Combined Footing Design Excel Sheet
Combined Footing Design Excel Sheet
50
S= 8.08 ft
ft
B= 9.33 ft
S1 S2
4.67
CG
Z1 Z2
4.17 ft 3.91 ft
3.50
ft 7.500 ft 7.500 ft
15.00 ft
The net bearing pressure of the soil to carry the Colm Service Load, q net = qa - C1
= 2.000 ksf
The CG of the Columns will be, (from the left side of Col. A)
X = [Load on Col.A* (S1/2) + Load on Col.B* (S1/2 + S) ] / (Load on Col.A + Load on Col.B)
= 59.06 in
= 4.92 ft
Y = [Load on Col.A* (Z1/2) + Load on Col.B* (Z2/2)] / (Load on Col.A + Load on Col.B)
= 6.00 in
= 0.50 ft
So, the distance from the center of Col.A to Upper end side = B/2 - Z1/2 - Y
= 4.67 ft
and the distance from the center of Col.A to Lower end side = 4.67 ft
Let, the cantilever distance from the left side of Col.A, C2 = 3.50 ft ( d/2 distance considering
d=3'-0")
Finally, App. Length of the Footing = 18.50 ft
Factored Load on Colm.A, PuA= 254.00 kips (Load taken from Staadpro)
Factored Load on Colm.B, PuB= 267.00 kips (Load taken from Staadpro)
The Net Upward pressure per linear foot in the longitudinal direction is, wu = qu*B
= 28.16
X 128.54 kip
98.57 kip
113.19 kip 115.00 kip
(+ve) (+ve)
(-ve)
57.36 kip-ft
Let "X" be the distance of zero shear from the the left side of Col.A
X-S1 S+S1/2-S2/2-X
Now, =
b c
So, X = 4.74 ft
The shear force acting on this perimeter, being equal to the Column load minus the soil pressure
within the perimeter, is :- Vu = PuA - qu*(S1+d)*(Z1+d) kips
= 234.69 kips
Since ØVc > Vu, So, d = 15.50 in is adequate for punching shear.
The selected value d= 15.50 in will now be checked for one-way or beam shear at a distance "d"
to the left side of Column B.
The factored shear force acting on that section is :-
Vu = c - wu*d kips
= 92.16 kips
Since ØVc > VuL, So, d = 15.50 in is also adequate for Beam shear.
Reinforcement Required: -
(1) 22.00 nos. Ø12mm = Ø12mm@ 5.00 in c/c
(2) 14.00 nos. Ø16mm = Ø16mm@ 8.00 in c/c
(3) 10.00 nos. Ø20mm = Ø20mm@ 11.00 in c/c
(4) 6.00 nos. Ø25mm = Ø25mm@ 18.00 in c/c
The distance from the point of Max. Moment to the nearer left end of the bar is:-
= X+C2-3/12 (deducting 3" clear cover)
= 7.99 ft
which is much larger than the required minimum development length. So, the selected reinforcement is
therefore adequate for both bending and bond.
Reinforcement Required: -
(1) 29.00 nos. Ø12mm = Ø12mm@ 4.00 in c/c
(2) 19.00 nos. Ø16mm = Ø16mm@ 6.00 in c/c
(3) 14.00 nos. Ø20mm = Ø20mm@ 8.00 in c/c
(4) 8.00 nos. Ø25mm = Ø25mm@ 13.00 in c/c
According to the rule, the width of the Transverse Beam around each Column will be,
= Width of the column + 2(d/2)
= 2.15 ft from the left side of Col.A
= 2.13 ft from the right side of Col.B
So, for Longitudinal bottom reinforcement, the covered area will be,
= 5.65 ft total for Col.A
or = 1.40 ft from the center of Col.A to the right side.
= 6.21 ft total for Col.B
or = 1.71 ft from the center of Col.B to the left side.
Reinforcement Required: -
(1) 29.00 nos. Ø12mm = Ø12mm@ 4.00 in c/c
(2) 19.00 nos. Ø16mm = Ø16mm@ 6.00 in c/c
(3) 14.00 nos. Ø20mm = Ø20mm@ 8.00 in c/c
(4) 8.00 nos. Ø25mm = Ø25mm@ 13.00 in c/c
From Step-11, the width of the transverse beam under Col.A, b= 2.15 ft
Since, the transverse reinforcement is placed on the top of the longitudinal bars, the actual depth
will be, d= Actual "d" - 1 in
= 14.50 in
Factored Load on Colm.A, PuA= 254.00 kips
Width of the Footing, B = 9.33 ft
The net upward load per linear foot of the transverse beam, WuA = PuA / B
= 27.22 kip/ft
= 27,224.01 lb/ft
The moment at the edge of Col.A, Mu = WuA*X1*(X1/2) X1=
= 236,130.50 lb-ft =
Reinforcement Required: -
(1) 21.00 nos. Ø12mm = Ø12mm@ 1.00 in c/c
(2) 14.00 nos. Ø16mm = Ø16mm@ 2.00 in c/c
(3) 10.00 nos. Ø20mm = Ø20mm@ 3.00 in c/c
(4) 6.00 nos. Ø25mm = Ø25mm@ 4.00 in c/c
Step-14: Design of Transverse Beam Under Col."B"
From Step-11, the width of the transverse beam under Col.B, b= 2.13 ft
Since, the transverse reinforcement is placed on the top of the longitudinal bars, the actual depth
will be, d= Actual "d" - 1 in
= 14.50 in
Reinforcement Required: -
(1) 24.00 nos. Ø12mm = Ø12mm@ 1.00 in c/c
(2) 16.00 nos. Ø16mm = Ø16mm@ 2.00 in c/c
(3) 11.00 nos. Ø20mm = Ø20mm@ 2.00 in c/c
(4) 6.00 nos. Ø25mm = Ø25mm@ 4.00 in c/c
2.13 ft
kips / ft
kips / ft
ft
ft
ft
ft
ft
kips
a distance "d"
kips
hort direction(B)
hort direction(B)
in
in
in
in
in
in
in
in
hort direction(B)
ansverse beam
B/2 - Z2/2
4.04 ft
ansverse beam
ft
2.13 ft
Detailing of Stirrups
in c/c
in c/c
in c/c
in c/c