Sr. As Per NEA Observation Contractor’s Clarification NEA Observation
No. Submission 1. Foundation Plan In Table Heading 2.1.2- Confirmed, Reference document will be Noted Excavation work the reference approved foundation plan /Drawings. document column is mentioned as Foundation Plan. We understand the reference document is the Approved Foundation Plan and Drawings Kindly verify 2 Testing of In Table 2.6 Concreting-Sub- Testing of concrete cubes will be done as per Noted. However, no. of Cubes for testing Concrete cubes heading 214-Testing of Concrete contract agreement. Will be done in house shall be casted strictly in line with the for compression Cube, the Quantum of Check- wherever possible if in house testing not requirement of IS 456 & 516 for each of strength. 7Days Contractor is mentioned as one possible. May be done at third party lab and we the concrete batch. or 28 Days. set per substation by third party will be inform to NEA. lab test. We understand that rest of the cube sampling and testing shall be done in house with record. Kindly elaborate 3 Masonry work In Table 2.7-Masonry work- Sub- Confirmed Quantum of check will be 100%. Noted heading 2.7.2-Plumb & Alignment the Quantum of check-Contractor is mentioned as random. We understand that the alignment should be accurate for any structure to be constructor hence, the Quantum of Check-Contractor should be 12.0%. 4 The quarry site plan may kindly Unable to understand which types of plan Please provide a details of quarry site be provided for both the required. Please suggest contract reference alongwith the material to be extracted viz substation sites clause for the same a viz requirement of material at site. Kindly Refer Pg- 6-B-1-27 5 The supplier for all the material Confirmed, Supplier/Make for the material i.e. Noted should be from the Approved stone aggregate sand, Cement, Bricks & Supplier list Reinforcement Steel will be as per approval from NEA. 6 FQP for Aggregates, pre & post Confirmed Noted pouring check, Plumbing & Sanitary installation, Floor finished & allied works, Doors, windows Shutters etc. and painting may please be included suitably 7 Wherever reference document Confirmed Noted to be mentioned. It should approved document, approved drawing. Relevant standard should be mentioned.