
30
1034
1000 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 4 nos 750.00 3000.00 6210.00
a. 1000Ltr. PVC water tank with Inlet, outlet, over
materials flow, cleanout hole etc. 1 nos 11550.00 11550.00
b.Tanki nipples with wash out plug etc. Ls 200.00 11750.00
Actual rate 17960.00
15% contractor overhead 2694.00
Rate per nos Rs. 20654.00 Total (Rs.) 20654.00
1035
500 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 4 nos 750.00 3000.00 6210.00
a. 500 ltr PVC water tank with Inlet, outlet, over flow,
materials cleanout hole etc. 1 nos 5775.00 5775.00
b.Tanki nipples with wash out plug etc. Ls 150.00 5925.00
1036
2000 Ltr. PVC WATER TANK
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 6 nos 750.00 4500.00 7710.00
a.2000 Ltr.PVC water tank with Inlet, outlet, over
materials flow, cleanout hole etc. 1 nos 23100.00 23100.00
b.Tanki nipples with wash out plug etc. Ls 200.00 23300.00
1037
1 HP Chinese Pump
sources Level Qty Unit Rate/unit cost Total cost
31
1038
1 HP Chinese Pump (Submersible)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
materials a. 1 HP Chinese submersible pump 1 sets 9240.00 9240.00
b. Zink Oxide screw etc. LS 40.00 9280.00
Actual rate 15060.00
15% contractor overhead 2259.00
Rate per nos Rs. 17319.00 Total (Rs.) 17319
1039
1.0 H.P. Electrical motor water pump, Submersible pump Italian
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
a.1.0 H P Electric motor pump (Submersible) Italian
materials or equivalent 1 nos 26089.00 26089.00
b.Zink oxide screws etc. Ls 23.00 26112.00
1040
0.5 H.P. Electrical motor water pump, Monoblock type (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
a.0.5 H P Electric motor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 6258.00 6258.00
b.Zink oxide screws etc. Ls 25.00 6283.00
Actual rate 12063.00
15% contractor overhead 1809.45
Rate per nos Rs. 13872.45 Total (Rs.) 13872.45
1041
1.0 H.P. Electrical motor water pump, Monoblock type (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
a.1.0 H P Electric motor pump with base plate
materials nuts,bolts,etc.set 1 nos 9465.00 9465.00
b.Zink oxide screws etc. Ls 25.00 9490.00
Actual rate 15270.00
15% contractor overhead 2290.5
Rate per nos Rs. 17560.5 Total (Rs.) 17560.5
32
1042
1 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
a.1 H P Electric motor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 9465.00 9465.00
b.Zink oxide screws etc. Ls 25.00 9490.00
Actual rate 15270.00
15% contractor overhead 2290.5
Rate per nos Rs. 17560.50 Total (Rs.) 17560.5
1043
2 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 3 nos 750.00 2250.00 6530.00
a.2 H P Electricmotor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 19200.00 19200.00
b.Zink oxide screws etc. Ls 40.00 19240.00
Actual rate 25770.00
15% contractor overhead 3865.5
Rate per nos Rs. 29635.50 Total (Rs.) 29635.5
1044
3 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 4 nos 750.00 3000.00 7280.00
a. 3 H P Electricmotor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 24500.00 24500.00
b.Zink oxide screws etc. Ls 50.00 24550.00
Actual rate 31830.00
15% contractor overhead 4774.5
Rate per nos Rs. 36604.5 Total (Rs.) 36604.5
1045
5 H.P. Electrical motor water pump Multi stage, coupled pump (Crompton)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 4 nos 750.00 3000.00 9420.00
a. 5 H P Electricmotor pump with base plate nuts,
materials bolts etc.set crompton 1 nos 28656.00 28656.00
b.Zink oxide screws etc. Ls 60.00 28716.00
Actual rate 38136.00
15% contractor overhead 5720.4
Rate per nos Rs. 43856.4 Total (Rs.) 43856.4
33
1046
1047
PORCELAIN CLAY TOILET PAPER HOLDER (Recessed type)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/9) 0.11 nos 1070.00 117.70 117.70
materials a. WHITE GLAZE TOILET PAPER HOLDER 1 nos 1157.00 1157.00
b. Zink oxide screw etc. Ls 10.00 1167.00
Actual rate 1284.70
15% contractor overhead 192.7
Rate per nos Rs. 1477.40 Total (Rs.) 1477.40
1048
CHROME PLATE TOILET PAPER HOLDER
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a.Chrome plate toilet paper holder 1 nos 462.00 462.00
b.Zink oxide screw etc. Ls 10.00 472.00
Actual rate 589.70
15% contractor overhead 88.45
Rate per nos Rs. 678.15 Total (Rs.) 678.15
1049
Recess SOAP DISH. ( American standard) Cotto
1050
PORCELAIN CLAY SOAP TRAY 15x15 cm (6"X 6") SIZE (Recessed type)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a.White glaze soap tray 1 nos 490.00 490.00
b.Zink oxide screw etc. Ls 10.00 500.00
Actual rate 617.70
15% contractor overhead 92.65
Rate per nos Rs. 710.35 Total (Rs.) 710.35
34
1051
CHROME PLATE SOAP DISH.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a.C.P Soap dish 1 nos 1042.00 1042.00
b.Zink oxide screw etc. Ls 10.00 1052.00
Actual rate 1169.70
1053
C P towel rod 1.5x60cm (½"x 24")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(2/9) 0.22 nos 1070.00 235.40 235.40
materials a .C P Towel rod 1 nos 682.50 682.50
b. Screws Ls 10.00 692.50
Actual rate 927.90
15% contractor overhead 139.18
Rate per nos Rs. 1067.08 Total (Rs.) 1067.08
1054
C P towel rod 1.5x45cm (½"x 18")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.222 nos 1070.00 237.54 237.54
materials a . C PTowel rod 1 nos 787.50 787.50
b. Screws etc. Ls 10.00 797.50
Actual rate 1035.04
15% contractor overhead 155.25
Rate per nos Rs. 1190.29 Total (Rs.) 1190.29
1055
CP Glass Shelf
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.222 nos 1070.00 237.54 237.54
materials a. C P Guard rail with glass 1 nos 680.00 680.00
b. Screws etc. Ls 10.00 690.00
Actual rate 927.54
15% contractor overhead 139.13
Rate per nos Rs. 1066.67 Total (Rs.) 1066.67
35
1056
Porcelain clay Glass Shelf Euorpean pattern( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.222 nos 1070.00 237.78 237.78
materials a. Porcelain clay basin shelf 1 nos 1169.55 1169.55
b. Screws etc. Ls 10.00 1179.55
Actual rate 1417.33
15% contractor overhead 212.59
Rate per nos Rs. 1629.92 Total (Rs.) 1629.92
1057
Looking Mirror 55x40cm (22"x 16")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/3) 0.33 nos 1070.00 353.10 353.10
materials a.Bevelled edge looking mirror 1 nos 750.00 750.00
b . Screws Ls 10.00 760.00
Actual rate 1113.10
15% contractor overhead 166.96
Rate per nos Rs. 1280.06 Total (Rs.) 1280.06
1058
Looking Mirror Modi guard 450x600mm (18"x 24")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 356.67 356.67
materials a.Bevelled edge looking mirror 50x40 cm 1 nos 1459.00 1459.00
b . Screws Ls 10.00 1469.00
Actual rate 1825.67
15% contractor overhead 273.85
Rate per nos Rs. 2099.52 Total (Rs.) 2099.52
1059
Looking Mirror 50x40cm (20"x 16")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials a.Bevelled edge looking mirror 50x40 cm 1 nos 650.00 650.00
b . Screws Ls 10.00 660.00
Actual rate 1013.10
15% contractor overhead 151.96
Rate per nos Rs. 1165.06 Total (Rs.) 1165.06
1060
Looking Mirror european pattern
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 356.67 356.67
materials a.Bevelled edge looking europen pattern 1 nos 1800.00 1800.00
b . Screws Ls 10.00 1810.00
Actual rate 2166.67
15% contractor overhead 325.00
Rate per nos Rs. 2491.67 Total (Rs.) 2491.67
36
1061
CP Shower rose 7.5 cm (3") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials a.7.5cm dia shower rose fancy type with 30cm CP rod
1 nos 906.00 906.00 906.00
Actual rate 1259.10
15% contractor overhead 188.86
Rate per nos Rs. 1447.96 Total (Rs.) 1447.96
1062
Pressure Adjustable Shower rose
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials a.Pressure Adjustable Shower rose, Jaquar, Essco,
ark or equivalent 1 nos 1350.00 1350.00 1350.00
Actual rate 1703.10
15% contractor overhead 255.46
Rate per nos Rs. 1958.56 Total (Rs.) 1958.56
1063
Shower Rose Ordinary type
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials a. Shower rose ordinary type (5.0 to 10.00 cm) 1 nos 672.00 672.00 672.00
Actual rate 1025.10
15% contractor overhead 153.76
Rate per nos Rs. 1178.86 Total (Rs.) 1178.86
1064
Shower head with arm and flange Euorpean pattern( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 356.67 356.67
materials a. Shower head with arm and flange 1 nos 2014.00 2014.00 2014.00
Actual rate 2370.67
15% contractor overhead 355.6
Rate per nos Rs. 2726.27 Total (Rs.) 2726.27
1065
C.P . FLUSH VALVE ( American standard) Cotto
37
1066
SENSOR FLUSH VALVE FOR URINAL ( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. C.P Flush valve for urinal sensor type electric Euor 1 nos 16000.00 16000.00 16000.00
Actual rate 16117.70
15% contractor overhead 2417.65
Rate per nos Rs. 18535.35 Total (Rs.) 18535.35
1067
15mm CP Bib Cock Heavy type
sources Level Qty Unit Rate/unit cost Total Cost
1068
15mm CP Bib Cock Ordinary type
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15mm fancy type bib cock 1 nos 682.50 682.50 682.50
Actual rate 800.20
15% contractor overhead 120.03
Rate per nos Rs. 920.23 Total (Rs.) 920.23
1069
15mm Auto closing Bib Cock with aerator
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15mm Auto closing bib cock with aerator 1 nos 2612.00 2612.00 2612.00
Actual rate 2729.70
1070
15mm Urinal Auto closing Valve with built in control cock
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15mm Urinal Auto closing valve with 1 nos 2694.00 2694.00 2694.00
built - in control cock
Actual rate 2811.70
38
1071
C.P. 15mm Angle valve European pattern
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15mm fancy type angle valve -cotto 1 nos 1244.00 1244.00 1244.00
Actual rate 1361.70
15% contractor overhead 204.25
Rate per nos Rs. 1565.95 Total (Rs.) 1565.95
1072
C.P. 15mm Angle valve Ordinary type
sources Level Qty Unit Rate/unit cost Total Cost
1073
15mm two way angle valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15mm two way angle valve, jaquar, essco, or equiv 1 nos 1150.00 1150.00 1150.00
Actual rate 1267.70
15% contractor overhead 190.15
Rate per nos Rs. 1457.85 Total (Rs.) 1457.85
1074
C.P. Pillar Cock 15mm dia Ordinary type
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. CP Piller Cock 1 nos 1054.00 1054.00 1054.00
Actual rate 1171.70
15% contractor overhead 175.75
Rate per nos Rs. 1347.45 Total (Rs.) 1347.45
1075
15mm CP concealed stop cock ordinary
sources Level Qty Unit Rate/unit cost Total Cost
39
1076
G.M.15 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
1077
G.M. 20 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a.20 mm gate valve 1 nos 1143.00 1143.00 1143.00
Actual rate 1260.70
15% contractor overhead 189.10
Rate per nos Rs. 1449.80 Total (Rs.) 1449.80
1078
G.M. 25mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 235.40 235.40
materials a 25mm gate valve 1 nos 1744.00 1744.00 1744.00
Actual rate 1979.40
15% contractor overhead 296.91
Rate per nos Rs. 2276.31 Total (Rs.) 2276.31
1079
1080
G.M. 40 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
40
1081
G.M. 50 mm Gate Valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 1070.00 470.80 470.80
materials a.50 mm gate valve 1 nos 5500.00 5500.00 5500.00
Actual rate 5970.80
1082
G.M.65 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 1070.00 470.80 470.80
materials a.65 mm gate valve 1 nos 11451.00 11451.00 11451.00
Actual rate 11921.80
15% contractor overhead 1788.27
Rate per nos Rs. 13710.07 Total (Rs.) 13710.07
1083
G.M 80 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.80 nos 1070.00 856.00 856.00
materials a.80 mm gate valve 1 nos 17440.00 17440.00 17440.00
Actual rate 18296.00
15% contractor overhead 2744.4
Rate per nos Rs. 21040.40 Total (Rs.) 21040.40
1084
G.M.100 mm GATE VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.80 nos 1070.00 856.00 856.00
materials a 100 mm gate valve 1 nos 31393.00 31393.00 31393.00
Actual rate 32249.00
15% contractor overhead 4837.35
Rate per nos Rs. 37086.35 Total (Rs.) 37086.35
1085
15 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. 15 mm G M check valve 1 nos 400.00 400.00 400.00
Actual rate 517.70
15% contractor overhead 77.65
Rate per nos Rs. 595.35 Total (Rs.) 595.35
41
1086
20 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 235.40 235.40
materials a. 20 mm G M check valve 1 nos 629.00 629.00 629.00
Actual rate 864.40
15% contractor overhead 129.66
Rate per nos Rs. 994.06 Total (Rs.) 994.06
1087
25 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 235.40 235.40
materials a.25 mm G M check valve 1 nos 1373.00 1373.00 1373.00
Actual rate 1608.40
15% contractor overhead 241.26
Rate per nos Rs. 1849.66 Total (Rs.) 1849.66
1088
32 mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 235.40 235.40
materials a.32 mm G M check valve 1 nos 2327.00 2327.00 2327.00
Actual rate 2562.40
15% contractor overhead 384.36
Rate per nos Rs. 2946.76 Total (Rs.) 2946.76
1089
50mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials a 50 mm G M check valve 1 nos 5236.00 5236.00 5236.00
Actual rate 5589.10
15% contractor overhead 838.36
Rate per nos Rs. 6427.46 Total (Rs.) 6427.46
1090
65mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 1070.00 470.80 470.80
materials a. 65 mm G M check valve 1 nos 9114.00 9114.00 9114.00
Actual rate 9584.80
15% contractor overhead 1437.72
Rate per nos Rs. 11022.52 Total (Rs.) 11022.52
1091
80mm GM CHECK VALVE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 1070.00 470.80 470.80
materials a.80 mm G M check valve 1 nos 12545.00 12545.00 12545.00
Actual rate 13015.80
15% contractor overhead 1952.37
42
Rate per nos Rs. 14968.17 Total (Rs.) 14968.17
43
1092
100mm GM CHECK VALVE with flange
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.44 nos 1070.00 475.56 475.56
materials 100mm GM CHECK VALVE with flange 1 nos 16270.00 16270.00 16270.00
Actual rate 16745.56
15% contractor overhead 2511.83
Rate per nos Rs. 19257.39 Total (Rs.) 19257.39
1093
PVC FLOOR TRAP 11x7.5cm (4" X 2½")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
un skilled 0.10 475.00 47.50 165.20
materials Floor Trap 11x7.5cm (4" X 2½") 1 nos 350.00 350.00 350.00
Actual rate 515.20
15% contractor overhead 77.28
Rate per nos Rs. 592.48 Total (Rs.) 592.48
1094
ALUMINIUM GRATING 100mm (4") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.06 nos 1070.00 64.20 64.20
materials Aluminium Grating 100 mm 1 nos 43.00 43.00 43.00
Actual rate 107.20
15% contractor overhead 16.08
Rate per nos. Rs. 123.28 Total (Rs.) 123.28
1095
C P GRATING 12.5cm (5") dia
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.06 nos 1070.00 64.20 64.20
materials C P GRATTING 12.5cm (5") DIA SIZE 1 nos 62.00 62.00 62.00
Actual rate 126.20
15% contractor overhead 18.93
Rate per nos. Rs. 145.13 Total (Rs.) 145.13
1096
C P GRATING 110mm (4") dia
sources Level Qty Unit Rate/unit cost Total Cost
44
1097
150mm dia CAST IRON PIPE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1.09 nos 1070.00 1166.30
un skilled 0.65 nos 750.00 487.50 1653.80
materials 150 mm dia cast iron pipe d/s 1 Rm 2466.07 2466.07
b.Anti- corrosive paint, nails etc L.s 15.00 2481.07
Actual rate 4134.87
15% contractor overhead 620.23
Rate per Rm Rs. 4755.10 Total (Rs.) 4755.10
1098
110mm dia CAST IRON PIPE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.54 nos 1070.00 577.80
un skilled 0.65 nos 750.00 487.50 1065.30
materials a 110 mm dia cast iron pipe d/s 1 Rm 1263.11 1263.11
b.Anti- corrosive paint, nails etc L.s 15.00 1278.11
Actual rate 2343.41
15% contractor overhead 351.51
Rate per Rm Rs. 2694.92 Total (Rs.) 2694.92
1099
75mm dia CAST IRON PIPE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.36 nos 1070.00 385.20
un skilled 0.36 nos 750.00 270.00 655.20
materials a.75 mm dia cast iron pipe d/s 1 Rm 1082.66 1082.66
b.Anti- corrosive paint, nails etc L.s 10.00 1092.66
Actual rate 1747.86
15% contractor overhead 262.17
Rate per Rm Rs. 2010.03 Total (Rs.) 2010.03
1100
50mm dia CAST IRON PIPE
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.36 nos 1070.00 385.20
un skilled 0.36 nos 750.00 270.00 655.20
materials a.50 mm dia cast iron pipe d/s 1 Rm 799.97 799.97
b.Anti- corrosive paint ,nails etc L.s 10.00 809.97
Actual rate 1465.17
15% contractor overhead 219.77
Rate per Rm Rs. 1684.94 Total (Rs.) 1684.94
45
1101
15mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 1070.00 192.60
un skilled 0.16 nos 750.00 120.00 312.60
materials a.15 mm G. I . Pipe 'B ' class 1 Rm 192.00 192.00
b. G I fitting and painting Ls 20.00
c. Jointing materials Ls 5.00 217.00
Actual rate 529.60
15% contractor overhead 79.44
Rate per Rm Rs. 609.04 Total (Rs.) 609.04
1102
20 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 1070.00 192.60
un skilled 0.16 nos 750.00 120.00 312.60
materials a. 20 mm G. I . PipeB' class 1 Rm 244.00 244.00
b. G I fitting and painting Ls 20.00
c. Jointing materials Ls 5.00 269.00
Actual rate 581.60
15% contractor overhead 87.24
Rate per Rm Rs. 668.84 Total (Rs.) 668.84
1103
25 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 1070.00 192.60
un skilled 0.32 nos 750.00 240.00 432.60
materials a. 25 mm G. I . Pipe B ' class 1 Rm 373.00 373.00
b. G I fitting and painting Ls 20.00
c. Jointing materials Ls 5.00 398.00
Actual rate 830.60
15% contractor overhead 124.59
Rate per Rm Rs. 955.19 Total (Rs.) 955.19
1104
32 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.18 nos 1070.00 192.60
un skilled 0.32 nos 750.00 240.00 432.60
materials a. 32 mm G. I . Pipe 'B' class 1 Rm 486.00 486.00
b. G I fitting and painting Ls 25.00
c. Jointing materials Ls 7.00 518.00
Actual rate 950.60
15% contractor overhead 142.59
Rate per Rm Rs. 1093.19 Total (Rs.) 1093.19
46
1105
40 mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.27 nos 1070.00 288.90
un skilled 0.32 nos 750.00 240.00 528.90
materials a.40 mm G. I . Pipe 'B ' class 1 Rm 560.00 560.00
b. G I fitting and painting Ls 25.00
c. Jointing materials Ls 7.00 592.00
Actual rate 1120.90
15% contractor overhead 168.13
Rate per Rm Rs. 1289.03 Total (Rs.) 1289.03
1106
50mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.27 nos 1070.00 288.90
un skilled 0.32 nos 750.00 240.00 528.90
materials a 50 mm G. I . Pipe 'B ' class 1 Rm 770.00 770.00
b. G I fitting and painting Ls 25.00
c. Jointing materials Ls 7.00 802.00
Actual rate 1330.90
15% contractor overhead 199.63
Rate per Rm Rs.. 1530.53 Total (Rs.) 1530.53
1107
80mm G. I . Pipe 'B ' class ( MEDIUM)
sources Level Qty Unit Rate/unit Cost Total Cost
labour skilled 0.27 nos 1070.00 288.90
un skilled 0.32 nos 750.00 240.00 528.90
materials a 80 mm G. I . Pipe 'B ' class 1 Rm 1225.00 1225.00
b. G I fitting and painting Ls 30.00
c. Jointing materials Ls 10.00 1265.00
Actual rate 1793.90
15% contractor overhead 269.08
Rate per Rm Rs.. 2062.98 Total (Rs.) 2062.98
1108
50 mm LEAD CAULKED JOINT @ 3 LBS PER JOINT
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
un skilled 0.20 nos 750.00 150.00 267.70
materials a. 99% Pure lead 3 Lbs. 90.70 272.11
b. Kerosence ,oil etc. Ls 30.00 302.11
47
1109
75 mm LEAD CAULKED JOINT @ 3 LBS PER JOINT
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/6) 0.17 nos 1070.00 181.90
un skilled(1/5) 0.20 nos 750.00 150.00 331.90
materials a. 99% Pure lead 3 Lbs. 90.70 272.11
b. Kerosence ,oil etc. Ls 30.00 302.11
Actual rate 634.01
15% contractor overhead 95.10
1110
110 mm LEAD CAULKED JOINT @ 4 LBS PER JOINT
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(2/9) 0.22 nos 1070.00 235.40
un skilled(2/5) 0.40 nos 750.00 300.00 535.40
materials a. 99% Pure lead 4 Lbs. 90.70 362.81
b. Kerosence ,oil etc. Ls 30.00 392.81
Actual rate 928.21
15% contractor overhead 139.23
Rate per joint Rs. 1067.44 Total (Rs.) 1067.44
1111
150 mmLEAD CAULKED JOINT @ 4 LBS PER JOINT
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 235.40
un skilled 0.40 nos 750.00 300.00 535.40
materials a. 99% Pure lead 4 Lbs. 90.70 362.81
b. Kerosence, oil etc. Ls 35.00 397.81
Actual rate 933.21
15% contractor overhead 139.98
Rate per joint Rs. 1073.19 Total (Rs.) 1073.19
1112
50 mm dia PVC PIPE 4 KG/CM. SQ.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/18) 0.06 nos 1070.00 64.20
un skilled(1/10) 0.10 nos 750.00 75.00 139.20
materials a.50 mm dia. Pvc pipe 1 RM 150.00 150.00
b. Jointing materialsetc. Ls 5.00 155.00
Actual rate 294.20
15% contractor overhead 44.13
Rate per Rm Rs. 338.33 Total (Rs.) 338.33
1113
75 mm dia PVC PIPE 4 KG/CM. SQ
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
un skilled 0.11 nos 750.00 82.50 200.20
materials a.75 mm dia. Pvc pipe 1 Rm 285.00 285.00
b. Jointing materialsetc. Ls 5.00 290.00
Actual rate 490.20
15% contractor overhead 73.53
Rate per Rm Rs. 563.73 Total (Rs.) 563.73
48
1114
110 mm dia PVC PIPE 4 KG/CM. SQ
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.17 nos 1070.00 181.90
un skilled 0.20 nos 750.00 150.00 331.90
materials a.110 m m dia. Pvc pipe 1 Rm 420.00 420.00
b. Jointing material setc. Ls 5.00 425.00
Actual rate 756.90
15% contractor overhead 113.53
Rate per nos Rs. 870.43 Total (Rs.) 870.43
1115
15.0 Ltr WATER HEATER ( Aeroston Geyser)American standard
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. 15.0 Ltr wate heater including copper pipe
connector with coupling and other necessary fittings
materials complete. 1 nos 11770.00 11770.00
b. Jointing materialsetc. Ls 90.00 11860.00
Actual rate 16570.00
15% contractor overhead 2485.50
Rate per nos Rs. 19055.50 Total (Rs.) 19055.50
1116
25.0 Ltr WATER HEATER (Geyser)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. 25.0 Ltr wate heater including copper pipe
connector with coupling and other necessary fittings
materials complete. 1 nos 16826.00 16826.00
b. Jointing materialsetc. Ls 90.00 16916.00
Actual rate 21626.00
15% contractor overhead 3243.90
Rate per nos Rs. 24869.90 Total (Rs.) 24869.90
1117
35.0 Ltr WATER HEATER (Geyser)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 3 nos 750.00 2250.00 5460.00
a.35.0 Ltr wate heater including copper pipe
connector with coupling and other necessary fittings
materials complete. 1 nos 20919.00 20919.00
b. Jointing material set. Ls 90.00 21009.00
Actual rate 26469.00
15% contractor overhead 3970.35
Rate per nos Rs. 30439.35 Total (Rs.) 30439.35
49
1118
50.0 Ltr WATER HEATER (Geyser)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 4 nos 750.00 3000.00 6210.00
a.50.0 Ltr wate heater including copper pipe
connector with coupling and other necessary fittings
materials complete. 1 nos 25011.00 25011.00
b. Jointing material set. Ls 90.00 25101.00
Actual rate 31311.00
15% contractor overhead 4696.65
Rate per nos Rs. 36007.65 Total (Rs.) 36007.65
1119
Acrylic Type BATH TUB
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
materials a. Bath tub 5"-6"x2"-6" with complete fittings. 1 nos 12075.00 12075.00
b. Jointing material set. Ls 90.00 12165.00
Actual rate 17945.00
1120
C.P. TELEPHONIC SHOWER with mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1 nos 1070.00 1070.00
un skilled 1 nos 750.00 750.00 1820.00
materials a. Bath tub spout(Hot and cold) with Telephonic shower. 1 nos 4169.00 4169.00
b. Jointing material set. Ls 10.00 4179.00
Actual rate 5999.00
15% contractor overhead 899.85
Rate per set Rs. 6898.85 Total (Rs.) 6898.85
1121
Acrylic Type SHOWER TRAY 70x70cm (29"x29)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 2 nos 1070.00 2140.00
un skilled 2 nos 750.00 1500.00 3640.00
a. Acrylic Type shower tray70x70cm (29"x29") with
materials complete fittings. 1 nos 4226.00 4226.00
b. Jointing material set. Ls 83.00 4309.00
Actual rate 7949.00
15% contractor overhead 1192.35
Rate per set Rs. 9141.35 Total (Rs.) 9141.35
1122
15mm CP Bath spout Euorpean pattern( American standard) Cotto
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 255.00 28.33 28.33
materials a. 15mm CP Bath spout Euorpean pattern 1 nos 2021.00 2021.00 2021.00
Actual rate 2049.33
15% contractor overhead 307.4
50
Rate per nos Rs. 2356.73 Total (Rs.) 2356.73
1123
Sensor mixer for basin (Battery operating)
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 1.00 nos 1070.00 1070.00 1070.00
materials a. Basin mixture complete set. 1 nos 20481.00 20481.00
b. Jointing material set. 85.00 20566.00
Actual rate 21636.00
15% contractor overhead 3245.4
Rate per set Rs. 24881.40 Total (Rs.) 24881.40
1124
C.P. SINK Mixer
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials a. Sink mixture complete set. 1 nos 3675.00 3675.00
b. Jointing material set. 85.00 3760.00
Actual rate 3877.70
15% contractor overhead 581.65
Rate per set Rs. 4459.35 Total (Rs.) 4459.35
1125
C I Cover 45x45cm (18"X18") (Medium)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials CI Cover 45x45cm (18" X 18") 1 nos 2408.00 2408.00
2408.00
Actual rate 2761.10
15% contractor overhead 414.16
Rate per set Rs. 3175.26 Total (Rs.) 3175.26
1126
C I Cover 55x55cm (22"X 22") (Medium)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 1070.00 353.10 353.10
materials CI Cover 22" X 22" 1 nos 3108.00 3108.00
3108.00
Actual rate 3461.10
15% contractor overhead 519.16
Rate per set Rs. 3980.26 Total (Rs.) 3980.26
1127
1.5 cm CP Flush cock with Spreader
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.25 nos 1070.00 267.50 267.50
materials a. ½" push valve 1 nos 915.00 915.00
b. Spreader 1 nos 940.00 940.00 1855.00
Actual rate 2122.50
15% contractor overhead 318.37
Rate per set Rs. 2440.87 Total (Rs.) 2440.87
1128
Flange 80 mm dia.
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 118.89 118.89
materials Flange 80 mm dia. 1 nos 2187.00 2187.00 2187.00
Actual rate 2305.89
15% contractor overhead 345.88
51
Rate per nos Rs. 2651.77 Total (Rs.) 2651.77
52
1129
1130
Motor Starter Switch
sources Level Qty Unit Rate/unit cost Total cost
1131
Pressure Senser Switch
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.25 nos 1070.00 267.50
un skilled 0.17 nos 750.00 127.50 395.00
materials a. Pressure Senser Switch (Italian) 1 nos 3675.00 3675.00 3675.00
Actual rate 4070.00
15% contractor overhead 610.5
Rate per set Rs. 4680.50 Total (Rs.) 4680.50
1132
Fire Post
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 5 nos 1070.00 5350.00
un skilled 2 nos 750.00 1500.00 6850.00
materials a. Landinng valve ISI marked is : 5290, Hose
53
1133
20 HP Electric motor pump.
sources Level Qty Unit Rate/unit cost Total cost
1134
Fire hose reel
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 4 nos 1070.00 4280.00
un skilled 2 nos 750.00 1500.00 5780.00
a. Swinging hose reel with 20 mm hydraulic rubber
braided hose 30 mt. Long, swinging up to 170°
materials
nozzle, U shape reel carriel, diamension 31½" heigth
over all 29" projection from wall (minimax) 1 sets 19700.00 19700.00
19700.00
Actual rate 25480.00
15% conctractor overhead 3822.00
Rate per set Rs. 29302.00 Total (Rs.) 29302.00
1135
G.M. 25mm float valve
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.22 nos 1070.00 237.78 237.78
materials G.M. 25mm float valve 1 nos 1975.00 1975.00 1975.00
Actual rate 2212.78
15% contractor overhead 331.91
Rate per nos Rs. 2544.69 Total (Rs.) 2544.69
1136
Grab bar American standard
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled(1/9) 0.222 nos 1070.00 237.78 237.78
materials Grab bar American standard 1 nos 5360.00 5360.00
b. Zink oxide screw etc. Ls 20.00 5380.00
Actual rate 5617.78
15% contractor overhead 842.66
Rate per nos Rs. 6460.44 Total (Rs.) 6460.44
1137
Euro Guard (Filter)
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. Euro Guard Water purification set (one litre per
materials
minute) 1 sets 22000 22000.00 22000
Actual rate 26710
15% conctractor overhead 4006.5
54
Rate per set Rs. 30716.5 Total (Rs.) 30716.50
55
1138
Kitchen Sink 90cm long stainless steel
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 2 nos 1070.00 2140.00
un skilled 1 nos 750.00 750.00 2890.00
a. Stainless steel, 90x45 size Bowl with drain board.
materials
Ordinary type 1 sets 2530.00 2530.00
b. Pvc bottle trap with 32mm Dia CP waste coupling
with CP chain and rubber. 1 nos 1246.00 1246.00
c. Zink Oxide screw etc. LS 18.00 18.00
d. ½" dia CP sink cock. 1 nos 1309.00 1309.00 5103.00
Actual rate 7993.00
15% contractor overhead 1198.95
Rate per set Rs. 9191.95 Total (Rs.) 9191.95
1139
Kitchen Sink 150 cm long
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 3 nos 1070.00 3210.00
un skilled 2 nos 750.00 1500.00 4710.00
a. Stainless steel, 62" x 20" size Bowl with drain
materials
board.Ordinary type 1 sets 5250.00 5250.00
b. 32 cm PVC bottle with cleaning hole and CP waste
coupling with CP chain and rubber. 1 nos 1246.00 1246.00
c. Zink Oxide screw etc. LS 18.00 18.00
d. ½" dia CP bib cock. 1 nos 1309.00 1309.00 7823.00
Actual rate 12533.00
15% contractor overhead 1879.95
Rate per Set Rs. 14412.95 Total (Rs.) 14412.95
1140
C.P. Water Spray 1.5cm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.25 nos 1070.00 267.50
un skilled 0.17 nos 750.00 127.50 395.00
a.Water spray (Health faucet) with 1.2 m. long flexible
materials
pipe. 1 sets 945.00 945.00
945.00
Actual rate 1340.00
15% contractor overhead 201
Rate per No Rs. 1541.00 Total (Rs.) 1541.00
1141
Hand drayer chinese
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 118.89 118.89
materials a) Hand drayer with complete accessories 1 nos 6500.00 6500.00 6500.00
Actual rate 6618.89
15% contractor overhead 992.83
Rate per nos Rs. 7611.72 Total (Rs.) 7611.72
56
1142
4 Kg/cm2, High Density Polethene Pipe 50mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.17 nos 1070.00 181.90
un skilled 0.20 nos 750.00 150.00 331.90
materials a.High density polethene pipe 50mm. 1 RM 103.19 103.19
103.19
Actual rate 435.09
15% contractor overhead 65.26
1143
4 Kg/cm2, High Density Polethene Pipe 110mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.17 nos 1070.00 181.90
un skilled 0.20 nos 750.00 150.00 331.90
materials a.High density polethene pipe 110mm. 1 RM 464.92 464.92
464.92
Actual rate 796.82
15% contractor overhead 119.52
Rate per Rm Rs. 916.34 Total (Rs.) 916.34
1144
4 Kg/cm2, High Density Polethene Pipe 125 mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.17 nos 1070.00 181.90
un skilled 0.20 nos 750.00 150.00 331.90
materials a.High density polethene pipe 125 mm. 1 RM 624.90 624.90
624.90
Actual rate 956.80
15% contractor overhead 143.52
Rate per Rm Rs. 1100.32 Total (Rs.) 1100.32
1145
4 Kg/cm2, High Density Polethene Pipe 140mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.20 nos 1070.00 214.00
un skilled 0.25 nos 750.00 187.50 401.50
materials a.High density polethene pipe 150mm. Dia 1.0 RM 990.41 990.41
990.41
Actual rate 1505.41
15% contractor overhead 225.81
Rate per Rm Rs. 1731.22 Total (Rs.) 1731.22
57
1147
4 Kg/cm2, High Density Polethene Pipe 180mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.33 nos 1070.00 353.10
un skilled 0.50 nos 750.00 375.00 728.10
1148
4 Kg/cm2, High Density Polethene Pipe 200mm
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 0.50 nos 1070.00 535.00
un skilled 0.50 nos 750.00 375.00 910.00
materials a.High density polethene pipe 200mm. 1.0 RM 1546.13 1546.13
1546.13
Actual rate 2456.13
15% contractor overhead 368.41
Rate per Rm Rs. 2824.54 Total (Rs.) 2824.54
1149
5 kg Fire extingusher
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 1.0 nos 1070.00 1070.00
un skilled 1070.00
materials a.5 kg Fire extingusher ABC type minimax 1.0 nos 7130.00 7130.00
7130.00
Actual rate 8200
15% contractor overhead 1230.00
Rate per set Rs. 9430 Total (Rs.) 9430.00
1150
560 mm dia 228 kg CI heavy Cover
sources Level Qty Unit Rate/unit cost Total cost
labour skilled 1.0 nos 1070.00 1070.00
un skilled 3.0 nos 750.00 2250.00 3320.00
materials a.228 kg CI heavy Manhole cover. 1.0 sets 32347.00 32347.00
32347.00
Actual rate 35667.00
15% contractor overhead 5350.05
Rate per set Rs. 41017.05 Total (Rs.) 41017.05
1151
15mm dia aeroflex insulation for hot water pipe
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials 15mm dia insulation aeroflex for hot water pipe 1 rm 84.00 84.00 84.00
Actual rate 201.70
15% contractor overhead 30.25
Rate per Rm Rs. 231.95 Total (Rs.) 231.95
58
1152
25 mm dia aeroflex insulation for hot water pipe
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials 25 mm dia insulation aeroflex for hot water pipe 1 rm 126.00 126.00 126.00
Actual rate 243.70
15% contractor overhead 36.55
Rate per Rm Rs. 280.25 Total (Rs.) 280.25
1153
32 mm dia aeroflex insulation for hot water pipe
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70 117.70
materials 32 mm dia insulation aeroflex for hot water pipe 1 rm 158.00 158.00 158.00
Actual rate 275.70
15% contractor overhead 41.35
Rate per Rm Rs. 317.05 Total (Rs.) 317.05
1154
CPVC Pipe SDR 13.5, 15mm (1/2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a. 15 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 203.40 203.40
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 303.40
Actual rate 321.60
15% contractor overhead 48.24
Rate per Rm Rs. 369.84 Total (Rs.) 369.84
1155
CPVC Pipe SDR 13.5, 20mm (3/4") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a. 20 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 317.70 317.70
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 417.70
Actual rate 435.90
1156
CPVC Pipe SDR 13.5, 25mm (1") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 1070.00 11.77
un skilled 0.019 nos 750.00 14.25 26.02
materials a. 25 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 465.30 465.30
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 565.30
Actual rate 591.32
15% contractor overhead 88.69
Rate per Rm Rs. 680.01 Total (Rs.) 680.01
59
1157
CPVC Pipe SDR 13.5, 32mm (1 1/4") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 1070.00 11.77
un skilled 0.019 nos 750.00 14.25 26.02
materials a. 32 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 692.10 692.10
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 792.10
Actual rate 818.12
15% contractor overhead 122.71
Rate per Rm Rs. 940.83 Total (Rs.) 940.83
1158
CPVC Pipe SDR 13.5, 40mm (1 1/2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 1070.00 11.77
un skilled 0.019 nos 750.00 14.25 26.02
materials a. 40 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 965.70 965.70
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 1065.70
Actual rate 1091.72
15% contractor overhead 163.75
Rate per Rm Rs. 1255.47 Total (Rs.) 1255.47
1159
CPVC Pipe SDR 13.5, 50mm (2") CTS
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.011 nos 1070.00 11.77
un skilled 0.019 nos 750.00 14.25 26.02
materials a. 50 mm CPVC Pipe SDR 13.5 CTS, 22.5 kg/cm2 1 Rm 1627.20 1627.20
b. Cpvc fittings Ls 80.00
c. Jointing materials (flow guard adesive soln) Ls 20.00 1727.20
Actual rate 1753.22
15% contractor overhead 262.98
Rate per Rm Rs. 2016.20 Total (Rs.) 2016.20
1160
CPVC CTS.15 mm ball Valve( 1/2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 15 mm CPVC ball valve, CTS sockets, 1 Rm 547.56 547.56 665.26
Actual rate 665.26
15% contractor overhead 99.78
Rate per Rm Rs. 765.04 Total (Rs.) 765.04
1161
CPVC CTS. 20 mm ball Valve( 3/4")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 20 mm CPVC ball valve, CTS sockets, 1 Rm 724.55 724.55 842.25
Actual rate 842.25
15% contractor overhead 126.33
Rate per Rm Rs. 968.58 Total (Rs.) 968.58
60
1162
CPVC CTS. 25 mm ball Valve (1")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 25 mm CPVC ball valve, CTS sockets, 1 Rm 1020.66 1020.66 1138.36
Actual rate 1138.36
15% contractor overhead 170.75
Rate per Rm Rs. 1309.11 Total (Rs.) 1309.11
1163
CPVC CTS. 32 mm ball Valve (1 1/4")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 32 mm CPVC ball valve, CTS sockets, 1 Rm 2012.41 2012.41 2130.11
Actual rate 2130.11
15% contractor overhead 319.51
Rate per Rm Rs. 2449.62 Total (Rs.) 2449.62
1164
CPVC CTS. 40 mm ball Valve (1 1/2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 40 mm CPVC ball valve, CTS sockets, 1 Rm 2803.55 2803.55 2921.25
Actual rate 2921.25
15% contractor overhead 438.18
Rate per Rm Rs. 3359.43 Total (Rs.) 3359.43
1165
CPVC CTS. 50 mm ball Valve (2")
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.11 nos 1070.00 117.70
materials a. 50 mm CPVC ball valve, CTS sockets, 1 Rm 4053.74 4053.74 4171.44
Actual rate 4171.44
15% contractor overhead 625.71
Rate per Rm Rs. 4797.15 Total (Rs.) 4797.15
1166
Multilayer composite PEX/AL/PEX Pipe , 16mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.16 mm mulitlayer composite PAP Pipe 60 kg/cm2 1 Rm 111.00 111.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 221.00
Actual rate 239.20
15% contractor overhead 35.88
Rate per Rm Rs. 275.08 Total (Rs.) 275.08
61
1167
Multilayer composite PEX/AL/PEX Pipe , 20mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.20 mm mulitlayer composite PAP Pipe 60 kg/cm2 1 Rm 141.00 141.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 251.00
Actual rate 269.20
15% contractor overhead 40.38
Rate per Rm Rs. 309.58 Total (Rs.) 309.58
1168
Multilayer composite PEX/AL/PEX Pipe , 25mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.25 mm mulitlayer composite PAP Pipe 70 kg/cm2 1 Rm 208.00 208.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 318.00
Actual rate 336.20
15% contractor overhead 50.43
Rate per Rm Rs. 386.63 Total (Rs.) 386.63
1169
Multilayer composite PEX/AL/PEX Pipe , 32mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.32 mm mulitlayer composite PAP Pipe, 40 kg/cm2 1 Rm 302.00 302.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 412.00
Actual rate 430.20
15% contractor overhead 64.53
Rate per Rm Rs. 494.73 Total (Rs.) 494.73
1170
Multilayer composite PEX/AL/PEX Pipe , 40 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.40 mm mulitlayer composite PAP Pipe, 40 kg/cm2 1 Rm 465.00 465.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 575.00
Actual rate 593.20
15% contractor overhead 88.98
Rate per Rm Rs. 682.18 Total (Rs.) 682.18
1171
Multilayer composite PEX/AL/PEX Pipe , 50 mm
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 0.01 nos 1070.00 10.70
un skilled 0.01 nos 750.00 7.50 18.20
materials a.50 mm mulitlayer composite PAP Pipe,30.5 kg/cm2 1 Rm 650.00 650.00
b. Brass fittings Ls 95.00
c. Jointing materials Ls 15.00 760.00
Actual rate 778.20
15% contractor overhead 116.73
Rate per Rm Rs. 894.93 Total (Rs.) 894.93
62
1172
150 mm RCC hump pipe NP2
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 15 nos 750.00 11250.00 14460.00
materials a.150 mm RCC hump pipe np2 32 Rm 632.00 20224.00
b.150 mm RCC collar 13 nos 111.78 1453.14
c. cement 0.035 mt 10369.92 362.95
d. sand 0.05 cum 1096.37 54.82
e. Jute 1.6 kg 50.00 80.00 22174.91
Actual rate 36634.91
15% contractor overhead 5495.23
Rate per Rm Rs. 1316.57 Total (Rs.) 42130.14
1173
200 mm RCC hump pipe NP2
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 20 nos 750.00 15000.00 19280.00
materials a.200 mm RCC hump pipe np2 32 Rm 816.00 26112.00
b.200 mm RCC collar 13 nos 144.90 1883.70
c. cement 0.052 mt 10369.92 539.24
d. sand 0.08 cum 1096.37 87.71
e. Jute 2.4 kg 50.00 120.00 28742.65
Actual rate 48022.65
15% contractor overhead 7203.39
Rate per Rm Rs. 1725.81 Total (Rs.) 55226.04
1174
300 mm RCC hump pipe NP2
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 22 nos 750.00 16500.00 22920.00
materials a.300 mm RCC hump pipe np2 32 Rm 1388.00 44416.00
b.300 mm RCC collar 13 nos 244.26 3175.38
c. cement 0.083 mt 10369.92 860.70
d. sand 0.13 cum 1096.37 142.53
e. Jute 3.63 kg 50.00 181.50 48776.11
Actual rate 71696.11
15% contractor overhead 10754.41
Rate per Rm Rs. 2576.58 Total (Rs.) 82450.52
1175
400 mm RCC hump pipe NP2
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 22 nos 750.00 16500.00 22920.00
materials a.400 mm RCC hump pipe np2 32 Rm 1612.24 51591.84
b.400 mm RCC collar 13 nos 337.41 4386.33
c. cement 0.083 mt 10369.92 860.70
d. sand 0.13 cum 1096.37 142.53
e. Jute 3.63 kg 50.00 181.50 57162.90
Actual rate 80082.90
15% contractor overhead 12012.43
Rate per Rm Rs. 2877.98 Total (Rs.) 92095.33
63
1176
600 mm RCC hump pipe NP2
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 9 nos 1070.00 9630.00
un skilled 35 nos 750.00 26250.00 35880.00
materials a.600 mm RCC hump pipe np2 32 Rm 3008.00 96256.00
b.600 mm RCC collar 13 nos 531.99 6915.87
c. cement 0.218 mt 10369.92 2260.64
d. sand 0.3 cum 1096.37 328.91
e. Jute 7 kg 50.00 350.00 106111.42
Actual rate 141991.42
15% contractor overhead 21298.71
Rate per Rm Rs. 5102.82 Total (Rs.) 163290.13
1177
150 mm RCC hump pipe NP3
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 3 nos 1070.00 3210.00
un skilled 15 nos 750.00 11250.00 14460.00
materials a.150 mm RCC hump pipe np3 32 Rm 1368.00 43776.00
b.150 mm RCC collar 13 nos 245.30 3188.84
c. cement 0.035 mt 10369.92 362.95
d. sand 0.05 cum 1096.37 54.82
e. Jute 1.6 kg 50.00 80.00 47462.60
Actual rate 61922.60
15% contractor overhead 9288.39
Rate per Rm Rs. 2225.34 Total (Rs.) 71210.99
1178
200 mm RCC hump pipe NP3
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 4 nos 1070.00 4280.00
un skilled 20 nos 750.00 15000.00 19280.00
materials a.200 mm RCC hump pipe np3 32 Rm 1820.00 58240.00
b.200 mm RCC collar 13 nos 329.13 4278.69
c. cement 0.052 mt 10369.92 539.24
d. sand 0.08 cum 1096.37 87.71
e. Jute 2.4 kg 50.00 120.00 63265.64
Actual rate 82545.64
15% contractor overhead 12381.84
Rate per Rm Rs. 2966.48 Total (Rs.) 94927.48
1179
300 mm RCC hump pipe NP3
b/ ljZn]if0fsf] nflu #@ ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 22 nos 750.00 16500.00 22920.00
materials a.300 mm RCC hump pipe np3 32 Rm 3320.00 106240.00
b.300 mm RCC collar 13 nos 592.02 7696.26
c. cement 0.083 mt 10369.92 860.70
d. sand 0.13 cum 1096.37 142.53
e. Jute 3.63 kg 50.00 181.50 115120.99
Actual rate 138040.99
15% contractor overhead 20706.14
Rate per Rm Rs. 4960.85 Total (Rs.) 158747.13
64
1180
400 mm RCC hump pipe NP3
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 22 nos 750.00 16500.00 22920.00
materials a.400 mm RCC hump pipe np3 32 Rm 4196.00 134272.00
b.400 mm RCC collar 13 nos 663.44 8624.66
c. cement 0.083 mt 10369.92 860.70
d. sand 0.13 cum 1096.37 142.53
e. Jute 3.63 kg 50.00 181.50 144081.39
Actual rate 167001.39
15% contractor overhead 25050.2
Rate per Rm Rs. 6001.61 Total (Rs.) 192051.59
1181
600 mm RCC hump pipe NP3
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 9 nos 1070.00 9630.00
un skilled 35 nos 750.00 26250.00 35880.00
materials a.600 mm RCC hump pipe np3 32 Rm 6356.00 203392.00
b.600 mm RCC collar 13 nos 943.92 12270.96
c. cement 0.218 mt 10369.92 2260.64
d. sand 0.3 cum 1096.37 328.91
e. Jute 7 kg 50.00 350.00 218602.51
Actual rate 254482.51
15% contractor overhead 38172.37
Rate per Rm Rs. 9145.47 Total (Rs.) 292654.88
1182
140 mm Plastic Gutter WATER PIPE ( HALF ROUND) for 30 m
b/ ljZn]if0fsf] nflu #) ld= lnOPsf]
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 9 nos 750.00 6750.00 13170.00
materials a. 140 mm Plastic water pipe (Half round Gutter) 30 Rm 183.20 5495.85
b. Joint Bracket 8 nos 285.00 2280.00
c. Short Stop End 1 nos 106.00 106.00
d. Stop End Outlet 1 nos 339.00 339.00
e. Running Outlet 2 nos 391.00 782.00
f. Elbow 90 Degree (with or w/o outlet) 1 nos 480.00 480.00
g. Support Bracket 30 nos 85.00 2550.00
h. Rafter Bracket 30 nos 86.00 2580.00
i. Top Bracket 30 nos 56.00 1680.00 16292.85
Actual rate 29462.85
15% contractor overhead 4419.42
Rate per Rm Rs. 1129.41 Total (Rs.) 33882.27
65
1183
180 mm Plastic Gutter WATER PIPE ( HALF ROUND) for 30. m
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 9 nos 750.00 6750.00 13170.00
materials a. 180 mm Plastic water pipe (Half round Gutter) 10 Rm 346.73 3467.25
b. Joint Bracket 8 nos 398.00 3184.00
c. Short Stop End 1 nos 156.00 156.00
d. Stop End Outlet 1 nos 471.00 471.00
e. Running Outlet 2 nos 575.00 1150.00
f. Elbow 90 Degree (with or w/o outlet) 1 nos 658.00 658.00
g. Support Bracket 30 nos 120.00 3600.00
h. Rafter Bracket 30 nos 122.00 3660.00
i. Top Bracket 30 nos 101.00 3030.00 19376.25
Actual rate 32546.25
15% contractor overhead 4881.93
Rate per Rm Rs. 1247.61 Total (Rs.) 37428.18
1184
250 mm Plastic Gutter WATER PIPE ( HALF ROUND) for 30. m
sources Level Qty Unit Rate/unit cost Total Cost
labour skilled 6 nos 1070.00 6420.00
un skilled 9 nos 750.00 6750.00 13170.00
materials a. 250 mm Plastic water pipe (Half round Gutter) 10 Rm 672.75 6727.50
b. Joint Bracket 8 nos 682.00 5456.00
c. Short Stop End 1 nos 335.00 335.00
d. Stop End Outlet 1 nos 891.00 891.00
e. Running Outlet 2 nos 1072.00 2144.00
f. Elbow 90 Degree (with or w/o outlet) 1 nos 1541.00 1541.00
g. Support Bracket 30 nos 333.00 9990.00
h. Rafter Bracket 30 nos 353.00 10590.00
i. Top Bracket 30 nos 182.00 5460.00 43134.50
Actual rate 56304.50
15% contractor overhead 8445.67
Rate per Rm Rs. 2158.34 Total (Rs.) 64750.17
66
110 mm dia UPVC pipe specials supplying , fixing,Jointing, laying all complete
UNIT : 1.0 nos
41
UNIT : 1.0 nos
Remark
41
!@@* ;fx|f] k|sf/sf] df6f] 9'Ëf lsl;dsf] ^ ld6/;Ddsf] ulx/f] vGg] /
@$ r &=%) ld6/ lnˆ6 ug]{ sfo{ .
b/ ljZn]if0fsf] nflu ! 3=ld= lnOPsf] -Ogf/ ;Ddsf] nflu_
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
>lds
HofdL 4.30 hjfg 750.00 3225.00 3225.00
lgdf{0f ;fdu|L
!@@(
43
1230
3'6" Ø R.C.C. Ring ;fO6df k'¥ofO{ Ogf/df lkm6 ug]{ sfo{
b/ ljZn]if0fsf] nflu ! /=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
l;kfn' 0.25 cGbfhL -hjfg_ 1070.00 267.50
>lds
HofdL 0.25 cGbfhL -hjfg_ 750.00 187.50 455.00
cf/=l;=l;=l/Ë 1.00 /=dL= 4430.00 4430.00
lgdf{0f ;fdu|L
4430.00
jf:tljs b//]6 4885.00
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 732.75
?= 5617.75 k}= hDdf b/ /]6 5617.75
1231
3' Ø R.C.C. Ring ;fO6df k'¥ofO{ Ogf/df lkm6 ug]{ sfo{
b/ ljZn]if0fsf] nflu ! /=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
l;kfn' 0.25 cGbfhL -hjfg_ 1070.00 267.50
>lds
HofdL 0.25 cGbfhL -hjfg_ 750.00 187.50 455.00
cf/=l;=l;=l/Ë 1.00 /=dL= 3810.00 3810.00
lgdf{0f ;fdu|L
3810.00
jf:tljs b//]6 4265.00
b/ k|lt 3=dL=sf] !%Ü 7]s]bf/ cf]e/x]8 639.75
?= 4904.75 k}= hDdf b/ /]6 4904.75
1232 2'6" Ø R.C.C. Ring ;fO6df k'¥ofO{ Ogf/df lkm6 ug]{ sfo{
b/ ljZn]if0fsf] nflu ! /=ld= lnOPsf]
k|To]s ;|
b/ k|lt
;|f]t ;fwg tx÷lsl;d kl/df0f PsfO{ /sd f]t ;fwgsf]
PsfO{
hDdf
l;kfn' 0.25 cGbfhL -hjfg_ 1070.00 267.50
>lds
HofdL 0.25 cGbfhL -hjfg_ 750.00 187.50 455.00
43