You are on page 1of 4

Project Proposal Outline

I. GENERAL INFORMATION

1.0 Project Title

Kilusang Koleheyo

2.0 Project Nature

Since the beggining of Life and Time as People we develop further and further

survive in this world making our life more easier and easier, as the Time goes by the thing

We take to develop further is becoming more less and the Result, is the ever changing

Climate Change that we have or as Scientist call it Global Warming.

3.0 Project Duration

June 7, 8, and 9 2023

4.0 Project Location

Banahaw Technological Collage Inc. CRA Building

5.0 Initiating Section

DIT-WAFT

6.0 Contact Person

Ms. Jelica l. Esquillo


8.0 BTCI-CWTS Project Cost Counterpart

• 50 pesos for 1 pack Garbage Bag

• 20 pesos for Broom

• 20 pesos for Dustpan

9.0 Community Project Cost Counterpart

• Garbage Bag

• Broom

• Dustpan

10.0 Total Project Cost

9 pcs. Broom = 180 pesos

3 pcs. Dustpan = 180 pesos

1 pack Garbage Bag = 50 pesos


II. PROJECT DESCRIPTIONS

In three days with our Groups of 3's in each rooms of the CRA Building per

Floor level, in which we will provide a Service by cleaning Each Classroom with proper

Handle and Care.

III. PROJECT RATIONALE

The Purpose of "Kilusang Koleheyo" is to create a Traditional Month Event of Cleaning

In the CRA Building as a sign of giving sincerity to all BTCI campus and to the Future who holds

This tradition with Proper Handle and Care, Also to inspire and empower the Future individuals

To strive for cleanliness, and sustainable invironment.

IV. PROJECT BENEFECIARIES

• Banahaw Technological Collage Inc. Teacher

• Banahaw Technological Collage Inc. Student

V. PROJECT OBJECTIVES

• Help to clean the Invironment for all the Benefeciaries

• Our Goal is to Create a Tradition that will last for a Decade

Until our time comes to an End.


VI. PROJECT ACTIVITIES AND TIME TABLE

START END

Activities

Cleaning the Classroom per Floor level 2:00 pm 3:00 pm

VII. PROJECT MANAGEMENT

Project-in-charge Role/Task

Erick Vargas, Gio Unlayao, Gervie Astoveza Sweeping 3rd floor

Bennedict Accleta, John Elloso, Paul Abrencillo Sweeping 2nd floor

Eustin Cuanan, Robert Evea jr., Mark Gabriel Sales Sweeping 1st floor

VIII. PROJECT FINANCIAL REQUIREMENT

Quantity Unit Material Cost Per Total

Material

9 Pcs Broom 20 pesos 180 pesos

3 Pcs Dustpan 20 pesos 180 pesos

1 Pack Garbage Bag 50 pesos 50 pesos

You might also like