You are on page 1of 2

Delivery No D Date of dismantle 20-May-23

SCAFFOLDS AREAS FINAL CALCULATIONS


SCAFFOLD AREA SCAFFOLD AREA
LOCATION SC NO LENGTH(m) WIDTH(m) HIGHT (m) (m2) (m3) TAG NO
1 1.50 1.50 4.00 0 9 Erection Date
2 0.00 0.00 0.00 0 0 0
Total 0.00 9

Reviewed By Checked By Approved By


Jabbar Abed Mohammad Hassan Semet Bayçelebi
DATE: 20-May-23
SCAFFOLDING DELIVERY NOTE
DELIVERY NO: D
DELIVERD TO: CALIKENERJI DESCRIPTION: SCAFFOLDING DISMANTLE
Erection Delivery No E Scaffold No DCC-1148 Erection Date 12-May-23
Erection Delivery No Scaffold No Erection Date
DR.CONCRETE GENERAL CONTRACTING LLC PROJECT NO: CY-19-8015-0077
WEST QURNA PHASE-2 SCAFFOLDING TYPE: INDEPENDENT/TOWER SCAFFOLDING

SN Description Length width Height Dismantling Date Total Qty (m3) Total Qty (m2) Comments

Scaffolding tower for Mechanical


1 Crew on MCB Building
1.50 1.5 4 20-May-23 9

Grand Total Area 9 0

Mohammad Hassan
Reviewed By Requested By Approved By
Dr. Concrete Rep Semet Bayçelebi Calik Enerji Rep

You might also like